CLEAN AGENT FIRE SUPPRESSION SYSTEM TEST QCDD FORM

Pin No. Date


Location Application Number
Project Name
Owner

QCDD Approved Drawing Ref. No. Type of Agent


Test Status Passed Integrity Test Status Passed
( Report attached)

TEST RESULT
MODE OF
OPERATION DESCRIPTION YES N/A REMARKS
OPERATION

1. Clean agent container filled with the required quantity as per approved drawing.
2. Amount of agent (in grams)
3. Quantity of agent (cylinder in number)
A. Activation of any of the detector.

AUTOMATI 1. Illumination of “ALARM” indication on the FM-200  


C Control Panel.
OPERATION 2. Illumination of Remote Indicator.  
st
3. Activation of Alarm Bell (1 stage alarm).  
4. “PRE-ALARM” signal has been sent to Main Fire
 
Alarm Control Panel.
5. Alarm signal has been sent to close associated damper.  
6. Magnetic door release has been de-activated.  

Page 1 of 3
CLEAN AGENT FIRE SUPPRESSION SYSTEM TEST QCDD FORM

B. Subsequent operation of a “cross-zoned”


detector.
1. Illumination of “PRE-DISCHARGE” indication on the
 
Clean agent Control Panel.
2. Illumination of Remote Indicator.  
3. Activation of Strobe/Horn (2nd stage alarm)  
4. Circuit actuated to energize 0 – 30 seconds.  
5. System abort operation enabled.  
6. “Alarm” signal has been sent to Main Fire Alarm
 
Control Panel.
7. Illuminated sign “Evacuate Now, Gas Discharge” has
 
been activated.
C. After completion of the pre-set time delay
sequence, check for the following results:
1. Impulse releasing module actuated and the impulse
 
valve operator/solenoid pin is in extended position.
2. Illumination of “RELEASE” indication on the Clean
 
agent Control Panel.
3. Activation of Strobe/Horn located outside protected
 
hazard.
4. Illuminated sign “Gas Released, Do Not Enter” has
 
been activated.
5. “FIRE” signal has been sent to Main Fire Alarm
 
Control Panel.
A. Electrical Activation
1. Activate the Manual Release Station.
Check if it duplicates the “cross-zoned detection
 
sequence” described above except delay, abort function,
pre-discharge indication and alarm bell.
2. Activate the Manual Release Station.
(If motorized smoke damper installed, damper will  
MANUAL closed 1st before gas released.)
OPERATION 3. Illumination of “RELEASE” indication on the Clean
 
agent Control Panel.
4. Activation of Strobe/Horn located outside protected
 
hazard.
5. Illuminated sign “Gas Released, Do Not Enter” has
 
been activated.
6. “FIRE” signal has been sent to Main Fire Alarm
 
Control Panel.

Page 2 of 3
CLEAN AGENT FIRE SUPPRESSION SYSTEM TEST QCDD FORM

A. Activate the abort switch during the pre-


discharge time delay period and check for the
ABORT following results:
1. Illumination of “ABORT” indication on the Clean
OPERATION  
agent Control Panel.
2. Release of gas is held if abort switch is pressed.  
B. Once released, wait for 30 seconds and check
for the following results:
1. Impulse valve Operator pin is in extended position;
illumination of “RELEASE” indication on the Clean
 
agent Control Panel; and activation of strobe light
located outside the protected hazard.

CERTIFICATION
The system as specified above has been installed and tested, in accordance with latest edition of NFPA, QCDD FSS and QCDD
approved drawings

________________________________ _______________________________________________
Contractor (QCDD Certificate No. / ID No. / Mobile No.)
(Signature over Printed Name with Stamp)

CERTIFICATION
The undersigned accepted the testing report for the system as specified herein.

________________________________ _______________________________________________
Consultant (UPDA No. / ID No. / Mobile No.)
(Signature over Printed Name with Stamp)

Page 3 of 3