E&C Division: Introduction To COP Project
E&C Division: Introduction To COP Project
5
History of ACG
September
1994
November
1997
History of ACG
August 2001
February
2002
August 2002
March 2004
February
2005
April 2006
April 2008
11
COP Concept
28
16 in
in ch
ch
to
to
Sa
• Gas export from WC-PDQ
O ng
ily
Ro
ac
ha
via DWG-PCWU topsides
ck l
s
• Produced water exported
DWG from WC-PDQ to DWG-
24
in
PCWU
ch
to
Sa
ng
WC-PDQ
• Injection water imported
2 ac
x
30
ha
l to WC-PDQ from DWG-
in
ch
to PCWU
Sa
n ga
c ha • Oil exported via Phase 2
l
Chirag 18 Marine Oil Export Pipeline
in
ch
WA
CA
CWP EA
Water Lines
Oil Lines
Gas Lines PS
AB
0 5km
oun
dar
y
12
COP Concept – Facilities Design
• Design Rates: WC -
–Oil: 183 MBOPD
–Gas Export: 229 MMscfd
–Gas Lift: 80 MMscfd
–Prod Water: 120 MBWPD to SSWI (future)
DWG Oil to
Sangacha
–Injection Water: 189 MBWPD Produce Injection water
from DWG Water
Gas export
DWG
13
COP Cumulative Production
1200
1000
360mmbbls
incremental
800
production
Mbd
600
400
200
0
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
14
WC-PDQ Process Flowscheme
Test Manifold
Gas Dehydration
(1 Train)
Lean
Test TEG
Separato Fuel Lift
(1 train) Gas Gas
HP Manifold
Rich
38
HP TEG
(2 trains) Export Gas
Compression
(2 x 50%) 110 barg 14”
Gas to
LP Manifold
Hydrocyclones 134
30”
LEGEND
Sand Oil to Sangachal
Reservoir
Oil Cyclones Flash Duplex
Gas Drum Filters 34 barg 16”
1
Produced
Produced Water
TEG Transfer Pumps To DWG
(2 x 100%)
15
What are the Challenges
Inlet
Oil
Water
Jetting Water In Sand Slurry Out
Area of influence
• Interlock system
Reliance on Operating procedures
• Easier to operate
Thank you!