4.JOB SAFETY ANALYSIS Lifting Project Title Installation of Wet Sprinkler System at Main Warehouse
4.JOB SAFETY ANALYSIS Lifting Project Title Installation of Wet Sprinkler System at Main Warehouse
4.JOB SAFETY ANALYSIS Lifting Project Title Installation of Wet Sprinkler System at Main Warehouse
Personal Protective Equipment Required Full body harness, Hard hat, Safety Goggles, Hand Gloves, Safety boot, dust mask, Ear
muffs
Project Title : Installation of Wet Sprinkler System at Main Warehouse
Revised JSA Review
Check One New JSA
Revision# Date
Falling hazards, Personnel Injuries, All platforms shall have complete guardrails
Working at height fatality system and toe boards.
Scaffolding collapse Wear full body harness and secure at 100
Un authorized entry %tie off at all times.
Damaged scaffolding planks Do not allow to keep any loose material and
Over load tools
Slipping, tripping Tools must be tie off
Check the scaffolding tag before using the
scaffolding
Ensure that the person who performing the
job attend working at height training
Follow the scaffolding tags system
Inspect the permanent platform
Make sure the guard rail and maid rail,
gratings in place on permanent platform
Hard Hat must be secured by Chin Strap
Open Holes/Gap must be hard barricaded
with warning signage and to be inspected by
authorized and competent person.
Electrocution Do not enter in the operation area, without
Working in Energized Area Hit by/struck by the permission from the MADDEN
Crushing by the live machine authorized person
Burning from hot surface Do not wear loose cloth while working near
Falling from height the rotating equipment/parts.
Un authorized entry Follow MPC LOTO procedure as required.
Live bus bar Secure proper access
Live electrical cable Use proper PPE's (Safety helmet, safety
glass, safety shoe reflective vest, electrical
rated PPE)
Use fall protection if working at heights
Only qualified personnel may perform the
job
Respect the barricading
Do not operate any electrical panel board
without permission from MPC authorized
department
Post multi language signage
House Keeping Tripping Hazards Arrange/ stage all the material in neat
Fire orderly manner.
Slip, Trip, Injury Remove damage, banding, crate material,
Environmental impacts nails etc. and dispose of properly Provide
trash receptacles for work areas means for
maintaining.
Keep the working area always clean
Maintain regular housekeeping throughout
the job
Waste must be disposed.