500 KV faisalabad west grid station

Control House Building


S. No. Discription work completed
1 RCC Frame Structure 100%

A Ground Floor

1 Backfill upto F.F.L 25000/34980cft

2 Brickwork(ft3) 100%
3 Trenches 175/245
4 Plaster(m2) 28%
5 Flooring(m2) 28%
6 Plumbing 0
7 False ceiling 0
8 Electrification 52%
9 Paint 0

B First Floor
1 Brickwork(ft3) 35%
2 Plaster(m2) 0
3 Flooring(m2) 0
4 Plumbing 0
5 False ceiling 0
6 Electrification 0
7 Paint 0

C Removing of form
1 Work 1st floor 100%
2 Roof Treatment 0%
500 KV faisalabad west grid station
sr no Control House Building
work completed
1 RCC Frame Structure 100%

A Ground Floor

1 Backfill upto F.F.L 25000/34980cft

2 Brickwork(ft3) 100%
3 Trenches 175/245
4 Plaster(m2) 30%
5 Flooring(m2) 30%
6 Plumbing 0
7 False ceiling 0
8 Electrification 52%
9 Paint 0

B First Floor
1 Brickwork(ft3) 40%
2 Plaster(m2) 0
3 Flooring(m2) 0
4 Plumbing 0
5 False ceiling 0
6 Electrification 0
7 Paint 0

C Removing of form
1 Work 1st floor 100%
2 Roof Treatment 0%
st grid station
500 KV faisalabad west grid station
sr no Control House Building
work completed
1 RCC Frame Structure 100%

A Ground Floor

1 Backfill upto F.F.L 25000/34980cft

2 Brickwork(ft3) 100%
3 Trenches 214/245
4 Plaster(m2) 35%
5 Flooring(m2) 30%
6 Plumbing 0
7 False ceiling 0
8 Electrification 52%
9 Paint 0

B First Floor
1 Brickwork(ft3) 45%
2 Plaster(m2) 0
3 Flooring(m2) 0
4 Plumbing 0
5 False ceiling 0
6 Electrification 0
7 Paint 0

C Removing of form
1 Work 1st floor 100%
2 Roof Treatment 0%
st grid station
500 KV faisalabad west grid station
sr no Control House Building
work completed
1 RCC Frame Structure 100%

A Ground Floor

1 Backfill upto F.F.L 25000/34980cft

2 Brickwork(ft3) 100%
3 Trenches 230/245
4 Plaster(m2) 40%
5 Flooring(m2) 30%
6 Plumbing 0
7 False ceiling 0
8 Electrification 52%
9 Paint 0

B First Floor
1 Brickwork(ft3) 50%
2 Plaster(m2) 0
3 Flooring(m2) 0
4 Plumbing 0
5 False ceiling 0
6 Electrification 0
7 Paint 0

C Removing of form
1 Work 1st floor 100%
2 Roof Treatment 0%