BOTERO IBAÑEZ y CIA. LTDA.

www.boteroibanez.com
Historical
Outline

Our
Services

Human
resources Historical Outline
Revenue BOTERO IBAÑEZ & CIA LTDA is a Colombian company
Summary
engaged in providing construction services, which was
created in 1990 for performance of civil works. It has the
experience, equipment and qualified personnel to carry out
Underway
Contracts mainly road infrastructure, urban development, and deep
foundation works.

Contact Since 1990 In the past year we have been involved in the drilling of
wells (slim hole) in the hydrocarbon industry.
us
Road infrastructure works
Historical Earth movement
Outline and rock excavation
Deep foundations
Our Services
Stabilization works
Our BOTERO IBAÑEZ & CIA LTDA is currently accredited in
Services Urban development quality assurance, based on ISO 9001 / 2008, and it has
the OHSAS 18001 Certificate on Safety and Occupational
Health Management System, which enable it to guarantee
Human its clients quality control and assurance in its entire works,
resources added to continuous improvement, all intended to provide
better services.

Revenue BOTERO IBAÑEZ & CIA LTDA is currently rated by the


Summary Colombian Safety Council - R.U.C.

Underway
Contracts Compliance,
quality and
Contact
us safety
Road infrastructure works
Historical Earth movement
Outline and rock excavation
Deep foundations
Stabilization works
Our
Services Urban development

Human
resources

Revenue
Summary
Road infrastructure works

Underway
Contracts

Contact
us
Road infrastructure works
Historical Earth movement
Outline and rock excavation
Deep foundations
Stabilization works
Our
Services Urban development

Human
resources
Earth
movement
Revenue
and rock
Summary excavation
Underway
Contracts

Contact
us
Road infrastructure works
Historical Earth movement
Outline and rock excavation
Deep foundations
Stabilization works
Our
Services Urban development

Human
resources

Revenue
Pre-Excavated Piles Deep
Summary
foundations
Underway
Contracts
Continuous Helical
Piles
Contact
us

Vibrated Piles Micropiles


Road infrastructure works
Historical Earth movement
Outline and rock excavation
Deep foundations
Stabilization works
Our
Services Urban development

Human
resources

Revenue
Summary
Stabilization
works
Underway
Contracts

Contact
us
Road infrastructure works
Historical Earth movement
Outline and rock excavation
Deep foundations
Stabilization works
Our
Services Urban development

Human
resources

Revenue
Summary

Underway
Contracts

Contact
us
Urban
development
Historical
Outline Human Resources
PARTNERS’ BOARD Organizational Chart
Our Statutory General Inspectors
Services Auditor
Manager
Legal HSEQ HSEQ
Advisor Dept Assistant

ETB Technical Commercial Administrative


Human Inspectorship Management Management Management
Resources Receptionist
Secretary
Messenger

Revenue Main
Shop
Logistics Dept
Head
Works Dept
Coordinator
Budget
Engineer
Accounting
Dept
Accountant
Outsourced
HR Dept
Head
Summary
Works
Asst. Transport Topographer Asst. Asst.
Engineer

Underway
Contracts Workers Shop Topography
Drivers Clerk Clerk
Assist. Commission

Average number employees per month 2007 2008 2009 2010 2011
Contact Plant personnel 166 132 110 96 110
us Personal consortia 138 100 68 131 69
TOTAL 304 232 178 227 179

Corporate Social Responsibility and Human Resource Planning


Historical
Outline

Our Revenue Summary


Services

REVENUES IN PAST YEARS EXPRESSED IN USD


Human
16.000.000,00
resources
14.000.000,00

12.000.000,00

10.000.000,00

Revenue 8.000.000,00

11.421.144,88

10.409.354,87

15.239.291,04

13.125.696,79
Summary 6.000.000,00 7.728.106,90
4.000.000,00

2.000.000,00
Underway 0,00
Contracts
2007 2008 2009 2010 2011

Contact
us

Strength and growth


Historical
Outline
Underway and awarded contracts

SHARE (FOR WORKS


DATES OF EXECUTION

IN CONSORTIUM)
CONTRACT CONTRACT EXECUTED
EXECUTED
TOTAL PRICE TOTAL PRICE VALUE (Expressed FROM TO
WORK Contr. No. CONTRACTING PARTY CITY VALUE (Expressed
(Expressed in (Expressed in US in Colombian

Our Colombian pesos) Dollars) pesos)


in US Dollars)

Services Contract Technical, Administrative and Accounting


Inspectorship: (i) 4600011844 execution of reconditioning
YEAR MONTH YEAR MONTH

and modernization works on the access road infrastructure in


Bogotá, Great Bogotá, Cundinamarca and Meta.
CT-EPMB-
(ii)4600011821 Execution of expansion civil works. (iii) Bogotá 6.786.037.111 3.738.863 1.186.486.598 653.712 12 06 14 06 100%
2007-34
4600011822 Provision of commissioning and assurance
services to the copper access network in Bogotá, Great Empresa de Teléfonos de
Bogotá, Cundinamarca and Meta, and other specific regions Bogotá ETB

Human throughout the country.


Perimeter Public Roads construction and reconditioning;

resources
SOCIEDAD
Construction and Reconditioning of sidewalks and curbs; Rain
020 de 2012 CONSTRUCTORA TORRES Bogotá 687.576.415 378.830 339.832.611 187.236 12 04 12 09 100%
sewage; Aqueducts; Public signaling for the Torres de Granada
DE SEVILLA S.A. ETAPA II
project.

Execution of works at "Porvenir "terminal - First phase of the


MASIVO Bogotá 1.151.774.262 634.586 802.331.793 442.056 12 07 12 10 100%
Bogota DC Integrated Public Transport System - SITP.
CAPITAL SAS

Revenue
CONTRACTING OF SUBSURFACE SAMPLING THROUGH
La Jagua de
DRILLING OF SHALLOW SLIM HOLE STRATIGRAPHIC 5.080.256.018 2.799.039 12 09 12 12 50%
Ibirico Cesar
WELLS, RECOVERY OF CORES. AGENCIA NACIONAL DE

Summary HIDROCARBUROS

CONSTRUCTION OF MICROPILES - DRILLING PROCESS


0,25 M DIAMETER, INSALLING OF REINFORCING PIPE, CONSTRUCTORA
Bogotá 518.128.618 285.470 12 09 12 12 100%
DRIVEN PILES AND REMOVAL OF SLUDGE FOR THE CONACERO S.A.
"CONSEJO SUPERIOR DE LA JUDICATURA" PROJECT.

PROMOTORA
Earth movement in Villas del Trebol project in Funza Funza 469.536.964 258.698 12 09 12 11 100%
CALEDONIA S.A.

Underway
CONSTRUCTION PROJECT FOR 50 KELLY TYPE PILES
FOR A TOTAL OF 1750 LN, 219 M3 BARRETTES and 185,73 GMC PARTNERS GROUP
Bogotá 242.885.551 133.821 12 09 12 10 100%
M3 OF MESH, 0,30M THICKNESS ON MORANO SAS
BUILDING CALLE 136 No. 17A-33 E

Contracts Construction of Kelly Type piles, 1,00 1,20 and 1,50 meter CONSORCIO LA
Tunja 2.042.443.840 1.125.313 12 12 13 04 100%
diameter on the road Tunja - Paez Route 60 Stretch 6009 PROSPERIDAD

PILES FOR MINOR BRIDGES, AGUA BLANCA AND


DORADA, LOCATED AT 4 AND 10 KM FROM LA La Hormiga -
101 205.979.375 113.487 12 11 13 01 100%
HORMIGA, PUTUMAYO, "CORREDOR DEL SUR Y Putumayo
MARGINAL DE LA SELVA" PROJECT.

Contact
SONACOL S.A.S.

us Construction of 12 Kelly Type Piles, 1,20 m diameters and 17


m deep in the project located on K5+800 Bogota Villavicencio
Road, Route 40, Stretch 4006
SERIJIMA LTDA
Via Bogota
Villavicencio
310.520.016 171.085 12 11 13 01 100%

Maintenance and reconditioning of roads: Cali Crossing


Route40 ( Loboguerrero - Santander de Quilichao, Florida,
Palmira, Sector Rio Desbaratado, Palmira and Internal 1719 Palmira - Valle 44.514.944.426 24.526.140 13 01 14 09 30%
Alternate Route to the Port of Buenaventura, Department of INSTITUTO NACIONAL
Valle del Cauca. DE VIAS
Historical
Outline

Our
Contact us
Services
222 street, 52 - 31 Bogotá - Colombia
Phone number: 57 1 6685984 – 6685985
Human Fax: 57 1 6762066
resources Cell phone: 57 3153645470
e-mail: boteroibanez@etb.net.co
web site: www.boteroibanez.com