ACCEPTANCE TEST PROCEEDURE for MW Link

ACCEPTANCE TEST PROCEEDURE for MW Link


(Jazz LTE 2018 Project)
PSH4828_PSH0706_Link_1_K

Site A Site B
Region:
Site Name:
Site ID:
Address:
City:
Site Type: GF RT GF RT

Link Type:

(Tick appropriate block):

MW for New site build MW for SWAP Site MW Upgrade  MW Swap Only

Checked by (Vendor) Verified by (MOBILINK)

Name: ______________ Name:_______________

Sign:________________ Sign:________________

Date:________________ Date:________________
ACCEPTANCE TEST PROCEEDURE for MW Link
SNAG LIST

PSH4828_PSH0706_Link_1_K

Fault Fault Resolved


Severity
Site ID / Verify
Item Detail Description Level Date Vendor
Name Mobilink
(B)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.

Note: Vendor to include all faults identified on equipment - specific tests in the above list
 Severity Level A faults must be resolved immediately.

 Severity Level B faults must be resolved within 7 days. (Number should not exceed 20)
Target Date:___________

 Link has to be Visible on NMS prior to acceptance Testing


 Parameters/Test and values defined for “Designed” and “Actual” value should be
evaluated and follow Link Budget. Link Budget will be Acceptance Criteria.

Checked by (Vendor) Verified by (MOBILINK)

Name: ______________ Name:_______________

Sign:________________ Sign:________________

Date:________________ Date:________________
ACCEPTANCE TEST PROCEEDURE for MW Link
Mobilink Provisional Acceptance Test/Final Acceptance Form
MW Link PSH4828_PSH0706_Link_1_K
Site A Name Site B Name Inst. Date  
Site ID / Code Site ID / Code PAT Date
Lat: Lat: FA Date    
Site A Site B
FA Date
Coordinates Long: Coordinates Long:
(if Extended)  
Link Configuration    
Provisional Acceptance Test Non.
Conformity Remarks
Equipment Detail Site A Site B (Major/Minor)
Type S. No. Type S. No.
ODU    
ODU (if protected)    
IDU    
Antenna    
Actual Antenna Height
Antenna (if Protected) / N/A / N/A    
Actual Antenna Height (if
M M
Protected)
Coupler Type  □ Balanced □ Un-Balanced
Link Frequency Information CH No. Freq. (MHz) CH No. Freq. (MHz)    
Polarization  □Horizontal □XPIC
TX Channel/ Frequency Designed: Actual:    
TX Channel/ Frequency Designed: Actual:    
Modulation Designed: Actual:
Capacity Designed: Actual:
PRBS test (15 Minutes) /BERT
Test ERR Bits: Result: □OK □NOK
XPIC Test (XPD Value) (For
every XPIC link)(Value should
be greater than -30db)
Basic Parameters Verify DBm DBm    
TX Power Designed: Actual:    
RX. Level (± 3dbm) Designed:  Actual:     
RX. Level (If protected)  
(4 dbm for balanced and 7dbm
for unbalanced Couplar)  Designed: Actual:  
Fade Margin (As per LB) Designed: Actual:
Ethernet Performance Test  
(2%~3% of 3G MW link scope Design Value Test Result
after 3G PO issued)  
Ethernet Throughput Test Mbps Mbps    
Ethernet Latency Test (<65ms) ms
Ethernet Packet Loss Test
(<0.5%)
Installations Check Site A Site B    
ODU Grounding Good Fault Good Fault    
IDU Grounding Good Fault Good Fault    
Antenna tightness. (25mpa) Good Fault Good Fault    
Bracing Good Fault Good Fault
IDU Power Redundancy Good Fault Good Fault
Breaker Rating
IDU On/Off Test Good Fault Good Fault
Boards Positioning as per Board
Good Fault Good Fault
Plan
Alarm Status Good Fault Good Fault
Tributary Labelling Good Fault Good Fault
LCT Login test Good Fault Good Fault
Software Version Good Fault Good Fault
IF cards Soft Tagging Good Fault Good Fault
Redundant Board Switching Test Good Fault Good Fault
NE attribute Confirmation (NE Good Fault Good Fault
ACCEPTANCE TEST PROCEEDURE for MW Link
ID/IP/GW/Name)
IF cable Clamping Good Fault Good Fault    
Antenna Support (For 1.2M/1.8M
Good Fault Good Fault
Antenna)
IF Connector Water proofing Good Fault Good Fault    
IDU Power Cable Connection Good Fault Good Fault    
Labelling Good Fault Good Fault
IF cable Grounding. Good Fault Good Fault      
NMS Functionality Good Fault Good Fault    
Installed By Accepted By Approved By
Signature   Signature   Signature  
Name   Name   Name  
Designation   Designation   Designation  
Date   Date   Date  
Final Acceptance Remarks
3 weeks operation from PAT date Good Fault    
Accepted By Approved By    
Signature   Signature  
   
Name   Name      
Designation   Designation      