Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

As Menara Intake As Saluran

D
Pipa D.2000

0,75
690.00
B C HOIST
HOIST

E F G H I
0
1.0
R=

2,00
680.00 A
.X.

. .
C
As Bendungan
.X. . EL.667.50 Timbunan Tubuh

.
670.00 B Bendungan
.X. Contr. Joint EL.663.00

0,75
. .
0
EL.665.50 1:2. EL.666.50 ( As Pipa )
Aliran

1:0.3
EL.667.00 EL.667.00

EL.661.50
660.00
B 95. Beton Bertulang K.225

EL.661.50
EL.662.00
70 Galian Bendungan Lantai akaerja t=10 cm
ELEVASI ( m )

As Saluran Pengelak
83. As Saluran Pengambilan
Beton Bertulang K.225 6.0 92
Lantai akaerja t=10 cm 0 0.30 0,75 2,00 0,75
650.00 6.0
0
6.0 3,72
B 1:2.
0
0
R
I = 26.00°
= 25.00
47.75 17.95 7.22 6.55 27.20
640.00 ( CL ) Pipa Pesat Contr. Joint CL
TL
= 11.55
= 5.88
POTONGAN B - B
D.2000 2.00 4.20 S,B
KETERANGAN: I = 27.00° ( Transisi )
EL.620.20
.X. A : Trashrack (3.00x3.25) Bentang Bersih R = 25.00 C D

. . . . . .
630.00 Beton Bertulang K.225 ( As Pipa )
CL = 11.59 Lantai akaerja t=10 cm Pipa Pesat Diletisi Steenlis Contr. Joint Pengelak Tunnel As Pipa Pesat D.1400
.X. B : Pintu Pengaman Pemeliharaan (2.00x2.00) Bentang Bersih
TL = 5.90 D.2000 Keliling Ø 4.20
.X. C : Pintu Pengaman Layan (2.00x2.00) Bentang Bersih As Pipa Pesat D.2000
620.00 i=0.0017 Aliran As Bangunan Pengelak

( Dasar Tunnel )
0,30 0,30

EL.618.40
Pengelak Tunnel Main Plugng Beton Bertulang K.225 Beton Tak Bertulang Pipa Pesat
Ø 4.20 0.50 0.50 D.1400 Pipa Pesat D.2000
Lantai akaerja t=10 cm Main Pluging
t =10 mm
85.60 C D

0,70
( Slop ) 15.95 50.00 Pipa Pesat D.1400
(Primary Pluging) (Main Pluging) t =10 mm

POTONGAN A - A 0
S,A 2.1 l )
R= unne
0,80 (T
0
0.7

4,20
0,30

5,90
R=
R
( Pip =1.00
aP
esa

1,00
t )
Y=9147750

655.0

Y=9147600

1,80
Y=9147650

Y=9147550
Y=9147700
0 Pipa Drainase Ø200

A
EL.633.00

0,80
EL.638.00

1,00

1,00
660.00 Sal. Irigasi Existing EL.643.00 Pipa Keluaran Ø400
X=508950
Contr. Joint
I = 28.00° Beton Bertulang K.225
R = 50.00 Lantai Kerja t =10 cm
CL = 24.23
665 TL = 12.36 0,70 4,20 0,70
.00 Ali
ran

1:3.2
EL
.66
5.5 Pengelak Tunnel 5,60
EL 0
Ditimbun Kembali
.66 Ø 4.20
1.5 X. .
Sampai EL.667.50
POTONGAN C - C
. .

0 EL.
662

EL
.00

I = 25.00°
0

Menara Intake

i=0.0017
.6
65.5

X=508900 65.5
0 R = 15.00
EL.6

EL.6
CL = 6.55
As Pipa Pesat
670.0
0
T Intake Pengambilan
65.5
0
1:2.0
EL.6
70.0
0
TL = 3.33
As Bangunan Pengelak

(Primary Pluging)
EL.662.00 EL.6
0,60

30.00
EL.663.00
( As Pipa )
65.0
EL.
690
.00
0
Pipa Pengambilan Contr. Joint
Gra
ting

D.2000

0,70
1:2.0 X=508900
U EL.6
70.0
0 EL.620.20 Pipa Pesat D.1400
S 675.00 EL.6 EL.6
( As Pipa ) t =10 mm
EL.665.00

75.0 61.2
0 5
EL.675.00
EL.670.00

EL.6
65.0
0
Contr. Joint
I = 85.00°
+680.00

23.26 0,30 0
R = 6.41 2.1
.00

30.44
EL.670.00
CL = 9.52 R=

33.44
0,80
663

36.43

(Main Pluging)
TL = 5.88
B Baut Angker D.19
39.42
49.04
EL.

100.00
42.41

680.00 0.7

4,20

5,60
R=

0,30
X=508850 17.9 BM.JT-2 2,00

24.00
0
1,41
CP-1 .690.00

1,23
B.17
6.55 NDUNG EL Grating 0,30
PUNCAK BE

1,80

0,53
B.18
685.00 ( CL ) 57.65 171.20 1% Pipa Drainase Ø200

B.19
( Slope )

0,57
B.20
EL

B.21

Drainase
.68

B.22

0,70
BM.JT-8
B.23
2

0,70
X=508850 (0.20x0.30)

( Transisi )
Pipa Keluaran Ø400
.00

4.00

12.40
B.24

EL. 690.00 Beton Tak Bertulang


1:2.4

CP- 6 Diletisi Steenlis Beton Bertulang K.225


1:1

00 Lantai Kerja t =10 cm


0. Keliling
. 68
.0

EL. 690.00 Drainase 0,70 4,20 0,70


EL
5,60

Y=9147550
Y=9147650
Y=9147700

Y=9147600
Y=9147800

.00
Y=9147750

80
POTONGAN D - D
E L. 6
A S,B

S,A KEMENTERIAN PEKERJAAN UMUMDAN PERUMAHAN RAKYAT Provinsi :


DIREKTORAT JENDERAL SUMBER DAYA AIR
JAWA TENGAH
DENAH SATKER BALAI BESAR WILAYAH SUNGAI BENGAWAN SOLO
PEJABAT PEMBUAT KOMITMEN PERENCANAAN DAN PROGRAM
Jl. Solo-Kartosuro Km. 7 PO Box 267, Pabelan, Kartasuro, Sukoharjo 57162, Telp./Fax. (0271) 716248 Kabupaten : KARANGANYAR
JUDUL GAMBAR : INTAKE PENGAMBILAN Pekerjaan :
STUDI INVESTIGASI TAMBAHAN
UNTUK DD BENDUNGAN JLANTAH

0 1 2 3 4 5m DENAH POT. MEMANJANG & MELINTANG No. Register :


S,B No. Lembar :
PT. engineering
BBWS BENGAWAN SOLO ADITYA consultant No. Kontrak :
Jalan Batu Permata No. 2A Margacinta Bandung 40287 Tanggal
0 10 20 30 40 50 m PPK PERENCANAAN DAN PROGRAM Telp: 62+22-7562994.fAXCIMILE:62+22-7562994

S,A
Email: aditya engineering consultant @ yahoo.com
31 HK0203-An.
Direksi Pekerjaan Disetujui Direncana Diperiksa
Januari 02/2017-05
Dr.Yunitta Chandra Sari, SE., ST., MT
2017
Ery Suryo Kusumo, S.Pd., MT. Ir. Suwahno Ir. Hadi Santoso, MT.

You might also like