Professional Documents
Culture Documents
NDC T 1,2 & 3 Internal Ins Pection Done
NDC T 1,2 & 3 Internal Ins Pection Done
TITLE :MOM of Daily Plant Review Meeting (DPRM) DOC. NO. : TSPL/SESI/TS/MTP/F01
Revision No : 01 Effective date : 05.05.2020
MEETING DATE : 27 Nov'20
Critical Points
Jo b
Defect/Discus
Sl. No. Area Point discussed Action Plan C riticality( Responsibility Target date Time(Hr)
sion date
w.r.t. HSE)
1 03.11..20 Unit#2&3 Under reserved shutdown As per PSPCL communication Concerned HOD's RSD RSD
2 26.11.20 Unit#3 Boiler lift not available Mr. N Yadav MTNA PR in progress -26.11.20
Schedule deferred due to Station R SD
After unit
3 27.11.20 CBM WDA/MCSA/Thermography scheduled in Oct'20 Schedule will be complied All After unit Mr. Rakesh Verma After unit restoration
restoration
restoration
Action need to explore with BT G Optn/WS Oprtn/
4 27.11.20 NDCT NDCT over flow issue Mr. L Mishra/ S Dwivedi/ SK Jha 28.11.20
C&I jointely
System Normalized/ C &I & AHP- oprtn need to
5 27.11.20 Unit#1 ESP C1 hopper high observed Mr. A Modi/ SK Jha 27.11.20
find out the reason
10 25.11.20 U#1 Main turbine shaft vibration 7Y-95 microns Under observation Mr. L Mishra/Mr. Pawan Under observation Under observation
11 20.11.20 HVAC HVAC Overhauling plan Plan prepared,under discussion Mr. Dev Prasad 27.11.20 Plan by 18:00 hrs
12 20.11.20 Buffer Tank Cable Trench Cleaning Cleaning - work in progress Mr. N Ydadav 30.11.20 18:00 hrs
13 19.11.20 Station Fish bone Diagram for major failures Diagram to be display at TSPL Conf. Hall Concerned HOD's 30.11.20 18:00 hrs
AO audit is scheduled in month of Dec'20,tentatively
14 17.11.20 Station For information & necessary action All HOD's Immediate
from 20th Dec'20
15 18.11.20 U#2 TG bearing #7 hydrogen leakage Under Discussion with TSPL Critical Mr. LK Mishra/Mr. P Devgan Under Observation
22 29.10.20 U#3 Boiler drain pump readiness jacket Cooling Line inspection planned today Mr. S Singh
Mill area all lights to be kept on 24x7 hrs (in
23 04.11.20 BTG Mill area low illumination observed Critical Mr. Lalan Mishra/ N Yadav Continuous Continuous
between Mill & SAF ).T imer setting to be chang ed
4 24.11.20 U#1 DPSH temp transmitter 61 hunting Work planned in long SD Mr. Neelesh Pathak SD
Mr. Sanjay Singh/Mr Neelesh
7 25.11.20 U#1 APH-B support bearing temperature showing bad scaffolding required-SD work SD work
Pathak
Spare / Expert Req./ Other issues
1 09.09.20 CHP SCR-1&2 Luffing cylinder bellow damage PR by 30th Sept'20 Mr. Pinaki Guha PR - 30th Sept'20
Phase2 LP Pump B-HIGH VIBR AT ION 5.4mm/sec at
2 24.08.20 AHP Under observation Mr. DK Adhikari under Observation
PDE H
Mill 1B high vibration (max vib 8.7mm/sec motor nde
3 20.08.20 Unit#1 Under observation Mr. Sanjay Singh Under Observation
A)
7 Nos. of coil rewindin g 5 coil received at SAD-D - done
4 28.07.20 CHP Side Arm Charger 3&4 brake not available Mr. N Yadav/ Pinaki Guha
3 nos. Break Shoe-PR done site SAD-B - planned
5 Nos. of coil rewindin g 5 coil received at SAD-D - done
5 28.07.20 CHP Stacker Reclaimer 1&2 brake not available Mr. N Yadav/ Pinaki Guha
8 nos. Break Shoe-PR done site SAD-B - planned
i. under observation
Mill 3E high vibration in load condition(13.5 mm/s ii. Old motor sent for refurbishment on 27th June ii-Sept'20-Old
6 13.07.20 U#3 Mr. Sanjay Singh/ N Yadav
MN DE A) 20 motor rectification
17 17.11.20 PH#1 DWB overflow line replacement work completed Critical Mr. Manoj Mishra Till Station SD
58 17.11.20 U#3 LP Sump make-up V\V replacement WIP Mr. Nishant chaturvedi 18.11.20
59 17.11.20 U#1 Dispenser header drain up mov feedback problem Scaffolding to be provided by BMD Mr. S Singh/Mr. Neelesh Pathak 18.11.20
60 16.11.20 U#2 C1 coal velocity leakage from sampling point Mech work in progress Critical Mr. S Singh 18.11.20
32 16.10.20 Station NDT of all Hooks for hoists/Crane/Hydra Finalisation of agency Mr. V K Shukla 23.10.2020,R1
15 01.09.20 AHP HCSD 2A belt conveyor readiness Rectification work in progress Critical Mr. DK Adhikari 30-10-20 R2
25 24.10.20 U#2 RH damper 1 reverse operation Trial planned Critical Mr. Lalan Mishra/Mr. S Jha After BMD Clrnc
15 10.11.20 Boilers Boiler preservation to be done Mr. LK Mishra/ S dwivedi 17.11.20 18:00 hrs
9 10.11.20 BOP Service Water Shutdown planned on 17.11.20 RK Gautam 14:00 hrs
7 20.10.20 U#2 H2 cooler-C & D OCCW return line pin hole leakage To be discussed Mr. Dev Prasad Clamping done
8 28.10.20 U#1 TDBFP B DE side lkg fropm Mech Seal WIP Critical Mr. Dev Prasad 04.11.20
9 28.10.20 HVAC Chiller-A Compressor-A high abnormal sound WIP Mr. Dev Prasad 10.11.20
9 05.11.20.20 Unit#2 Boiler hydro test Hydro test to be done Critical Mr. Sanjay Singh/ Lalan Mishra 09.11.20 22:00 hrs
6 04.11.20 Audit BSC Audit (9th Nov'20 to 13 Nov'20) Audit in progress a sper schedule All Concerned Module Owner 07.11.20 18:00 hrs
14 27.10.20 U#2 High emission issue rectification Mr. Akash Modi As per SD duration
10 24.10.20 U#1 Slurry pump A replacement -Casing leakage Work Completed, Trial to be taken Critical Mr. Akash Modi 05.11.20 R2
5 27.10.20 U#1 Mill B work i/p Mr. S Singh/Mr. Lalan Mishra 01.11.20 R1
52 05.10.20 CHP Coal Yard Heap no. 790 - Smoke observed 05.11.20 Consumption wirhin 30 days
5 05.11.20.20 Unit#1 Boiler hydro test Hydro test in progress Critical Mr. Sanjay Singh/ Lalan Mishra 06.11.20 22:00 hrs
7 29.10.20 U#3 Cable connection pending from C&I & EMD Mr. N Yadav/Mr. S Jha 04.11.20 R1
16 27.10.20 DM Plant IPF auto drain provision WIP Mr. S Jha 10.11.20
31 13.10.20 CHP Auto lubrication system availablity of stacker Mr. Pinaki Guha/Mr. S Jha 05.11.20
15 25.10.20 U#3 Boiler drain pump line flushing Critical Mr. S Singh 04.11.20
8 27.10.20 U#1,2 & 3 FF DP switch chamber wise installation Mr. Akash Modi
6 29.10.20 Aux Boiler Planned by oprn Mr. Lalan Mishra 04.11.20 R1 After BMD Clrnc
24 27.10.20 DM Plant Hypo Generator A E-4 vessal H2 cylinder Leakage Planned on 29th Oct'20 Mr. RK Gautam
26 22.10.20 BOP IAC-1 tripped on HF fault-Separator pressure high Work in progress Critical Mr. A Srimani 29.10.2020
18 26.10.20 Aux boiler 1 Red hot observed near burner area during trial Mr. S Singh 31.10.2020
16 26.10.20 Aux boiler 2 SH tube leakage Mr. S Singh/Mr. Lalan Mishra 03.11.20 R1
12 29.10.20 U#2 Turbine pin & bellow inspection Completed Critical Mr. Dev Prasad 30.10.20
13 24.10.20 U#1 MOT main oil purifier i/l pump tripped on overload Completed Mr. Dev Prasad/Mr. N Yadav 30.10.20
14 27.10.20 U#1 FD fan 1A fan vibration X showing bad(0.0 mm/s) WIP-Local vibration 2.7 mm/s at Fan casing Mr. S Jha 29.10.2020
31 19.10.20 HCSD HCSD conveyor area Bulker road barrier repairing Planned Critical Mr. Akash Modi/Mr. DK Adhikari 28.10.2020,R1
32 19.10.20 Station Manpower deployment for black out condition As per shift rota Critical Mr. N Yadav 20.10.2020
20 26.10.20 CHP WIP Mr. N Gupta 29.10.2020
25 22.10.20 U#1 Near Generator stair dislocated Barricading done Mr. Dev Prasad Opportunity SD
9 29.10.20 U#2 CCCW-B pump abnormal sound Completed/ Load trail pending Mr. Dev Prasad
8 24.10.20 U#2 Planned Critical Mr. Dev Prasad
2 29.10.20 ESP ESP isolation to be removed from critical work list Communication to be given to HSE Mr D Sarkar/Mr. Lalan Mishra 30.10.20
37 19.10.20 Station Auxilliary power optimisation & implementation plan Updated list to be shared today During Station SD
17 24.10.20 U#1&2 Hydrazine dosing Tank-B lvl transmeter not working completed Mr. S Jha 26.10.2020
10 25.10.20 HCSD HCSD 11 KV incomer-2 trip circuit not healthy completed Critical Mr. N Yadav 26.10.20
11 20.10.20 AHP U2 BA Gate RHS 5th gate damage Completed Mr. Akash Modi 24.10.20
26 17.10.20 U#3 Boiler Hydro test to be planned Mr. S Singh/Mr. D Prasad 19.10.2020
8 10/22/2020 U#1 Slurry pump B spool piece replacement Completed Mr. DK Adhikari 22.10.2020
3 24.10.20 U#1 Completed Mr. S Jha 24.10.2020
2 24.10.20 AHP Silo 1 Heater A not available Completed Critical Mr. N Yadav 24.10.2020
16 16.10.20 DM Plant FECL3 Pump A dosing issue at ZDS Completed Mr. RK Gautam
2 20.10.20 BMD U1 - Mill E HAD not operating WIP Mr. S Singh/Mr. S.Jha
3 22.10.20 U#1 HP heater 1 vent line welding Completed Mr. Dev Prasad 22.10.20
15 15.09.20 AHP Sludge Pump-1B motor IR value low completed Mr. DK Adhikari 19.10.2020
1 21.10.20 AHP SAC-11 & SAC-16 Discharge MOV Replacement Completed Mr. DK Adhikari
1 10.10.20 Unit#1 BASP 1A casing leakage Work in progress Critical Mr. DK Adhikari 10/12/2020
10 24.09.20 Unit#3 Coal pipe F2 velocity showing zero Completed Mr. SK Jha/ Sanjay Singh PTW to be issued from Oprtn
2 08.10.20 CHP Conv. 4A belt replacement Completed Critical Mr. Pinaki Guha 10/10/2020 40 hrs job planned
36 09.10.20 SY BCU Upgradation work in progress Critical Mr. N Yadav 10/10/2020 18:00 hrs
1 05.10.20 Unit#1 Mill A inching motor Gear Box jamming Rectification in progress Mr. Sanjay Singh
31 22.09.20 Main Gate UV tunnel not operative RK Gautam/ N Yadav 07-10-20 R1, 18:00 hrs
28 25.09.20 Silo Silo 1& 2 Illumination poor Rectification work in progress Mr. N Yadav Continuous
5 06.10.20 Unit#3 HPH#3 leakage from manhole Water to be diverted by channeling Mr. Dev Prasad 10/7/2020 15:00 Hrs
9 06.10.20 CHP Coal Yard 3 FF line leakage Under rectification through local isolation Mr. Pinaki Guha 10/6/2020 18:00 Hrs
10 06.10.20 CHP Coveyor 3A belt rectification Cut / Joint work in progress Mr. Pinaki Guha 10/6/2020 23:00 Hrs
6 03.10.20 Unit#1 B2 bypass air damper cable short Rectification in progress Mr. N Yadav 05-10-20, 06-10-202 18:00 hrs
2 05.10.20 Unit#3 BASP 3A - suction issue Rectification in progress, COMPL Mr. DK Adhikari 10/5/2020
3 05.10.20 Unit#1 E1 CAD - hunting PTW availability by Oprtn for attending the work Mr. SK Jha 05-10-20, 06-10-2020 R1
22 23.09.20 CHP All EPB to be taken in service - CHP area Mr. N Yadav Opportunity
24 28.09.20 Unit#1 Boiler internal inspection & rectification Unit Sunchronozed @ 09:05 hrs - 03 Oct'20 Critical Mr. Sanjay Singh 10/3/2020 108 Hrs job plan
25 29.09.20 Unit#3 Boiler internal inspection & rectification Unit Sunchronozed @ 03:01 hrs - 03 Oct'20 Critical Mr. Sanjay Singh 9/2/2020 48 Hrs job plan
5 03.10.20 Unit#2 IDCT-1 belt damaged Rectification in progress Mr. Dev Prasad 10/3/2020
11 20.08.20 FF System Programming issue / Planned on OEM visit Mr. SK Jha Date of visit to be
19 25.09.20 U#1,2 & 3 BA area ash heap to be removed Ash removal work in progress Critical Mr. Akash Modi 9/29/2020 18:00 hrs
11 01.10.20 CHP Stacker Reclaimer- 1 PM/ Related maint. To be done Mr. Pinaki Guha/ SK Jha/ N Yadav 10/3/2020 Conv. 7A under PTW
2 01.10.20 CHP Conv. 7A 110 mtr belt replacement (Old Belt) Completed Critical Mr. Pinaki Guha 10/3/2020 48 Hrs job plan
3 27.09.20 CH AHU not working in Comp. House Mr. Ganesh Babu/ Dev Prasad 9/29/2020
4 27.09.20 Unit#1 Mill D RGB oil leakage observed Minor leakage - under observation/ to be rectified Mr. Sanjay Singh
25 22.09.20 Station Machine Guarding HSE/ All HOD's 25-09-20-R1 18:00 hrs
2 27.09.20 Mills Mills classifier cleaning Critical Mr. Sanjay Singh/ Ganesh Babu 9/28/2020 22:00 hrs
BOP IAD-4 IAD-4drain valave replacement Drain Valve replacement in progress Mr. RK Gautam 9/29/2020
BOP IAC IAC- 1 Trial planned today
35 26.09.20 AHP Dry Ash Unloader not in service DAU to be taken in servece Mr. Akash Modi 9/26/2020
4 14.09.20 Unit#1 FF B1 hopper level high Critical Mr. Akash Modi Continuous Continuous
48 26.09.20 Silo 1 Silo-1 Level high & Heater not working Deashing in progress &
45 26.09.20 Unit#2 Mill B tripped on high temp- Spike observed C&I checking planned -today Mr. SK Jha 9/26/2020
10 24.09.20 Unit#1 Hydrogen dryer A not effective Gas top up done,Under observation Mr. Dev Prasad Under observation 18:00 hrs
17 17.09.20 WS IPF -5 not available due fill damaged Cleaning done.Repairing i/p.Clearance for trial Mr. Rk Gautam 25-09-20 R1
2 26.09.20 Unit#2 BASP 2B - discharge line leakage Rectification in progress Mr. DK Adhikari 9/26/2020
3 26.09.20 Unit#3 Feeder E2 belt damaged Belt replacement in progress Mr. Sanjay Singh 9/26/2020 18:00 hrs
4 26.09.20 Unit#1 APH A&B - Guide Bearing haevy ash deposition Ash removal in progress Mr. Sanjay Singh 9/26/2020 18:00 hrs
25 15.09.20 CHP Work in progres Mr. Pinaki Guha 9/25/2020 18:00 hrs
29 21.09.20 Station Boom Lifter availability Servicing plan to be done Mr. N Yadav 9/22/2020 Service Engg. Visit site by - 22.09.20
30 21.09.20 Station Sizer Lift repairing To be planned Mr. DK Adhikari 9/22/2020
15 29.08.20 Blr Permissives for import coal revision Import Coal start permissive to be disabled Mr. SK Jha under discussion Under process
9 24.09.20 Unit#3 CW pump A cooling line leakage Planned today Mr. Dev Prasad 9/25/2020
4 25.09.20 Plant Isolation to be done accordingly Critical All HOD's/Oprn As & when required
41 24.09.20 Unit#3 SADC adjustment from 60 % to 70 % Mr. Ganesh Babu 9/25/2020 12:00 hrs
42 24.09.20 Unit#1/2 CAQMS data communication to CPCB- Validation Rectification done & communication started Mr. Sk Jha 9/24/2020
43 24.09.20 Unit#1 Air ingress point identification Mr. Ganesh Babu 25-09-20-List submi Completed
36 22.09.20 Station Machine Guarding HSE/ All HOD's 25-09-20-R1 18:00 hrs
18 01.09.20 AHP Cable termination by EMD today Critical Mr. S Jha/Mr. N yadav 9/26/2020 18:00 hrs
1 24.09.20 Unit#1 BASP 1B discharge line leakage Spool piece to be replaced - WIP Mr. DK Adhikari 9/25/2020 10:00 hrs
3 24.09.20 Unit#3 BASP 3A discharge line leakage WIP Mr. DK Adhikari 9/25/2020 10:00 hrs
6 25.09.20 Silo Scaffolding & rectification work planned Critical Mr. DK Adhikari 9/25/2020
44 24.09.20 Station Man power availability at site - Strike on 25 sept'20 Being Ensured All HOD's 9/25/2020
16 21.09.20 Unit#1 BASP 1A discharge line leakage Completed Mr. DK Adhikari 23-09-20 R1
7 21.09.20 Unit#3 PA Fan 3A lub oil cooler temp in higher side Cooller back flushing / PHE to be changed Mr. Sanjay Singh 9/22/2020
10 24.09.20 Unit#1 Ash Conveying Conveying line to be checked Completed Mr. Akash Modi 9/24/2020 18:00 hrs
15 23.09.20 Unit#2 Mill E - Hot air box gland leakage Completed Mr. Sanjay Singh 9/23/2020 17:00 hrs
4 23.09.20 Unit#1 CEP 1A - VFD Commissioning to be done Load trial completed Mr. N Yadav 9/24/2020 19:00 hrs
13 23.09.20 BOP IAD- 2 not effective c Mr. RK Gautam 9/23/2020
23.09.20 CHP Conveyor 12B Gearbox oil seal replacement work Mr.Pinaki Guha
23.09.20 CHP Con-3A zone-4 LHS cable short Mr. N Yadav
23.09.20 Unit#1 Seal oil Pump-B tripped on overload completed Mr. Dev Prasad
20 19.09.20 Unit#2 Boiler Internal inspection & rectification Critical Mr. Sanjay Singh 9/22/2020 Light Up done
19 21.09.20 Uni#1 APH ash Conveying line - Discahrge valve jamming Inspection in progress - Mr. DK Adhikari 9/21/2020 14:00 hrs
14 03.09.20 Unit#2 FF Seal Air fan A - Motor Burnt Motor burnt- under rewinding Mr. N Yadav 22-09-20 R1
1 20.09.20 Unit#2 APH tripped on over voltage To be checked by Oprtn & EMD Mr. Ganesh Babu/ N Yadav 9/21/2020
1 16.09.20 Unit#2 Boiler drain tank drain MIV passing SD work Mr. S Singh SD
2 10.09.20 Unit#1 TDBFP B mech seal water leakage from flange on opportinity Mr. Dev Prasad on opportinity
3 10.09.20 Unit#3 U#3 ESP B O/L and ID fan B I/L temp mism SD work Mr. SK Jha on opportinity
4 08.09.20 Unit#2 HPH-1 Water box vent valve Passing SD work Mr. Dev Prasad To be planned To be planned
5 09.09.20 Unit#1 ID Fan A & B Oil Seapage from flow meter SD work Mr. SK Jha on opportinity
6 09.09.20 Unit#2 Rectification planned in Opportunity SD Mr. DK Adhikari Opportunity SD Opportunity SD
30 29.08.20 Unit#1 C1 field not available SD Mr. sanjay Singh SD
7 08.09.20 Unit#3 ESP Field A3 - Internal ispection Mr. Sanjay Singh Shutdown work Opportunity SD
8 31.08.20 Unit#2 LPH-5 Emergency drip CV passing Joint Inspection planned with Oprtn/ C&I/ TMD Mr. VK Shukla/ G Babu/ SK Jha S/D 18:00 hrs
9 27.06.20 Ash Dyke Turfing & grass punching work Planned from 10th July'20 Mr. N Rana Oct'20
9 04.09.20 Unit#1 ESP C1 field not available Internal field short observed Mr. N Yadav/ Sanjay Singh Planned in SD Shutdown
10 05.08.20 Unit#1 under observation Mr. S Singh SD
11 05.08.20 Unit#1 Deaerator 100% CV stuck Planned in SD Mr. VK Shukla SD
12 05.08.20 Unit#1 TDBFP B cartridge bolt minor water seepage Planned on opportunity Mr. VK Shukla SD work
14 29.06.20 U#1,2 & 3 Deaerator inlet condensate flow not corect. Flow element issue Mr. S Jha
15 24.06.20 SWAS Room SWAS room MS left hand side leakage Isolation issue Mr. VK Shukla on opportunity
6 17.09.20 Unit#1 CEP B not available due to VFD installation Load trial planned today Mr. N Yadav/ Ganesh Babu 9/20/2020
5 17.09.20 Unit#3 BA Slurry Pump#3B discharge line spool piece leakage Permit awaited from operation Mr. DK Adhikari
1 20.09.20 APH APH A Secendory air outlet duct leakage Bellow leakage attending- WIP Mr. Sanjay Singh 9/20/2020
2 19.09.20 Unit#2 Mill 2C - Mesh rectification Work in progres(completed by 20.09.2020) Mr. Sanjay Singh 21-09-20 R1
3 19.09.20 Unit#2 Mill 2D - NDE side inert MOV steam Leakage Work in progres(completed by 20.09.2020) Mr. Sanjay Singh 20-09-20 R1
4 19.09.20 Uni#3 Mill 3C- CAD rectification SD Mr. Sanjay Singh SD
16 19.09.20 HCSD HCSD 11 KV incommer Sec A not available Mr. N Yadav 9/19/2020 14:00 hrs
1 19.09.20 Unit#1 BA hopper gate damged 1 nos. Planned in Shutdown Mr. DK Adhikari S/D job
2 19.09.20 Unit#2 BA hopper gate damged 1 nos. Planned in Shutdown Mr. DK Adhikari S/D job
3 19.09.20 Unit#3 BA hopper gate damged 2 nos. Planned in Shutdown Mr. DK Adhikari S/D job
4 19.09.20 AHP Pahse -2 HP Pump -A - Not Available Shutdown required Mr. DK Adhikari Opportunity SD
10 17.09.20 U#1&2 Ammonia dosing p/p-A disch issue Work in progres Mr. Dev Prasad 9/18/2020
3 17.09.20 SAC SAC 19 final interstage temperature high WIP Mr. DK Adhikari 9/18/2020
16 17.09.20 Unit#1 Normalised at 05:25 hrs Mr. DK Adhikari/Mr. R Ganesh Babu 9/18/2020 05:25 hrs
11 14.09.20 Unit#1/2/3 Clinker Grinder not in service Unit #3 - to be taken in service asper oprtnl req. Mr. DK Adhikari/ Ganesh Babyu 16:00 hrs
2 17.09.20 Unit#1 CEP A not available for VFD installation WIP Mr. N yadav 9/18/2020
17.09.20 CHP SAC#D cable trolley wheel 1 no. fell down Completed Mr. Pinaki Guha
15 16.09.20 Unit#2 Boiler Internal inspection & Rectification All HOD's 9/18/2020 60 hrs job planned
12 14.09.20 CHP Conv. -4A take up pulley NDE side temp. high (M2 notif.) completed Mr. Pinaki Guha 9/17/2020 18:00 hrs
1 17.09.20 WS ZDS HRCC -2 Tripping issue completed Mr. N Yadav 9/20/2020
17.09.20 Unit#2 Boiler dispenser hdr mov checking Completed Mr. S Jha 9/17/2020
2 30.07.20 TG House TG U#2/3 gate shutter damaged Completed Mr. Pankaj
12 10.09.20 Service water Service water consumption high Leakage to be identified Mr. Ganesh babu 9/15/2020
1 15.09.20 Unit#2 Mill D Bypass damper red hot observed Ractification work in progress Mr. Sanjay Singh 9/15/2020 18:00 hrs
2 15.09.20 Buffer Tank PTC Transformer Space Heater Installation Mr. N Yadav 9/15/2020 18:00 hrs
3 15.09.20 AHP FAD-1 Tripped Inspection & Rectification work planned today Mr. DK adhikari 9/15/2020 18:00 hrs
4 15.09.20 Silo Silo Vent Fan B not Available Work In progress Mr. DK adhikari 9/15/2020 18:00 hrs
5 15.09.20 Unit#1 BA Sump Pump Not Available Work In progress Mr. N Yadav 9/15/2020 18:00 hrs
6 14.09.20 Station Rain Pond - KSB pump not available - suction issue Work Planned from 15.09.20 Mr. DK Adhikari 9/15/2020 18:00 hrs
14 14.09.20 Unit#2 TG Battery room- New battery replacement to be done Mr. N Yadav 9/15/2020 18:00 hrs
4 10.09.20 Unit#1 ESP C1 & D1 pass ash conveying issue Inspection in progress Mr. Akash Modi 9/11/2020
5 09.08.20 Unit#2 Mill C Feeder C1 Actuator to be replaced Actuator motor under rewinding Mr. SK Jha 9/14/2020
3 14.09.20 Unit#1 Feeder 1E1 - running feedback not Inspection & rectification - WIP Mr. SK Jha 9/14/2020 14:00 hrs
7 09.09.20 BOP Fecl3 p/p B dosing issue at ZDS WIP Mr. RK Gautam 9/11/2020
8 10.09.20 BOP Acid metering p/p-B discharge line leaka WIP Mr. RK Gautam 9/11/2020
18 10.09.20 Compressor SAC effeciency test Test completed,report sharing by 11th Sept'20 Mr. Gaurav Sharma 9/11/2020
14 09.09.20 CHP CHP Area housekeeping plan CHP- Area wise housekeeping plan to be made Mr. Pinaki Guha 10-09-20-R1 13:00 hrs
4 10.09.20 Unit#1 TDBFP B main pump NDE side high temperature Mr. Dev Prasad 9/11/2020
5 10.09.20 Unit#1 Turbine EER package AC A not available WIP Mr. Dev Prasad 9/11/2020
6 10.09.20 Unit#1 Boiler EER package AC A not available Compressor inspection planned today Mr. Dev Prasad 9/11/2020
7 10.09.20 Unit#2 Stator water tank resin replacement Replacement planned after MIV inspection for any passing Mr. Dev Prasad 9/11/2020
1 10.09.20 CHP Conveyor 7B belt cut work completed. Mr. Pinaki Guha 9/10/2020
3 10.09.20 Unit#1 ID Fan B loading issue at full load Inspection in progress Mr. R Ganesh Babu 9/11/2020
13 09.09.20 Unit#1 Ext-4 deaerator pegging mov bush damage completed Mr. Dev Prasad 9/10/2020 16:00 hrs
9 09.09.20 Unit#3 GT Y PHASE GRP1-FAN2 ABNORMAL SOUND completed Mr. N Yadav/Mr. R Ganesh Babu
3 10.09.20 Unit#1 Mill D MAG Close feedback not coming Completed Mr. SK Jha 9/10/2020
10 09.09.20 Unit#1 HP Heater-2 I/L hdr drain passing at 6.9 m completed Mr. Dev Prasad
1 09.09.20 Unit#1 MILL E NDE side motor temp. high completed Mr. Sanjay Singh 9/10/2020
1 09.08.20 Unit#3 Mill D RGB temp high observed completed Mr. Sanjay Singh 9/9/2020
9 02.09.20 CHP Work In progress Mr. Pinaki Guha 9/9/2020 14:00 hrs
16 30.06.20 Unit#1 Slurry pump-A KGV passing in DWB-2 After valve refurbishment Mr. DK Adhikari
3 09.08.20 AHP Pahse -2 HP Pump -A - Not Available Suction issue observed- WIP Mr. DK Adhikari 9/9/2020 18:00 hrs
4 09.08.20 Unit#1 BASP-1A not availble Discharge line leakage - rectification in progress Mr. DK Adhikari 9/9/2020 16:00 hrs
12 05.09.20 Unit#1 Unit#1 under reserved shutdown Synchronized @ 04:25 hrs - 09.09.20 Mr. Ganesh babu 9/9/2020 04:25 hrs
2 08.09.20 Unit#2 LP Condensor vaccum low observed Mr. Ganesh Babu/ Dev Prasad 9/8/2020 14:00 hrs
3 07.09.20 Unit#1 BASP 1B suction line leakage Work in progress Mr. DK Adhikari 9/8/2020 18:00 hrs
5 03.09.20 Unit#3 TDBFP A LOP B trip - high vibration Motor Bearing to be checked- EMD Mr. N Yadav 08-09-20 R1 18:00 hrs
11 04.09.20 CHP Conv. 9B Belt replacement 250 mtr 250 mtr belt replacement done- Load Trial in progress Mr. Pinaki Guha 9/8/2020 In process
11 08.09.20 CHP Conv. 11B Belt replacement (25 mtr) Mr. Pinaki Guha 9/8/2020 24 hrs plan
4 07.09.20 Unit#1 Reheater SWASS sample not available Reheater RHS sample - WIP Mr. Dev Prasad 9/7/2020
3 07.09.20 CAQMS CAQMS Station -1 bad value observed To be checked by OEM from remote Mr. SK Jha 9/7/2020
6 03.09.20 AHP BASP 3A - High Vibration Mr. DK Adhikari 07-09-20 R2 18:00 hrs
4 05.09.20 AHP Sludge Pump -1A Motor abnormal sound observed Bearing replacement in progress Mr. N Yadav 9/5/2020
13 05.09.20 AHP DWB -1 Centre Decanter WIP- as per 60 hrs work plan Mr. DK adhikari 9/8/2020 02:00 hrs
10 04.09.20 Unit#3 CEP 3B- VFD commissioning & to be taken in service Mr. N Yadav/ VK Shukla/ SK Jha 9/7/2020 18:00 hrs
11 19.08.20 Unit#1 TDBFP Booster Pump A DE mech seal leakage observed Mr. VK Shukla To be planned on 10th Sept'20
5 05.09.20 Unit#3 Seal oil vaccum pump mech seal leakage Mech seal replacement in progress Mr. D Prasad 9/5/2020
6 04.09.20 Unit#1 Mill -1E classifier i/l pipe repairing Planned after Mill 1B availability Mr. Sanjay Singh
1 05.09.20 Unit#1 A1 coal feedar tripped on over load Work in progress Mr. Sanjay Singh 9/5/2020
2 05.09.20 WS HRSCC 2 turbine tripping issue. Completed- Relay reset done Mr. Sanjay Dwivedi 9/5/2020
3 05.09.20 Unit#3 TDBFP B LOP B high vib MNDE- V Bearing replacement in progress Mr. N Yadav 9/8/2020
13 05.09.20 FF System CHP area FF leakage Done Mr. Pinaki Guha 9/6/2020
11 25.08.20 AHP FAD -2 not available (evaporator gas leakage) Rectification Done- Trial planned today Mr. DK Adhikari 9/4/2020 14:00 hrs.
6 03.09.20 Unit#3 Clinker grinder trip - M2 Heavy clinker formation- Planned to be taken in service today Mr. DK Adhikari/ Ganesh Babu 9/3/2020 14:00 hrs
3 04.09.20 Unit#2 Mill 2E - feeder E1 - Current hunting Work in progress Mr. Sanjay Singh 9/4/2020 17:00 hrs
1 04.09.20 Unit#1 Mill -1B DE side bypass air damper DE side bypass air damper rectification - work in progress Mr. Sanjay Singh 9/4/2020 19:00 hrs
16 04.09.20 Unit#3 ESP C1 field not available Mr. N Yadav 9/4/2020 18:00 hrs
19 04.09.20 Hostel Sepco hostel rooms readyness (5 rooms) Mr. N Yadav 9/4/2020 20:00 hrs
15 04.09.20 Unit#3 ESP A1 field not available Charged with 500mamp. Mr. Sanjay Singh 9/4/2020 18:00 hrs
13 04.09.20 Unit#3 CEP 3A- VFD commissioning & to be taken in service Planned from 04.09.20 - WIP Mr. N Yadav/ VK Shukla/ SK Jha 9/5/2020 18:00 hrs
12 03.09.20 Unit#1/2/3 SADCAvailability (Unit#2- 19/ U#3- 14 - Not avail) All units joint inspection planned by - Oprtn/ BMD/C&I Mr. Ganesh Babu/ S Singh/ SK Jha 9/3/2020 18:00 hrs
17 04.09.20 WS Potable water system shutdown Mr. RK Gautam 9/4/2020 15:00 hrs
10 02.09.2020 Blr MILL 2F Both bypass mesh repairing WIP Mr. Sanjay Singh 9/3/2020
1 31.08.20 Unit#2 Seal air fan 2A not Available Motor No Load trial planned today,COMPLETED Mr. N Yadav 8/31/2020 16:00 hrs.
2 01.09.20 AHP BSAP 2B not available Discharge line Leakage arresting work Mr. DK Adhikari 01-09-20, completed 18:00 hrs
14 01.09.20 Unit#3 Mill - 3C coal pipe red hot observed 3/5 points conpleted, WIP Mr. Sanjay Singh 9/2/2020 20:00n hrs
16 02.09.20 Unit#2 Emission on higher side Air ingress point to be identified / Air flow to be adjusted 9/2/2020 16:00 hrs.
11 24.08.20 Unit#2 BA Agitator A not available Rectification - Completed Mr. DK Adhikari 02-09-20 R2
6 28.08.20 Unit#1 Seal Oil Vaccum Pump not available - Motor issue Pump dismantaling for inspection & rectification Dev Prasad 02-09-20 R1 18:00 hrs
4 31.08.20 Unit#3 Mill 3C- C2 feeder leakage & Mesh repairing work WIP Mr. Sanjay Singh
2 31.08.20 WS PAC Pump - VFD Mr. N Yadav/ G Babu/ SK Jha 02-09-20 R1 14:00 hrs
02.09.20 CHP C-12A tail snub ND bearing replacement - M2 Completed Mr. Pinaki Guha 9/2/2020
1 01.09.20 Unit#1 Mill 1E Mesh repairing work in progress Mr. Sanjay Singh 9/1/2020 18:00 hrs
2 31.08.20 CAQMS CAQMS Station -1 power supply not available Work in progress Mr. N Yadav 8/31/2020 16:00 hrs.
3 01.09.20 CHP Stacker Reclaimer 1 Bucket rectification work Mr. Pinaki Guha 8/31/2020
4 01.09.20 Unit#2 CCCW Pump B CCCW-B pump tripped on ele fault Mr. N Yadav 8/31/2020
5 29.08.20 Unit#2 H2 drop rate trending Trend for H2 drop rate to be discussed in DPRM Continuous Being monitored
6 29.08.20 Station Resource availability at critical locations All HOD's 8/29/2020 Arrangement done.
23 26.08.20 AHP Silo-2 DAU cone alignment work Work in progress Mr. DK Adhikari 8/26/2020
24
25 25.08.20 TSPL MO Smoke detector's not function at TSPL main office Detector checking - 26.08.2020 Mr. SK Jha/ n Yadav 8/26/2020 18:00 hrs
26 29.07.20 Plant Fire Fighting Shutdown All HOD's 8/26/2020 SD taken for 06:00hrs to 18:00 hrs
27 24.08.20 Unit#1 BA gate rectification / Hangging support Planned- arrangement being done Mr. DK Adhikari 8/25/2020 18:00 hrs
28 24.08.20 Unit#2 BASP-2B suc./dis. flange gasket lkg Work in Progress Mr. DK Adhikari 8/25/2020 16:00 hrs
29 25.08.20 Unit#1 Mill C centre pipe leakage Rectification planned today Mr. Sanjay Singh 8/25/2020
30 25.08.20 Unit#1 Unit PCC sec A tranformer cooling fan abnormal sound Rectification planned today Mr. N Yadav 8/25/2020
31 25.08.20 APH Shoot blowing AT2 NA Work in Progress Mr. Sanjay Singh 8/25/2020
32 25.08.20 FRS not operating properly from DCS Planned today Mr. SK Jha 8/25/2020
33 25.08.20 CHP Wt-1 lean cylinder -3 base damage (M2 notification) Completed Mr. Pinaki Guha 8/25/2020
34 25.08.20 Unit#1 Mill- 1F tripped on RGV temp high (M2 notification) Completed Mr. SK Jha 8/25/2020
35 25.08.20 Unit#2 H2 dryer ineffective Rectification planned today Mr. VK Shukla 8/25/2020 18:00 hrs
36 25.08.20 Unit#3 H2 dryer ineffective Rectification planned today Mr. VK Shukla 8/25/2020 18:00 hrs
37 19.08.20 HVAC Chiiler B comp B tripped on overload Trial taken Mr. VK Shukla 21-08-20 R1 18:00 hrs
38 19.08.20 Unit#2 MOT External Purifier Pump Seal Leak Work in progress Mr. VK Shukla 8/19/2020
39 17.08.20 Unit#3 ESP D3 field not available WIP- Megger value checking in progress Mr. N Yadav 8/24/2020
40 24.08.20 CCTV TG #3 outer CCTV camera rectification Inspection planned on 25.08.20 Mr. SK Jha 8/25/2020 18:00 hrs
41 23.08.20 CHP Conv. #9B belt patch open Mr. Pinaki Guha
42 24.08.20 Unit32 DV 18 - Blr-2 Mill F near CST Horizontal line leakage Work in Progress Mr. Sanjay Singh 8/24/2020 16:00 hrs
43 17.08.20 AHP FAD-2 Evoprator leakage Work in progress Mr. DK Adhikari 8/21/2020
44 17.08.20 Unit#3 MOT PHE A I/L MIV(OCCW side) gearbox damaged Planned today Mr. VK shukla 8/18/2020
45 17.08.20 Unit#3 TDBFP A Booster pump A DE side water leakage unit SD Mr. VK shukla SD
47 01.08.20 Unit#3 CEP discharge NRV leakage Tightening done,Gasket repacement planned in SD Mr. VK Shukla SD work
48 24.06.20 Unit#3 Main turbine brg 6 oil seepage Leakage from Parting plate bolt Mr. VK Shukla Under Observation
49 21.06.20 U#3 HP bypass spray block v/v cv passing Shutdown work Mr. VK Shukla Shutdown work
50 20.06.20 Unit#3 Gland seal overflow control valave inoperative SD work Mr. VK Shukla SD
52 05.08.20 Unit#2 LPH 7A level transmitter 1 hunting SD work Mr. S Jha/Mr. VK Shukla SD
53 05.08.20 Unit#3 CCCW-A D/S NRV passing SD work Mr. VK Shukla SD
54 17.08.20 Unit#3 CW pass B inlet duct MIV passing SD-minor passing Mr. VK Shukla SD
55 18.08.20 Unit#1 H2 dryer-B heating time to be reduce Modification after study Mr. S Jha
56 17.08.20 Unit#2 Turbine EER package AC A&B compressor tripping Planned today Mr. VK Shukla 8/18/2020
57 17.08.20 Unit#3 Turbine EER Tower AC A,B Ineffective Compressor issue,WIP Mr. N Yadav 8/18/2020
58 17.08.20 Unit#2 Fire Riser ARV passing at TG 13.7mtr FF system shutdown required Mr. VK Shukla
59 18.08.20 TG FF line pin hole lkg near FEH-8(U2-10m) FF system shutdown required Mr. VK Shukla
60 19.08.20 Unit#2 Mill E NDE SIDE ABNORMAL SOUND Work in progress Mr. Sanjay Singh 21-08-20 R1
61 19.08.20 Unit#3 Mill A reducer Gear Box defect Rectification in progress Mr. Sanjay Singh 8/19/2020 16:00 hrs
62 18.08.20 Unit#2 Planned Mr. S Singh 8/19/2020
63 24.06.20 Unit#1 CW pump B gland leakage Leakage observed during trial Mr. VK Shukla On Opportunity
64 20.06.20 Unit#1 RHS staircase at elevation 65 mtr in hanging condition Additional support to be provided Mr. Sanjay singh
65 22.06.20 Tezmann office Oil drum sludge to be removed Behind Tezmann office work planned Mr. Singh/Mr. MLN Rao
66 20.08.20 Unit#1 ESP C1 field not effective / Hopper level high Inspection Planned ubder Unit Shutdown Mr. N Yadav
67 20.08.20 Unit#2 ESP C2 field not effective / Hopper level high Inspection Planned ubder Unit Shutdown Mr. N Yadav
68 21.08.20 CHP Rectification in progress Mr. Pinaki Guha 8/21/2020
69 21.08.20 Unit#2 Under reserved shutdown RSD taken on 21.08.20 @ 11:22 hrs All HOD's
70 20.08.20 CHP Conv. 2B - Belt folded Rectification in progress Mr. Pinaki Guha 8/20/2020
71 20.08.20 CHP Rooler Screen jamming issue Rectification in progress Mr. Pinaki Guha 8/20/2020
73 19.08.20 Unit#2 To by planned by O&E Mr. Gaurav Sharma 20-08-20 R1 Unit#2 Planned
74 19.08.20 IDCT IDCT 3 belt damaged Belt replacement WIP Mr. VK Shukla 8/19/2020 18:00 hrs
75 24.07.20 AHP Pahse 1 DWB-1 Centre Decater support damged Work in progress Mr. Deepak Adhikari 19-08-20R1 22:00 hrs
76 20.08.20 AHP Creative-2 Pump-C installation work Creative-2 Pump-C installation work Mr. DK Adhikari
77 15.07.20 Road sweeping machine 1 no. not available Informed to agency for alternate machine deployment Mr. Jaymon
78 18.08.20 Unit#3 PA Fan A fan bearing temperature at DE side -67 deg Under Observation Mr. S Singh 8/18/2020
79 18.08.20 Unit#1 Mill D2 & E2 bypass red hot observed Hoist rope TPI planned today for inspection Mr. S Singh 8/18/2020
80 17.08.20 Unit#2 Clinker Grinder jamming Planned - ok Mr. DK Adhikari 8/18/2020
81 22.06.20 Unit#3 SH 1st & 2nd stage RHS after MOV bonnet leakage completed Mr. S Singh
82 15.07.20 U#3 PA Fan A oil seepage into winding from motor bearing Mr. S Singh/Mr. N Yadav SD
83 17.07.20 FOPH HFO-Tank-A long R/C expansion bellow seepage Planned in SD Mr. S Singh
84 06.08.20 Unit#3 ID Fan B high vibration 5.1mm/sec at MDE A Mr. S Singh on opportunity
85 02.07.20 Unit#2 APH A&B gearbox oil leakage from view glass View glass not available.PR done Mr. S Singh
87 03.07.20 Mills Arrangement of bag removal mechanism in CHP Under discussion Mr. Sanjay Singh Under Observation
88 04.08.20 U#2 &3 Flusher installed / Smple collected on 19.08.2020 Mr. Sanjay Singh
89 17.08.20 Unit#2 Soot blower B12 & C14 start fault Planned today Mr. N Yadav 8/18/2020
90 18.08.20 Unit#2 U#2 MOT & TDBFP A oil top required Planned today Mr. VK Shukla 8/18/2020
91 18.08.20 Unit#3 H2 dryer A SOV issue Planned today Mr. S Jha 8/18/2020
92 17.08.20 Unit#2 BA slurry pump A casing leakage Planned today Mr. DK Adhikari 8/19/2020 18:00 hrs
93 18.07.20 CHP Satcker 1 not available in reclaiming Bucket jerking observed-WIP Mr. Pinaki Guha 8/18/2020 15:00 hrs
94 17.08.20 Unit#3 CEP A Motor DE side mech seal leakage Planned today Mr. VK shukla 8/18/2020
95 18.08.20 HSE Critical risk assement finalisation To be discussed in evening meeting today Mr. AS Khan 8/18/2020
97 17.08.20 station Joint inspection planned with civil & EMD Mr. N Yadav 8/18/2020 16:00 hrs
98 17.08.20 CHP SCR#2 Boom conv. carrying idler damage completed Mr. P Guha
99 01.08.20 CHP Paddle Feeder -2 Stucking issue/ inspection in progress Completed Mr. Pinaki Guha Arm rectification planned
100 17.08.20 CHP Stacker -2 left side low cut limit issue completed Mr.Pinaki Guha 8/17/2020
101 17.08.20 SAC SAC#D cable trolley on wheel dislocated Completed Mr. P Guha
102 13.08.20 Unit#1 TDBFP A balancing line leakage Rectification to be done Mr. VK shukla 8/13/2020
103 17.08.20 Unit#2 D4 coal velocity element checking c Mr. S Jha
104 05.08.20 Unit#3 DV-35 oil canal QBD broken &I/L miv passing Completed Mr. VK Shukla Unit shutdown
105 13.08.20 HVAC Chiller A Compressor B jamming issue/ NA Rectification to be done Mr. VK shukla 8/13/2020
106 12.08.20 Unit#2 Clinker Grinder Bush damaged Work in progress Mr. DK Adhikari 8/13/2020
107 12.08.20 Eng. Station Unit#3 Eng. Station C&I - water coming from AC duct Mr. VK Shukla 8/13/2020
108 12.08.20 CHP No load trial done/ Load trial planned Mr. Pinaki Guha 8/14/2020 (42 hrs work planned)
109 01.08.20 CHP CHP Area lighting defects Mr. N Yadav contineous
110 17.08.20 Unit#2 MILL B centre pipe chute leakage Mr. Sanjay Singh
111 05.08.20 Unit#1 Final superheater metal temp 59 hunting Scaffolding required from BMDWork planned tody Mr. S Jha/Mr. S Singh BMD- EOD
112 14.08.20 AHP Creative pump-2C oil seal Creative pump-2C oil seal replacement Mr. DK Adhikari 8/14/2020
113 23.07.20 Unit#1 & 3 Wall Blowers availability Hot Air to be arrested to avoide SB damage Mr. Sanjay Singh/ Ganesh Babu
115 13.08.20 Unit#1 BASP A casing leakage Rectification in progress Mr.DK Adhikari 8/13/2020
116 13.08.20 Unit#2 Mill E under PTW Rectification in progress Mr. Sanajay Singh 8/13/2020
117 05.08.20 CHP IRD healthiness permissive MOC to be moved To be moved by CHP oprn Mr. Pinaki Guha 8/12/2020 EOD
118 10.08.20 IAC 1 IAC- 1 Not vailable - Gear system wear out Joint Trial planned today Mr. RK Gautam 8/12/2020
119 08.08.20 AHP Pahse 1 DWB-2 Centre Decater support damged Work in progress /Scaffolding work being done Mr. Deepak Adhikari 8/12/2020
120 06.08.20 Unit#1 TG EOT gearbox oil leakage WIP Mr. VK Shukla 8/11/2020 EOD
121 01.08.20 Unit#2/3 TDBFP Seal Water Temp. not accurate Mr. Ganesh Babu/ SK Jha
122 08.08.20 Unit#2 TDBFP#A BP NDE flange leakage online Sealing Planned Mr. VK Shukla 8/11/2020 EOD
123 11.08.20 AHP Ph#2 Belt conv-3A GB abnormal sound. Mr. DK Adhikari 8/11/2020 EOD
124 11.08.20 Unit#2 Mill C Ball charging MOV leakage Work in progress Mr. Sanjay Singh 8/11/2020
125 10.08.20 CHP CHP area Motor Cooling fan status Mr. Pinaki Guha/ N Yadav 8/10/2020
126 10.08.20 Unit#1 Mill C Mix air gate feedback not coming PTW to be issued by Oprtn as per availability Mr. Ganesh Babu/ SK Jha 8/10/2020
127 10.08.20 Unit#2 Mill F - MOV Connection required PTW to be issued by Oprtn as per availability Mr. Ganesh Babu/ N Yadav 8/10/2020
129 10.08.20 Fire Pump VFD installation in Fire Pump Action plan submission- EMD Mr. N Yadav 8/10/2020
131 10.08.20 Station Environment exception report - Daily Mr. SLM Rao 8/10/2020
132 11.08.20 Unit#3 CW PUMP-B Hydrulic Cylinder oil leakage Rectification in progress Mr. VK Shukla 8/12/2020 0.5
133 11.08.20 Unit#1 BASP-1B dis line lkg Completed Mr. DK Adhikari
134 11.08.20 Unit#2 BASP-2B dis line lkg Completed Mr. DK Adhikari
135 11.08.20 Unit#3 BASP-3B dis line lkg Completed Mr. DK Adhikari
136 11.08.20 Unit#3 PA fan-a Motor DE brg temp. 70c Mr. Sanjay Singh
137 01.08.20 AHP Bulker washing pump not available Pump available-sump cleaning to be done Mr. N Yadav/ DK Adhikari
139 01.08.20 CHP Crusher D Alignment work Completed Mr. Pinaki Guha 8/7/2020
140 03.08.20 U#1,2 & 3 LP HP bypass moisture High Mr. VK Shukla 8/8/2020
141 04.08.20 CHP Stacker 1 WIP-Pressure puley to be replaced - 6 hrs job Mr. Pinaki Guha 8/7/2020
142 10.08.20 Unit#2 BA agitator A not leakage observed Work in progress Mr. DK Adhikari 8/10/2020
143 10.08.20 IAD IAD -2 not available/ Electrical feeder issue Work in progress Mr. N Yadav 8/10/2020
144 28.07.20 BTG Mill Ball charging Plan Mr. Sanjay singh/ Ganesh Babu
145 07.08.20 U#1,2 & 3 Bunker floor grizzly mesh damage Rectification planned from today-U#3 B2 Mr. Pinaki Guha
146 04.08.20 Plant Road Sweeping M/C not available Machine available 0n 05th Aug'20 Mr. Jaymon
147 05.08.20 Unit#3 OCCW-A DE&NDE side gland leakage Completed Mr. VK Shukla 8/7/2020
149 05.08.20 IAC house IAC#1 abnormal sound Mr. RK Gautam 8/11/2020
150 05.08.20 Unit#3 Condenser Loop drain minor passing Dummy to be done -welded valve Mr. VK Shukla 8/7/2020
151 07.08.20 Unit#1 Coal feeder E belt damage Completed Mr. S Singh 8/8/2020
152 07.08.20 Unit#3 H2 dryer A SOV heating & cooling cycle gap WIP Mr. S Jha 8/8/2020
153 07.08.20 Unit#2 Mill B DE side seal air mov reverse operation Planned today Mr. S Jha 8/8/2020
154 05.08.20 Unit#1 C2 bypass damper inoperative Operation will confirm from local Mr. R Ganesh Babu/Mr. S Jha 8/7/2020
156 07.08.20 U#1,2 & 3 Identified CPP prefilter valve replacement Valve PR done,under TBA Mr. VK Shukla/TSPL commercial
157 07.08.20 Unit#2 Coal mill 2C4 coal pipe leakage Completed Mr. S Singh 8/7/2020
158 08.08.20 Unit#2 SSC Chain Tightnening Completed Mr. DK Adhikari 8/8/2020
159 06.08.20 U#1 &U#2 BA unburnt high U#2-4.6% & U#3-2.50% Mr. S Singh/Mr. R ganesh Babu 8/8/2020
160 08.08.20 Unit#1 H2 dryer A ineffective Rectification planned today Mr. VK Shukla 8/8/2020
161 07.08.20 Unit#1,2 & 3 Rectification planned today Mr. N Yadav 8/8/2020
163 07.08.20 CHP Detail investigation to be carrried out Mr. N Yadav/Mr. S jha 8/8/2020
165 06.08.20 Unit#1 Corner-1 SOFA duct bellow damage SD work Mr. S Singh SD
167 07.08.20 Unit#1 Vacuum P/P-B PHE choke suspected-abnormal sound c Mr. VK Shukla 8/7/2020
168 07.08.20 Unit#1 Mill-1E Main Motor Lube Oil leakage Completed Mr. S jha
170 06.08.20 Unit#3 Mill D D1 bypass damper not operating c Mr. S Jha 8/6/2020
171 05.08.20 Unit#3 Condenser pit pump tripping frequently Completed Mr. N yadav 8/6/2020
172 05.08.20 Unit#3 H2 drier A comp o/l SOV not working Completed Mr. S Jha 8/6/2020
173 04.08.20 CHP Conv. 3A flap gate c Mr. Pinaki Guha 8/5/2020
174 06.08.20 Unit#2 TDBFP A DC LOP motor spark observed Ok Mr. N yadav
176 05.08.20 Unit#1 Vaccum Pump B NDE side gland leakage c Mr. VK Shukla 8/5/2020
177 04.08.20 AHP LP Pump 1B abnormal sound Completed Mr. DK Adhikari 8/4/2020
180 04.08.20 CHP Conv. 10A hooter not available Completed Mr. N Yadav 8/4/2020
181 04.08.20 Unit#2 Seal Oil Pump Coupling damaged Completed Mr. VK Shukla 8/4/2020
182 04.08.20 CHP Conv. 12 A - HTMS not available Completed Mr. N Yadav 8/4/2020
184 01.08.20 Unit#1 Boiler internal inspection Completed- Light Up done @ 10:56 hrs Mr. Sanjay Singh 8/4/2020
185 01.08.20 BTG Oprtn Light Up procedure (for BCCL Coal ) To be Review/ Revised (Mills in service) Mr. Ganesh Babu 8/4/2020
186 01.08.20 Unit#1 Deaerator upstream 30% valve Spindle bend - to be rectified Mr. VK Shukla 8/3/2020
187 01.08.20 CW Pump CW Pump A Tripping issue Mr. SK Jha 8/3/2020 trial to be taken
188 31.07.20 Unit#2 Amonia Dossing Pump not avail. Work in progress Mr. VK Shukla 7/31/2020
190 30.07.20 Unit#2 RH sample of unit # 2 not coming properly Rectification to be done Mr. Sanjay Singh
191 30.07.20 Unit#1 RH sample of unit # 1 RH side not coming at SWAS Rectification to be done Mr. Sanjay Singh
192 30.07.20 Unit#2 Eco sample of unit # 2 is not coming at SWAS Rectification to be done Mr. VK Shukla
193 30.07.20 Unit#1 Feeder F2 Belt damaged Not Available - Rectifcation WIP Mr. Sanjay Singh 7/30/2020
194 30.07.20 Unit#2 Seal Oil RC Pump Abnormal sound Rectification Planned today Mr. VK shukla 7/30/2020
195 28.07.20 Unit#1 H2 druiyer A not effective Comp-A Flushing done- WIP Mr. VK Shukla 7/29/2020
196 29.07.20 Unit#2 TDBFP B RC Con Valve Not closing less than 6% Mr. SK Jha
197 28.07.20 CHP Conv. 5A Belt replacement Belt replacement - WIP Mr. Pinaki Guha 31-07-20 ( 36 Hrs plan)
198 01.08.20 Unit#1 ESP Top roof top hole Hole to be rectified Mr. Sanjay Singh 8/1/2020
199 08.07.20 Unit#3 Slurry pump A high vibration-6.1 mm/s at pump DE H Mr. DK Adhikari
201 01.08.20 Unit#1 Mill E under PTW COC tripped/ Feeder chocked due to wet coal- WIP Mr. Sanjay Singh 8/1/2020
202 01.08.20 Unit#1 H2 dryier not effective WIP Mr. VK Shukla 8/1/2020
203 01.08.20 Unit#2 H2 dryier not effective WIP Mr. VK Shukla 8/1/2020
204 01.08.20 Unit#2 H2 cooler A/B gland leakage WIP Mr. VK Shukla 8/1/2020
205 01.08.20 AHP CAD -5 cable damaged Work in progress Mr. N Yadav 8/1/2020
206 01.08.20 Unit#1 Mill Ball Charging MOV not working - 1E Rectification Planned today Mr. SK Jha 8/1/2020
207 01.08.20 Unit#3 Mill Ball Charging MOV not working - 3C Rectification Planned today Mr. SK Jha 8/1/2020
209 31.07.20 Unit#1 HPH 2 FW side drain passing Rectification to be done - Today Mr. VK Shukla 7/31/2020
210 25.07.20 Canal Canal Shutdown till 31.07.2020 (7 days) Mr. N Yadav Detailed plan submitted
211 31.07.20 Unit#2 PA fan A & B Air leakage from defuser Leakage to be arrested Mr. Sanjay Singh 7/31/2020
212 CHP Crusher C Alignment work Trial planned today Mr. Pinaki Guha 7/31/2020
213 29.07.20 Unit#3 BASP-A Not Available - Dis MIV- Rectifcation WIP Mr. DK Adhikari 7/31/2020
214 29.07.20 Unit#2 AVR Room temp high (26 Deg C) AVR Room AC not working properly Mr. VK Shukla 7/30/2020
215 28.07.20 Unit#3 IPBD pressurization unit Control supply tripping Mr. N Yadav/ SK Jha 7/30/2020
216 30.07.20 IACH IAD -2 tripped due to water ingress Rectification - WIP Mr. N Yadav 7/30/2020
217 29.07.20 Unit#3 Seal oil Vaccum Pump not avail. Completed Mr. VK shukla 30-07-20 R1
218 30.07.20 SILO 1 DAU/ Ash slider- flow not coming Inspection & rectification - WIP Mr. D K Adhikari 7/30/2020
219 20.07.20 CHP Railway Railway line emabarkment raincuts rectification 10/70 attended,rectification by 28th July 20 Mr. Pinaki Guha 7/28/2020
220 29.07.20 CHP Stacker Reclaimer- 1 SCR-1 Pressure pulley replacement work Mr. Pinaki Guha 7/29/2020
221 28.07.20 Unit#2 BASP-B Completed Mr. DK Adhikari 7/29/2020
222 21.07.20 Switchyard Dia 2 auto reclosure checking Mr. N Yadav/ Ganesh Babu 7/28/2020
223 21.07.20 Switchyard Dia 6 Communication error Mr. N Yadav/ Ganesh Babu 7/28/2020
224 24.07.20 Unit#1 Mill E CAD Mill Capacity Air Damper not working Mr. Sanjeev Jha 7/27/2020
225 24.07.20 SILO- 1 Silo-1 water ingress Mr. Akash Modi/ Pankaj
226 24.07.20 CHP Conveyor 9A Belt replacement work in progress Mr. Pinaki Guha 7/28/2020
227 28.07.20 SAC SAC-17 C&I work completed/ Trail planned today Mr. Ganesh Babu 7/28/2020
228 24.07.20 Unit#2 Unit #2 Shutdown taken @ 12:30 hrs Boiler clearance by 14:00 hrs for filling planned Mr. Ganesh Babu/ Sanjay Singh 7/28/2020
229 23.07.20 IDCT - 3 IDCT #3 belt Belt inspection (run feedback not coming) Mr. VK Shukla 27-07-20 r1
230 25.07.20 CHP Stacker 2 - Bucket Wheel Hydl line leakage Work in progress Mr. Pinaki Guha 7/27/2020
231 25.07.20 CHP Stacker 2 - Bucket Wheel Hydl line leakage Limit Switch to be checked before taking in service Mr. Jha 7/27/2020
232 25.07.20 Unit#2 TDFP A trip on steam valve close WIP - NRV gasket replacement in progress Mr. VK Shukla 7/27/2020
233 20.07.20 CHP In view of low rakes today ,HIPO open point to be closed WIP Mr. Pinaki Guha
234 20.07.20 CHP Stacker 2 rail alignment Planned after grouting work(start date-22nd July 20) Mr. Pinaki Guha/Mr. Pankaj
235 23.07.20 BOP IAC#1 Abnormal sound obserbed during trial after PM Mr. RK Gautam
237 23.06.20 U#1,2 & 3 Mill classifier cleaning Being carried out as per available opportunity Mr. Sanjay Singh
238 22.06.20 Reservoir Reservoir level to be maintained Reservoir level 5.5 mtr -29.06.20 Mr. Pawan Devgan/Mr. S Dwivedi
239 19.06.20 Plant Mobilisation of Agency for conducting TPI Mr. Ashik Khan
240 17.07.20 U#3 Turbine EER package tower AC B not effective Rectification planned today Mr. N Yadav 7/22/2020
241 23.07.07 Buffer tank Cable fault identified rectification work in progress Mr. N Yadav 24-07-20 R1
242 21.07.20 Buffer Tank Buffer Tank I/C-1 tripped WIP-fault locator being arranged Mr. N Yadav 26-07-20 R1
243 25.07.20 BASP House BASP House Sump Pump Not working in auto Mr. Sanjiv Jha 7/25/2020
244 25.07.20 Unit#3 A2 coal feerder Oulet gate not working properly Mr. Sanjiv Jha 7/25/2020
245 25.07.20 Unit#3 Seperator MOV Feedback not coming properly Mr. Sanjiv Jha 7/25/2020
246 13.07.20 U#1 Generator RTD panel leakage current & voltage-- 60 V completed Mr. S Jha 7/14/2020
247 25.07.20 Unit#1 O2 grid value showing wrong Rectification in progress Mr. Sanjiv Jha 7/25/2020
248 21.07.20 FOPH HFO supply pump-C motor DE side abnormal sound Completed Mr. N Yadav 7/22/2020
249 22.07.20 U#2 BC 1 ignitor jamming and BC 2 gun jamming Completed Mr. S Singh 7/22/2020
250 09.07.20 HCSD PH#1 Bin 3 overflow line leakage Completed Mr. DK Adhikari 7/21/2020
251 21.07.20 U#1 Boiler lift rain water ingress in motor room Completed Mr. S Singh 7/22/2020
252 21.07.20 U#2 LTSH temp.T26,33 & 35 showing wrong Completed Mr. S Jha 7/22/2020
254 21.07.20 U#2 BA Slurry Pump B dis line lkg near NRV Completed Mr. DK Adhikari 7/22/2020
255 21.07.20 U#2 BA Slurry Pump-A flushing MOV not operting Completed Mr. N Yadav 7/22/2020
256 21.07.20 CHP 23 no's sump pump not available Completed Mr. Pinaki Guha 7/22/2020
257 21.07.20 CHP Flap gates 07 no's not available Completed Mr. Pinaki Guha 7/22/2020
258 23.07.20 Unit#1 Light Up planned on 23.07.20 @ 21:00 hrs Mr. Ganesh Babu 7/23/2020
259 22.06.20 U#2 Boiler lift TPI expired TPI done,certicate awaited Mr. N Yadav Received
260 21.07.20 RWPH Rain dewatering pump B suction issue Completed Mr. Pradeep 7/21/2020
261 21.07.20 U#2 Vacuum Pump-C Pump DE gland leakage completed Mr. VK Shukla
262 20.07.20 U#2 CW pump B discharge valve hydraulic oil leakage completed Mr. VK Shukla 7/21/2020
264 21.07.20 FF Basin FF basin-1 MOV pit dewatering required completed Mr. Pradeep
265 14.07.20 HCSD Bulker washing pump motor not available completed Mr. N Yadav 7/20/2020
266 19.07.20 DM Plant Antiscalent pump-A tripping issue completed Mr. N yadav 7/20/2020
267 20.07.20 DM Plant Acid dosing line leakage near UF#1 completed Mr. Pradeep 7/20/2020
268 03.07.20 Unit#3 Covering of U#3 BA slurry pit Completed Mr. DK Adhikari
269 19.07.20 U#1 APH A main motor tripped on overload Mr. G Babu
270 18.07.20 GT Bay DIA-2 GS30 breaker feedback issue Completed Mr. N yadav 7/18/2020
271 09.07.20 HCSD Creative pump 2B bearing inspection work Completed Mr. DK Adhikari 7/16/2020
272 18.07.20 U#2 APH A main motor tripped on overload Completed Mr. N yadav 7/18/2020
273 11.07.20 HCSD Creative pump 2C belt inspection work Completed Mr. DK Adhikari 7/11/2020
274 08.07.20 Unit#1 Mill D inching motor restoration Completed Mr. N Yadav/Mr. S Singh 7/16/2020
275 16.07.20 CHP Stacker-2 bucket wheel hydraulic motor seepage Completed Mr. Pinaki Guha 7/16/2020
276 15.07.20 CHP C12A 470mtr. Belt replacement work completed Mr. Pinaki Guha 7/17/2020
277 03.07.20 Unit#2 U#2 Seal oil vacuum low (-80 Kpa) completed Mr. VK Shukla
278 23.06.20 Unit#1 TDBFP-B PHE-B oil side o/l temp high ok now Mr. VK Shukla
279 15.07.20 BOP IDCT-3 fan not rotating completed Mr. VK Shukla 7/16/2020
280 14.07.20 Scissor lift Scissor lift not available due to motor problem completed Mr. N Yadav 7/16/2020
281 15.07.20 U#1 BA slurry pump dewatering Pump B not running in auto Completed Mr. S Jha 7/16/2020
282 19.06.20 Unit#2 PA Fan A minor oil leakage from bellow Completed Mr. Sanjay Singh
283 14.07.20 U#2 TDBFP-A & MDBFP not tripped on MFT As per logic Mr. S Jha 7/15/2020
284 13.07.20 U#2 Mill F inerting line sound observed No passing observed Mr. Sanjay Singh
285 13.07.20 U#1 Feedwater flow tx difference Completed Mr. S Jha/Mr. R Ganesh Babu 7/15/2020
286 15.07.20 U#1 UAT#1 group 2&4 -Fan tripping-1 no. each completed Mr. N Yadav 7/15/2020
287 15.07.20 IACH IAC 2 Filter DP alarm Completed Mr. RK Gautam 7/15/2020
288 15.07.20 IACH IAD-2 heater not working Completed Mr. N Yadav 7/15/2020
289 06.07.20 FOPH HFO heating line drain MIV damage completed Mr. S Singh 7/15/2020
290 15.07.20 U#2 Steam inerting MIV replacement '0' Mtr completed Mr. S Singh 7/15/2020
291 14.07.20 Potable pump Potable pump water leakage near PH#1 DWB 1 completed Mr. DK Adhikari 7/15/2020
292 14.07.20 U#2 TDBFP-B BFP NDE side mechanical seal 'O' ring damage completed Mr. VK Shukla 7/15/2020
293 13.07.20 CHP Boom conveyor 1 belt cut & joint work completed Mr. Pinaki Guha 7/15/2020
294 13.07.20 CHP Conveyor#4B belt replacement work completed Mr. Pinaki Guha 7/14/2020
295 13.07.20 U#1 Mix bed A vent pnumatic v/v flange leakage completed Mr. VK Shukla 7/14/2020
296 14.07.20 Switchyard DIA2 GS020 breaker not closing completed Mr. N Yadav 7/14/2020
297 03.07.20 BOP IDCT 1 outlet MIV teeth damaged completed Mr. VK Shukla
298 29.06.20 Unit#1 Vacuum pump-B & C seal water temperature high completed Mr. VK Shukla
299 14.07.20 U#2 MDBFP Bearing temperature high alarm completed Mr. S Jha
300 11.07.20 HCSD PH#1 DWB 3 centre decanter support damage completed Mr. DK Adhikari 7/14/2020
301 13.07.20 U#2 BA Slurry Pump A discharge line pin hole leakage completed Mr. DK Adhikari 7/14/2020
302 09.07.20 SAC CAD-1 Compressor replacement completed Mr. Nilesh
303 09.07.20 U#1 PA Fan-B Blade pitch problem completed Mr. S Singh On Opportunity
304 13.07.20 U#2 Cable tray washing completed Mr. Sanjay Singh 7/13/2020
306 09.07.20 U#2 TD BFP-B R/C line NRV top Flange leakage completed Mr. VK Shukla
307 13.07.20 Aux boiler 2 SH gun igniter power supply to be checked completed Mr. N Yadav 7/13/2020
308 13.07.20 CHP Stacker Reclaimer-2 boom conveyor. Impact idler damage completed Mr. Pinaki Guha 7/13/2020
309 12.07.20 U#1 GSC overflow CV not closing below 11% completed Mr. S Jha 7/13/2020
310 03.07.20 U1&2 completed Mr. VK Shukla/Mr. G Babu 11-07-20-R1
312 10.07.20 Unit#3 SSC to be checked for interlock protection completed Mr. S Jha 7/12/2020
313 09.07.20 Unit#1 completed Mr. N Yadav/Mr. R Ganesh Babu
314 11.07.20 CHP Conveyor#4B skirt rubber damage in DE side c Mr. Pinaki Guha 7/11/2020
315 12.07.20 U#1 SH 1st stage spray water CV calibaration reqrd completed Mr. S Jha
316 10.07.20 CHP Conveyor 12B belt calibaration c Mr. S Jha 7/11/2020
318 08.07.20 Unit#1 Seal oil vacuum pump motor got decoupled from pump c Mr. VK Shukla 7/11/2020
319 06.07.20 Unit#1 Mill-F MAG got closed in Mill Running ok Mr. S Jha
320 12.07.20 U#1 HP Bypass hydraulic pump-B discharge SOV malfunction ok Mr. S Jha
321 08.07.20 Unit#1 BA SP house drain pump B not working ok Mr. S Jha
322 09.07.20 U#2 Wall blower B-3 D11 flange leakage Completed Mr. S Singh 7/10/2020
323 09.07.20 SAC SAC#17 air filter jamming Completed Mr. DK Adhikari 7/10/2020
324 10.07.20 U#1 Soot blower MIV jamming Completed Mr. S Singh 7/10/2020
325 03.07.20 U#1,2 & 3 ESP & FF leakage rectification plan to be submitted C Mr. Sanjay Singh 7/9/2020
326 09.07.20 U#1 LRSB R10 not extending fully ok Mr. S Singh
327 03.07.20 Unit#3 Tower AC not effective ok Mr. N Yadav
328 09.07.20 U#2 D2 CRM shear pin damage c Mr. S Singh
329 08.07.20 CHP Stacker Reclaimer 2 boggey wheel damage Completed Mr. Pinaki Guha 7/8/2020
330 06.07.20 CHP Conveyor 1C belt replacement completed Mr. Pinaki Guha 7/7/2020
331 02.07.20 Unit#1 Boiler corner B1 & C1 area red hot observed Completed Mr. Sanjay Singh
332 08.07.20 HCSD HP pump-1B high vibration-25.2 mm/s at MNDE A c Mr. DK Adhikari 7/8/2020
343 06.07.20 Silo Silo wet ash unloader to be taken in service Taken in service Mr. Akash Modi 7/6/2020
344 06.07.20 Silo 3 Silo-3 Air slider-04 flow establishing Completed Mr. DK Adhikari 7/6/2020
345 06.07.20 CHP Stacker 2 wheel jamming c Mr. Pinaki Guha 7/6/2020
346 04.07.20 Unit#1 Mill-D HAD phase loss alarm c Mr. S Jha
347 06.07.20 IACH IAD-3 IN & OUT DP high. c Mr. Arnab
348 07.07.20 IACH IAD#1 HEAT EXCHANGER WATER LEAKAGE c Mr. Arnab
349 06.07.20 Unit#2 E3 MDV not operating... c Mr. S Jha
350 30.06.20 Unit#2 Mill D pinion oil spray issue Mr. R Ganesh Babu/Mr. S Singh
351 03.07.20 Unit#3 ID fan B inlet &outelt temperature checking c Mr. S Jha/Mr. S Singh
352 01.07.20 Unit#2 & 3 Modification of slurry trench strainer Completed Mr. DK Adhikari 7/4/2020
353 24.06.20 Unit#1 TDBFP-B LOP-A oil seal leakage Completed Mr. VK Shukla
354 03.07.20 AHP Plan for operation of bottom ash handling at 36 tph Conveyor taken in service Mr. Akash Modi 7/4/2020
355 01.07.20 Unit#2 Vacuum pump A DE/NDE heavy gland leakage completed Mr. VK Shukla
356 03.07.20 Unit#1 TDBFP-B LOP-A&B Current not showing c Mr. N Yadav 7/4/2020
357 06.07.20 Unit#1 Mill-F MAG got closed during mill running condition C Mr. S Jha
358 28.06.20 Unit#2 APH B I/L CO checking required c Mr. S Jha 7/4/2020
359 01.07.20 SAC CAD 5 tower B NRV passing C Mr. DK Adhikari 7/4/2020
360 29.06.20 SAC SAC#13 Separator jamming alarm Completed Mr. DK Adhikari 7/3/2020
361 04.07.20 Unit#2 Generator Stator bar temperature 1 hunting c Mr. S Jha 7/5/2020
362 01.07.20 Unit#2 Mill B NDE Side Coal Leakage c Mr. S Singh 7/3/2020
363 02.07.20 Unit#2 TEER package A/C-B comp-1 low press c Mr. VK Shukla 7/4/2020
364 04.07.20 Unit#1 BA Slurry Pump-1B Dis.MIV replacement work C Mr. DK Adhikari 7/4/2020
365 01.07.20 Unit#3 H2 dryer A SOV issue C Mr. S Jha 7/4/2020
366 02.07.20 Unit#3 CW forebay screen level hunting c Mr. S Jha 7/3/2020
367 03.07.20 Unit#2 TDBFP A lop A LP side NRV flange leakage c Mr. VK Shukla 7/4/2020
368 02.07.20 HCSD Paddle mixer-04 discharge chute leakage C Mr. DK Adhikari 7/3/2020
369 30.06.20 HCSD Paddle mixture 3 not available due to gearbox oil seal replacement C Mr. DK Adhikari 7/2/2020
370 03.07.20 Unit#3 Slurry pump-A suction side inspection C Mr. DK Adhikari 7/3/2020
371 02.07.20 Unit#1 CV-1,RSV 2,IPCV 2 DP high switch acting checked & found ok Mr. VK Shukla
372 01.07.20 Unit#1 TDBFP B LOP-B current bad in DCS Completed Mr. N Yadav 7/2/2020
373 01.07.20 Unit#2 ESP A1 & A2 field transformer incoming cable lug heating. Completed Mr. N Yadav 7/2/2020
374 01.07.20 TG common Cooling water strainer cleaning completed Mr. VK Shukla 7/2/2020
375 29.06.20 Unit#2 C2 feeder main+COC shaft gland leakage Completed Mr. S Singh Mill SD
376 01.07.20 Unit#1 Mill F centre pipe coal leakage Completed Mr. S Singh 7/2/2020
377 02.07.20 Unit#1 BA slurry pump B NRV line leakage Completed Mr. DK Adhikari 7/2/2020
378 30.06.20 Unit#1 BA Agitator A jamming Completed Mr. DK Adhikari 7/2/2020
379 30.06.20 CHP SCR#2 takeup heap collision limit switch installation Completed Mr. Pinaki Guha/Mr. S Jha 7/1/2020
380 01.07.20 Unit#2 Completed Mr. VK Shukla 7/2/2020
381 01.07.20 CHP Stacker Reclaimer 1 not available due to fire incident Restoration work completed Mr. Pinaki Guha 7/2/2020
385 01.07.20 HCSD CAD 5 tower B passing completed Mr. DK Adhikari 7/1/2020
386 29.06.20 Unit#3 OCCW electrical strainer Seal water leakage completed Mr. VK Shukla
387 01.07.20 Unit#2 Wall blower D14 & A1 not retract auto completed Mr. N Yadav 7/1/2020
388 01.07.20 Unit#1 Mill E & F cable tray washing for coal removal completed Mr. S Singh Mill SD
389 26.06.20 Unit#1 Wall blower C1 not extending completed Mr. N Yadav
390 01.07.20 Unit#1 Mill A centre pipe coal & hot air box leakage Completed Mr. S Singh 7/1/2020
391 01.07.20 Unit#3 C2 Capacity damper link damaged Completed Mr. S Singh 7/1/2020
392 27.06.20 Unit#1 H2 dryer B ineffective Completed Mr. VK Shukla 6/27/2020
393 29.06.20 Unit#3 MS & CV hanger support block Nut missng Completed Mr. VK Shukla 6/30/2020
394 27.06.20 Unit#2 H2 Drier-B Compressor-B Ineffective Completed Mr. VK Shukla 6/30/2020
395 29.06.20 Buffer Tank Incomer 1 power source tripping completed Mr. N Yadav
396 30.06.20 Unit#2 Mill F start fault Rectified Mr. N Yadav 6/30/2020
397 30.06.20 Unit#3 Slurry pump-A pump suction issue completed Mr. DK Adhikari
398 29.06.20 AHP CAD#5 both tower valve inspection completed Mr. S Jha 6/30/2020
399 29.06.20 Unit#2 Mill F lube oil cooler ineffective completed Mr. S Singh 6/30/2020
400 30.06.20 Unit#3 UAT 3 energy meter not showing reading Completed Mr. N Yadav 6/30/2020
401 30.06.20 Unit#1 Vacuum pump C tripped on overload Completed Mr. N Yadav 6/30/2020
402 19.06.20 Silo Area Silo blower-D vibration high-8.0 Motor DE V Completed Mr. Deepak Adhikari 6/29/2020
403 28.06.20 DM Plant SMBS dosing pump 1&2 discharge issue Completed Mr. RK Gautam 6/29/2020
404 27.06.20 Unit#3 Mill C1 & D1 coal tonnage & RPM difference Completed Mr. S Jha 6/29/2020
405 30.06.20 CHP Conveyor 2B fluid coupling oil leakage Completed Mr. Pinaki Guha 6/30/2020
406 28.06.20 Unit#2 GT Y-phase group-1 fan-3 abnormal sound Completed Mr. N yadav 6/29/2020
407 29.06.20 Unit#3 U3 BA Slurry Pump-B Discharge NRV heavy water leakage ok Mr. DK Adhikari 6/29/2020
408 29.06.20 Unit#3 CEP R/C line hanger support nut missng c Mr. VK Shukla
409 27.06.20 HCSD PH#1 DWB 1 centre decanter screen damage Completed Mr. DK Adhikari 6/29/2020
410 25.06.20 FOPH LDO supply pump motor C not available-meggar value low Completed Mr. N Yadav 6/27/2020
411 29.06.20 Unit#3 ABT system UAT-3(unit-3) Export reading showing wrong value Completed Mr. N Yadav
412 26.06.20 AHP HCSD-3 RC line welding leakage Completed Mr. DK Adhikari 6/27/2020
413 28.06.20 Unit#1 Condensate line to deaerator flange leakage SD gasket replacement Mr. VK Shukla
414 26.06.20 Unit#3 ECU-B 0 mtr water leakage Completed Mr. VK Shukla 6/27/2020
415 21.06.20 U#1&2 U#1&2 hydrazine p/p-C discharge issue Completed Mr. VK Shukla 6/27/2020
416 20.06.20 Unit#2 TD Booster P/P-A & B NDE body flng leak Completed Mr. VK Shukla 6/27/2020
417 27.06.20 Unit#2 BA Slurry Pump-B RC line lkg arresting work completed Mr. DK Adhikari 6/27/2020
418 26.06.20 Unit#1 Vacuum pump-A DE NDE heavy gland lkg Completed Mr. VK Shukla 6/27/2020
419 27.06.20 Unit#3 BA Slurry Pump-A RC line leakage arresting work completed Mr. DK Adhikari 6/27/2020
420 22.06.20 Weigh bridge In motion weigh bridge issue completed Mr. S Jha
421 28.06.20 Unit#2 E2 Feeder O/L Coal Leakage completed Mr. S Singh
422 27.06.20 Unit#1 A2 coal feeder i/l gate MOV Bush damage completed Mr. Sanjay Singh 6/27/2020
423 25.06.20 CHP Conveyor#12B 35 mtrs belt replacement work Completed Mr. Pinaki Guha 6/26/2020
424 24.06.20 Unit#1 SADC F-4 Jaming & B4 Link damage Completed Mr. S Singh/Mr. S Jha 6/27/2020
425 23.06.20 ZDS UF Module 1 ZDS UF-1 leakage attained Completed Mr. RK Gautam 6/25/2020
426 23.06.20 H2 Plant H2 dryer skid 2 rectifier 2 cooling fan abnormal sound Completed Mr. N Yadav 6/26/2020
427 24.06.20 Unit#2 CEP A disch line root vlv union lkg Completed Mr. VK Shukla 6/26/2020
428 26.06.20 Unit#1 HP heater 1 manhole leakage Completed Mr. VK Shukla 6/26/2020
429 26.06.20 Unit#1 ID fan A & B Bearing Cooling Fan drain installation Completed Mr. S Singh 6/26/2020
430 26.06.20 HCSD PH 1 sludge pump A discharge side jamming Completed Mr. Deepak Adhikari 6/26/2020
431 25.06.20 AHP SAC#4 Separator DP high Completed Mr. DK Adhikari 6/27/2020
432 23.06.20 Unit#1 Extraction 3 not fully opening (50 % open) c Mr. S Jha/Mr. VK Shukla 6/26/2020
433 22.06.20 All DG DG control supply fuse to be replaced for healthiness of DG checked & found ok Mr. N Yadav
434 23.06.20 Unit#2 H2 dryer B ineffective completed Mr. VK Shukla 6/25/2020
435 25.06.20 Unit#3 Feeder F2 belt replacement c Mr. S Singh 6/25/2020
436 21.06.20 Unit#1 FW flow TX-1 showing more deviation ok now Mr. S Jha 6/25/2020
437 23.06.20 Unit#1 B1 coal pipe velocity showing Zero ok Mr. S Jha 6/25/2020
438 24.06.20 Unit#2 Mill A Ball Charging line Chocking c Mr. S Singh 6/25/2020
439 24.06.20 FOPH Under ground leakage at FOPH area clamping done Mr. RK Gautam 6/25/2020
440 24.06.20 Unit#2 Vaccum pump A gland leakage Completed Mr. VK Shukla 6/24/2020
441 24.06.20 Unit#2 OCCW A&B NDE side gland leakage c Mr. VK Shukla 6/25/2020
442 22.06.20 Unit#3 ESP D1 field tripped Completed Mr,. N Yadav 6/24/2020
443 24.06.20 Unit#3 Deaerator i/l condensate temperature not correct Completed Mr. S Jha 6/24/2020
444 22.06.20 Unit#2 Mill F inching motor not available completed Mr. S Singh 6/24/2020
445 22.06.20 Unit#3 Mix Bed C Resin trap Inlet flange dropwise water leakage Completed Mr. VK Shukla 6/23/2020
446 23.06.20 Unit#2 vaccum pump A SOV passing Completed Mr. S Jha 6/24/2020
447 23.06.20 HCSD HCSD 3 piston seal damage completed Mr. DK Adhikari 6/24/2020
448 24.06.20 Unit#3 MDBFP BP DE side cooling union lkg. Completed Mr. VK Shukla
449 23.06.20 Unit#1 Mill C feeder outlate gate actuator issue C Mr. S Jha 6/24/2020
450 24.06.20 Unit#3 Condenser pit pump B not running in auto Completed Mr. S Jha 6/24/2020
457 22.06.20 Hypo dosing p/p#b dosing issue for hrscc Completed Mr. RK Gautam 6/23/2020
458 23.06.20 Unit#2 Furnace pressure tx#1 value hunting observed Completed Mr. S Jha 6/23/2020
459 22.06.20 CHP Wagon tippler 3 rear couple pin damage Completed Mr. Pinaki Guha 6/22/2020
460 23.06.20 Unit#2 Mill F steam inerting steam leakage No Leakage Mr. S Singh 6/23/2020
461 21.06.20 U3 ECU 0 mtr ECU -B Cooling water pump tripping c Mr. N Yadav 6/24/2020
462 22.06.20 Unit#1 LRSB R-10 taking high current. Completed Mr. N yadav 6/23/2020
463 22.06.20 Unit#2 R-16 motor chain damage c Mr. S Singh 6/23/2020
464 22.06.20 Unit#2 L-19 cable chain damage c Mr. N Yadav 6/23/2020
465 23.06.20 Unit#2 BA slurry pump-2A dis MIV leakage attend completed Mr. DK Adhikari 6/23/2020
466 23.06.20 Unit#1 Slurry pump-B RC line lkg arresting completed Mr. DK Adhikari 6/23/2020
467 22.06.20 Unit#3 Slurry pump B discharge line leakage c Mr. Deepak Adhikari 6/23/2020
468 23.06.20 HCSD PH 1 sludge pump A & B gland leakage c Mr. Deepak Adhikari 6/23/2020
469 23.06.20 Unit#3 Eco conveying stopped due to vessel 3 & 4 leakage c Mr. DK Adhikari 6/23/2020
470 23.06.20 SAC SAC 1 air end temperature high c Mr. DK Adhikari 6/23/2020
471 23.06.20 FAD FAD 7 refrigerant pressure high c Mr. DK Adhikari 6/23/2020
472 22.06.20 Unit#1 Coal pipe F4 purge MOV cable laying completed Mr. S Jha 6/23/2020
473 21.06.20 TD BFP-A & B MOT Oil Level Low. Oil top up done Mr. VK Shukla 6/22/2020
474 21.06.20 FOPH FOPH HFO Tank Level Trx value hunting completed Mr. S Jha 6/23/2020
475 19.06.20 Unit#1 APH A O2 inlet value showing wrong in DCS completed Mr. SK Jha 6/23/2020
476 22.06.20 ETP CEMB O/L flowmeter need to checking completed Mr. S Jha 6/23/2020
477 22.06.20 Unit#2 LRSB R-14 MCB tripping during retracting Completed Mr. N Yadav
478 21.06.20 Unit#1 Mill 1C not available Completed Mr. S Jha/Mr. S Singh 6/22/2020
479 22.06.20 Unit#2 LRSB R14 stuck Completed Mr. S Singh 6/22/2020
480 21.06.20 Unit#3 L20 poppet valve lever damage condition Completed Mr. Sanjay Singh 6/23/2020
481 22.06.20 HCSD CAD-5 tower-B outlet valve replacement work Completed Mr. Deepak Adhikari 6/22/2020
482 20.06.20 AHP CAD#2 not available due to leakage Completed Mr. Deepak Adhikari 6/22/2020
483 21.06.20 AHP Creative Pump 2B-gland leakage Completed Mr. Deepak Adhikari 6/24/2020
484 22.06.20 SAC SAC 6 filter jamming Completed Mr. Dk Adhikari 6/22/2020
485 22.06.20 Unit#3 CEP to flash tank line hammering Completed Mr. R Ganesh Babu 6/22/2020
486 19.06.20 Unit#3 Emergency source 1 failure for boiler area HT Fans MOV power Completed Mr. N Yadav 6/20/2020
487 20.06.20 Unit#1 BA SP-1B Dis MIV leakage completed Mr. Deepak Adhikari 6/20/2020
488 20.06.20 Unit#2 Vaccum Pump A separator Makeup SOV passing completed Mr. S Jha 6/20/2020
489 19.06.20 Unit#2 Slurry line-A leakage at DWB-3 top completed Mr. Deepak Adhikari 6/21/2020
490 16.06.20 Unit #2 ESP Fluidizing Blower 2A abnormal sound Completed Mr. Deepak Adhikari 6/21/2020
491 20.06.20 Unit#2 APH a&b fire alarm checking Completed Mr. S Jha 6/20/2020
492 20.06.20 Unit#3 condensate transfer pump 3A not available Completed Mr. VK Shukla 6/20/2020
493 20.06.20 Unit#1 Feedwater flow transmitter leakage Completed Mr. S Jha 6/20/2020
494 18.06.20 HCSD Silo 2 Vent Fan B not available Completed Mr. DK Adhikari 6/20/2020
495 20.06.20 Unit#2 H2 Drier-A both Compressor ineffective Completed Mr. VK Shukla 6/20/2020
496 18.06.20 AHP Creative Pump 2C-gland leakage 2c Completed,2B Mr. Deepak Adhikari 6/20/2020
497 17.06.20 Main Plant HVAC System CEP VFD room not working-completed 6/18/2020
498 18.06.20 Unit#1 Blr EER room Temp .is in high range (30 Deg C)-completed Mr. N yadav 6/18/2020
504 18.06.20 Unit#1 Stator water Cooler A High vibration 8.2 mm/sec at PDE H completed. Mr. VK Shukla 6/20/2020
505 19.06.20 U#1 &U#2 Mill 1C & 2E centre coal pipe leakage Completed Mr. Sanjay Singh 6/19/2020
506 19.06.20 Unit#2 E3 purge MOV coal leakage Completed Mr. Sanjay Singh 6/19/2020
507 19.06.20 Unit#1 BA Slurry pump-A RC line lkg. arrest work C Mr. DK Adhikari 6/19/2020
508 15.06.20 Unit#1 ID Fan 1A completed Mr. SK Jha 6/19/2020
509 15.06.20 Unit#3 Seal Air Fan 3B Completed Mr. Sanjay Singh Planned in SD
510 18.06.20 Unit#1 Seal oil Vaccum Pump B Abnormal sound observed Mr. VK Shukla 6/18/2020
511 18.06.20 Unit#2 OCCW - A Gland leakage observed/ to be arrested-Completed Mr. VK Shukla 6/18/2020
512 18.06.20 Unit#1 Vacuum pump-B pump NDE side abnormal Completed Mr. VK Shukla
513 18.06.20 Unit#1 BA SP Drain Pump B Completed Mr. N Yadav 6/18/2020
514 15.06.20 Unit#2 LRSB R13 Stucked during operation / Cable tray rectification to be done Mr. Naveen Gupta 6/17/2020
515 18.06.20 Unit#1 ID Fan B Discharge damper Limit Setting Completed Mr. SK Jha
516 18.06.20 AHP Paddle Mixture - 4Chute Line leakge arresting completed Mr. Deepak Adhikari 6/18/2020
517 13.06.20 BOP IAC 3 Couple trial Planned- 17.05.2020 Mr. RK Gautam 6/17/2020
518 16.06.20 Unit#3 TDBFP A LOP A TDBFP-A LOP-A oil lkg from oil seal Mr. VK Shukla 6/17/2020
519 17.06.20 Unit#1 Mill A Cooler to be replaced Mr. Sanjay Singh 6/17/2020
520 16.06.20 Unit#1 Seal Oil Vacuum Pump High Vibration - Max vib 6.5 mm/sec at MNDE H Mr. VK Shukla 6/17/2020
521 15.06.20 BOP PTP PAC Pump B PAC p/p B o/l line leakage near IPF 4 Mr. RK Gautam 6/16/2020
522 15.06.20 Unit#1 Vaccum pump A Current feedback not coming Mr. Naveen Gupta 6/16/2020
523 14.06.20 Unit#3 MDBFP MDBFP dischage line drain valve passing Mr. VK Shukla 16-06-20 R1
524 15.06.20 Unit#1 APH Conv. Line APH Convy. To be done Mr. Deepak Adhikari 16-06-20 R1
525 15.06.20 Unit#2 BASP B Not availble/ WIP Mr. Deepak Adhikari 6/16/2020
526 13.06.20 AHP Creative Pump 1C Trial Planned today Mr. Deepak Adhikari 6/16/2020
527 14.06.20 Unit#1 BS Drain Pump Trial planned - 17.06.2020 Mr. Deepak Adhikari 6/17/2020
528 16.06.20 CHP Stacker Reclaimer 2 SCR#2 boom cov. takeup guide pipe replac Mr. Pinaki Guha
529 14.06.20 Unit#1 OCCW Electric Strainer Mr. Mari Ganesh 6/17/2020
530 14.06.20 Unit#1 BA Slurry Pump A High vibration 11.2mm/sec at PDE H - Completed Mr. Deepak Adhikari 6/15/2020
531 14.06.20 Unit#1 EH Oil Pump B EH Oil Pump B Pressure not developing Mr. Mari Ganesh 6/15/2020
532 15.06.20 AHP Service Air Compressor 13 High Vibration Max vib 11.1 mm/sec at C NDE A Mr. Naveen Gupta
535 13.06.20 Unit#1 Mill C Not vailable due to felt leakage- WIP Mr. Sanjay Singh 6/13/2020
536 13.06.20 Unit#3 TDBFP A LOP A Mr. Mari Ganesh/ Naveen Gupta 6/15/2020
537 14.06.20 Unit#1 U1 Cond Vacuum Pump B Vacuum pump B DE,NDE side gland lkg Mr. Mari Ganesh 6/14/2020
538 13.06.20 Unit#2 H2 dryer H2 dryer not effective Mr. Mari Ganesh 6/13/2020
542 04.05.20 SOV - replaced/ Crack opening still observed Mr. S Jha/ Mari Ganesh Under discussion
543 14.06.20 Unit#3 U3 TDBFP A LOP A U#3 TDBFP-A LOP-A oil lkg Mr. Mari Ganesh 6/14/2020
544 22.05.20 SY metering room Mr. S Isac/Mr. Pankaj
545 23.04.20 BOP Recycle pump B not available Mr. Naveen Gupta 08-06-20 R2
546 12.06.20 Unit#1 BA SP 1A Suction line leakage / Work Completed - Trial under progress Mr. Deepak Adhikari 6/12/2020
547 25.05.20 Unit#2 TG Mr. Mari Ganesh/ Ganesh Babu Under Observation
548 02.06.20 Unit - I Dropping of EH oil header Pr. In TDBFP A Mr. Ganesh Babu/ SK Jha
549 23.05.20 Plant PSSR for all area All concerned HOD's
551 28.05.20 TG Chiller A/B not avail Mr. Mari Ganesh 07-06-20 r1
552 09.06.20 Unit#2 Light Up Unit Synchronized at 05:05 hrs / Load ramp up in progress Mr. Ganesh Babu 6/10/2020
553 09.06.20 Unit#3 Light Up Unit Lighted Up at 11:30 hrs Mr. Ganesh Babu 6/10/2020
554 09.06.20 Unit#1 FF Pre-coating FF Pre-coating planned Mr. Ganesh Babu/ Akash Modi 6/10/2020
556 04.06.20 Unit#3 CW Pmp A Hyd Pump B Mr. Mari Ganesh/ Ganesh Babu 06-06-20 R1
557 08.06.20 HVAC HVAC Cooling WP- C Minor Leakage observed/ Mech seal to be replaced Mr. Mari Ganesh
558 08.06.20 WS Hypo Gentr B Not available Mr. RK Gautam Revert by 10-06-20
559 08.06.20 FF System Overhead line - FF to be taken in service All concerned HOD's/ HSE
560 29.05.20 Unit#1 Mill F-Inching Motor not available Motor shifted at Mill 1F ,damage motor under rectification Mr. Naveen Gupta/ Sanjay Singh 10-06-20 R2
561 21.05.20 Unit#2 Bunker 2F smoke Mill Taken in service Mr. Ganesh Babu Under Observation
562 20.05.20 Unit#2 Bunker 2E smoke Mill Taken in service Mr. Ganesh Babu Under Observation
563 25.05.20 Unit#3 Bunker 3C smoke Mill Taken in service Mr. Sanjay Singh Under Observation
564 12.06.20 Station Issues for DC revision Mr. Gaurav Sharma 6/12/2020
571 12.06.20 HR/ Admin. Sunady off resuffling Mr. R Panda/ Jaymond 6/12/2020
572 13.06.20 Unit#3 APRDS Header U#3 Gland Steam Overflow CV Reverse Opn Mr. SK Jha
573 08.06.20 Unit#3 Trb MCC Mr. Mari Ganesh/Pankaj 6/10/2020
577 04.06.20 AHP Rain Pond Rain pond cleaning & readyness Mr. Akash Modi
578 05.06.20 SY Dia 3 Brkr testing Work in progress Mr. Naveen Gupta 09-06-20 R2
579 06.06.20 Unit#2 SB/LRSB Trial taken/ defect notf. Raised for 16 no. (EMD- 5 Nos) Mr. Naveen Gupta
580 08.06.20 TG Common PCC -2 Auto Change over not successful Mr. Naveen Gupta 6/9/2020
581 30.05.20 Unit#2 IDCT-1 GB abnormal sound- Shaft clearance observed - WS Mr. Mari Ganesh 07-06-20 R1
582 30.05.20 CHP Coal Yard Fire Smoke observed/ Action being taken as req. Mr. Pinaki Guha 5/30/2020
583 29.05.20 FOPH LDO Transfer pump A Mr. Ganesh Babu Under Observation
584 25.05.20 NTCT Lown maint. Lown maint. To be done Admin 6/5/2020
585 03.06.20 Unit 1 wall blower B8 not starting Rectification planned today Mr. Naveen Gupta 6/3/2020
586 03.06.20 Unit#2 Mill B inching motor abnormal sound Rectification planned today Mr. Naveen Gupta 6/3/2020
587 03.06.20 Unit#2 wall blower drain MOV inoperative Rectification planned today Mr. Sanjiv Jha 6/3/2020
588 03.06.20 Unit#2 Mill C inching motor not disengaging Rectification planned today Mr. Sanjay Singh 6/3/2020
589 03.06.20 Unit#2 U2 IPBD not developing pressure Planned today Mr. Naveen Gupta/Mr. S Jha 6/3/2020
590 03.06.20 Raw water trafo-B 11KV VCB not closed Planned today Mr. Naveen Gupta 6/3/2020
591 03.06.20 Unit#3 U#3 Turbine JOP line pressure switch oil leakage for brng 7 Planned today M. S Jha 6/3/2020
592 03.06.20 Unit#3 U3 oil purifier modification line oil leakage WIP Mr. M Ganesh 6/3/2020
593 03.06.20 Station HSE will compile data Mr. Pradeep Pradhan 6/4/2020
594 05.06.20 Unit#2 Mill C Couple trial Planned Mr. Sanjay Singh 6/5/2020
595 05.06.20 FF System fire Hydent Pump A No Load trial U/P , Load trial Planned Mr. Mari Ganesh 6/6/2020
596 06.06.20 Unit#1 Seal Oil Vcm Pmp Trail Planned today Mr. Naveen Gupta 6/6/2020
597 04.06.20 CHP Paddle Feeder -2 Coal stucking issue Mr. Pinaki Guha 6/4/2020
598 01.06.20 Weigh Bridge Weighment Failure OEM at site.Calibaration work in progress Mr. SK Jha 05-06-20 R1
599 02.06.20 H2 plant Make up SOV SOV passing observed-work inprogress SK Jha 03-06-20-R1
600 28.05.20 BOP IAC-5 not available work completed,trial today Mr. Mari Ganesh 03-06-20 R2
601 01.06.20 Unit#3 LRSB R10 Limit switch setting Mr. Naveen gupta 03-06-20 R1
602 02.06.20 Unit#3 CW Pump A Hydraulic skid Pr switch rectified,trial today Mr. Sanjiv Jha 03-06-20-R1
603 19.05.20 CHP Conv. 2A Belt replacement done/ Trial planned Mr. Pinaki Guha 6/2/2020
604 01.06.20 Unit#2 ESP Charging / checking planned today Mr. Ganesh Babu/ Mr. Naveen Gupta 6/2/2020
605 02.06.20 Unit#1 APH A Mr. SK Jha / Mr. Naveen Gupta 6/3/2020
606 30.05.20 FFPH Diesel Sprinkler Pump Completed Mr. RK Gautam 6/2/2020
607 01.06.20 Unit#3 PA Fan 3A Megger value low Completed Mr. Sanjay Singh 6/1/2020
608 01.06.20 Unit#1 TDBFP A LOP B Trial Planned today Mr. Mari Ganesh/ Ganesh Babu 04-06-20 R1
609 01.06.20 HSE Fire Tender GB abnormal sound Completed Mr. PK Pradhan 6/2/2020
610 29.05.20 Unit#2 SSC conv. Chain rotation work in progress Mr. Deepak Adhikari 01-06-20 R1
611 18.05.20 CWPH CW pump 1B completed Mr. Mari Ganesh 01-06-20 R1
612 30.05.20 IACH IACH Ins Air Drier C IAD 3 d/s NRV passing Mr. Mari Ganesh 6/1/2020
613 30.05.20 IACH IACH Combined Air Drier D Trial Planned today Mr. Naveen Gupta 6/1/2020
614 29.05.20 Unit#2 TDBFP B / A Mr. Ganesh Babu/ SK Jha 6/1/2020
615 30.05.20 Unit#1 ESP Inspection done/ C1 field observation rectification - WIP Mr. Sanjay Singh 5/30/2020
616 27.05.20 Unit#1 ID Fan 1B IGV cheking in progress Mr. Sanjay Singh 30-05-20 R2
617 29.05.20 NDCT Heavy Under Ground Water lkg FF Shutdown taken/ WIP Mr. Mari Ganesh 5/30/2020
618 25.05.20 SY Mukhtasar-2 Ckt maint. Planned for 5 days Maint. By PSTCL / 27.05.2020 Mr. Naveen Gupta 6/2/2020
619 28.05.20 Uni#1 MOT oil purifier Top Up arrangement - WIP Mr. Mari Ganesh 30-05-20 R1
621 14.04.20 Plant PCC transformer cooling fan availability Mr. Naveen Gupta 29-05-20 R1
622 14.04.20 BOP Self suction recycle pump not available Completed Mr. RK Gautam 5/28/2020
623 20.05.20 Unit#2 LRSB- R2 Removed/ Restoration plan to be submitted- 26.05.2020 Mr. Sanjay Singh 5/30/2020
624 28.05.20 CHP DE/DS/ Sump Pump Sataus Daily Status to be updated in DPRM by Mr. JN Murhti Mr. Pinaki Guha Contineous
625 27.05.20 Unit#2 PA fan 2A Completed Mr. Sanjay Singh 5/28/2020
626 27.05.20 Unit#3 ESP A1 field Completed Mr. Ganesh Babu 5/28/2020
627 21.05.20 DM RO RO-2 2nd Stage I/Lflange & vessel leakage Completed Mr. RK Gautam 5/27/2020
628 25.05.20 Unit#2 Mill-C HP pump-A Mill-C HP pump-A motorHigh Vibration Mr. Naveen Gupta
629 27.05.20 Unit#3 ESP Completed Mr. Sanjay Singh 5/27/2020
630 22.05.20 Unit#2 ID Fan B Cooling Air Fan A Completed Mr. Naveen Gupta 28-05-20 R2
631 25.05.20 Unit#2 CST down stean drain Completed Mr. Mari Ganesh/ Pankaj 5/28/2020
632 25.05.20 Unit#3 CST make up MOV Completed Mr. Mari Ganesh 27-05-20 R1
633 27.05.20 Unit#3 ESP C1 field Completed Mr. Sanjay Singh 5/29/2020
634 26.05.20 Unit#2 PA Fan A LOP A not available Completed Mr. Naveen Gupta 5/27/2020
635 27.05.20 Unit#3 TDBFP B OVEF A Completed Mr. Naveen Gupta 5/27/2020
636 18.05.20 Silo Silo vent fan 3B Completed Mr. DK Adhikari 5/25/2020
637 18.05.20 Silo Silo vent fan 1A Completed Mr. DK Adhikari/Mr. Pankaj 5/22/2020
638 22.05.20 Unit#2 CCCW A Discharge NRV abnormal sound Completed Mr. Mari Ganesh 5/22/2020
639 22.05.20 Unit#1 Oil purifier i/p pump not developing pressure Completed Mr. Mari Ganesh 5/22/2020
640 21.05.20 Unit#1 EH oil pump-A pressure inadequate Completed Mr. Mari Ganesh/Mr. S Jha 5/22/2020
641 26.05.20 Unit#2 FRS FRS 30% under PTW for gland leakage Mr. Sanjay Singh 5/26/2020
642 27.05.20 Unit#1 APH APH flow deviation observed / Purging planned Mr. SK Jha 5/26/2020
643 21.05.20 TWS C TWS-3 abnormal sound observed Completed Mr. RK Gautam 5/23/2020
644 21.05.20 Unit#2 Acid Bulk Tank B Vent Flange Damaged Completed Mr. RK Gautam 5/22/2020
645 25.05.20 Unit#2 Mill E Completed Mr. Sanjay Singh
646 25.05.20 Plant Service water Shutdown Completed Mr. RK Gautam 5/25/2020
647 22.05.20 Unit#1 TDBFP-A LOP-B oil seepage from gland Completed Mr. S Jha 5/22/2020
648 22.05.20 Unit#1 B2 purge MOV limit setting Completed Mr. S Jha 5/22/2020
649 22.05.20 Unit#3 FF line ARV passing Completed Mr. S Singh 5/22/2020
650 25.05.20 Unit#2 Mill B Completed Mr. Sanjay Singh
651 07.05.20 IACH IACH Completed Mr. RK Gautam 5/24/2020
652 21.05.20 Unit#1 & 3 Sluice pump g
684 13.05.20 Unit#2 Mill 3E internal inspection Completed Mr. Sanjay Singh 5/18/2020
685 18.05.20 AHP SAC-5 Completed Mr. DK Adhikari 5/18/2020
686 17.05.20 AHP Fluidizing Blower- 2A Completed Mr. Deepak Adhikari 5/18/2020
687 11.05.20 Unit#2 CW Pump-2B Motor sapce heater resistance open Completed Mr. S Isac 5/15/2020
688 43963 Station/HSE TSPL safety app open points closure All o pen p oin ts to be cl osed ,status sh ared b y H SE o n All HOD's/Mr. P Pradhan 5/18/2020
14 .0 5.202 0 - discu ssed
689 18.05.20 Unit#3 PA fan B LOP B Trial U/P - no load Mr. Sanjay Singh/ Naveen Gupta 5/18/2020
690 18.05.20 Unit#2 PA fan 2A Completed Mr. Sanjay Singh 5/18/2020
691 14.05.20 SY Moga Circuit under maint. Completed Mr. Naveen Gupta 5/17/2020
692 11.05.20 DM Plant Hypo dosing p/p common outlet line leakage Completed Mr. RK Gautam 13-05-20 R1
693 14.05.20 Unit#1 CTP to Boiler filling line Completed Mr. Mari Ganesh 5/16/2020
694 15.05.20 FF System Fire Hydent Pump A Completed Mr. Mari Ganesh 5/16/2020
695 12.05.20 Unit#1 PA Fan A LOP A motor NDE side abnormal sound Completed Mr. S Singh/Mr. S Isac 5/15/2020
696 16.05.20 Unit#2 Reheat damper Inspection & rectification work to be done- Completed Mr. Sanjay Singh 5/16/2020
697 12.05.20 AHP Silo#1,2&3 DAU Spout Alignment work Completed Mr. DK Adhikari 16-05-20 R1
698 12.05.20 AHP Paddle mixer- 1 Readiness work Completed Mr. DK Adhikari 15-05-20 R1
699 12.05.20 Unit#2 Bunker B coal unloading work Completed Mr. Sanjay Singh B2 side completed
700 14.05.20 Uni#2 ID FAN A beck actuator installation Completed Mr. Sanjay Singh 17-05-20 R1
701 14.05.20 Uni#2 ID FAN B beck actuator installation Completed Mr. Sanjay Singh 17-05-20 R1
1 5-05 -20
H FO A/B co mpl
702 08.05.20 FOPH FOPH tank - Nozzle ckecking Completed Mr. Sanjay Singh H SD ta nk 29 N ozzle
re pla ced
703 13.05.20 Unit#2 Mill 1D internal inspection Internal Inspection to be done- Completed Mr. Sanjay Singh 5/17/2020
704 15.05.20 CHP Conv. 5B Bel t rep lace ment in p rogre ss/ Trial p lan ned - 1 6.05 .2 020 - Mr. Pinaki Guha 5/16/2020
COMPLETED
705 15.05.20 BTG All Units Seal Trough Seal Trough charged for all units Mr. Ganesh Babu Compl- 15-05-20
706 13.05.20 Unit#2 Mill 2B internal inspection & Mock drill Internal Inspection and Mock drill - done Mr. Sanjay Singh 14-05-20 R1
Hyd rant pump to b e sto ppe d fo r 2 h rs i n eve nin g fo r
707 43963 Station Jockey pump continuous running due to system leakages ob servatio n- Don e Mr. Ganesh Babu Under Observation
Le akag e ide ntifica ti on do ne.
708 13.05.20 CHP Conv 7B belt replacement work 235 Mtyr belt replacement under progress - Compl Mr. Pinaki Guha 5/14/2020
709 13.05.20 Plant Service Water Line leakages Completed Mr. Ganesh Babu 5/14/2020
710 43962 All unit CA & PA for coal mill fire Preparation by operation - done Mr. Ganesh Babu 14-05-20 R1
711 02.03.20 TG IDCT float replacement to be done Completed Mr. Mari Ganesh 5/14/2020
712 11.05.20 Unit#1 Spiral water wall MOV enage lever not available Completed Mr. S Jha 5/14/2020
713 12.05.20 Unit#3 Relay room FCU B abnormal sound Completed Mr. M Ganesh 5/14/2020
714 11.05.20 Unit#2 APH Soot Blower AT-1&3 inopeartive Completed Mr. S Isac 5/13/2020
715 10.05.20 Unit#3 Mill B journal bearing NDE side oil leakage Completed Mr. S Singh 5/14/2020
716 11.05.20 Unit#3 BA Agitator A blade replacement Completed Mr. DK Adhikari 5/12/2020
717 12.05.20 Unit#1 Boiler Lift TPI expired Completed Mr. S Singh/Mr. S Isac 5/13/2020
718 43861 FOPH HFO supply pump mech seal to be procured Mech Received at site Mr. Sanjay Singh/MLN Rao
i. MOV rep lace d
Co upl ing ma chin ing work in p rogre ss Mr. Sanjay Singh/Mr. S Jha
719 15.04.20 Unit#1 Back pass ring header passing ii . Water seep age fro m Bo ile r se para to r h ead er ,d rai nin g 13-05-20 R2
pl ann ed tod ay
720 12.05.20 Aux. boiler 1 AUX blr 1 gun 2 ignitor not proven Completed Mr. S Jha 5/13/2020
721 12.05.20 Aux. boiler 1 AUX blr 2 oil pump not started Completed Mr. S Jha 5/13/2020
Re cti fi ed wa ll bl owe r tria l ta ken o n 29.04 .2 0 & defect
722 25.04.20 BLR SB/LRSB status circu lated Mr. Sanjay Garai/ Ganesh Babu 5/6/2020
Pla n submi ssion b y - 0 6.05.20 20
723 25.04.20 BLR- Mills Mills ball shorting to be done To be planned after discussion with TSPL - Plan submission Mr. Sanjay Singh Not Planned
724 43547 Plant U#1,2 & 3 boiler preservation to be done Under preserved condition Mr. Ganesh Babu / Mr. S Dwivedi Continuous
H IPO po int closu re-Perma nen et p ow er supp ly fo r U #2 Mr. S Isac
725 43962 U#2 Completed 5/14/2020
co nd ense r d ewa te ring p ump
C lea nin ed d urin g Boil er
726 43963 Boiler Area Cable tray cleaning Completed Mr. S Isac
w ashi ng
727 13.05.20 Unit#2 Barring gear trial Completed Mr. Ganesh Babu 5/13/2020
728 07.05.20 SY Nakodar ckt line maintenance work Completed Mr. Naveen Gupta 5/14/2020
729 43962 All unit Mills start up checklist to be prepared Completed Mr. Ganesh Babu 5/13/2020
730 11.05.20 Unit#2 CCCW pump A motor not available Completed Mr. S Isac 5/12/2020
731 43963 JS store JS store to be audited for stocking of expired consumable Completed Mr. S Isac 5/12/2020
732 03.05.20 Store MCB/DB – covered roof damaged due to storm behind gate 2 & 3 Completed Mr. S Isac/Mr. Sunther/Mr. SK Sinha
Temp ora ry p owe r ca ble for Gas cylin der stora ge she d to b e Mr. S Isac/Mr. Pankaj
733 03.05.20 Store Completed 5/9/2020
e ithe r re moved o r to be u nd ergro und ed
734 27.04.20 Unit#2 CRV-2 Not properly operated completed,trial ok Mr. Mari Ganesh 5/11/2020
735 11.05.20 Unit#3 U#3 Relay FCU-A tripping frequently Completed Mr. S Jha 5/11/2020
736 09.05.20 BTG CPP separator backwash pneumatic vlv air leakage Completed Mr. S Jha 12-05-20-R1
w ater spra ying i n bun ker to b e do ne after informi ng Mr. Pinaki Guha/Mr. Ganesh Babu/Mr. S
737 43956 All unit SOP made & circulated on 11th May'20 Singh 5/11/2020
ma in te nan ce dep t.
i. Bunke r e mpty w ork compl eted . Mr. Pinaki Guha/Mr. Sanjay Singh
738 43937 Unit#3 Bunker E smoke observed Ii.Fe ede r i / Gate MOV re cti fi ed 5/11/2020
739 43953 Switchyard Station Transformer 2 under maintenance Work Completed- Charging done Mr. S Isac 11-05-20 R1
740 11.05.20 Unit#3 BA Agitator B motor cable connection for trial Completed Mr. S Isac 5/11/2020
741 01.05.20 Unit#2 U2 UPS 1 & UPS 2 voltage & current showing bad Completed Mr. Naveen Gupta/Mr. S Jha
742 06.05.20 Unit#1 Scanner air fan A motor NDE side abnormal sound Completed Mr. S Isac 5/11/2020
743 24.04.20 Unit#2 IDCT 2 Gear Box sound observed Completed Mr. Mari Ganesh/ MLN Rao
744 05.05.20 Unit#3 Hot PA & SA duct washing Completed Mr. Sanjay Singh 10-05-20 R2
745 28.04.20 Unit#3 Mill D - seal air line modification Completed Mr. S Singh 09-05-20 R1
746 07.05.20 U#1 BASP 1B Completed Mr. DK Adhikari 5/8/2020
747 08.05.20 Unit#1 IDF A & B IGV Checking Completed Mr. SK Jha 5/9/2020
748 08.05.20 Unit#3 ID Fan-A&B IGV checking.... Completed Mr. SK Jha 5/9/2020
749 09.05.20 Unit#2 MOT oil purifier abnormal sound Completed Mr. Mari Ganesh 5/10/2020
750 08.05.20 Unit#2 Turbine IPCV valve 2 not oprating properly Completed Mr. Mari Ganesh 5/9/2020
751 08.05.20 Unit#1 OCCW bypass line - PTW for 2 days Completed Mr. Mari Ganesh 5/10/2020
752 09.05.20 AHP SAC -11 air cooler lkg arresting work Completed Mr. DK Adhiakri
753 05.05.20 Unit#1 HPLP bypass oil tank cleaning Completed Mr. Mari Ganesh 5/8/2020
754 08.05.20 Unit#3 Boiler Lift Maintennce work Completed Mr. Naveen Gupta 5/9/2020
755 28.04.20 Unit#2 U#2 scrapper auto tension inspection Completed Mr. DK Adhikari 5/8/2020
756 25.04.20 IAC/ BOP IAC AHU blower A not available Completed Mr. S Isac/Mr. L Mishra 5/6/2020
757 23.04.20 Unit#3 Boiler lift not available Completed Mr. Naveen Gupta 5/8/2020
758 07.05.20 Unit#3 Tower AC not effective Completed Mr. Naveen Gupta 5/9/2020
759 07.05.20 U#1 HPLP Bypass Completed Mr. Ganesh Babu 5/7/2020
760 01.05.20 Plant Itentification of leakages with respect to FF water consumption. Completed Mr. Ganesh Babu/Concerned HOD's Under discussion
761 06.05.20 Unit#1 Aux. steam to preheating MOV abnormal sound Completed Mr. S Jha/ Mari Ganesh 5/6/2020
762 23.04.20 Chimney Chimney lift not avaialble Completed Mr. Naveen Gupta/Mr. PK Pradhan 5/6/2020
763 23.03.20 HVAC U#2 & U#3 turbine EER tower AC not working Completed Mr. S Isac/Mr. Ganesh babu
764 14.04.20 Unit#1 TG Seal oil vacuum pump N/A Completed Mr. Naveen Gupta Under Observation
Re cti fi cation w ork compl eted
765 43954 CHP 13 minor rain cuts observed Mr. Pinaki Guha 5/5/2020
Pla n submi tted
EH o il A R/c pump mo to r n ot a vail abl e,shi fted a t U# 1 seal o il
766 04.05.20 Unit#2 Completed Mr. S Isac 5/6/2020
va cuu m p ump 1A
767 05.05.20 FOPH FOPH Foam Tank filling Filling done Mr. Sanajay Singh
768 28.04.20 Unit#1 CTP A not available Completed Mr. Naveen Gupta 5/4/2020
769 04.05.20 Unit#1 Boiler drain pump B suction MIV inoperative Completed Mr. Sanjay Singh 5/4/2020
770 03.05.20 L&T store gate Power failure at security post at L& T Stores gate. Completed Mr. S Isac 5/6/2020
771 27.04.20 Unit#1 Oil purifier not available Completed Mr. Mari Ganesh 5/5/2020
772 05.05.20 FF System FF system Shutdown FF systen shu td own ta ken on 0 6.05.2 020 ,d efect b ein g All concerned HOD's Completed
attend ed a s p er ide ntified l ist
773 29.04.20 CPP Area CPP operation from main CCR Not planned Mr. SK Jha
774 05.05.20 Unit#3 APH - A Main Motor Re verse con nectio n of main Mo to r/ APH in te rnal i nspe ction Mr. Naveen Gupta/ Sanajay Singh N o Ob serva ti on foun d -
un der pro gress b y BMD for an y a bno rmali ty. ok
775 23.03.20 HVAC System IDCT make up pump motor not available Completed Mr. S Isac/Mr. M Ganesh 3/28/2020
776 43941 Unit#2 Bunker 2B both side smoke observed CO2 inerting capping done,No smoke observed Mr. Pinaki Guha/Mr. Sanjay Singh Under observation
777 21.04.20 WS Hydrazine availability 15 0 kg Hydra zine a vai lab le at site Mr. S Dwivedi/ MLN Rao 4/21/2020
Avai lab ili ty for suffi cien t stock
778 21.04.20 Plant HSE Mock drill Mock drill completed FOPH Mr. PK Pradhan 4/21/2020
779 27.04.20 AHP BASP 1B discharge line leakage Completed Mr. DK Adhikari 5/1/2020
780 01.05.20 U#1 & U#3 HPCV & IPCV suction side DP switch malfunctioning Completed Mr. S Jha/Mr. M Ganesh 5/1/2020
781 28.04.20 Unit#3 Mill C - seal air line modification Completed Mr. S Singh 5/3/2020
782 28.04.20 Unit#2 PA & FD Duct washing Completed Mr. S Isac/Mr. S Singh 5/1/2020
783 01.05.20 Unit#3 SB - R 10, to be checked (stuck inside during trial) completed Mr. Sanjay Singh 5/1/2020
784 29.04.20 DM Plant ZDS operation from DM control room Completed Mr. SK Jha 5/15/2020
785 01.05.20 Unit#3 U3 oil purifier hose pipe pin hole lkg Completed Mr. Mari Ganesh
786 28.04.20 Unit#2 Turbine zero speed not acting Completed Mr. S Jha 4/29/2020
787 28.04.20 Unit#1 CRV - 2 moog valve replacement work scaffolding in progress Mr. M Ganesh 4/29/2020
788 28.04.20 Unit#3 HPLP bypass oil replacement completed Mr. M Ganesh 4/29/2020
789 25.04.20 SILO Silo Blower heater in Auto Completed Mr. SK Jha 4/29/2020
790 14.04.20 IPBD IPBD Compressor checking IPBD air supply fed from instrument air & its working. Mr. Naveen Gupta 4/25/2020
791 43936 Unit#1 Bunker 1D smoke observed Coal removal done - 27.04.2020 Mr. Sanjay Singh/ Ganesh Babu 5/2/2020
Transforme r to be ke pt charg ed as pe r o pratio na l
792 25.04.20 Plant Transformer discharging Mr. Naveen Gupta/ Ganesh Babu 4/25/2020
req uire ment onl y - Co mple te d
793 24.04.20 Unit#2 Mill 2B megger value low observed Completed Mr. Naveen Gupta 4/24/2020
794 14.04.20 Unit#1 EH oil pressure low(TDBFP A oil path to be checked) Completed Mr. Mari Ganesh/SK Jha 21-04-20-R3
795 21.04.20 SY SY Dia -2 Completed Mr. S Isac 4/21/2020
796 23.04.20 Unit#2 EH Oil pump -B not available Completed Mr. Naveen Gupta 4/23/2020
797 23.04.20 Unit#2 EH Oil pump -A not available Completed Mr. Mari Ganesh 4/23/2020
798 23.04.20 Unit#1 Hydrogen filling line Completed Mr. Ganesh Babu/ M Ganesh 4/23/2020
Equ ipme nts for wh ich TPI h as expi red ,to b e iso lated (not in
799 15.04.20 Plant Lifting tools TPI Avaialability use )-Chi mney li ft compl eted Mr. PK pradhan/Ganesh Babu
iso latio n don e by Oprtn as per li st
800 43805 BOP IAC 1 not available due to high vibration (35mm/sec) Completed Mr. Rajesh Gautam/ Sabu
801 15.04.20 U#2 TDBFP-A DC EOP taking high curret -31 Amps Completed Mr. S Isac 18-04-20 R1
802 17.04.20 BOP Service water pump house C VFD tripping Completed Mr. S Isac 18-04-20 R1
803 16.04.20 U#3 CRH NRV SOV issue & lock nut missing Completed Mr. S Jha/Mr. M Ganesh 4/17/2020
804 16.04.20 U#1 A1,A2,B2 & F2 FF line to feeder choke Completed Mr. Sanjay Singh 4/17/2020
805 16.04.20 U#2 A2 FF line to feeder choke Completed Mr. Sanjay Singh 4/17/2020
806 15.04.20 Unit#2 Mill & Feeder Floor water Washing Completed Mr. Sanjay Singh 4/17/2020
807 14.04.20 Unit#1 Boiler EER package AC-A abnormal sound Completed Mr. Naveen Gupta/M Ganesh 4/17/2020
808 17.04.20 Workshop Workshop MIS report to be shared to all concerned MIS circulation started Mr. Sunthar After material availability
809 17.04.20 Buffer Tank VT Pump B breaker rack in issue Completed Mr. S Isac 4/17/2020
810 15.04.20 Plant Summer Management Input received,will be circulated today along with DPRM All HOD's 4/16/2020
811 15.04.20 Unit#2 Gland seal drain valve d-coupling work Completed Mr. Mari Ganesh/SK Jha 4/16/2020
812 14.04.20 Unit#1 TG Seal oil vacuum pump cooling line modification work Work completed, commissioning done Mr. Mari Ganesh/ Ganesh Babu 4/16/2020
813 15.04.20 U#1 TDBFP 1B HPCV delinked. Completed Mr. Mari Ganesh 4/16/2020
814 14.04.20 Unit#2 TG HPH 3 partition plate replacement work Completed Mr. Mari Ganesh 4/15/2020
815 15.04.20 U#1 CST make up MIV spindle broken Completed Mr. Mari Ganesh.Mr. R Ganesh 4/16/2020
816 16.04.20 U#1 Mill & feeder A1 seal air MOV checking Completed Mr. S Jha 4/16/2020
817 16.04.20 IAD#1 IAD-1 tower A drain valve tube damage Completed Mr. S Jha 4/16/2020
818 15.04.20 Unit#3 Boiler lift gate not working properly Completed Naveen Gupta 4/16/2020
D iese l Oil sprin kle r Pu mp- Pini on crack foun d, to b e made
819 14.04.20 BOP Completed Mr. RK Gautam/ Naveen Gupta 15-04-20 R1
a vai lab le by 15 .0 4.20
820 15.04.20 CHP HTMS-12A oil leakage arresting work Completed Mr. Pinaki Guha
C ritical Work PTW da ily status to be di scussed i n da ily DPR M
821 20.03.20 Plant Being discussed Mr. Ganesh Babu Continuous
me etin g by Ore ration
822 23.03.20 CW pump CW pump 2A & 3A self sealing valve eroded Completed Mr. M Ganesh
Sw itch Yard & Transforme r Ya rd area D e-veg itatio n to b e don e Mr. Sabu
823 20.03.20 SY & TY & the ir pla n Completed Continuous
824 14.04.20 TG all units EH oil in service Completed Mr. Mari Ganesh/ Ganesh Babu 4/14/2020
825 24.03.20 U#1 FRS 30% CV MOV not available Completed Mr. Sanjay Singh 4/14/2020
826 15.04.20 Unit#2 Mill 2 E LP pump B decoupling Completed Mr. Sanjay Singh
827 04.03.20 Unit#3 ESP Seal Air Fan 3B - High Vib. MNDE- 17.2 Completed Mr. DK Adhikari
828 04.03.20 Unit#3 ESP Seal Air Fan 3D - High Vib. MNDE- 15.1 Completed Mr. DK Adhikari
U# 2/ C W pu mp C W pu mp 2A motor rep lace ment(Motor tripp ed o n defferen ti al
829 23.03.20 h ouse p rotectio n duri ng trial ) Completed Mr. M Ganesh 3/26/2020
835 25.03.20 Plant Sta tu s o f he aters to b e che cked & kept in servi ce as Completed Mr. Ganesh Babu/Mr. S Isac/Concerned 3/27/2020
a pp lica ble (Electrica l Pane l/Motor/Lub e oi l ta nks,e.t.c.) HOD's
836 43852 U#1 U1 APH SB drain MOV wheel N/A Completed Mr. S Jha
837 43852 U#1 U1 Dispensor Mov engaging lever N/A Completed Mr. S Jha
838 20.03.20 U#1 TDBFP A box up work Completed Mr. M Ganesh 3/26/2020
839 24.03.20 U#1 APH seal plate & Bracing rectification work Completed Mr. Sanjay Singh 26-03-20-R1
Ba sed o n manp owe r
840 24.03.20 Silo#2 Dry Ash Unloader readyness work Completed Mr. deepak Adhikari
a vail ab ility
841 20.03.20 U#1 BA gate oil leakage Completed Mr. DK Adhikari 26-03-20-R1
Ba sed o n manp owe r
842 23.03.20 U#3 BA gate 'O' ring oil seepage Completed Mr. DK Adhikari
a vail ab ility
843 23.03.20 HVAC System HVAC cooling system B suction valve passing Completed Mr. M Ganesh Spares Required
Ba sed o n manp owe r
844 23.03.20 U#1 ESP C1 master hopper leakage from heater chamber Completed Mr. S Isac/Mr. DK Adhikari
a vail ab ility
845 20.03.20 Unit#1&2 OCCW bypass valave tapping Completed Mr. M Ganesh
846 23.03.20 U#1 HP bypass spray CV passing Completed Mr. M Ganesh
847 23.03.20 U#3 DC EOP pressure not developing Completed Mr. M Ganesh 3/26/2020
848 20.03.20 Unit#1&2 GT 2 Phase B spri nkli ng system lea kag e fro m b ypass li ne & FF Completed Mr. M Ganesh
p ressu re low
849 20.03.20 CHP Conveyor 12A & 5B belt replacement plan Completed Mr. Pinaki Guha
850 43547 Plant O&M Sub Business Partner manpower availability during Curfew Completed All HOD's/Admin Completed
851 43547 Plant U#1,2 & 3 boiler preservation Completed Mr. Ganesh Babu / Mr. S Dwivedi Completed
852 43547 Plant Accomodation facility for emergency contractor manpower Completed Mr. Avanesh Gautam/Concerned HOD's Completed
Al te rna te a rrang emet to b e mad e fo r d rinki ng wa te r
853 43548 Plant (i den tificatio n of tap pin g po ints & i ssue of materia l to b usi ness Completed Concerned HOD's/Mr. Avanesh Gautam Completed
p artne rs for wo rk e xecutio n)
L T fee ders cross veri fi cation for BTP / BOP / AHP / CH P; Mr. Ganesh Babu / Mr. Akash Modi /
854 43548 Plant te mp ora ry su ppl ies to be remo ved. Completed Mr. Sanjay Divedi / Mr. Murty Completed
855 23.03.20 Buffer Tank Buffer Tank Incomer 2 cable meggar value low Completed Mr. S Isac/Mr. SK Sinha Completed
856 20.03.20 Unit#2 APH Box up Completed Mr. Sanjay Singh 3/20/2020
857 20.03.20 Unit#2 ID Fan 3A bearing cooling fan B Completed Mr. Sanjay Singh 3/20/2020
858 20.03.20 Unit#1 APH A/B internal inspection Completed Mr. Sanjay Singh 3/24/2020
859 20.03.20 SW Service Water line charging Completed Mr. Ganesh Babu 3/20/2020
860 23.03.20 Switchyard Dia 2 not operating from remote Completed Mr. S Isac 3/23/2020
861 23.03.20 U#3 TG Excitation system transfomer B phase cooling fan MCB tripping Completed Mr. S Isac 3/24/2020
862 23.03.20 U#1 APH B flue gas path expansion bellow repair work Completed Mr. Sanjay Singh 3/24/2020
863 23.03.20 U#2 ESP C2 field internal inspection Completed Mr. Sanjay Singh 3/23/2020
864 04.03.20 Unit#3 ESP Seal Air Fan 3C - High Vib. MNDE- 16.2 Completed Mr. DK Adhikari
865 43796 U#1 HPH 2 waterbox vent passing Completed Mr. VK Shukla 28-11-19 -MI
866 05.03.20 Unit#3 H2 Dryer -B not available Completed Mr. VK Shukla
867 01.02.20 AHP Readyness of Tower AC at HCSD pump CR Complated Mr. Sabu/ VK Shukla 07-03-0202
868 26.02.20 Unit#3 Mill 3E tripped on earth fault Completed Mr. Sabu 3/8/2020
869 27.02.20 Unit#3 Prefilter B top drain MIV passing Completed Mr. VK Shukla MI
870 28.02.20 TG 11KV FCU -A outlet bellow damaged Completed Mr. VK Shukla 15-04-20 R1
871 28.02.20 Unit#3 Relay room FCU - A outlet bellow damaged Completed Mr. VK Shukla 15-04-20 R1
872 02.03.20 Unit#3 Lub Oil puriofier not available (Internal/ External) Completed Mr. Sabu/ VK Shukla 05-03-20 R1
873 11.02.20 Unit#1 CEP 1A not available Completed Mr. VK shukla/ Sabu
874 43857 AHP Silo & DWB Gratings & Handrailing inspection and rectification Completed Mr. DK Adhikari/ Akash Modi 3/15/2020
875 43802 DG Emergency DG - all alarm setting Completed Mr. Sabu 3/19/2020
876 43826 SY Switch Yard Dia -2 gas pressor low Completed Mr. Sabu/ MLN Rao 3/19/2020
877 03.03.20 CWPH CW - 2A motor replacement work Completed Mr. Sabu/ VK Shukla 3/7/2020
878 05.03.20 Unit#1/2 U#1& 2 preservation Plan Completed Mr. Ganesh Babu
879 05.03.20 Unit#1 NDCT -1 inspection Completed Mr. RK Gautam 3/7/2020
L T fee ders po wer kno b broke n & isol ation i s b ein g don e in Mr. Sabu 1 0-03 -20 R 1
880 43556 Station completed
p ow er live co ndi ti on C HP/BOP Ba lan ced
EMD - 15 -03 -2 0 R2
881 43764 Plant HVAC/ AC's overhauling plan Completed Mr. VK Shukla/ Mr. N Gupta
TMD - 10-0 3-2 0 R2
882 02.03.20 Unit#3 BASP 3B oil seal replacement under progress Completed Mr. DK ahikari 05-03-20 R1
883 01.03.20 CHP Conv. 13A belt replacement work (60 mtr) Completed Mr. Pinaki Guha 3/5/2020
884 03.03.20 Unit#3 Coal Feeder F1 pulley shaft damaged Completed Mr. Sanjay Singh 3/5/2020
885 43819 BOP IAC -2 Bearing damaged Load trial done -Max Vib. CNDE - V 3.9mm/s Mr. Rajesh Gautam/ Sabu 3/4/2020
886 01.03.20 AHP Goodwin pmp tripping on overload Completed Mr. Sabu 3/4/2020
887 29.02.20 Optrn Emergency Siren availability/Trial Completed Mr. Sabu/Ganesh Babu 3/2/2020
888 19.02.20 Unit#3 TDBFP 3B LOP A not available Completed Mr. Sabu 02-03-20 R1
889 26.02.20 Unit#2 Steam inerting Hdr I/L MIV Hvy passi Completed Mr. Sanjay Singh 2/29/2020
890 26.02.20 CAQMS CAQMS staion 2 & 4 AC not working (2 Nos.) Completed Mr. Sabu 29-02-20 R2
891 01.03.20 Unit#3 BA Slurry Pump A Completed Mr. DK Adhikari 3/3/2020
892 26.02.20 CWPH CWP 3B/ 2A/ 1B Hydraulic unit fault Completed Mr. SK Jha 2/26/2020
893 26.02.20 WS Acid Unloading Pump-A bearing replacement Completed Mr. Rajesh Gautam 01-03-20 r1
894 23.02.20 Silo Silo Vent fan-2A high vib. rectification Completed Mr. DK Adhikari/ Sabu 29-02-20 R1
895 27.02.20 Unit#3 Vaccum Pump A separator Makeup SOV passing Completed Mr. SK Jha 29-02-20 R1
896 24.02.20 CHP Crusher DE-A screw gear bearing rep work Completed Mr. Pinaki Guha 2/25/2020
897 18.02.20 AHP Ph#2 DWB-2 bin vibrator-1 not working Completed Mr. Sabu 27-02-20R1
898 26.02.20 Unit#3 DC loss due to Mill-3C HAD Not opened Completed/ RCA to be done Mr. Sanjay Singh
899 26.02.20 SWP Service Water Pump tripped during C&I work Completed Mr. SK Jha 2/26/2020
900 19.02.20 AHP BASP 2B not available / MIV leakage observed Completed Mr. DK adhikari 2/20/2020
901 18.02.20 AHP PH-1 DWB-1 bin vibrator-2 not working Completed Mr. Sabu MI
902 12.02.20 Unit#3 Mill-B not available Completed Mr. Sanjay Singh
903 11.02.20 FOPH LDO supply pum B inspection&repair Completed Mr. Sanjay Singh 2/14/2020
904 12.02.20 Unit#2 MOT Oil purifier not avail Completed Mr. VK Shukla 2/13/2020
905 10.02.20 Unit#2 GT R Phase second source not available Completed Mr. Sabu 2/20/2020
906 10.02.20 Unit#1 TDBFP A suction flow low Completed Mr. Sanjiv Jha
907 43863 Unit#2 BA Agitator C not available Completed Mr. DK Adhikari Completed
908 10.02.20 Unit#1 PA-FAN-B-Vibration-Fault (5.9 mm/sec) Work planned for 12 hrs at low load Mr. Sanjay Singh
Val ve to b e rep lace d/ Trim asse mbly to be cha ng ed-
909 43821 Unit# 1 TDBFP RC valve hunting Mr. VK Shukla S/d
Re ceive d at si te
910 43849 EMD DCDB Sec A fault alarm To be attended in Shutdown Mr. Sabu 1/21/2020
911 43852 U#1 Deaerator 100% CV stuck on 23% SD job Mr. VK Shukla Unit Shutdown
912 12.02.20 Unit#1&2 U#1&2 Ammonia dosing p/p-A dosing issue Completed Mr. VK Shukla
913 11.02.20 Unit#1 BASP-1B MIV body & RC line lkg atten Completed Mr. DK Adhikari 2/13/2020
914 11.02.20 Unit#3 BA Agitator-3C inspection Completed Mr. DK Adhikari
915 43864 Unit#2 BASP-B dis. line lkg. arrest work Completed Mr. DK Adhikari 11-02-20 R1
916 10.02.20 Unit#2 H2 dryer B Comp A not available Completed Mr. VK Shukla 2/11/2020
917 43869 Unit #3 PA FAN B darin lkg attending Completed Mr. Sanjay Singh 11-02-20 R1
918 43869 Unit#3 N2H4 P/P B CPP side NRV leakage Completed Mr. VK Shukla 2/11/2020
919 43864 Unit#3 Agitator B& C not available Completed Mr. DK Adhikari 14-02-20 R1
920 43859 U#1 CEP A high vibration-8.5 mm/s at MNDE H Completed Mr. VK Shukla
921 43856 EMD Goodwin Pump not available due to motor issue Completed Mr. DK Adhikari 2/10/2020
922 43864 Unit#1 BASP-1B RC line lkg attend Completed Mr. DK Adhikari
923 43869 TMD Unit #3 U#3 TD BFP-B LHS SV oil leakage. Completed Mr. VK Shukla 2/10/2020
924 43869 BLR Unit #3 U#3 fd fan B internal inpection work Completed Mr. Sanjay Singh 2/9/2020
925 43869 BLR Unit#1 FD fan 1B Servo CL seal leakage Completed Mr. Sanjay Singh
926 43869 TMD Unit#1 U#1 Vacuum pump A abnormal sound Completed Mr. VK Shukla 2/8/2020
927 43854 U#2 TDBFP-B RC CV gland leakage Under observation Mr. VK Shukla
928 43852 U#1 BA Slurry Pump Level not maintaining Under observation Mr. Ganesh Babu
929 43853 U#2 BA SSC Auto tensioner device healthiness to be ensured Completed Mr. DK Adhikari/ Mr. S Jha 2/1/2020
930 43617 SAC SAC - 19 not available due to internal damage Completed Mr. Deepak Adhikari 01-02-20 R1
Trial take n on 29 .01.20 /Mi nor dro pwi se lea kag e obse rved-
931 43846 FOPH HFO supply pump C DE side abnormal sound Mr. S Singh
Un der ob servatio n
932 43853 U#2 Mill E not available Completed Mr. Sanjay Singh 01-02-20 R1
933 43859 WS RO-3 vessel no-15 permeate line leakage Completed Mr. Pradeep 1/31/2020
934 43858 BOP Hypo Generator E3 & E4 vassel H2 cylinder leakage Completed Mr. Pradeep 1/31/2020
935 43859 Unit#1 Seal Oil Vacuum Pump maintenance work Completed Mr. VK Shukla/ Sabu 1/30/2020
936 43858 AHP SAC -5 Comp oil seal leakage Completed Mr. Pradeep 1/30/2020
937 43857 BOP Fecl3 pump a tripping issue (ZDS) Completed Mr. Sabu 1/29/2020
938 43857 BOP Fecl3 pump 3 dosing issue (ZDS) Completed Mr. PK Roy 1/29/2020
939 43857 BOP PE dosing Tank A agitator abnormal sound (ZDS) Completed Mr. PK Roy 1/29/2020
940 43858 AHP Silo 1 dry ash unloader mech jamming Completed Mr. DK Adhikari
941 43854 U#2 TDBFP 2A DC EOP current showing bad Completed Mr. Sabu 1/24/2020
942 43847 AHP Phase#1 slurry line-2A passing in dwb-3 Completed Mr. D Adhikari 25-01-20 R3
943 43854 U#1 BA Slurry Pump-B RC line valve body leakage Completed Mr. DK Adhikari 1/25/2020
944 43855 U#2 E1 Feeder inlet MOV coupling bush damage Completed Mr. S Jha/Mr. S Singh 1/25/2020
945 43852 Raw water Raw water tank I/L MOV A not working. Completed Mr. S Jha/Pradeep Kumar 25-01-20-R2
946 43854 DM Plant HYPO generator 1 E5 vassel lkg Completed Mr. Pradeep Kumar 1/25/2020
947 43853 DM Plant HYPO generator 2 E3 vessel leakage Completed Pradeep Kumar 23-01-20-R1
948 43832 Unit#1 BA Agitator 1A not available Completed Mr. D Adhikari 1 0-01 -20 R 1
2 3-01 -20 R 3
949 43852 U#1 Mill F inching motor abnormal sound Completed Mr. Sabu 1/23/2020
950 43849 TMD HVAC IDCT-1 shaft & bearing inspection Completed Mr. VK Shukla 22-01-20 R1
951 43852 U#2 slurry pump-B RC line lkg arresting Completed Mr. D Adhikari 1/22/2020
952 43852 U#2 Mill A mill side LP pump B abnormal sound Completed Mr. Sanjay Singh 1/22/2020
953 43852 U#1 C1 ERM tripped on O/L Completed Mr. S Singh 1/22/2020
954 43849 EMD Sludge Pump 1A not available Completed Mr. Sabu 1/21/2020
955 43836 Unit#1 Clinker Grinder not available Completed Mr. Sabu 21-01-20 R1
956 43849 AHP BASP-A Casing bottom side water lkg. Completed Mr. D Adhikari 21-01-20 R1
957 43745 U#1 FF B pass side insulation cladding dislocated Completed Mr. D Adhikari 22-01-20 R6
958 43849 Unit#2 U#2 feeder A1 inspection&repair work Completed Mr. S Singh
959 43847 WS PAM#B dosing issue in ZDS Completed Mr. Pradeep
960 43847 Unit#2 Mill B& feeder B1&B2 inspection work Completed Mr. S Singh 1/18/2020
961 43846 CHP Plough feeder 13A 2E Motor damaged Completed Mr. Pinaki Guha 1/17/2020
962 43844 WS UF-B Vessal no#13,34&39 leakage (DMP UF B) Completed Mr. Pradeep 17-01-20 R1
963 43844 WS RO-2 concentrated drain v/v jamming issu(DMP RO B) Completed Mr. Pradeep 1/16/2020
964 43839 AHP SAC #3 periodic maintenance work Completed Mr. D Adhikari 16-01-20 R1
965 43824 FOPH HFO supply pump C inspection wrk Completed Mr. S Singh 1/14/2020
966 43843 Unit#2 Clinker Grinder inspection work Completed
967 43840 Unit#2 4th Extraction to TDBFP NRV Passing. Completed Mr. VK Shukla 1 1-01 -20
1 3-01 -20 R 1
968 43766 U#2 LPH-5 emg.Drain CV valve passing Completed Mr. VK Shukla 02-11-2019 R1
969 43756 U#2 LP Bypass - B Valve passing Completed Mr. VK Shukla Unit Shutdown
970 43832 U#2 ESP ESP Field C1 not avail. Completed Mr. S Singh/ S Gupta
971 43817 U#2 TDBFP 2A BP NDE side steam leakage Completed Mr. VK Shukla 21-12-19 R1
972 43817 U#2 APRDS safety valve flange leakage Completed 21-12-19 R1
973 43840 Unit#2 U#2 taken shutdown for boiler abnormal sound @ 16:29 hrs Completed Mr. Sanjay Singh 1/13/2020
974 43841 Silo#1 SILO#1 DRY ASH UNLOADER RVF JAMMING Completed Mr. D Adhikari
975 43833 AHP SAC#15 overhauling work Completed Mr. D Adhikari 1/15/2020
976 43825 Unit#2 BA CG inspectn for abnormal sound Completed Mr. D Adhikari/S Gupta 11-01-20R1
977 43840 Unit#2 U#2 Mill B feeder B1 for inspection Completed Mr. Sanjay Singh 1/11/2020
978 43832 FF System Fire Hydent Pump B not available Completed Mr. Pradeep/S Gupta 1/10/2020
979 43836 AHP SAC #8 periodic maintenance work Completed Mr. D Adhikari 1/10/2020
980 43835 Unit#2 H2 Dryer-A COMP-A replacement work Completed Mr. VK Shukla 08-01-20 R2
981 43836 Unit#2 Unit #2 Deareator inlet pH analyzer not working. Completed Mr. SK Jha 1/7/2020
982 43836 Unit#2 Unit #2 Eco inlet pH analyzer not working Completed Mr. SK Jha 1/7/2020
983 43836 Unit#1 Unit#1 Cep cation column resin change over required. Completed Mr. SK Jha 1/7/2020
984 43826 FOPH LDO supply pump A not avail. - high Vib Completed Mr. S Singh 03-01-20 R2
985 43833 Unit#1 BASP-1B dis MIV body lkg attend Completed Mr. D Adhikari 1/5/2020
986 43833 Unit#1 H2 dryer-B not effective Completed Mr. VK Shukla 1/4/2020
987 43818 AHP Slurry pump 1A vlv passing at bin 2 top Completed Mr. D Adhikari 03-01-20 R4
Sl ud ge pump C n ot a vail ab le du e to me ch seal l eaka ge (3 /4 - Mr. Pradeep/Mr. Sanjay Gupta
988 43756 STP Completed MI
a vai l)
989 43829 AHP U#1 BASP-A RC line modification work Completed Mr. Deepak Adhikari
990 43829 AHP CBM-VIB: Phase 1 LP Pump C Completed Mr. Deepak Adhikari
991 43809 Station Bl ack Out H and lin g mana geme nt - Aw aren ess/Plan & Train ing Completed Mr. Pinaki Guha 1/4/2020
to Oprtn pe opl e
992 43826 Station CEMS display board data mismatched Completed Mr. SMS Rao/ SK Jha 31-12-19 R2
993 43828 WS FeCl3 tank A bottom leakage Completed Mr. Pradeep 12/30/2019
994 43817 Silo Silo blower -B abnormal sound DE Side Completed Mr. S Gupta 28-12-19 R2
995 43825 DMP UF-A vessel no. 9,14 & 18 heavy leakage Completed Mr. Pradeep 28-12-19 R1
Secu rity to al low En try & Exit of the Emp loye e's wi th va lid
996 43825 Station During Plant Emergency/Black Out Condition (Entry/Exit) Sharad Kumar WEF- 26-12-19
CL MS g ate pass
997 43825 SILO SILO#1 VENT FAN-A DIS. BELLOW DAMAGE Completed Mr. D Adhikari
998 43823 AHP Paddle mixture- 4 blade inspection inspection done Mr. D Adhikari 12/25/2019
999 43818 H2 plant H2 plant storage tank E water dripping from sprinkler Completed Mr. Pradeep 25-12-19 R3
1000 43818 FOPH HFO heater B steam seepage from down side Completed Mr. S Singh 23-12-19 R2
1001 43801 AHP PH#2 BC-6A Gear box abnormal sound Completed Mr. D Adhikari 24-12-19 R4
1002 43823 Unit#2 U#2 BASP-2B casing lkg attend Completed Mr. D Adhikari 24-12-19 R4
1003 43821 IAC IAC - HVAC Compressor not working Completed Mr. VK Shukla 24-12-19 R4
1004 43821 Unit# 1 Mill C tripped on DCS mill faceplate electrical fault prior to mill trip Completed Mr. Sanjay Gupta 12/23/2019
1044 43803 Unit#1 U nit-1 TDBFP B R C valve h eavy gl and l ea kage ,MD BFP taken Completed Mr. VK Shukla 12/3/2019
i n service
1045 43797 IAD IAD#1 tower#B drain PCV YV3 stucked in outlet Completed Mr. Pradeep 30-11-19-R2
1046 43800 WS UF CEB Hypo pump-1 dosing issue Completed Mr. Pradeep Kumar 12/2/2019
1047 43799 U#3 H2 blower motor winding meggar value zero Completed Mr. Sanjay Gupta 11/30/2019
1048 43798 U#1 WB B3 & C2 Not retracting in auto Completed Mr. Sanjay Gupta 11/30/2019
1049 43795 Unit#2 Oil purifier vaccum pump motor taking high current Completed Mr. Sanjay Gupta/Mr. VK Shukla 11/30/2019
1050 43797 AHP LP Water pump-2B oil seal replacement Completed Mr. D Adhikari 11/30/2019
1051 43782 AHP BA Agitator-3C Readiness work Completed Mr. D Adhikari 11/30/2019
1052 43790 Unit#3 CBM-VIB: U3 FF Seal AIr Fan B Completed Mr. D Adhikari 30-11-19-R3
1053 43800 Unit#1 U#1 Mill F GG Pump Replace Completed Mr. S Singh 11/30/2019
1054 43795 Unit#2 Wall blower B12 poppet valve not opening Completed Mr. Sanjay Singh 29-11-19-R1
1055 43798 ZDS ZDS Acid Dosing Pump-2 dossing issue Completed Mr. Pradeep 11/29/2019
1056 43797 DM Plant UF-2 Turbidity meter not working Completed Mr. Sanjiv Jha 11/29/2019
1057 43797 U#2 D2 Feeder Belt sway-Inspection & readiness Completed Mr. Sanjay Singh 11/28/2019
1058 43797 AHP Sludge pump 2A leakage Completed Mr. D Adhikari 11/29/2019
1059 43798 U#2 EF4 gun not inserting & DE2 gun not retracting Completed Mr. Sanjiv Jha 11/29/2019
1060 43797 U#1 HP Heater-3 Drain valve gland leakage Completed Mr. VK Shukla 11/29/2019
1061 43793 WS VT pump-3 VFD exhaust fan not working Completed Mr. S Gupta 27-11-19 R2
1062 43794 ZDS Anti scalant dosing pump A jamming issue Completed Mr. S Gupta 26-11-19 R1
1063 43794 WS PAM dosing pump B VFD issue Completed Mr. S Gupta 11/25/2019
1064 43795 AHP PH#1 LP pump-1C Abnormal sound from Pump completed Mr. D Adhikari 28-11-19-R1
1065 43795 CHP Conveyor 5A, 25 mtr belt replacement completed Mr. Pinaki Guha 11/28/2019
1066 43795 Unit#2 H2 dryer tripping in refrigerant pressure low Completed Mr. VK Shukla 11/27/2019
1067 43794 Unit#3 TDBFP B RC CV Gland lkg attending wrk Completed Mr. VK shukla 11/26/2019
1068 43795 MP Emergency siren power supply not available Completed Mr. Sanjay Gupta 11/26/2019
1069 43790 Aux Boiler Aux Boilers trial to be taken jointly with (Oprtn/ C&I/BMD) Completed Oprtn 26-11-19 R1
1070 43796 Silo Silo vent 1B tripped on overload Completed Mr. D Adhikari/Mr. S Gupta 28-11-19-R1
1071 43790 AHP PH#1 HP flushing line passing in DWB-1 Completed Mr. D Adhikari 25-11-19 R1
1072 43793 Unit#1 Mill A inspection for nde side red hot Completed Mr. S Singh 11/25/2019
1073 43793 SAC SAC#2 SS tube leakage Completed Mr. SK Jha 11/25/2019
1074 43784 Unit#3 AB old line leakage near Silo 3 Completed Mr. D Adhikari 23-11-19 R2
1075 43784 Unit#3 AB old line leakage near FF B1 SL Completed Mr. D Adhikari 23-11-19 R2
1076 43786 AHP SAC 4 not available Completed Mr. D Adhikari 22-11-19 R3
1077 43789 Silo #3 Silo-3 dedusting fan bags replacment wrk Completed Mr. D Adhikari 11/21/2019
1078 43485 U#1 Clinker grinder not available Completed Mr. D Adhikari 21-11-19 R6
1079 43789 Unit#3 U#3 BASP-3A Dis.line lkg Completed Mr. D Adhikari 11/21/2019
1080 43782 FOPH HFO Suplly Pump A Mech seal to be replaced Completed Mr. Sanjay Singh 11/20/2019
1081 43787 Unit#2 TDBFP 2B RC valve stuck on 2.5 % / Passing observed Completed Mr. VK shukla 11/19/2019
1082 43786 Unit#1 ESP PCC bus coupler alarm Completed Mr. S Gupta 11/18/2019
1083 43786 FFPH FFPH HVAC Abnormal Sound Completed Mr. VK shukla 11/18/2019
1084 43783 AHP Phase 1 bin2 vibrator 3 not working Completed Mr. S Gupta 22-11-19 R3
1085 43788 AHP SAC 17 tripped on discharge high pr. Completed Mr. D Adhikari 11/20/2019
1086 43789 Unit#1 U#1 TDBFP-1B RC Valve Gland Leakage Completed Mr. VK Shukla 11/20/2019
1087 43788 Unit#3 Ammonia pump FW side oil leakage Completed Mr. VK shukla 11/20/2019
1088 43748 AHP/WS Mechanical Loto for valves Completed Mr. Sanjay Dwivedi 11/20/2019
1089 43777 Uni#1 Under Reserved Shutdown Taken on load on 20.11.19 Operation 11/20/2019
1090 43783 Unit#3 Mill E DE side coal and steam lkg ar Completed Mr. Sanjay Singh 19-11-19 R1
1091 43780 AHP HP Pump 1 B -Heating issue Completed Mr. D Adhikari 20-11-19 R3
1092 43782 Unit#2 Mill 2C not available due to abnormal sound Completed Mr. Sanjay Singh 11/18/2019
1093 43784 Unit#3 TD-B MAIN PUMP STNR DRN MIV PASSING Completed Mr. VK Shukla 11/20/2019
1094 PA 2B internal inspection Completed Mr. S Singh 11/20/2019
1095 43780 AHP Seal water pump B - Pump NDE side Bearing damage Completed Mr. D Adhikari 18-11-2019 R2
1096 43774 U#1 U1 HPH1 FW I/L Drain passing Completed Mr. VK Shukla 11/18/2019
1097 43774 U#1 U1 HPH1` Shell side drain passing Completed Mr. VK Shukla 11/18/2019
1098 43774 U#1 U1 Separator overflow A side MOV passing Completed Mr. Sanjay Singh 11/18/2019
1099 43772 U#1 TDBFP-A BP DE Side wtr lkg fm casing Completed Mr. VK Shukla 11/4/2019
1100 43775 AHP Phase-1 HP flushing line Bin2 passing Completed Mr. D Adhikari/ Mr. Ganesh Babu 13-11-19 R2
1101 43784 BOP UF-3 leakages attained required (ZDS) Completed Mr. Pradeep 11/16/2019
1102 43786 Unit#2 BP A NDE side casing flange lkg,onli Completed Mr. VK Shukla 11/18/2019
1103 43786 AHP Ph#2 dwb-2 drain v/v jamming issue Completed Mr. D Adhikari 11/18/2019
1104 43783 BOP Sludge feed pump#1 in centrifuge suction Completed Mr. Pradeep 11/15/2019
1105 43782 AHP U#2 BASP-2B Dis line lkg attend Completed Mr. D Adhikari 11/15/2019
1106 43783 SY D ia2 Dhu ri Ckt-1 lin e disch arge d @ 10:07 h rs for lin e Completed As per PSTCL 11/14/2019
ma in te nan ce
1107 43783 Unit#3 TDBFP B RC CV GLAND LEAKAGE Completed Mr. VK Shukla 11/14/2019
1108 43780 AHP HP Pump 2 A - Abnormal sound Completed Mr. D Adhikari 13-11-19 R1
1109 43782 AHP SAC#2 elbow damaged,replacement work Completed Mr. D Adhikari 13-11-19 R1
1110 43782 AHP P#1 HP pumps RC valve passing Completed Mr. D Adhikari 11/14/2019
1111 43775 WS Coal Waste Plant - Pump B not avail Completed Mr. S Gupta/ Mr. Pradeep 11-11-19 R2
1112 43778 SY Nakodar Line discharged at 9:15 hrs on 09.11.19 Completed Mr. Sanjay Gupta 11/9/2019
1113 43779 Unit#2 Seal oil vacuum pump abnormal sound Completed Mr. VK Shukla/ Mr. Sanjaya Gupta 11/11/2019
Pre AOH testin g of U nit#3
1114 43677 Unit#3 Completed Mr. Gaurav Sharma 11/16/2019
(Ful l loa d req uire d)
1115 43775 Unit#3 BASP B Motor Bearing temp high Completed Mr. S Gupta 11-11-19 R1
1116 43776 BOP IAD -3 heater not working Completed Mr. S Gupta/ Mr. Pradeep 11/11/2019
Mr. Sanjay S ingh 0 9-11 -19
1117 43777 FOPH HFO supply pump C pump DE side seal dmg Completed Mr. Sanjaya Gupta 1 1-11 -19 R 1
1118 43779 Unit#3 NH3 Dosing pump B ,digpha damaged Completed Mr. VK Shukla 11/11/2019
1119 43777 U#1 BLR U#1 DV 15 Inlet MIV jamming Completed Mr. Sanjay Singh 11/9/2019
1120 43774 CHP Paddle feeder D- GB Output shaft bearing replacement Completed Mr. Pinaki Guha 11/8/2019
1121 43773 AHP HCSD vib screen 1A mess & support damage Completed Mr. D Adhikari 11/10/2019
1122 43779 Unit#2 Mill A inching motor replacement Completed Mr. Sanjay Singh 11/10/2019
1123 43778 Unit#1 DV 15 Inlet MIV jamming (BBF Corner 1 & 4 DV 15) Completed Mr. Sanjay Singh 11/10/2019
1124 43778 Unit#2 P#1 slurry line-2A leakage at bin top (U2 BASP Sump Pump A) Completed Mr. Deepak Adhikari 11/10/2019
1125 43776 CHP Conv 7B belt (165mtr) replacement work Completed Mr. Pinaki Guha 11/10/2019
1126 43776 H2 plant H2 building Chemical room Package AC AC to be removed Mr. S Gupta 11/8/2019
1127 43777 Unit#3 U#3 Extraction -4 Main MOV not opening Completed Mr. VK Shukla 11/8/2019
1128 43776 U#2 Wall blower C1 Not Retracted Completed Mr. S Gupta 11/7/2019
1129 43776 AHP P#1 sludge pmp com.discharge line lkg Completed Mr. D Adhikari 11/7/2019
1130 43771 CHP Conv 3B belt (220 mtr) replacement work Completed Mr. Pinaki Guha 06-11-19 R1
1131 43773 U#1&2 CPP- Amonia dosing pump A&B not avail. Completed Mr. V k Shukla/ Mr. S Gupta 06-11-19 R1
1132 43776 Plant Dhuri line -1 Under planned shutdown on 07.11.19 Line charged Mr. S Gupta 11/7/2019
1133 43756 U#1 PA Fan - B Blade pitch BPC Defective Completed Mr. Sanjay SIngh Equipment Shutdown
1134 43753 U#3 Agitator C not available due to base damage Completed Mr. Deepak Adhikari S/D job
1135 43761 Unit#3 Booster pump 3A rectification Completed Mr. VK Shukla S/D job
1136 43754 U#3 MS sampling line(RHS) leakage Completed Mr. Sanjay Singh S/D job
1137 43742 Common Canal under shutdown Water received at plant on 07.11.19 @ 07:00 hrs Concerned HOD's 11/6/2019
1138 43774 U#2 Lube oil purifire vacuum pump mech seal leakage Completed Mr. VK Shukla 11/6/2019
1139 43768 Silo Silo Blower 1A not available Completed Mr. Deepak Adhikari 05-11-19 R3
1140 43773 Unit#2 External Oil purifier Vaccum Pump tripping issue Completed Mr. VK shukla 11/5/2019
1141 43773 AHP PH#2 Sludge Pump valve replacement Completed Mr. D Adhikari 11/5/2019
1142 43773 U#2 A-6 wallblower not retracting in auto Completed Mr. Sanjaya Gupta 11/5/2019
1143 43774 U#3 Turbine eer room pakage ac -A not avail Completed Mr. VK Shukla 11/5/2019
1144 43774 U#3 Turbine eer room pakage ac -b not avail Completed Mr. VK Shukla 11/5/2019
1145 43774 U#1 FF CL3 inlet damper proxy damaged Completed Mr. SK Jha 11/5/2019
1146 43757 U#1 BA Agitator 1B - shaft felt down in sump Completed Mr. Deepak Adhikari RCA completed
1147 43773 WS Waste water Transfer P-B suction issue Completed Mr. Pradeep Completed
1148 43773 WS H2SO4 Pump C suction issue Completed Mr. Pradeep Completed
1149 43773 WS H2SO4 Pump D suction issue Completed Mr. Pradeep Completed
1150 43771 U#2 Unit#2 Internal oil purifier not avail Completed Mr. SK Jha Completed
1162 43752 U#2 Mill inerting steam trap replacement 6 no's at U#2 boiler '0' mtr Completed Mr. Sanjay Singh Completed
1163 43762 U#3 FF DL5 BAG INSPECTION & REPLACEMENT Completed Mr. Deepak Adhikari Completed
1164 43760 DWB PH#1 DWB3 CENTER DECANTER DRAIN LINE LKG Completed Mr. Deepak Adhikari 24-10-19 R1
1165 43760 CHP Conveyor 7B belt replacement work Completed Mr. Pinaki Guha 10/24/2019
1166 43742 Silo Auto cut off installation in silo#3 Install ed in Si lo# 3 & commissi one d. Mr. Sanjiv Jha/Mr. Akash Modi Completed
Bypa ssed as p er ope ration al req uire ment
1167 43760 CHP Wagon Tippler lean plate modification work Completed Mr. Pinaki Guha 10/23/2019
1168 43761 AHP ph#1 sludge pmp 1B BELT damaged Completed Mr. Deepak Adhikari 10/23/2019
1169 43761 Unit#1 Oil purifier SOV rectification Completed Mr. SK Jha 10/23/2019
1170 43761 Unit#3 ESP fluidizing blower 3A Completed Mr. Deepak Adhikari Completed
1171 43761 Unit#3 FF CR1 & CR2 bag inspection & replacmnt CR1 - 19 bags replaced/ CR2 - 40 bags replaced Mr. Deepak Adhikari Completed
R efurb ishe d fi lter
1172 43761 Silo blower 1D Completed Mr. Deepak Adhikari
i nstall ed
1173 43755 U#1,2 & 3 EH oil inbuilt hydraulic skid DP high indication observed in local Completed Mr. SK Jha Completed
1174 43756 U#1&2 Ammonia dosing pump A discharge issue Completed Mr. VK Shukla 10/19/2019
1175 43756 U#2 Atomizing Header Safety Vavle Replacement Completed Mr. Sanjay SIngh 10/19/2019
1176 43754 U#2 BA Slurry Pump-A RC line leakage Completed Mr. Deepak Adhikari 22-10-2019-R2
1177 43755 U#1 TDBFP B BP DE & NDE side water leakage Completed Mr. VK Shukla Equipment Shutdown
1178 43755 U#1 Mill E NDE side level showing wrong Completed Mr. Sanjiv Jha S/D
1179 43754 ZDS HRSCC 2 gearbox problem Completed Mr. Pradeep 19-10-2019-R1
1180 43760 SILO#1 Vent fan-1B Maintenance work Completed Mr. Deepak Adhikari Trial planned today
1181 43757 U#1 Mill 1B - HP Pump B feeder side hot spot observed Completed Mr. Sanjaya Gupta 10/19/2019
1182 43757 U#1&2 U nit# 1 & 2 Amo nia D osin g pump B n ot a vail abl e due to Completed Mr. VK Shukla 10/19/2019
D iap hra gm dama ged
1183 43757 U#3 Unit#3 SWAS chiller blender motor not available Completed Mr. Sanjaya Gupta 10/19/2019
1184 43757 U#2 Coal Mill 2C - Abnormal sound observed Completed Mr. Sanjay Singh 10/19/2019
1185 43727 SAC FAD-7 Evaporator leakage Completed Mr. Deepak Adhikari 18-10-2019-R1
1186 43754 DM Plant Disk filter 1 motor not running in auto Completed Mr. Sanjiv Jha 10/17/2019
1187 43754 DM Plant DMF feed pump 2 tripping issue. Completed Mr. Sanjay Gupta 10/16/2019
1188 43754 U#2 Mill C knife gate C3 coal leakage attending Completed Mr. Sanjay Singh 10/16/2019
1189 43754 U#1 TDBFP 1B R/C control valve heavy leakage Completed Mr. VK Shukla 10/16/2019
1190 43753 SWRO SWRO cartridge filter replacement required Completed Mr. Pradeep 10/16/2019
1191 43754 U#1 OCCW A NDE side gland leakage Completed Mr. VK Shukla 10/17/2019
1192 43753 Switchyard Dia 2 CB-GS020 SF6 gas presssure low Completed Mr.Sanjay Gupta 10/16/2019
1096 10/17/2019 U#3 TDBFP A housekeeping required near latch block Completed Mr. VK Shukla 10/17/2019
1097 10/16/2019 U#3 Soot blower line leakage near R17 Completed Mr. Sanjay Singh 10/17/2019
1098 10/17/2019 HCSD PH#2 DWB-3 decanter line leakage Completed Mr. Deepak Adhikari 18-10-2019-R1
1099 10/18/2019 CHP Conveyor#1A gearbox replacement work Completed Mr.Pinaki Guha 10/21/2019
1100 9/6/2019 Station HIRA-DEC revision SOP defined & circulated Completed 22-10-2019 R3
Road sweeping vehicle to be replaced with new one or alternate machine t o be
1101 10/16/2019 CHP Completed Mr. Rajesh Gautam/MLN rao 11/1/2019
arranged