PROGRESS 

DRILLING PROJECT DBM‐BUMANIK Update
13‐Sep‐2019
Block Keuno Pit B 10:26 PM
Petasia Timur, Morowali Utara ‐ Sulawesi Tengah

Plan 4 Rigs Realitation 4 Rigs
Periode Total Depth  Average  Total Depth Persen of Plan Average  Persen of 
(m) Day (m) (m) (%) Per Day (m) Plan (%)
Sept 2019  (26 Days) 1000,00 10,00 358,10 35,81 9,95 99,47
Okt 2019  (20 Days) 1000,00 12,50 0,00 0,00 0,00 0,00

CUMULATIVE ALL  PROGRESS
Depth Average Core
Rig Recovery (%)
(m) Day (m) Lenght (m)
GMS‐01 98,20 10,91 95,35  97,10 
GMS‐02 118,00 13,11 115,90  98,22 
GMS‐03 86,50 9,61 84,77  98,00 
GMS‐04 55,40 6,16 54,50  98,38 

Total
Avg. Rec.
Depth (m) Avg/Day (m)
(%)

358,10 9,95 97,88 

Progress Drilling 5 ‐ 30 September 2019
Depth Average Core Average
Rig Day
(m) Day (m) Lenght (m) Rec.  (%)
GMS‐01 9,00 98,20 10,91 95,35  97,10 
GMS‐02 9,00 118,00 13,11 115,90  98,22 
GMS‐03 9,00 86,50 9,61 84,77  98,00 
GMS‐04 9,00 55,40 6,16 54,50  98,38 

Total
Avg.
Depth (m) Avg/Day (m)
 Rec. (%)
358,10 9,95 97,88 

Rig Hole Finish Total


GMS‐01 5
GMS‐02 3
12
GMS‐03 2
GMS‐04 2
Preparasi
Resume Progress Sample

Progress Sample
GMS‐01 GMS‐02 GMS‐03 GMS‐04 Total
Raw 63 75 78 41 257
Pulp 51 52 36 16 155
Presspelet 10 18 35 8 71
13‐Sep‐2019
Update
Hole Finish  11:29 PM
Periode September 2019
Date EOH Core L Core Rec
No Hole ID Rig Sample
Start Finish (m) (m) (%)
1 P163113 5‐Sep‐2019 5‐Sep‐2019 GMS‐01 7,00  7,00  100,00  7
2 P163111 6‐Sep‐2019 7‐Sep‐2019 GMS‐01 13,60  13,50  99,26  14
3 P163119 5‐Sep‐2019 7‐Sep‐2019 GMS‐03 25,40  25,05  98,62  26
4 P163115 5‐Sep‐2019 7‐Sep‐2019 GMS‐02 24,50  23,60  96,33  25
5 P163319 7‐Sep‐2019 8‐Sep‐2019 GMS‐03 13,10  13,10  100,00  13
6 P163117 5‐Sep‐2019 9‐Sep‐2019 GMS‐04 16,00  15,60  97,50  16
7 P163313 7‐Sep‐2019 9‐Sep‐2019 GMS‐01 30,00  28,90  96,33  30
8 P163315 7‐Sep‐2019 9‐Sep‐2019 GMS‐02 21,00  20,70  98,57  21
9 P163511 10‐Sep‐2019 11‐Sep‐2019 GMS‐01 15,00  14,90  99,33  15
10 P163515 9‐Sep‐2019 11‐Sep‐2019 GMS‐02 29,00  28,40  97,93  30
11 P163517 9‐Sep‐2019 11‐Sep‐2019 GMS‐04 24,40  23,90  97,95  25
12 P163513 12‐Sep‐2019 13‐Sep‐2019 GMS‐01 15,60  15,60  100,00  16
13 #DIV/0!
14 #DIV/0!
15 #DIV/0!
16 #DIV/0!
17 #DIV/0!
18 #DIV/0!
19 #DIV/0!
20 #DIV/0!
21 #DIV/0!
22 #DIV/0!
23 #DIV/0!
24 #DIV/0!
25 #DIV/0!
26 #DIV/0!
27 #DIV/0!
28 #DIV/0!
29 #DIV/0!
30 #DIV/0!

Sept 2019 Hole Depth (m) Sample


GMS‐01 5 81,20  66,00 
GMS‐02 3 74,50  76,00 
GMS‐03 2 38,50  39,00 
GMS‐04 2 40,40  41,00 
Total 12 234,60  238 
DAILY PROGRESS DRILLING PROJECT DBM‐BUMANIK 13‐Sep‐2019
Update
Block Keuno Pit B 11:21 PM
Petasia Timur, Morowali Utara ‐ Sulawesi Tengah

GMS‐01 GMS‐02 GMS‐03 GMS‐04 Total


Date Depth Core L Core Rec. Depth Core L Core Rec. Depth Core L Core Rec. Depth Core L Core Rec. Depth/Day
(m) (m) (%) (m) (m) (%) (m) (m) (%) (m) (m) (%) (m)
5‐Sep‐2019 7,00  7,00  100,00  10,00 10,00  100,00  16,00 16,00  100,00  11,90 11,50  96,64  44,9
6‐Sep‐2019 12,00  12,00  100,00  10,20 10,20  100,00  8,00 7,65  95,63  0,00 0,00  0,00  30,2
7‐Sep‐2019 8,60  8,50  98,84  9,30 8,40  90,32  14,40 14,40  100,00  3,10 3,10  100,00  35,4
8‐Sep‐2019 15,00  14,45  96,33  15,30 15,20  99,35  0,10 0,10  100,00  0,30 0,30  100,00  30,7
9‐Sep‐2019 8,00  7,45  93,13  12,20 12,00  98,36  0,00 0,00  0,00  14,70  14,40  97,96  34,9
10‐Sep‐2019 10,00  10,00  100,00  9,50 8,90  93,68  19,00 18,50  97,37  10,00  9,80  98,00  48,5
11‐Sep‐2019 5,00  4,90  98,00  17,00 17,00  100,00  18,00 17,12  95,11  0,40  0,40  100,00  40,4
12‐Sep‐2019 14,00  14,00  100,00  23,00 22,90  99,57  7,00 7,00  100,00  0,00  0,00  0,00  44
13‐Sep‐2019 18,60  17,05  91,67  11,50 11,30  98,26  4,00  4,00  100,00  15,00  15,00  100,00  49,1
14‐Sep‐2019 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
15‐Sep‐2019 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
16‐Sep‐2019 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
17‐Sep‐2019 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
18‐Sep‐2019 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
19‐Sep‐2019 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
20‐Sep‐2019 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
21‐Sep‐2019 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
22‐Sep‐2019 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
23‐Sep‐2019 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
24‐Sep‐2019 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
25‐Sep‐2019 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
26‐Sep‐2019 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
27‐Sep‐2019 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
28‐Sep‐2019 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
29‐Sep‐2019 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
30‐Sep‐2019 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0

Total 98,20  95,35  97,10  118,00  115,90  98,22  86,50  84,77  98,00  55,40  54,50  98,38  358,10 
Average 10,91  10,59  97,10  13,11  12,88  98,22  9,61  9,42  98,00  6,16  6,06  98,38  9,95 
Rig  GMS‐01 Update
13‐Sep‐2019
Daily Progress 11:29 PM
5 ‐ 30 Sept 2019
Depth/Day CL Core Rec. EOH EOH
Date Operator Hole ID
(m) (m) (%) (m) Sample
5‐Sep‐2019 Aswan P163113 7,00 7,00  100,00  7,00  7,00 
6‐Sep‐2019 Aswan P163111 12,00 12,00  100,00  CONTINUE
P163111 1,60 1,50  93,75  13,60  14,00 
7‐Sep‐2019 Aswan
P163313 7,00 7,00  100,00  CONTINUE
8‐Sep‐2019 Aswan P163313 15,00  14,45  96,33  CONTINUE
9‐Sep‐2019 Aswan P163313 8,00  7,45  93,13  30,00  30,00 
10‐Sep‐2019 Aswan P163511 10,00  10,00  100,00  CONTINUE
11‐Sep‐2019 Aswan P163511 5,00  4,90  98,00  15,00  15,00 
12‐Sep‐2019 Aswan P163513 14,00  14,00  100,00  CONTINUE
P163513 1,60  1,60  100,00  15,60  16,00 
13‐Sep‐2019 Aswan
P163713 17,00  17,00  100,00  CONTINUE
14‐Sep‐2019 #DIV/0!
15‐Sep‐2019 #DIV/0!
16‐Sep‐2019 #DIV/0!
17‐Sep‐2019 #DIV/0!
18‐Sep‐2019 #DIV/0!
19‐Sep‐2019 #DIV/0!
20‐Sep‐2019 #DIV/0!
21‐Sep‐2019 #DIV/0!
22‐Sep‐2019 #DIV/0!
23‐Sep‐2019 #DIV/0!
24‐Sep‐2019 #DIV/0!
25‐Sep‐2019 #DIV/0!
26‐Sep‐2019 #DIV/0!
27‐Sep‐2019 #DIV/0!
28‐Sep‐2019 #DIV/0!
29‐Sep‐2019 #DIV/0!
30‐Sep‐2019
TOTAL 98,20  96,90  98,68  81,20  82,00 
Rig  GMS‐02 Update
13‐Sep‐2019
Daily Progress 11:29 PM
5 ‐ 30 Sept 2019
Depth/Day CL Core Rec. EOH EOH
Date Operator Hole ID
(m) (m) (%) (m) Sample
5‐Sep‐2019 Kama P163115 10,00 10,00  100,00  CONTINUE
6‐Sep‐2019 Kama P163115 10,20 10,20  100,00  CONTINUE
P163115 4,30 3,40  79,07  24,50  25,00 
7‐Sep‐2019 Kama
P163315 5,00 5,00  100,00  CONTINUE
8‐Sep‐2019 Kama P163315 15,30  15,20  99,35  CONTINUE
Kama P163315 0,70  0,50  71,43  21,00  21,00 
9‐Sep‐2019
Kama P163515 11,50  11,50  100,00  CONTINUE
10‐Sep‐2019 Kama P163515 9,50  8,90  93,68  CONTINUE
P163515 8,00  8,00  100,00  29,00  30,00 
11‐Sep‐2019 Kama
P163715 9,00  9,00  100,00  CONTINUE
12‐Sep‐2019 Kama P163715 23,00  22,90  99,57  CONTINUE
13‐Sep‐2019 Kama P163715 11,50  11,30  98,26  CONTINUE
14‐Sep‐2019 #DIV/0!
15‐Sep‐2019 #DIV/0!
16‐Sep‐2019 #DIV/0!
17‐Sep‐2019 #DIV/0!
18‐Sep‐2019 #DIV/0!
19‐Sep‐2019 #DIV/0!
20‐Sep‐2019 #DIV/0!
21‐Sep‐2019 #DIV/0!
22‐Sep‐2019 #DIV/0!
23‐Sep‐2019 #DIV/0!
24‐Sep‐2019 #DIV/0!
25‐Sep‐2019 #DIV/0!
26‐Sep‐2019 #DIV/0!
27‐Sep‐2019 #DIV/0!
28‐Sep‐2019 #DIV/0!

TOTAL 118,00  115,90  98,22  74,50  76,00 


Rig  GMS‐03 Update
13‐Sep‐2019
Daily Progress 11:40 PM
5 ‐ 30 Sept 2019
Depth/Day CL Core Rec. EOH EOH
Date Operator Hole ID
(m) (m) (%) (m) Sample
5‐Sep‐2019 Angko P163119 16,00 16,00  100,00  CONTINUE
6‐Sep‐2019 Angko P163119 8,00 7,65  95,63  CONTINUE
Angko P163119 1,40 1,40  100,00  25,40 26,00
7‐Sep‐2019
Angko P163319 13,00 13,00  100,00  CONTINUE
8‐Sep‐2019 Angko P163319 0,10  0,10  100,00  13,10 13,00
9‐Sep‐2019 Angko P163519 0,00  0,00  0,00  No Crew
10‐Sep‐2019 Angko P163519 19,00  18,50  97,37  CONTINUE
11‐Sep‐2019 Angko P163519 18,00  17,15  95,28  CONTINUE
12‐Sep‐2019 Fadli P163519 7,00  7,00  100,00  CONTINUE
13‐Sep‐2019 Fadli P163519 4,00  4,00  100,00  CONTINUE
14‐Sep‐2019 #DIV/0!
15‐Sep‐2019 #DIV/0!
16‐Sep‐2019 #DIV/0!
17‐Sep‐2019 #DIV/0!
18‐Sep‐2019 #DIV/0!
19‐Sep‐2019 #DIV/0!
20‐Sep‐2019 #DIV/0!
21‐Sep‐2019 #DIV/0!
22‐Sep‐2019 #DIV/0!
23‐Sep‐2019 #DIV/0!
24‐Sep‐2019 #DIV/0!
25‐Sep‐2019 #DIV/0!
26‐Sep‐2019 #DIV/0!
27‐Sep‐2019 #DIV/0!
28‐Sep‐2019 #DIV/0!
29‐Sep‐2019 #DIV/0!

TOTAL 86,50  84,80  98,03  38,50  39,00 


Rig  GMS‐04 Update
13‐Sep‐2019
Daily Progress 11:37 PM
5 ‐ 30 Sept 2019
Depth/Day CL Core Rec. EOH EOH
Date Operator Hole ID
(m) (m) (%) (m) Sample
5‐Sep‐2019 Fadli P163117 11,90 11,50  96,64  CONTINUE
6‐Sep‐2019 Fadli P163117 0,00 0,00  0,00  CONTINUE
7‐Sep‐2019 Fadli P163117 3,10 3,10  100,00  CONTINUE
8‐Sep‐2019 Fadli P163117 0,30  0,30  100,00  CONTINUE
P163117 0,70  0,70  100,00  16,00  16,00 
9‐Sep‐2019 Fadli
P163517 14,00  13,70  97,86  CONTINUE
10‐Sep‐2019 Fadli P163517 10,00  9,80  98,00  CONTINUE
11‐Sep‐2019 Fadli P163517 0,40  0,40  100,00  24,40  25,00 
12‐Sep‐2019 Glen 163717 0,00  0,00  0,00  Breakdown
13‐Sep‐2019 Glen 163717 15,00  15,00  100,00  CONTINUE
14‐Sep‐2019 #DIV/0!
15‐Sep‐2019 #DIV/0!
16‐Sep‐2019 #DIV/0!
17‐Sep‐2019 #DIV/0!
18‐Sep‐2019 #DIV/0!
19‐Sep‐2019 #DIV/0!
20‐Sep‐2019 #DIV/0!
21‐Sep‐2019 #DIV/0!
22‐Sep‐2019 #DIV/0!
23‐Sep‐2019 #DIV/0!
24‐Sep‐2019 #DIV/0!
25‐Sep‐2019 #DIV/0!
26‐Sep‐2019 #DIV/0!
27‐Sep‐2019 #DIV/0!
28‐Sep‐2019 #DIV/0!
29‐Sep‐2019 #DIV/0!
#DIV/0!
TOTAL 55,40  54,50  98,38  40,40  41,00 