3E: TEAM COMPOSITION AND TASK ASSIGNMENTS

Team Organization
The Project Team has been formed and organized in such a way as to enable the Consultant to provide the
optimum combination of resources and experience to assure the successful completion of the Project. The main
responsibility of the, Consultancy Services to be provided will lie with the Team Leader of the project. He will
be mobilizing all the resources available with the Firm so that the project works are carried out smoothly. He will
also identify, based upon the reports and feedback they will receive from the Project Team Members, and decide
about the type of backstopping support required at any time, and will mobilize the same. He will develop
appropriate linkage with the Client, Head Office and Consultant's Project Personnel and brief them regularly as
per the established lines of communication.
Back-up support from the Head Office will be made to the Consultant's Project Teams during the whole period
of services for carrying out their duties to a successful completion of the Project in consummate workman-like
manner. The Team Leader relevant advisors and support staffs will always be alert to the needs of Project Teams
and will promptly respond with required information, supplies and other resources.
Staffing Schedule
The Consultant has put a lot of efforts in understanding the nature, size, scope and the importance of the
proposed services, which have been reflected in above section of this Proposal. Similarly, a careful
consideration has also been made while selecting the proposed team members for the Project. The Consultant
fully understands that despite the experience and a sound establishment of the firms, the success of the Project
will depend in large measure on the composition of the Project Team. The team must represent a combination of
inter-disciplinary skills, including a high degree of technical expertise in a number of disciplines, and successful
professional experience in similar type of projects, with cross-cultural skills enabling them to work
collaboratively and aptly with Client's officials, other agencies and personnel related to the proposed Project.
Manning (Staffing) Schedule is presented and Task assignment of expert is presented in table below.
Table: 5.1- Team Composition and Task Assignments [Experts]

Name Proposed Position Task / Responsibilities

Mr. Dwarika Senior Sanitary Carry out all required activities as described in and/or that
Phuyal Engineer/Team follows from the activities described in the scope of the
Leader study.
Supervise and ensure the overall management of the team
for successful execution of this assignment.
Proactively plan and lead to achieve the objectives which
may entail carrying out additional tasks/activities not
mentioned in the scope of the study.
Co-ordinate with SDMS, WSSDO, WUA, public
representatives, and other important stakeholders for
effectively carrying out the required activities.
Deploy, in a timely manner, adequate number of survey and
design personnel as per the agreed terms.

Page 1 of 5
Name Proposed Position Task / Responsibilities

Ensure achievement of agreed periodic targets of physical


progress by preparing detailed work schedule and
monitoring of compliance with schedule.
Review the available data, reports and identify need and then
plan and execute all necessary surveys, studies and
investigations to prepare feasibility report.
Perform all the duties render in proposal and ToR

Mr Kalidas Sewerage Network Carry out activities described in and/or that follows from the
Neupane and Treatment activities described in the scope of the study related to
Design Specialist sewerage those assigned by Team Leader.
Carry out all necessary surveys, studies, and investigations
as detailed out in the scope of the study.
Review available data/reports and also that obtained from
surveys, studies, and investigations related with sewerage.
Carry out all activities as detailed out in the scope of the
study, approach and procedures etc.
Prepare Preliminary design, socio-economic report, Cost
estimates etc. for Sewerage network and treatment as
detailed out in scope of the study.
Anticipate the likely environmental impact of carrying out
various subprojects and proactively plan to take necessary
action so that implementation is not delayed.
Proactively anticipate and carry out any other activity as per
the scope of the study.
Perform all the duties render in proposal and ToR

Savitiri Devi Sociologist/GESI Carry out activities described in and/or that follows from the
Shrestha Specialist activities described in the scope of the study/Approach and
procedures as far as relevant to social study and those
assigned by Team Leader.
Prepare socio-economic profile of the project including
social maps using appropriate techniques and give results
regarding social, economic, health and sanitation status of
the community, especially focusing on the likely
improvement in health status of the citizens; likely impact of
health and hygiene education program to be implemented
during the project; willingness to pay for sewerage service;
ability to pay for sewerage service;
Based on the different socio-economic strata, prepare, for
the project, possible structures for differential contribution in

Page 2 of 5
Name Proposed Position Task / Responsibilities

capital investment, O&M and tariff etc for consideration of


project authorities
Develop social inclusion program for specially benefiting
the poor and weaker sections of the project on priority and
with additional assistance, support and efforts.
Proactively make a effective program with WUA and
implement for the purpose of substantially increase the
households' tap connection including socially and
economically backward groups.
Proactively anticipate and carry out any other activity as per
the scope of the study.
Perform all the duties render in proposal and ToR

Surendra Maharjan Surveyor Carry out activities described in and/or that follows from the
activities described in the scope of work related to the field
of consultant and those assigned by Team Leader.
Collect and review all available surveys and investigations.
Responsible for assessing the need for survey and
investigation and shall plan the survey in such a manner that
all necessary survey data are available to key experts for
designing.
Responsible for supervising, monitoring and quality of the
survey work.
Assist in finalizing the mobilization schedule of key experts
according to the survey need and expected completion time
of surveys.
Proactively anticipate and carry out any other activity as per
the scope of work.
Perform all the duties render in proposal and ToR

The Study team composed of Expert with Field Team and support staffs CV of experts are produced in FORM
TECH-3F

Table: Team Composition and Task Assignments [Support Staff]

Proposed Position Task / Responsibilities

TBN Sub Engineer / Responsible for Topographic Survey


Quantity Surveyor /
Assist the Project Team
Surveyor

Page 3 of 5
Proposed Position Task / Responsibilities

Do all the job assigned by the team leader


Perform all the duties render in proposal and ToR

TBN Auto Responsible for Preparation of CAD Drawings


Cad/Computer
Assist the Expert
operator

TBN Social Mobilizer Responsible for Data Collection Work


Assist the Expert Team

TBN Support staff Assist the Expert Team

Page 4 of 5
Fig.: Organization Structure of Consulting Team for Proposed Assignment

Environ- Tech Consultant (P) Ltd.


PROJECT LIAISON OFFICE Stakeholders
Client

PROJECT COORDINATOR TEAM LEADER

PROPOSED EXPERT ADDITIONAL EXPERT

Support Staff at Support Staff at ENVIRONMENTALI


Project Office Head office
ST