Site of The Project
Site of The Project
Site of The Project
1.1.1 Site of the Project Highway shall include the land, buildings, structures
and road works as described in Annex-I of this Schedule-A.
1.2 The dates of handing over the Right of Way to the Contractor are specified
in Annex-II of this Schedule-A.
1.3 An inventory of the Site including the land, buildings, structures, road
works, trees and any other immovable property on, or attached to, the Site
shall be prepared jointly by the Authority Representative and the
Contractor, and such inventory shall form part of the memorandum
referred to in Clause 8.2.1 of this Agreement.
125
Annex - I
(Schedule-A)
Site
[Note: Through suitable drawings and description in words, the land, buildings,
structures and road works comprising the Site shall be specified briefly
but precisely in this Annex-I. All the chainages/location referred to in
Annex-I to Schedule-A shall be existing chainages.]
1. Site
2. Land
The Site of the Project comprises the land (sum total of land already in
possession and land to be possessed) as described below:
Hazaribagh-Barkagaon-Tandwa-Khelari-Bijupara (SH-7) Road
Design Chainage Length
126
11 10.000 11.000 1 16.1
127
39 38.000 39.000 1 13.0
51 50.000 51.000 1 15
52 51.000 52.000 1 15
53 52.000 53.000 1 15
54 53.000 54.000 1 15
55 54.000 55.000 1 15
56 55.000 56.000 1 15
57 56.000 57.000 1 15
58 57.000 58.000 1 17
128
61 60.000 61.000 1 16.0
63 62.000 63.000 1 17
67 66.000 67.000 1 15
129
85 84.000 85.000 1 12.5
130
3. Carriageway
4. Major Bridges:
The Site includes the following ROB (road over railway line)/RUB (road
under railway line):
Sl No. Chainage Type of Structure length (m) Width (m) ROB/RUB
(km)
Foundation Super-
structure
1 6.900 RCC 60 11 ROB
131
7 Minor bridges:
132
17 69.140 RCC RCC To be retained
10 Culverts:
14 Major junctions:
133
9 92.580 √ - T-junction ODR I-Makluskinganj
10 106.060 √ - T-junction Y-Junction NH Ranchi-Daltonganj
(NH: National Highway, SH: State Highway, MDR: Major District Road)
15 Minor junction:
1 3.307 Left T
2 5.173 left T
3 11.210 Left T
4 12.510 Left T
5 12.610 Left T
6 21.120 Right T
7 23.860 Right T
8 25.630 Left T
9 27.186 Left T
10 27.985 Both T
11 28.764 Left T
12 30.742 Right T
13 33.510 Right T
14 35.430 Right T
15 35.980 Right T
16 38.227 Left T
17 41.704 Left T
18 42.228 Left T
19 43.000 Left T
20 58.347 Left T
21 58.811 Right T
22 63.355 Left T
23 67.040 Left T
24 69.060 Left T
25 70.555 Right T
26 72.860 Left T
27 72.960 Right T
134
28 76.130 Both T
29 78.410 Left T
30 79.050 Right T
31 81.245 Right T
32 82.495 Right T
33 82.670 Left T
34 87.310 Left T
35 87.890 Left T
36 90.294 Right T
37 95.810 Right T
38 101.400 Right T
39 102.000 Left T
40 103.080 Both T
135
Annex - II
(Schedule-A)
The dates on which the Authority shall provide Right of Way to the Contractor on different
stretches of the Site are stated below:
* The Right of way will be provided within 15 days of sighing agreement as per detail given in
schedule-A, Annex.1, Sl.no.2 under the heading Land.
136
:
Annex - III
(Schedule-A)
Alignment Plan
137
Annex - IV
(Schedule-A)
Environment Clearance
138