Professional Documents
Culture Documents
Logistic Dept Warning Letter
Logistic Dept Warning Letter
Date:
te - 16-Jan-2021
: REF. No : WS/WNLTR-A0007
Employs Name: Logistic Dept. E.C. No:
Company Name: IRIS Construction Tourism Industry and Trade WLL, Doha, Qatar
Designation: Site/Project:
On date 11th Jan 2021 vehicle came workshop for brake complaints. During repair it has been found that
shock absorber, top strut mount damaged. Also brake pad was totally worn out which damaged the
wheel disc. These all damaged explaining careless and rough driving of vehicle which is totally
unexpectable.
Verbal warning
The employee is here by warned that he could be dismissed it the violation is repeated after the
3rd warning
I the undersigned have received this safety warning letter / disciplinary notice and I admit that have
understood the contents.
IRIS/WS/WLTR-01 Page 1 of 1
IRIS/WS/WLTR-01 Page 1 of 1