RAB PEKERJAAN PARKIR DAN POS JAGA

NO ITEM PEKERJAAN SAT

1 Pek. Galian Tanah T= 400 mm area parkir m3


2 Subgrade incld peralatan dan pemadatan
Area Asphalt m2
Area Paving Block m2
3 Sub Base tebal 300 mm incld peralatan dan pemadatan
Area asphalt & paving Block m2
4 Base Course tebal 100 mm incld peralatan & pemadatan
Area asphalt & paving block m2
5 Sand Bending tebal 20 mm incld peralatan & pemadatan
Area Asphalt m2
6 Asphalt Hotmix pavement t = 30 mm + lap. Prime coat + pemadatan
Sirkulasi m2
7 Kansteen beton uk. 150x200 mm + angkur,groutingh,material baru ml
8 Paving block uk. 100x200 mm tebal 80 mm + pasir
Area Parkir m2
9 Gutter air hujan 40 x 50 cm AS 10/A-H' + 10-21/H' ml
10 Dinding penahan tanah tanab depan tower B AS 1'/J-O
Galian Pondasi batu kali 50/40 cm m3
Pasangan Pondasi batu kali m3
Pasangan dinding bata tebal 1 batu m2
Plesteran drymix tebal 12.5 mm + acian (spray) + perapihan m2
HARGA
VOLUME BOBOT
SATUAN TOTAL
2,882.40 33,450.00 96,416,280.00 5.35%
-
3,856.68 31,500.00 121,485,420.00 6.74%
2,489.67 31,500.00 78,424,605.00 4.35%
-
6,346.35 33,000.00 209,429,550.00 11.63%
-
6,346.35 35,700.00 226,564,695.00 12.58%
-
3,856.68 41,000.00 158,123,880.00 8.78%
-
3,856.68 44,000.00 169,693,920.00 9.42%
990.86 167,000.00 165,473,620.00 9.19%
-
1,930.70 221,000.00 426,684,700.00 23.69%
164.54 625,000.00 102,837,500.00 5.71%
-
15.45 54,500.00 842,025.00 0.05%
15.45 625,000.00 9,656,250.00 0.54%
154.50 134,500.00 20,780,250.00 1.15%
154.50 97,000.00 14,986,500.00 0.83%
-

1,801,399,195.00 100.00%