4.JOB SAFETY ANALYSIS Lifting Project Title Installation of Wet Sprinkler System at Main Warehouse

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 8

MA’ADEN PHOSPHATE COMPANY

JOB SAFETY ANALYSIS


Location Main Warehouse JSA# 01 Page of 1-9
Department (Prepared by) PIU
JSA Title or Job All Kind of Lifting Activity (Crane, Chain Block)
Description

Personal Protective Equipment Required Full body harness, Hard hat, Safety Goggles, Hand Gloves, Safety boot, dust mask, Ear
muffs
Project Title : Installation of Wet Sprinkler System at Main Warehouse
Revised JSA Review
Check One New JSA
Revision# Date

BASIC JOB STEPS POTENTIAL HAZARDS RECOMMENDATIONS


 Area should be clear from any debris
 Material must be segregate
 Good housekeeping
 Adequate access
 Ensure area is properly prepared for job
 Area must be leveled properly
 Provide proper barricades
 Improper access
 Provide Signage
 Material scattered
Work area preparation  All Heavy Equipment must be inspected by
 Bad housekeeping MPC
 Uneven ground  Plant Equipment and Hand Tools must be
 Oil spillage inspected prior to start the work
 Damaged & Defective Equipment's  Follow the color coding system
and Tool  Safety induction should be done for new
person and specific training (fire watcher,
permit receiver)
 Approved control measure and prevention
measures and JSA are discussed with all
persons involved of the work
 Injury/ damage as a result of incorrect  Obtain Hot Work Permit
PTW Obtain Valid Work Permit information  All personals must be inducted by MPC
 Unauthorized personal  Gas test must be done if it is required/ for
 Miscommunication work permit instruction
 Permit Must Be Obtain from MPC Permit
Issuer and received by Subcontractor's MPC
approved permit receivers.
 Permit must be closed at the end of the shift
 Personal injury  Pre-inspection of equipment prior to start
Material preparation  Sharp edges the job
 Hit by/hit by objects  Follow safe operating procedures
 Rolling over  Proper supervision from immediate
 Slip, trip hazard supervisor
 Collision, crushing between load and  Provide proper barricade and signage
stationary objects  Mandatory PPE (Safety shoe, Safety
 Improper stacking of material Helmet, Safety glass, Reflective vest &
 Property damage Gloves) should be strictly followed.
 Ensure that overhead object has properly
place
 Material should be properly stacked
 Ensure fire extinguisher is present in the
area

 Incompetent Worker/Operator  Pre-inspection of equipment’s prior to start


Shifting of scaffolding materials at required  Struck by reversing truck the job
location by fork lift  Falling of materials  PPE must be provided to all workers (Safety
 Person could be struck during Loading Helmet, Safety Glass, Safety Shoe,
and Unloading of materials Reflective Vest)
 Roll over of stacked materials  All Heavy Equipment Operator must have
 Property damage valid SAG license and 3rd party certificates
 Traffic inconvenience and obtain the monthly sticker from MPC
 Tip over  Trained & MPC approved flag man with
flag and reflective vest.
 Flagman must be provided at all times
especially while the truck/forklift is
reversing.
 Reverse alarm must be function properly
 Vision must be clear
 Keep the forks as low as possible
 Materials to be secured by truck latching
belt during transportation.
 Transportation of materials for long
distance and long materials are not allowed
with forklift.
 Only authorized personnel are allowed to
this activity.
 Never sit, stand and work under lifted or
suspended loads.
 Wedge block must be provided
 Follow SWL (safe working load)
 Maximum speed limit for forklift 10kph
 Operator need to wear seat belt always
 Signage must be provided near the area
 Provide revolving danger light in all
 transporting vehicle

 Irregular inspection on all lifting  Wire rope shall be provided properly


 tackles identified for SWL and manufacturer.
Piping Erection and Installation using  Shackle improperly maintained and  Inspections shall be done by authorized
crane, chain block and other lifting inspected  personnel and by the safety dep't. Shall keep
equipment’s  Wear and tear of wire ropes the records.
 Mechanical failure  Safe working load stamp shall provide by
 Chain block failure the manufacturer
 Over loading of chain block  Defective tools or equipment shall not have
 Improper coordination allowed to use
 Falling of lifted materials  Ensure proper rigid mounting
 Collapse of loads  Ensure to use PPE (Safety shoe, Safety
 Collapse of rigid mounting Helmet, Safety glass, Reflective vest &
 Personal injury  Gloves)
 Stay away from lifted loads
 Inadequate access  Lift the material slowly
 Property damages  Provide sufficient access as possible
 Fall from height  Be sure not to over load the capacity of
chain block
 Be sure not to over load the maximum
 strength of wire ropes
 Wire rope clips position must be as per the
standard
 Inspect chain blocks before use
 Third party inspection certificate required
for chain block, lifting tools and
equipment's.
 Use Chain block as per manufacture
recommendations only
 Use two tag lines to control load
movements
 Use fall protection if working at height,
 Ensure proper access, working platform and
work at height training
 Only qualified & authorized personnel
allowed to do the job
 Barricade the area
 Provide proper signage
 all lifting tackles must be 3rd party certified
 No scaffolding frame used for any kind of
lifting
 Softener should use to protect the lifting
belt from sharp edges while lifting
 Lifting activities should be done by certified
rigger
 Slip trip and falling hazard,  Follow MPC monthly inspection sticker
Lifting by means of crane  Falling of suspended load, with valid color code
 Falling person and materials from  Inspection of all lifting materials like sling
height. and shackle,
 Lifting operations, crane overturning.  Toolbox talk to be conducted prior to start
 Falling of suspended load due to the lifting job
 damage of lifting gears  Lifting operations to be planned,
 Struck by, hit by  The crane should be certified by authorized
 Equipment struck by vehicle. 3rd party inspection company
 Electrocution  Load chart must be providing in the
 Mechanical failure operator cabin
 Uneven ground surface  Load chart must attach with work permit
 Damaged out rigger pad  Load moving indicator should work
 Back pain, body injury properly
 Bad weather condition  Ensure anti two block device is working
 Ergonomic hazards  The out rigger must fully have extended and
 Personal injury away from excavation at least 2 meters
 Third party certified operator and rigger
 Proper eye contact with the operator and
rigger always
 Inspections of lifting equipment prior to
start the lift.
 Provide slings softener to protect from sharp
edges.
 Inspection of man lift before use,
 Moving equipment on site must have a
signal man or flag man,
 Ground surface must be leveled
 compacted
 Only competent person performs the job
 All person work at elevated work area must
have full body harness and100% tie off

 Working area must barricaded and free from


any obstruction.
 Fulltime supervision of supervisor and
 safety personnel
 Provide two tag line for controlling the
 load
 Monitor the weather condition. Do not
 allow any lifting activity the wind speed is
more than 32 km/hour
 Nobody allows to work, walk, sit, stand
under the suspended load
 Provide proper signage
 Ensure the crane swing area don't have any
overhead electrical power line
 Check the out-rigger pad regular base
 For heavy lifting make lifting plan,
 Follow MPC lifting procedures

 Falling hazards, Personnel Injuries,  All platforms shall have complete guardrails
Working at height  fatality system and toe boards.
 Scaffolding collapse  Wear full body harness and secure at 100
 Un authorized entry %tie off at all times.
 Damaged scaffolding planks  Do not allow to keep any loose material and
 Over load tools
 Slipping, tripping  Tools must be tie off
 Check the scaffolding tag before using the
scaffolding
 Ensure that the person who performing the
job attend working at height training
 Follow the scaffolding tags system
 Inspect the permanent platform
 Make sure the guard rail and maid rail,
 gratings in place on permanent platform
 Hard Hat must be secured by Chin Strap
 Open Holes/Gap must be hard barricaded
with warning signage and to be inspected by
authorized and competent person.
 Electrocution  Do not enter in the operation area, without
Working in Energized Area  Hit by/struck by the permission from the MADDEN
 Crushing by the live machine authorized person
 Burning from hot surface  Do not wear loose cloth while working near
 Falling from height the rotating equipment/parts.
 Un authorized entry  Follow MPC LOTO procedure as required.
 Live bus bar  Secure proper access
 Live electrical cable  Use proper PPE's (Safety helmet, safety
glass, safety shoe reflective vest, electrical
rated PPE)
 Use fall protection if working at heights
 Only qualified personnel may perform the
job
 Respect the barricading
 Do not operate any electrical panel board
without permission from MPC authorized
department
 Post multi language signage

House Keeping  Tripping Hazards  Arrange/ stage all the material in neat
 Fire orderly manner.
 Slip, Trip, Injury  Remove damage, banding, crate material,
 Environmental impacts nails etc. and dispose of properly Provide
trash receptacles for work areas means for
maintaining.
 Keep the working area always clean
 Maintain regular housekeeping throughout
the job
 Waste must be disposed.

Prepared By:- Date: Jaseem Shadab Alam


Employees
Mohammed Younes.
Participating in
Approved By:- Date:
the
Development
Reviewed By:- Date: Of JSA
HSE Department
SHEM-P-08.10.09-A