Professional Documents
Culture Documents
Confidence Oil & Shipping Limited (Ship Building Project) : Work Order
Confidence Oil & Shipping Limited (Ship Building Project) : Work Order
Company Name BRB CABLE INDUSTRIES LTD. Company Name Confidence Oil & Shipping Limited
Awal Center, Level # 17, 34 Kemal
House:no-10/B,Road:no-6,
Address Address Ataturk Avenue, Banani C/A, Dhaka
Dhanmondi,Dhaka-1205.
– 1213.
Representative Mr. Saiful Representative Sayela Alam
Contact Number 01713064213 Contact Number 01799994009
E-mail Address brbdo@brbcable.com E-mail Address sayela.alam@cg-bd.com
Supply of Cables
For 700Ton For 2000 Ton 3x700Ton+ BRB CABLE INDUSTRIES LTD.
2x2000Ton
7 YZP 120 YZP 3x4mm² 180 720 3x4RM MC-210 194.64 140,140.80
3x4mm²
8 YZP 130 YZP 3x6mm² 150 690 3x6 RM MC- 272.56 188,066.40
3x6mm² 210
9 YZP 180 YZP 3x10mm² 115 770 3x10RM MC- 419.72 323,184.40
3x10mm² 210
1 of 3
10 3x16mm² 50 3x16mm² 50 250 3x16RM 863.16 215,790.00
FLEXIBLE FLEXIBLE NYY(F) WP
(NYY‐WP) (NYY‐WP)
14 YZP 5x1.5 200 YZP 5x1.5 250 1100 5x1.5RM MC- 125.89 138,479.00
210
1. Payment Terms: 2O% Advance payment and rest 80% payment will be made after 25-30 days after product delivery
up to site with proper bill submission.
2. Delivery Time: 15 working days after receiving of work order.
3. VAT : Included
4. Transport and Loading Cost: Included
5. Delivery Location: Confidence Oil & Shipping Limited; Alam Shipyard, Purbogram, Rupgonj, Narayangonj.
6. Contact Person: Name: Billal Hossain; Phone: 01704119664; Email: bil.hossain@cg-bd.com
7. Warranty : 5 years replacement warranty.
8. Quality Inspection: COSL team will visit BRB CABLE INDUSTRIES LTD. Factory and inspect the production process
2 of 3
and quality before delivery.
9. Return/Change: After delivery If any item does not match with quality, BRB CABLE INDUSTRIES LTD. authority will
replace the product at free of cost.
10. COSL reserves the right to cancel the work order for non-cooperation, slow work speed, delay of delivery etc.
Approved by
Khalid Islam
Managing Director, COSL
3 of 3