PJT Name: Aramco cogen project

MCCL JOB SAFETY ANALYSIS

JOB STEP Decisions on management Measures (Cause elimination ,


RISK LEVEL
No.
DESCRIPTION Potential Risk Factors BEFORE
alternative mesure. Task improvement , daily management RISK RANK AFTER Responsible Person
(PPEs, Warning Signs) Trainings

Use proper PPE,-Ensure that all tools to be use was inspected,


Roof Drain Fixing Fall From Height, manlift collapsed due
to defectve tools and un trained 4
colour coded and in good conditon
2-Use full body Harness, 3- Machine and 1 SUPERVISOR
by MAN LIFT operator, Electrical hazard operator should have TUV, Fire Extingushier should be
placed,over head lines must be cleared