PREVENTIVE MAINTENANCE CHECK POINTS & SCHEDULE FOR BOILER AREA

1.BOILER

S.NO Details of Activity Function 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30


1 Functioning of Mobrey
2 Cleaning the gauge glass
3 Drain the ash deposits & fluidisation in 2nd & 3rd compartment when only 1st in running
4 Functioning of Safety Valves
5 Change over of feed pump
6 Change over of P.A fan
7 Strainer cleaning in feed water line
8 Functioning of digital manometer
9 Calibration of steam pressure gauges
10 Water level in condensate pots
11 Cleaning of all electrical panels
12 Inspection of all fan bearings surface temp (Limit-80 0)
13 Inspection of all RAL bearings surface temp (Limit-50 0)
14 Inspection of all RAL sprockets & chains physical condition
15 Inspection of all fans coupling physical condition
16 Lubrication of bearings & tightness of plumber blocks base bolts
17 Tightness of all fans foundation bolts
2.BAG FILTER

S.NO Details of Activity Function 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30


1 Physical inspection of ash deposits in cone
2 Functioning of Hopper level switches
3 Inspection of all RAL & Screw feeder bearings surface temp. (Limit-50 0)
4 Inspection of all RAL sprockets & chain physical condition
5 Functioning of three way damper single solenoid valve
6 Functioning of pulse jet solenoid valves
7 Lubrication of screw feeder bearings & gear box
8 Cleaning of bags
9 Cleaning of dust deposits on bag filter external roof
3.ASH HANDLING

S.NO Details of Activity Function 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30


1 Cleaning of panels & panel mounted instruments
2 Cleaning of blow valve seatings
3 Cleaning of air filter regulator
4 Check the functioning of pressure switches, solenoid valves
5 Ash drain from SILO
6 Cleaning of filter mounted on ash SILO
7 Lubrication of screw feeder bearings & gear box
8 Inspection of all RAL bearings surface temp (Limit-50 0)
9 Inspection of all RAL sprockets & chain physical condition
4.COAL HANDLING PLANT

S.NO Details of Activity Function 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30


1 Free movement of conveyor idlers
2 Physical condition of idlers
3 Slackness of conveyor belt
4 Cleaning of scrapers, discharge end hoppers & rollers of conveyors
5 Physical condition of conveyor of belt & belt joints
6 Lubrication of conveyor roller bearings, gear box, base bolts & coupling bush bolt tightness
7 Slackness of bucket elevator belt
8 Bucket elevator bucket fixing fasteners tightening, buckets, belts & belt joining physical condition
9 Lubrication of elevator roller bearings, gear box, base bolts & couplings bush bolts tightness
10 Functioning DE system pulsing solenoid valves
11 Cleaning of all DE system ducts including I.D fan