Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT (WINRIP) IBRD Loan 8043-IND

PACKAGE :
PROVINCE :

DENSITY TEST by SAND CONE


AASHTO : T 191- 86

DATE : ..............................

LOCATION : .................................. TESTED BY : ..............................

KM POST
DESCRIPTION

SURFACE CALIBRATION

1 WEIGHT BEFORE

2 WEIGHT AFTER

3 WEIGHT OF SAND (1-2)

DETERMINING OF VOLUME OF HOLE

4 WEIGHT BEFORE

5 WEIGHT AFTER

6 WEIGHT OF SAND (4-5)

7 WEIGHT OF SAND IN HO (6-3)

8 UNIT WEIGHT OF SAND


7
9 VOLUME OF HOLE
8

DETERMINING OF DENSITY

10 WEIGHT OF WET SAMPLE + CONTAINER

11 WEIGHT OF DRY SAMPLE + CONTAINER

12 WEIGHT OF CONTAINER

13 WEIGHT OF WET SAMPLE (10-12)

14 WEIGHT OF DRY SAMPLE (11-12)

15 MOISTURE CONTENT
13
16 WET UNIT WEIGHT
9
16 x 100
17 DRY UNIT WEIGHT
100 + (15)

18 MAXIMUM DRY DENSITY


17
19 DEGREE OF DENSITY x 100%
18

20 TICKNESS ( cm )

Prepared by contractor Checked by consultant Approved by PM's staff


Name : Name : Name :

Position : Position : Position :

Date : Date : Date :

Signature : Signature : Signature :

1 513164969.xls
Position : Position :

Date : Date :

Signature : Signature :

1 513164969.xls

You might also like