21.

SEWERAGE
1 Specification No. correspond to Book of Specification of B& R Department Vol. II, 1966 (Public Health Works).
2 Rate for all finished works include the removal of surplus debris, unused material and byproducts.
MRS, 2nd BI-ANNUAL-2020 (1st JULY-2020 to 31st DECEMBER-2020) DISTRICT OKARA

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

1 Providing and laying R.C.C. pipe, moulded with cement Chapter - 8


concrete 1:1½:3, with spigot socket or collar joint, etc.
including cost of reinforcement, conforming to B.S. 5911:
Part I: 1981, Class "L" including carriage of pipe from
factory to site of work, lowering in trenches to correct
alignment and grade, jointing, cutting pipes where
necessary, finishing and testing, etc., complete.
i) 100 mm (4") i/d Rft. 24.15 132.50 Metre 79.20 434.60
ii) 150 mm (6") i/d Rft. 29.00 201.95 Metre 95.10 662.40
iii) 225 mm (9:) i/d Rft. 56.00 365.60 Metre 183.70 1199.15

2 Providing and laying non-reinforced concrete pipe, ditto


moulded with cement concrete 1:1½:3, conforming to
ASTM Specification C-14-73, Class 2, including carriage
of pipe from factory to site of work, lowering in trenches to
correct alignment and grade, jointing, cutting pipe where
necessary, finishing and testing, etc. complete.
i) 100 mm (4") i/d Rft. 18.10 67.90 Metre 59.35 222.70
ii) 150 mm (6") i/d Rft. 21.75 92.15 Metre 71.35 302.25
iii) 200 mm (8") i/d Rft. 34.85 125.80 Metre 114.30 412.60
iv) 225 mm (9:) i/d wall thickness 1 inch (25 mm) Rft. 37.30 147.85 Metre 122.35 484.95
v) 250 mm (10") i/d Rft. 37.85 161.75 Metre 124.15 530.55

3 Providing and laying R.C.C. pipe sewers, moulded with ditto


cement concrete 1:1½:3 conforming to ASTM
Specification C-76-79, Class II. Wall B, including carriage
of pipe from factory to site of work, lowering in trenches to
correct alignment and grade, jointing with rubber ring,
cutting pipes where necessary, testing, etc., complete.

i) 310 mm (12") i/d Rft. 56.75 430.80 Metre 186.15 1413.00


ii) 380 mm (15") i/d Rft. 71.10 540.20 Metre 233.20 1771.85
iii) 460 mm (18") i/d Rft. 85.50 668.00 Metre 280.45 2191.05
iv) 530 mm (21":) i/d Rft. 106.85 819.85 Metre 350.45 2689.10
v) 610 mm (24") i/d Rft. 122.80 1017.75 Metre 402.80 3338.20
vi) 690 mm (27") i/d Rft. 183.00 1212.15 Metre 600.25 3975.85
vii) 760 mm (30") i/d Rft. 219.45 1479.50 Metre 719.80 4852.75
viii) 840 mm (33") i/d Rft. 273.60 1763.35 Metre 897.40 5783.80
ix) 910 mm (36") i/d Rft. 336.60 2335.10 Metre 1104.05 7659.15
x) 1070 mm (42") i/d Rft. 437.75 3010.65 Metre 1435.8 9874.95
xi) 1220 mm (48") i/d Rft. 828.35 4056.45 Metre 2717 13305.15
xii 1370 mm (54") i/d Rft. 1148.15 5087.75 Metre 3765.95 16687.8
xiii) 1520 mm (60") i/d Rft. 1455.1 5839.40 Metre 4772.75 19153.25
chapter-21(Sewerage) Page 121
MRS, 2nd BI-ANNUAL-2020 (1st JULY-2020 to 31st DECEMBER-2020) DISTRICT OKARA

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite

xiv) 1680 mm (66") i/d Rft. 2292.55 7099.50 Metre 7519.55 23286.35
xv) 1830 mm (72") i/d Rft. 2850.35 8087.25 Metre 9349.15 26526.20

4 Providing and laying R.C.C. pipe sewers, moulded with Chapter-8


cement concrete 1:1½:3 conforming to ASTM Specification
C-76-79, Class III, Wall B, including carriage of pipes from
factory to site of work, lowering in trenches to correct
alignment and grade, jointing with rubber ring, cutting pipes
where necessary, testing, etc. complete:-

i) 310 mm (12") i/d Rft. 56.75 577.65 Metre 186.10 1894.70


ii) 380 mm (15") i/d Rft. 71.10 717.70 Metre 233.25 2354.05
iii) 460 mm (18") i/d Rft. 85.50 888.30 Metre 280.40 2913.60
iv) 530 mm (21":) i/d Rft. 106.85 1078.15 Metre 350.50 3536.35
v) 610 mm (24") i/d Rft. 122.80 1256.45 Metre 402.80 4121.15
vi) 690 mm (27") i/d Rft. 183.00 1583.05 Metre 600.20 5192.40
vii) 760 mm (30") i/d Rft. 219.45 1887.10 Metre 719.75 6189.70
viii) 840 mm (33") i/d Rft. 273.60 2179.50 Metre 897.40 7148.75
ix) 910 mm (36") i/d Rft. 336.60 2747.60 Metre 1104.05 9012.15
x) 1070 mm (42") i/d Rft. 437.75 3469.65 Metre 1435.80 11380.45
xi) 1220 mm (48") i/d Rft. 841.35 4317.90 Metre 2759.55 14162.70
xii 1370 mm (54") i/d Rft. 1166.30 5667.75 Metre 3825.50 18590.20
xiii) 1520 mm (60") i/d Rft. 1477.85 6658.95 Metre 4847.30 21841.35
xiv) 1680 mm (66") i/d Rft. 2328.90 8740.50 Metre 7638.70 28668.85
xv) 1830 mm (72") i/d Rft. 2895.80 11003.00 Metre 9498.15 36089.85

5 Providing and laying R.C.C. pipe sewers, moulded with Chapter - 8


cement concrete 1:1½:3 conforming to ASTM
Specification C-76-79, Class IV, Wall B, including carriage
of pipes from factory to site of work, lowering in trenches
to correct alignment and grade, jointing with rubber ring,
cutting pipes where necessary, testing, etc. complete:-

i) 310 mm (12") i/d Rft. 56.75 656.00 Metre 186.10 2151.70


ii) 380 mm (15") i/d Rft. 71.10 785.00 Metre 233.25 2574.80
iii) 460 mm (18") i/d Rft. 85.50 1016.80 Metre 280.40 3335.15
iv) 530 mm (21":) i/d Rft. 106.85 1292.35 Metre 350.50 4238.90
v) 610 mm (24") i/d Rft. 122.80 1438.85 Metre 402.80 4719.35
vi) 690 mm (27") i/d Rft. 183.00 1822.95 Metre 600.20 5979.20
vii) 760 mm (30") i/d Rft. 219.45 2202.85 Metre 719.75 7225.45
viii) 840 mm (33") i/d Rft. 273.60 2541.80 Metre 897.40 8337.15
ix) 910 mm (36") i/d Rft. 336.60 3377.95 Metre 1104.05 11079.65
x) 1070 mm (42") i/d Rft. 437.75 4142.85 Metre 1435.80 13588.60
xi) 1220 mm (48") i/d Rft. 841.35 5217.45 Metre 2759.30 17113.35
xii) 1370 mm (54") i/d Rft. 1166.30 6631.10 Metre 3825.70 21749.85
xiii) 1520 mm (60") i/d Rft. 1477.85 8464.35 Metre 4847.30 27763.05
xiv) 1680 mm (66") i/d Rft. 2328.90 11209.30 Metre 7638.70 36766.40
xv) 1830 mm (72") i/d Rft. 2895.80 13267.40 Metre 9498.15 43517.00