PPIC

Marketing
Monthly
SUPPLIER Order
Monthly CUSTOMER
Order
Daily Production Schedule

Daily
Daily

Pre Assy 1 Pre Assy 2 Main Assy Front Main Assy Rear Final Assy Front Final Assy Rear Final Check

Gudang Gudang
Bahan Baku Barang Jadi
79 C/T = 314,48 s C/T = 312,27 s C/T = 311,52 s C/T = 307,72 s C/T = 299,73 s C/T = 161,25 s C/T = 347,26 s

C/O = 0 s C/O = 0 s C/O = 0 s C/O = 0 s C/O = 150 s C/O = 0 s C/O = 0 s

Line Available = 27.600 s Available = 27.600 s Available = 27.600 s Available = 27.600 s Available = 27.600 s Available = 27.600 s Available = 27.600 s Line
Stamping Painting
Uptime= 100% Uptime= 100% Uptime= 100% Uptime= 100% Uptime= 99% Uptime= 100% Uptime= 100%

Operator= 1 Operator= 2 Operator= 2 Operator= 2 Operator= 2 Operator= 2 3 unit Operator= 1

250,00 1041,79
314,48 312,27 311,52 307,72 299,73 161,25 347,26

8 4,5

Cycle Time =2054,23 second


Keterangan Garis:
Aliran Work In Timeline Total Lead Time Perakitan = 3346,02 second
Keterangan: Electronic
Pengangkutan Process
C/T = Cycle Time Information
Total Jarak = 59,50 meter
C/O = Change Over Time Manual Aliran Jarak Antar
LT = Lead Time Information Material Stasiun Kerja Total Operator= 12 orang

Gambar 4.6 Current State Mapping Lini Perakitan Frame Chassis Tipe FE-TZ Short
(Sumber: Pengolahan Data)
PPIC

Marketing
Monthly
SUPPLIER Order
Monthly CUSTOMER
Order
Daily Production Schedule

Daily
Daily

Pre Assy 1 Pre Assy 2 Main Assy Front Main Assy Rear Final Assy Front Final Assy Rear Final Check

Gudang Gudang
Bahan Baku Barang Jadi
C/T = 314,48 s C/T = 314,27 s C/T = 311,52 s C/T = 307,72 s C/T = 299,73 s C/T = 302,04 s C/T = 314,78 s

98 C/O = 0 s C/O = 0 s C/O = 0 s C/O = 0 s C/O = 0 s C/O = 0 s C/O = 0 s

Line Available = 27.600 s Available = 27.600 s Available = 27.600 s Available = 27.600 s Available = 27.600 s Available = 27.600 s Available = 27.600 s Line
Stamping Painting
Uptime= 100% Uptime= 100% Uptime= 100% Uptime= 100% Uptime= 99% Uptime= 100% Uptime= 100%

Operator= 1 Operator= 2 Operator= 2 Operator= 2 Operator= 2 Operator= 1 1 unit Operator= 1

250,00 314,78
314,48 314,27 311,52 307,72 2299,73 302,04 314,78

8 4,5

Cycle Time =2162,54 second


Keterangan Garis:
Aliran Work In Timeline Total Lead Time Perakitan = 2727,32 second
Keterangan: Electronic
Pengangkutan Process
C/T = Cycle Time Information
Total Jarak = 59,50 meter
C/O = Change Over Time Manual Aliran Jarak Antar
LT = Lead Time Information Material Stasiun Kerja Total Operator= 11 orang

Gambar 5.6 Future State Value Stream Mapping Lini Perakitan Frame Chassis Tipe FE-TZ Short
(Sumber: Pengolahan Data)