مشروع خط نقل طاقة 132 ك - ف
مشروع خط نقل طاقة 132 ك - ف
Design,test,suplly,shipment materialsfor132kvdouble
circuit overhead transmission lines,work
execution,completion and guarantee of the work
SHARQ AL MOSULE 400 KV_BARTELLA 132 KV S/S
*ﺍﻟﻌﻤﻞ ﻳﺸﻤﻞ ، :ﺗﺼﻨﻴﻊ ،ﺗﺠﻬﻴﺰ ،ﺗﺴﻠﻴﻢ ﻭﺗﻨﺰﻳﻞ ﺍﻟﻤﻮﺍﺩ ،ﻓﺤﺺ ،ﺗﻨﻔﻴﺬ ﺍﻋﻤﺎﻝ ﻋﻠﻰ ﺃﺳﺎﺱ ﺗﺴﻠﻴﻢ ﺍﻟﻤﻔﺘﺎﺡ
*ﻛﻞ ﺍﻟﻤﻮﺍﺩ ﺍﻟﻤﺠﻬﺰﺓ ﺗﻜﻮﻥ ﻁﺒﻘﺎ ﻟﻠﺠﺪﻭﻝ) (Cﻣﻦ ﺍﻟﻤﻮﺍﺻﻔﺎﺕ ﺍﻟﻔﻨﻴﺔ ﺍﻟﻤﺮﻓﻘﺔ ﻁﻴﺎ
*ﺍﻻﻋﻤﺎﻝ ﺍﻻﻧﺸﺎﺋﻴﺔ:
ﻋﻠ���ﻰ ﺍﻟﻤﻘ���ﺎﻭﻝ ﺗﻨﻔﻴ���ﺬ ﺍﻻﻋﻤ���ﺎﻝ ﺍﻟﻤﺒﻴﻨ���ﺔ ﻓ���ﻲ ﺟ���ﺪﻭﻝ ﺍﻟﻜﻤﻴ���ﺎﺕ ﺍﻟﻤﺮﻓ���ﻖ ﻭﻗ���ﻮﺍﺋﻢ ﺍﻷﺑ���ﺮﺍﺝ structure listﺍﻟﻤﺮﻓﻘ���ﺔ
ﻁﺒﻘﺎ ﻟﻠﻤﻮﺍﺻﻔﺎﺕ ﺍﻟﻔﻨﻴﺔ ﺍﻟﻤﺮﻓﻘﺔ ﻭﻳﺸﻤﻞ ﺍﻟﻌﻤﻞ :
-۱ﺍﻻﻋﻤ���ﺎﻝ ﺍﻟﻤﺪﻧﻴ���ﺔ :ﻋﻠ���ﻰ ﺍﻟﻤﻘ���ﺎﻭﻝ ﺗﻨﻔﻴ���ﺬ ﺍﻻﻋﻤ���ﺎﻝ ﺍﻟﻤﺒﻴﻨ���ﺔ ﻓ���ﻲ ﺟ���ﺪﻭﻝ ﺍﻟﻜﻤﻴ���ﺎﺕ ﺍﻟﻤﺮﻓ���ﻖ ﺣﺴ���ﺐ ﺍﻟﻤﻮﺻ���ﻔﺎﺕ ﺍﻟﻔﻨﻴ���ﺔ
ﺍﻟﻤﺮﻓﻘﺔ ﻭﻳﺸﻤﻞ ﺍﻟﻌﻤﻞ :
ﺃ -ﺗﺠﻬﻴ������ﺰ ﺍﻟﻤ������ﻮﺍﺩ ﺍﻟﻼﺯﻣ������ﺔ )ﺳ������ﻤﻨﺖ ،ﺣﺪﻳ������ﺪ ﺗﺴ������ﻠﻴﺢ ،ﺍﻟﺤﺼ������ﻰ ،ﺍﻟﺮﻣ������ﻞ ،ﺍﻟﺦ(ﺍﻟﻤﻄﻠﻮﺑ������ﺔ ﻟﺼ������ﺐ ﺍﻟﻘﻮﺍﻋ������ﺪ
ﺍﻟﻜﻮﻧﻜﺮﻳﺘﻴﺔ
ﺝ -ﺃﺧ���ﺬ ﻧﻤ���ﺎﺫﺝ ﻣ���ﻦ ﺍﻟﻤ���ﻮﺍﺩ ﺍﻻﻧﺸ���ﺎﺋﻴﺔ ﻭﺍﻟﻤﻜﻌﺒ���ﺎﺕ ﺍﻟﻜﻮﻧﻜﺮﻳﺘﻴ���ﺔ ﻭﺍﺟ���ﺮﺍء ﺍﻟﻔﺤﻮﺻ���ﺎﺕ ﺍﻟﻤﺨﺘﺒﺮﻳ���ﺔ ﻟﺒﻴ���ﺎﻥ ﻣﻄﺎﺑﻘﺘﻬ���ﺎ
ﻣ����ﻊ ﺍﻟﻤﻮﺍﺻ����ﻔﺎﺕ ﺍﻟﻘﻴﺎﺳ����ﻴﺔ ﺍﻟﻌﺮﺍﻗﻴ����ﺔ ﺍﻟﺼ����ﺎﺩﺭﺓ ﻋ����ﻦ ﺍﻟﻤﺮﻛ����ﺰ ﺍﻟﻘ����ﻮﻣﻲ ﻟﻠﻤﺨﺘﺒ����ﺮﺍﺕ ﺍﻻﻧﺸ����ﺎﺋﻴﺔ ﻋﻠﻤ����ﺎ ﺍﻥ ﺃﺟ����ﻮﺭ
ﺍﻟﻔﺤﺺ ﻳﺘﺤﻤﻠﻬﺎ ﺍﻟﻤﻘﺎﻭﻝ.
-۲ﺍﻟﺘﺸﻴﻴﺪ ﻭﺍﻟﻨﺼﺐ ﻟﻸﺑﺮﺍﺝ :ﻋﻠﻰ ﺍﻟﻤﻘﺎﻭﻝ ﺗﻨﻔﻴﺬ ﺍﻟﻌﻤﻞ ﺣﺴﺐ ﺍﻟﻤﻮﺍﺻﻔﺎﺕ ﺍﻟﻔﻨﻴﺔ ﺍﻟﻤﺮﻓﻘﺔ ﻭﻳﺸﻤﻞ ﺍﻟﻌﻤﻞ :
-۳ﺍﻋﻤﺎﻝ ﺍﻟﺘﺴﻠﻴﻚ :ﻋﻠﻰ ﺍﻟﻤﻘﺎﻭﻝ ﺗﻨﻔﻴﺬ ﺍﻟﻌﻤﻞ ﺣﺴﺐ ﺍﻟﻤﻮﺍﺻﻔﺎﺕ ﺍﻟﻔﻨﻴﺔ ﺍﻟﻤﺮﻓﻘﺔ ﻭﻳﺸﻤﻞ ﺍﻟﻌﻤﻞ :
)spacerﻭﻣﺨﻤ�����ﺪﺍﺕ ﺏ -ﻋﻤ�����ﻞ ﻛﺎﻓ�����ﺔ ﺍﻟﺘﻮﺻ�����ﻴﻼﺕ jumperﻭﺗﺜﺒﻴ�����ﺖ ﺍﻟﻔﻮﺍﺻ�����ﻞ ﺑ�����ﻴﻦ ﺍﻻﺳ�����ﻼﻙ )damper
ﺍﻻﻫﺘﺰﺍﺯ)(vibration damper
*ﺍﻋﻤﺎﻝ ﺍﻟﺘﺠﻬﻴﺰ
ﺃ -ﻳﻘ����ﻮﻡ ﺍﻟﻤﻘ����ﺎﻭﻝ ﺑﺘﺠﻬﻴ����ﺰ ﺍﻟﻤ����ﻮﺍﺩ ﺍﻟﻼﺯﻣ����ﺔ ﻷﻧﺸ����ﺎء ﺍﻟﺨ����ﻂ ﻭﺍﻟﻤﺒﻴﻨ����ﺔ ﻓ����ﻲ ﺟ����ﺪﺍﻭﻝ ﺍﻟﻜﻤﻴ����ﺎﺕ ﺍﻟﻤﺮﻓﻘ����ﺔ ﻁﻴﺎ)ﺣﺪﻳ����ﺪ
ﺍﻷﺑﺮﺍﺝ ،ﺍﻻﺳﻼﻙ ،ﺍﺳﻼﻙ ،OPGWﺍﻟﻌﻮﺍﺯﻝ ،ﺍﻟﻤﻠﺤﻘﺎﺕ ( ﻭﺣﺴﺐ ﺍﻟﻤﻮﺍﺻﻔﺎﺕ ﺍﻟﻔﻨﻴﺔ ﺍﻟﻤﺮﻓﻘﺔ
ﺏ -ﻋﻠ���ﻰ ﺍﻟﻤﻘ���ﺎﻭﻝ ﺗ���ﺎﻣﻴﻦ ﻣﻮﻗ���ﻊ ﻋﻤ���ﻞ ﻭﻣﺨ���ﺰﻥ ﻟﺨ���ﺰﻥ ﺍﻟﻤ���ﻮﺍﺩ ﻭﻳﻜ���ﻮﻥ ﻣﺴ���ﺆﻭﻻ ﻋ���ﻦ ﺍﻟﻤ���ﻮﺍﺩ ﺣﺘ���ﻰ ﺍﺳ���ﺘﻼﻡ ﺍﻟﻌﻤ���ﻞ
ﺑﺎﻟﻜﺎﻣﻞ
ﺝ -ﺗﻘﺪﻳﻢ ﺷﻬﺎﺩﺓ ﻓﺤﺺ ﻣﺆﻳﺪﺓ ﻣﻦ ﻁﺮﻑ ﺛﺎﻟﺚ ﻣﻌﺘﻤﺪﺓ ﺩﻭﻟﻴﺎ ﻭﻳﺘﻔﻖ ﻋﻠﻴﻬﺎ ﺍﻟﻄﺮﻓﺎﻥ
ﺩ-ﺗﻘﺪﻳﻢ ﻣﺨﻄﻄﺎﺕ ﺑﺎﻟﻤﻮﺍﺩ ﺍﻟﻤﺠﻬﺰﺓ ﻣﻊ ﺍﻟﻌﺮﺽ ﺍﻟﻔﻨﻲ ﻟﻴﺘﺴﻨﻰ ﺩﺭﺍﺳﺘﻬﺎ ﻭﻣﺼﺎﺩﻗﺘﻬﺎ ﺧﻼﻝ ﻓﺘﺮﺓ ﺗﻮﻗﻴﻊ ﺍﻟﻌﻘﺪ
ﻳﻠﺘ�����ﺰﻡ ﺍﻟﻤﻘ�����ﺎﻭﻝ ﺑ�����ﺄﺟﺮﺍء ﻛﺎﻓ�����ﺔ ﺍﻟﻔﺤﻮﺻ�����ﺎﺕ ﺍﻟﻤﻄﻠﻮﺑ�����ﺔ ﻭﺑﺤﻀ�����ﻮﺭ ﻛ�����ﻮﺍﺩﺭ ﺷ�����ﺮﻛﺘﻨﺎ ﺍﻟﻤﺒﻴﻨ�����ﺔ ﺍﻋ�����ﺪﺍﺩﻫﻢ ﻓ�����ﻲ
ﺟﺪﺍﻭﻝ ﺍﻟﻜﻤﻴﺎﺕ ﺍﻟﻤﺮﻓﻘﺔ ﻭﺣﺴﺐ ﺍﻟﻤﻮﺍﺻﻔﺎﺕ ﺍﻟﻔﻨﻴﺔ ﺍﻟﻤﺮﻓﻘﺔ .
*ﻋﻠ������ﻰ ﺍﻟﻤﻘ������ﺎﻭﻝ ﺗﻘ������ﺪﻳﻢ ﺟ������ﺪﻭﻝ ﺯﻣﻨ������ﻲ ﻳﺒ������ﻴﻦ ﺗﻔﺎﺻ������ﻴﻞ ﺍﻟﻌﻤ������ﻞ)ﻷﻋﻤ������ﺎﻝ ﺍﻟﺘﻨﻔﻴ������ﺬ ﻭﺍﻟﺘﺠﻬﻴ������ﺰ ﻭﻧﻘ������ﻞ
ﺍﻟﻤ�������ﻮﺍﺩ( ﻭﺣﺴ�������ﺐ ﺍﻟﻤ�������ﺪﺓ ﺍﻟﻤﻄﻠﻮﺑ�������ﺔ ﻭﺍﻟﺒﺎﻟﻐ�������ﺔ )(۱۸۰ﻳ�������ﻮﻡ ﻭﺣﺴ�������ﺐ ﺍﻟﻤﻮﺍﺻ�������ﻔﺎﺕ ﺍﻟﻔﻨﻴ�������ﺔ ﺍﻟﻤﺮﻓﻘ�������ﺔ
ﺟﺪﻭﻝ )(B
*ﻋﻠ�������ﻰ ﺍﻟﻤﻘ�������ﺎﻭﻝ ﺗﻘ�������ﺪﻳﻢ ﻗﺎﺋﻤ�������ﺔ ﺑﺎﻻﻋﻤ�������ﻞ ﺍﻟﻤﻤﺎﺛﻠ�������ﺔ ﺍﻟﺘ�������ﻲ ﺳ�������ﺒﻖ ﻟﻠﻤﻘ�������ﺎﻭﻝ ﺍﻥ ﻧﻔ�������ﺬﻫﺎ ﺑﻨﺠ�������ﺎﺡ ﺩﺍﺧ�������ﻞ
ﺍﻟﻌﺮﺍﻕ
*ﺗﻘﺪﻳﻢ ﻓﺘﺮﺓ ﺿﻤﺎﻥ ﻟﻤﺪﺓ ﺳﻨﺔ ﻛﺎﻣﻠﺔ ﻟﻠﻌﻤﻞ ﺍﻟﻤﻨﺠﺰ ﻭﺍﻟﻤﻮﺍﺩ ﺍﻟﻤﺠﻬﺰﺓ ﻣﻦ ﻗﺒﻞ ﺍﻟﻤﻘﺎﻭﻝ
* ﺗﺠﻬﻴﺰﺭ ﻛﺮﻓﺎﻥ ﻋﺪﺩ۲ﻭﺑﺎﺑﻌﺎﺩ ۹*٤ﻡ ﻣﺆﺛﺚ ﺑﺸﻜﻞ ﻛﺎﻣﻞ ﻭﺣﺴﺐ ﺗﻮﺟﻴﻬﺎﺕ ﺍﻟﻤﻬﻨﺪﺱ ﺍﻟﻤﺸﺮﻑ
Design,test,suplly,shipment materialsfor132kvdouble
circuit overhead transmission lines,work
execution,completion and guarantee of the work
*Line route for line as a shown on drawing with Google coordination and
STRUCTURE LIST
*The tenderer should visit the work site before submitting the tender
*All major material shall supply according to schedule c/ volume 3/3 technical
specification
*Construction works:
the contractor shall carry out the works as indicated in the attached quantities
tables and attached structure list according to attached technical specification
and the work include:
2-Assemble and Erection Towers :shall be carried out by the contractor according
to attached technical specification and the work include:
b-supply all equipment ,tools and laborers to assemble towers and erection
c-tighting accessories (anti climbing device , step bolt , circuit and tower number
plate, danger plate, birds guards, warning markers ,etc.)
a-stringing works of line(all the 6twin teal phase conductors and1 opgw)
b- install the spacer damper, vibration damper, make all connection jumper
1-the contractor shall supply the material in the attached quantities table
according to attached technical specification
2-The contractor shall provide a work site and material storage ware house and
shall be responsible for all material until the work is fully received
2
** NOTE: The quantities of the executed works and supplied materials shall be
calculated according to the actual quantities
Contractor is obliged to conduct all required tests and in the presence of our
company engineers shown in the attached quantities table and according to
attached technical specification
*the contractor should submit a schedule showing the details of the work (for the
execution work, supply and transport of materials)and according to required
period of 180 days and according to according to schedule B/ volume 3/3
technical specification
*The work is subject to the general condition of civil ,electrical and mechanical
engineering work
* The tenderer must submit similar work s which he has successfully carried out
inside Iraq
*The warranty period is one year for work performed and material supplied by
the contactor
*The car required to run project: 3cars Toyota pick-up four wheel drive model
2017
3
Factory Acceptance Tests(FAT)
Person to witness all the tests before shipping at manufacturing factory for following :
(Extension)
1 leg extension 0.0 meter leg extension all 4 legs 3-1
(Extension)
------- leg extension 0.0 meter leg extension all 4 legs 4-1
Interfaces :