Daqing Petroleum Iraq Branch HSE-MS record No.

22

JOB SAFETY ANALYSIS 工作安全分析

Rig: Well: Date:


Associated Permit No.:
工作许可号
Loacation/Area: Date Of Elaboration:
位置/区域

Work/Job/Project (Contract No. ) Crew:


合同号:
Brief Descriptión (Work/Operation): GyroData operation. Estimated Time Hours
工作描述: 预计时间: 小时

N0. Activities Risk * Reason Of The Risk Prevention And Control Actions
序号 活动 风险 风险产生原因 预防和控制措施
Handling tolos during rig up the gyro Pinch point Damage to personal during rig up Keep area clear, Clear unnecessary
1 tolos. gyro tools due to improper personal from the rig floor, only the
handling or miscommunication gyro crew can handel their tolos.
Rig up upper sheave well Droping Drop sheave Wheel during rigging Clear rig floor while lifting.
up The upper sheave need to hang to the
2 Fishing sling cut due to hanging to highest rig fram which on the same sid
the wrong place. of lower sheave Wheel.
All personal with full PPE.
Remove T-bar Pinch point Personal harmed by spinning bar Do not take tensión in line until
Line of fire Cable slipping back down hole personnel is down from man riding and
3 completely clear of action.
Clear floor for inetial tention.
Lifting operation Confeusion If there is more than one given the The lifting operation should be
signal for the crane driver, sling is cordinate by Gyro date crew.
4 not adequate.
falling
Daqing Petroleum Iraq Branch HSE-MS record No. 22

Executor Personnel 执行人员


Name I.D. N0. Signature Client Contr. Name I.D. N0. Signature Client Contr.
姓名 卡号 签字 甲方 乙方 姓名 卡号 签字 甲方 乙方

Elaborated By: Drilling Supervisor. Rig Manager: