To: GBM GENERAL CONSTRUCTION □ Fax □ E-mail

Brgy. Lower Quirino, Baguio City Offer No. :


21-0847
Date: 25 February 2021
Attention: MR. GILVEN BEAMOND MEDINA (74) 246-8602
Project: PROPOSED SMART HUB - BAGUIO CITY 0926-0623592
Location: Brgy. Harrison Caranto, Baguio City ken/beverly

gbm_generalconstruction@yahoo.com

I. SUPPLY OF

UL FIRE RATED STEEL DOOR -3 hour fire rating


- 45mm thick door, GALV panel with honeycomb insulation on GALV single rabbet jamb (100/50.8)
- In accordance & conforming to:
- UL 10C: Positive Pressure Fire Test for Steel Door
- NAAMM/HMMA 861-06
- ANSI/NFPA 80-1999

1 set/s (0.626mW x 2.04mH), 1 panel @ 10,520.00 = 10,520.00

1 set/s (0.726mW x 2.04mH), 1 panel @ 11,080.00 = 11,080.00

1 set/s (0.926mW x 2.04mH), 1 panel @ 13,155.00 = 13,155.00


34,755.00
II. SUPPLY OF HARDWARE:

9 pc/s " TOYO/LEC" Butt hinge 4.5" x 4" x 3.4mm @ 180.00 = 1,620.00
with 2 Ball Bearing (2BB ) Painted
3 set/s "THASE " #5510 F-36-ND-689 Fire Exit Device @ 5,200.00 = 15,600.00
Horizontal Rim Without Cylinder Key, UL Listed Aluminum Color Finish
3 set/s "TOYO/POSSE" A073 Door Closer Surface Mounted @ 2,200.00 = 6,600.00
UL Listed Silver Color 23,820.00

III. DELIVERY CHARGE: Baguio City = 17,000.00

IV. GENERAL REQUIREMENTS = 6,000.00

************ = 81,575.00
*Additional preliminaries or requirements under the "New Normal" plus 12% VAT….. 9,789.00
Safety Protocol are NOT INCLUDED IN THIS OFFER. TOTAL…………..P 91,364.00
*Should this be required ( Rapid Test, SwabTest/RT-PCR vvvvvvvvvvvvvv
full health certificate,and all other medical certificates, quarantine)
a separate cost shall be charged accordingly.

NOTES:

- Supply only.
- Above price subject to change anytime without prior notice.
- All steel parts are epoxy prime painted. Paint finish by others.
- All hardware samples and door accessories samples and all required hinges for the steel doors shall be issued
by the client/buyer prior to door fabrication.
- Unloading of items shall be on street level only; vertical haulage shall be for the account of the client/buyer.
- PLEASE REFER TO OTHER TERMS WRITTEN AND CONTAINED AT THE REVERSE SIDE OF THIS PAGE.

Terms of Payment
- Door/s : 50% upon signing of this contract, 50% before delivery.
- Hardware : 50% upon signing of this contract, Full payment before delivery.
Place of Delivery : Jobsite.
Date of Delivery : To be confirmed.

LEC STEEL MANUFACTURING CORP.


Conformed and Accepted by:

Name:_____________________ By:_________________
Designation:________________ Ms. Jully Lim .
Date:______________________ Page 1/1 President .