Project Delivery Systems Lecture 3
Project Delivery Systems Lecture 3
Program Management
Program Management
• Program Management is sometimes referred
to as a Delivery Method.
• Many owners and developers, particularly in
the public sector, now favor Program
Management.
• Where they lack sufficient expertise or
resources to manage various elements of
construction.
Program Management
• Program Management has emerged as useful
tool when outside resources are required
• Program Managers are typically involved in all
five phases of the construction process, or at
least most of them
• Often they provide services on multiple
structures or multiple building site
undertakings
Program Management
• The multifaceted scope of work is what most
distinguishes Program Management from
other project management methods.
• Program Managers assume many
responsibilities traditionally undertaken by
owners using in-house resources.
.
Program Management
• A fundamental challenge in defining Program
Management is determining where is a
delivery method or management method
• Project Delivery Systems has been used to
describe both a delivery method and a
management method.
Five Phases of Every Project
Construction Phase Model
Every construction undertaking comprises five
basic phases:
• Real state – Locating and Purchasing real property (land),
identifying its real use, arranging for zoning, permitting,
and environmental compliance
• Financing – Process of obtaining funds to pay for and
develop real property
• Design – Includes architectural and engineering work
• Construction – Improvements are made to real property
• Occupancy – Finished construction product is leased or
sold, Operations and maintenance are setup
Five Phases of Every Project
Construction Phase Model
• Owners often select a management method based
on their comfort level with respect to the various
phases of project development and available in-
house resources to manage those phases
effectively
• For example, most commercial developers and
public owners are confident in their ability to
manage the real state, financing and occupancy
phases
Five Phases of Every Project
Construction Phase Model
• It is a fundamental principal that someone need to
take overall responsibility for each phase of the
construction process
• Many owners retain independent sources to
manage design and construction phase work
Five Phases of Every Project
Construction Phase Model
– Program Managers are typically used in situations
where
• Owner lacks resources
• Program manager is desired to provide overall leadership
in the overall construction process
• Owner believes Program Management is the most
effective way to contain program costs
• Program Management is the owner’s traditional
management method
Delivery or Management Method