1 PURPOSE
1.1 This procedure defines the process of tool repairs and/or maintenance performed to ensure tooling and product
quality is maintained.
2 SCOPE
2.1 This procedure applies to all maintenance and repairs for customer tooling used to manufacture the product.
2.2 This procedure applies to the stamping department where customer tools are used to manufacturer the product..
3 RESPONSIBILITY
3.1 Engineering is responsible for the effectiveness and maintenance of this procedure.
3.2 Production Scheduling is responsible for checking tool repair status when planning production orders.
3.3 Tooling Manager is responsible for scheduling repairs and/or maintenance in timely manner.
3.4 Tooling, Production Setup and Quality personnel are responsible for reviewing tool condition generally at time
of last-off in order to request for actions needed for repair and/or maintenance.
3.5 Quality personnel are responsible for checking last-off samples when tool repair requests are issued that may
require additional action to be included on repair tickets.
3.6 Tooling personnel are responsible for performing and documenting actions taken and labor hours on repair
tickets.
3.7 Tooling, Production and Quality personnel are responsible for verifying actions taken on tool repairs to ensure
product quality is maintained.
Document Name: Tool Repairs and Maintenance Process Printed copies of this document are not controlled Date: 01/24/2020
File ID: LAR-P-019 REV E Page: 1 of 5
Tool Repair & Tool Maintenance Process
6 PROCEDURE
6.1 Management of production tooling and manufacturing, test, inspection tooling, and equipment
Larsen provides resources for tool and gauge design, fabrication, verification activities for production and
service materials and for bulk materials, as applicable.
Larsen establishes and implements a system for production tooling management, whether owned by Larsen’s
customer, including:
Larsen verifies that customer-owned tools, manufacturing equipment, and test/inspection equipment are
permanently marked in a visible location so that the ownership and application of each item can be determined.
Larsen has a system implemented to monitor these activities if any work is outsourced.
Document Name: Tool Repairs and Maintenance Process Printed copies of this document are not controlled Date: 01/24/2020
File ID: LAR-P-019 REV E Page: 2 of 5
Tool Repair & Tool Maintenance Process
6.2 The following diagram describes this process for tool repairs and/or maintenance required.
Tool is setup in press, setup person Actions taken are updated in tool repair database.
submits sample to QC along with Enter Actions Person entering ticket in system, makes check mark
ticket for setup inspection. in section 2 and initials on ticket form. Ticket is
Taken
placed in part folder for verification at next setup.
Document Name: Tool Repairs and Maintenance Process Printed copies of this document are not controlled Date: 01/24/2020
File ID: LAR-P-019 REV E Page: 3 of 5
Tool Repair & Tool Maintenance Process
NOTE: ELP Stamping
Two weeks in advance the tooling department is notified about the production planning and/or tooling needs. Production
works together with planning and program management to perform the necessary actions and complete the tool repair tickets
(including regular or last off tickets) for the upcoming tooling demand. As part of the semi-weekly tool planning, the
notification about tooling needs is made by program management and distributed to all involved teams via email.
7 RECORDS
7.1 The following table list the records maintenance established by this procedure.
Access
How Minimum Disposal
Record Dept Location Restriction
Organized Retention Authority
(if any)
Repair Tickets Front File Cabinet Date Closed None 2 Months Plant Manager
El Paso Office
Repair Tickets Production Desk Date Closed None 3 Months Production
Mundelein Office Control
Repair Database N/A Tool Repair Ticket None Active Life Engineering
Database Number of Tool plus Admin
one year or
as specified
by customer
of regulatory
agency
.
8 REVISION
8.1 The following table list the changes made to this document.
Document Name: Tool Repairs and Maintenance Process Printed copies of this document are not controlled Date: 01/24/2020
File ID: LAR-P-019 REV E Page: 4 of 5
Appendix A – Tool Repair Ticket Form
BS
Repair Ticket Field Descriptions 1
T-INDEX: ____ JOB #____ Press # ___
1. Ticket Index number, Job# and Press# WHEN WAS THIS REQUESTED?
when entered in repair database. Person
2 (Check one box only)
entering data makes check mark in
request section and initials below. SETUP IN PROCESS LAST OFF OTHER BS