This document outlines the preventive maintenance checklist and schedule for various areas of a boiler, including the boiler area, bag filter, ash handling, and coal handling plant. It lists over 30 detailed maintenance activities to be performed on a daily, weekly, monthly, and half-yearly basis to ensure proper functioning of equipment, check for issues, and perform cleaning. The goal is to conduct regular inspections and maintenance to minimize downtime and maximize efficiency of the boiler operations through preventive care of all systems.
This document outlines the preventive maintenance checklist and schedule for various areas of a boiler, including the boiler area, bag filter, ash handling, and coal handling plant. It lists over 30 detailed maintenance activities to be performed on a daily, weekly, monthly, and half-yearly basis to ensure proper functioning of equipment, check for issues, and perform cleaning. The goal is to conduct regular inspections and maintenance to minimize downtime and maximize efficiency of the boiler operations through preventive care of all systems.
This document outlines the preventive maintenance checklist and schedule for various areas of a boiler, including the boiler area, bag filter, ash handling, and coal handling plant. It lists over 30 detailed maintenance activities to be performed on a daily, weekly, monthly, and half-yearly basis to ensure proper functioning of equipment, check for issues, and perform cleaning. The goal is to conduct regular inspections and maintenance to minimize downtime and maximize efficiency of the boiler operations through preventive care of all systems.
1 Functioning of Mobrey 2 Cleaning the gauge glass 3 Drain the ash deposits & fluidisation in 2nd & 3rd compartment when only 1st in running 4 Functioning of Safety Valves 5 Change over of feed pump 6 Change over of P.A fan 7 Strainer cleaning in feed water line 8 Functioning of digital manometer 9 Calibration of steam pressure gauges 10 Water level in condensate pots 11 Cleaning of all electrical panels 12 Inspection of all fan bearings surface temp (Limit-80 0) 13 Inspection of all RAL bearings surface temp (Limit-50 0) 14 Inspection of all RAL sprockets & chains physical condition 15 Inspection of all fans coupling physical condition 16 Lubrication of bearings & tightness of plumber blocks base bolts 17 Tightness of all fans foundation bolts 2.BAG FILTER
1 Physical inspection of ash deposits in cone 2 Functioning of Hopper level switches 3 Inspection of all RAL & Screw feeder bearings surface temp. (Limit-50 0) 4 Inspection of all RAL sprockets & chain physical condition 5 Functioning of three way damper single solenoid valve 6 Functioning of pulse jet solenoid valves 7 Lubrication of screw feeder bearings & gear box 8 Cleaning of bags 9 Cleaning of dust deposits on bag filter external roof 3.ASH HANDLING
1 Free movement of conveyor idlers 2 Physical condition of idlers 3 Slackness of conveyor belt 4 Cleaning of scrapers, discharge end hoppers & rollers of conveyors 5 Physical condition of conveyor of belt & belt joints 6 Lubrication of conveyor roller bearings, gear box, base bolts & coupling bush bolt tightness 7 Slackness of bucket elevator belt 8 Bucket elevator bucket fixing fasteners tightening, buckets, belts & belt joining physical condition 9 Lubrication of elevator roller bearings, gear box, base bolts & couplings bush bolts tightness 10 Functioning DE system pulsing solenoid valves 11 Cleaning of all DE system ducts including I.D fan