CE/Admn/PLA/EMP/1 014/(A)/05 Office of the Chief Engineer

Public Works Department


Administration
Thiruvananthapuram
Dated 13/05/2020
CIRCULAR

Sub: Preparation of estimate for Public Works -Cost Index to be adopted to


DSR 2018 with base 118 - reg

Ref: 1. GO(P) No 173/2019/Fin dated 22/12/2019

2. Govt.Letter No PWD-H3/9/2020-PWD dated 28/04/2020

As per reference 1 cited, the new cost indices to be applied while preparing
esti mate for Public Works based on DSR 2018 considering the GST provisions is
attached as Annexure I. Adoption of new cost index and DSR 2018 will be mandatory
for all estimates with effect from 15/05/2020 based on the Govt. Circular.

Copy to

1. The Chief Engineer, PWD ,Roads, Thiruvanathapuram


2. The Chief Engineer, PWD ,Buildings, Thiruvanathapuram
3. The Chief Engineer, PWD ,NH, Thiruvanathapuram
4. The Chief Engineer, PWD ,Bridges, Thiruvanathapuram
5. The Chief Engineer, PWD ,Design, Thiruvanathapuram
6. The Chief Engineer, PWD ,KSTP, Thiruvanathapuram
7. The Chief Engineer, PWD, Road Maintenance , Thiruvanantapuram.
8. Project Director,KRFB
9. PWD E-governance cell for making necessary changes in the PRICE software
ANNEXURE I
-----·~-----r---~~~--------,------·
Cost index with respect to Cost index with respect to Cost Index to be applied
j ~~ :~'~j (t• l ocation DPAR 2012 DPAR 2019 in DSR 2018
i
With base 100 With base 118
I A 1
B C D E
i ~ lrrivandrum 160 135 135.59
- i Pathanamthitta 162 138 137.29
1
l,_ _ _3_ t-1<_o_tt_ay.;._a_m_ _ _ __ _- + -- -- 1_6_
1 _ _ _--+- - --1_3_7_ _ _--l-- --1_3_6_.4_4_
- _ __ :
lr-~-+-------------r---------------+-----------------~----------------
l<ollam 1
L. 163 139 138.14
!
,---T-~.:.__
'::. Alleppy
______-+- -- -167 138 141.53
- - - --r----------+--------- '
1 - 1\/lunna r 165 137 139.83
:- --- -r-- - - -- - - -- - t - - - - -- - - -- - 1 1 - - - - - - - - - - - t - - - - - - -- - --·
; ' 1 !dukki 167 138 141.53
,
! __ _ _ _ __ _-+- - - -1_6_0_ _ __ + - - -- -1_3_5_ _ _ _+ - - - -1_3_5_.5_9_ ___,
_ b_-tjE_r_n_al_<u_la_m
i ; ICalicut 161 135 136.44
,- -----T.- - - - - -- ---+- - - - - - - - -r----------r----- -- --
1 :..G IIVI ahe 161 135 136.44
~----t-----------------+--------------~----------------r---------------
!_~. 1. iBadagara 161 135 136.44
---~~· -~--------t-----------11-----------t-----------

! :.:. 2 !i<annur 158 136 133.90


r-~ 3 lrl<-a-sa-r-ag_o_d_ _ _ _ _ _-t-- - - - 7 _ _ _--l~------1-
1-5_ 34 13_3___05----~
___ _ _- t - - - - -
r---+---~---------+-----------------+------------+--------------;
Il ..~ ~- /I Nad apu ram 157 136 133.05
1 .:. _, jTrichur 160 136 135.59
,--
!
-. -
:.E
---,
IPalai<kad 159 135 134.75
I ~7 if\llalappuram 161 135 136.44
! :.8 Kalpetta 161 135 136.44
rl.9 :20
Wayanad
Vit hura
161
163
135
137
136.44
138.14
I ::: 1 Chennerka ra 162 138 137.29
!- c.;. New De lh i 118 98 100.00
! :::.3 1\llumbai 145 - 122.88
(Not e- Cost indices for other locations will be publis hed shortly)

. \~ '
\•)};\- <(~· .