1. The document is a work breakdown structure for a parking area and guard post project listing 10 work items including earthworks, subgrade works, paving, asphalt works, curbstones, drainage, retaining walls and plastering.
2. It provides details of the scope of works, quantities, unit rates and total costs for each work item such as earthworks of 2,882.40m3 at Rp33,450 per m3 for a total cost of Rp96,416,280.
3. The total estimated cost for all 10 work items is Rp1,801,399,195.
1. The document is a work breakdown structure for a parking area and guard post project listing 10 work items including earthworks, subgrade works, paving, asphalt works, curbstones, drainage, retaining walls and plastering.
2. It provides details of the scope of works, quantities, unit rates and total costs for each work item such as earthworks of 2,882.40m3 at Rp33,450 per m3 for a total cost of Rp96,416,280.
3. The total estimated cost for all 10 work items is Rp1,801,399,195.
1. The document is a work breakdown structure for a parking area and guard post project listing 10 work items including earthworks, subgrade works, paving, asphalt works, curbstones, drainage, retaining walls and plastering.
2. It provides details of the scope of works, quantities, unit rates and total costs for each work item such as earthworks of 2,882.40m3 at Rp33,450 per m3 for a total cost of Rp96,416,280.
3. The total estimated cost for all 10 work items is Rp1,801,399,195.