Acceptance Test Proceedure For MW Link (Jazz LTE 2018 Project) PSH4828 - PSH0706 - Link - 1 - K Site A Site B
Acceptance Test Proceedure For MW Link (Jazz LTE 2018 Project) PSH4828 - PSH0706 - Link - 1 - K Site A Site B
Site A Site B
Region:
Site Name:
Site ID:
Address:
City:
Site Type: GF RT GF RT
Link Type:
MW for New site build MW for SWAP Site MW Upgrade MW Swap Only
Sign:________________ Sign:________________
Date:________________ Date:________________
ACCEPTANCE TEST PROCEEDURE for MW Link
SNAG LIST
PSH4828_PSH0706_Link_1_K
Note: Vendor to include all faults identified on equipment - specific tests in the above list
Severity Level A faults must be resolved immediately.
Severity Level B faults must be resolved within 7 days. (Number should not exceed 20)
Target Date:___________
Sign:________________ Sign:________________
Date:________________ Date:________________
ACCEPTANCE TEST PROCEEDURE for MW Link
Mobilink Provisional Acceptance Test/Final Acceptance Form
MW Link PSH4828_PSH0706_Link_1_K
Site A Name Site B Name Inst. Date
Site ID / Code Site ID / Code PAT Date
Lat: Lat: FA Date
Site A Site B
FA Date
Coordinates Long: Coordinates Long:
(if Extended)
Link Configuration
Provisional Acceptance Test Non.
Conformity Remarks
Equipment Detail Site A Site B (Major/Minor)
Type S. No. Type S. No.
ODU
ODU (if protected)
IDU
Antenna
Actual Antenna Height
Antenna (if Protected) / N/A / N/A
Actual Antenna Height (if
M M
Protected)
Coupler Type □ Balanced □ Un-Balanced
Link Frequency Information CH No. Freq. (MHz) CH No. Freq. (MHz)
Polarization □Horizontal □XPIC
TX Channel/ Frequency Designed: Actual:
TX Channel/ Frequency Designed: Actual:
Modulation Designed: Actual:
Capacity Designed: Actual:
PRBS test (15 Minutes) /BERT
Test ERR Bits: Result: □OK □NOK
XPIC Test (XPD Value) (For
every XPIC link)(Value should
be greater than -30db)
Basic Parameters Verify DBm DBm
TX Power Designed: Actual:
RX. Level (± 3dbm) Designed: Actual:
RX. Level (If protected)
(4 dbm for balanced and 7dbm
for unbalanced Couplar) Designed: Actual:
Fade Margin (As per LB) Designed: Actual:
Ethernet Performance Test
(2%~3% of 3G MW link scope Design Value Test Result
after 3G PO issued)
Ethernet Throughput Test Mbps Mbps
Ethernet Latency Test (<65ms) ms
Ethernet Packet Loss Test
(<0.5%)
Installations Check Site A Site B
ODU Grounding Good Fault Good Fault
IDU Grounding Good Fault Good Fault
Antenna tightness. (25mpa) Good Fault Good Fault
Bracing Good Fault Good Fault
IDU Power Redundancy Good Fault Good Fault
Breaker Rating
IDU On/Off Test Good Fault Good Fault
Boards Positioning as per Board
Good Fault Good Fault
Plan
Alarm Status Good Fault Good Fault
Tributary Labelling Good Fault Good Fault
LCT Login test Good Fault Good Fault
Software Version Good Fault Good Fault
IF cards Soft Tagging Good Fault Good Fault
Redundant Board Switching Test Good Fault Good Fault
NE attribute Confirmation (NE Good Fault Good Fault
ACCEPTANCE TEST PROCEEDURE for MW Link
ID/IP/GW/Name)
IF cable Clamping Good Fault Good Fault
Antenna Support (For 1.2M/1.8M
Good Fault Good Fault
Antenna)
IF Connector Water proofing Good Fault Good Fault
IDU Power Cable Connection Good Fault Good Fault
Labelling Good Fault Good Fault
IF cable Grounding. Good Fault Good Fault
NMS Functionality Good Fault Good Fault
Installed By Accepted By Approved By
Signature Signature Signature
Name Name Name
Designation Designation Designation
Date Date Date
Final Acceptance Remarks
3 weeks operation from PAT date Good Fault
Accepted By Approved By
Signature Signature
Name Name
Designation Designation