Professional Documents
Culture Documents
Marine Gangway Lifting Plan For IFAT in KPME Jombang-13 Feb 21
Marine Gangway Lifting Plan For IFAT in KPME Jombang-13 Feb 21
Marine Gangway Lifting Plan For IFAT in KPME Jombang-13 Feb 21
3670
3560
4305 Center of gravity
Center of gravity ±27,5 Ton 9826
20450
COPYRIGHT OF BUITENDIJK TECHNIEK, WHOSE PROPERTY THIS DOCUMENT REMAINS. NO PART OF IT MAY BE DISCLOSED,
DUPLICATED OR IN ANY OTHER WAY MADE USE OF EXCEPT WITH THE WRITTEN APPROVAL OF BUITENDIJK TECHNIEK.
TITLE:
SPREADER
100
STEP 1 ADD 2x WOODEN BLOCKS 500 mm x 500 mm x 100 mm HIGH 67° 50°
UNDER LEGS TO ROTATE ON LET SLING TO TOP EARS HANG LOSE
(ALL SLINGS SAME LENGTH ±4 m)
E ( 1 : 50 ) ±3715
E
E
2418 1297 F 1297 2418
WOOD BLOCK WOOD BLOCK
H G
SLING TO BOTTOM EARS
CENTER OF GRAVITY; 29 Ton (ALL SLINGS SAME LENGTH ±4 m)
CENTER OF GRAVITY
10867 9696
27617
GENERAL NOTES
TOTAL WEIGHT; ±29002 Kg
(TOWER)
COPYRIGHT OF BUITENDIJK TECHNIEK, WHOSE PROPERTY THIS DOCUMENT REMAINS. NO PART OF IT MAY BE DISCLOSED,
DUPLICATED OR IN ANY OTHER WAY MADE USE OF EXCEPT WITH THE WRITTEN APPROVAL OF BUITENDIJK TECHNIEK.
TITLE:
DUPLEX HOOK
SWL 108T
WITH 5 OF SHEAVES
WIRE ROPE SOFT EYE SLING
Dia. 64mm x 3.897m Length
WIRE ROPE SOFT EYE SLING (SWL 50T)
Dia. 64mm x 3.319m Length SHACKLE 35t (2ea)
(SWL 50T)
CPY SPP
REV REV DATE DESCRIPTION DRAWN CHKD APPD
REVISIONS
C.O.G
REFERENCE
DRAWINGS
CREATIVE CONSTRUCTION ™
N.T.S
COMPANY DRAWING NO. X CORE SIZE REV.
- NON CORE A3 01
SUPLIER'S NUMBER CONTRACTOR'S NUMBER
- -
B
-
3729 1871
2418 1297
(A) C.O.G (B)
3715
(C) (D)
LOCATION PLAN
10864 9586 NOTE : GENERAL NOTES :
(A), (B), (C) AND (D) : WIRE ROPE SOFT EYE SLING
LENGTH WILL BE SHOWN AT VIEW A AND B
20450
A
-
PLAN VIEW
(C) WIRE ROPE SOFT EYE SLING (A) WIRE ROPE SOFT EYE SLING
Dia. 44mm x 5.436m Length Dia. 44mm x 4.375m Length
(SWL 25T) (SWL 25T)
(B) WIRE ROPE SOFT EYE SLING
(D) WIRE ROPE SOFT EYE SLING Dia. 44mm x 5.436m Length
Dia. 44mm x 4.375m Length (SWL 25T)
GREEN PIN SHACKLE (SWL 25T) GREEN PIN SHACKLE
25t (4ea) 25t (4ea) CPY SPP
REV REV DATE DESCRIPTION DRAWN CHKD APPD
REVISIONS
°
59
59
40°
40°
°
REFERENCE
DRAWINGS
3729 1871 1871 3729
DWG NO. TITLE
ALL RIGHT RESERVED
THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND PROPERTY BP BERAU LTD. AND COPYRIGHT THEREIN IS VESTED BP BERAU LTD. NO PART OF THIS
DOCUMENT, DATA, INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF BP
BERAU LTD.
- -
LIFTING GANGWAY TOWER
FOR TRANSPORT
CONTRACT NO. @BP p.l.c. SCALE
1155422 SECURITY CLASSIFICATION:
BP INTERNAL 1/200
COMPANY DRAWING NO. X CORE SIZE REV.
- NON CORE A3 01
SUPLIER'S NUMBER CONTRACTOR'S NUMBER
- -
1 2 3 4 5 6 7 8 9 10 11 12
50T WLL.
B B
A
-
TYP.
Ø 4
C TYP. C
10
10
D D
Ø
Ø
E E
Ø
2 QTY. REQ'D
Ø160
G G
12 QTY. REQ'D
1 QTY. REQ'D
1 2 3 4 5 6 7 8 9 10 11 12
Ground Bearing Pressure Calculation