8' X 20' Frame: Typical Profiles & Accessories
8' X 20' Frame: Typical Profiles & Accessories
8' X 20' Frame: Typical Profiles & Accessories
Sheet 1 of 4
Attached to Wall, Flush Beam 8’ x 20’ Frame
Legend Key
BF Flush Trex Elevations Box Beam Design per Elevations Span Table:
BS Beam Support by Other E-75, 75psf Total Design Load.
Sheet 2 of 4
8’ x 20’ Frame
Standard Deck Board Patterns
Estimated Material List
90 Degree (Attached to Wall, Flush Beam)
90 Degree
Qty
Components
16’ 20’
Joist 8
Track 1 1
Beam 1
Mid Span Blocking 15
Buildex Teks Select* 525
L70Z 32
Touch Up Paint 1
Beam Support by Other
Diagonal
Diagonal
Qty
Components
12’ 16’
Joist 16’ +1 +2
Mid SpanBlocking +5
Buildex Teks Select* +155
L70Z +10
Requires Joist @ 12”oc
Design per Elevations Span Table:
E-75, 75psf Total Design Load.
See Code Report CCRR-0186 and Trex
Elevations Install Guide for details and notes.
Notes:
*Quantity has a 10% Waste Factor Added to Calculation
Sheet 3 of 4
Specialty Patterns
8’ x 20’ Frame
Adjustments to Standard Pattern Material List
Mid Span
Blocking
Buildex
Select*
Single Picture
L70Z
Track
Joist
Teks
Frame Border
12’ +1
Qty -1 +45 +2
16’ +1
Mid Span
Track 16’
Blocking
Joist 16’
Buildex
Select*
Double Picture
L70Z
Teks
Frame Border
Qty +2 +2 -2 +145 +8
Mid Span
Single Picture
Blocking
Buildex
Select*
L70Z
Track
Joist
Teks
Frame Border w/
Breaker Board
12’ +1
Qty -1 +90 +4
16’ +1 +1
Mid Span
Blocking
Buildex
Select*
Single Picture Frame Border
L70Z
Track
Joist
16’ +3+1
Qty +4 +250 +12
20’ +2
Requires Joist @ 12”oc
Mid Span
Blocking
Buildex
Select*
Teks
w/ Herringbone Pattern
12’ +1
Qty 16’ +3 +1 +3 +245 +12
20’ +2
Requires Joist @ 12”oc
Notes:
*Quantity has a 10% Waste Factor Added to Calculation
Sheet 4 of 4