PM Schedule 2018

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 19

PT.

SINAR KARYA MUSTIKA


General Contractor, Supplier, Heavy Equipment Rental
Job Site Gebe - Halteng

Weekly PM Service and Backlog Repairs Plan


Maintenance Department Period : 25 April - 01 May 2018

Preventive Maintenance
Current Service Estimate Remaining Unit
No. Unit No Brand Model Last Record Next PM Duration
SMU Date Hours / KM Condition
PM SMU PM SMU
1 BDT-73 Hino FM 260 PS (20 Ton) 1082.1 500 1000 29-Apr-18 -82.1 PS 2 1 Hrs
2 BDT-107 Hino FM 260 TI (20 Ton) 5165.1 4500 5000 26-Apr-18 -165.1 PS 2 1 Hrs
3 BDT-108 Hino FM 285 TI (20 Ton) 4567.3 4000 4500 27-Apr-18 -67.3 PS 1 1 Hrs
4 BDT-109 Hino FM 285 TI (20 Ton) 4547.5 4000 4500 25-Apr-18 -47.5 PS 4 2 Hrs
5 BDT-110 Hino FM 285 TI (20 Ton) 4242.2 3500 4000 26-Apr-18 -242.2 PS 4 2 Hrs
6 BDT-199 Hino FM260JD 1024.4 500 1000 30-Apr-18 -24.4 PS 2 1 Hrs
7 EXC-67 Hitachi ZX 200-5G 7008.8 6750 7000 29-Apr-18 -8.8 PS 3 2 Hrs
8 EXC-70 Hitachi ZX 210-F 1792.6 1500 1750 25-Apr-18 -42.6 PS 1 1 Hrs
9 EXC-71 Hitachi ZX 210-F 1770.2 1500 1750 26-Apr-18 -20.2 PS 1 1 Hrs
10 EXC-59 Komatsu PC 200-8 4316 4000 4250 28-Apr-18 -66 PS 1 1 Hrs
11 EXC-10 Komatsu PC 300-8 9330 9000 9250 30-Apr-18 -80 PS 1 1 Hrs
12 EXC-55 Komatsu PC 300-8 14824 14500 14750 29-Apr-18 -74 PS 1 1 Hrs
13 BD-16 Komatsu D85ESS 9978 9750 10000 26-Apr-18 22 PS 4 1 Hrs
14 VB-06 Bomag BW211D-40 559.3 250 25-Apr-18 -309.3 PS 1 1 Hrs
15 LT-01 Toyota DYNA 130HT (WU342R) 5598.1 5000 5500 1-Mar-18 -98.1 PS 1 1 Hrs
16 LT-03 Hino Hino 130HT 2255.7 1500 2000 28-Apr-18 -255.7 PS 3 2 Hrs
17 LT-18 Hino Hino D130HD 3764.7 3000 3500 1-Mar-18 -264.7 PS 1 1 Hrs
18 WT-72 Hino FM 260 PS (20 Ton) 4147 3500 4000 28-Apr-18 -147 PS 4 2 Hrs
19 GN-03 Genset Workshop Mitsubishi 6D14 5250 5500 5750 1-Mar-18 500 PS 1 1 Hrs
20 LAMP-08 Dosan Tower Light 3000 3500 4000 30-Apr-18 1000 PS 4 2 Hrs

List Distribution : Service Duration : Prepared by:


- Logistic & Warehouse 250 Hrs Service = 1 Hrs
- Mine Operation 500 Hrs Service = 1 Hrs
Maintenance Department
- Project Manager 1000 Hrs Service = 2 Hrs
2000 Hrs Service = 2 Hrs
PT. SINAR KARYA MUSTIKA
General Contractor, Supplier, Heavy Equipment Rental
Job Site Gebe - Halteng

Weekly PM Service and Backlog Repairs Plan


Maintenance Department Period : 30 April - 06 May 2018

Preventive Maintenance
Current Service Estimate Remaining Unit
No. Unit No Brand Model Last Record Next PM Duration
SMU Date Hours / KM Condition
PM SMU PM SMU
1 BDT-106 Hino FM 260 TI (20 Ton) 6003.3 5500 6000 30-Apr-18 -3.3 PS 3 2 Hrs
2 BDT-108 Hino FM 285 TI (20 Ton) 4595.2 4000 4500 30-Apr-18 -95.2 PS 1 1 Hrs
3 BDT-111 Hino FM 285 TI (20 Ton) 4504.2 4000 4500 30-Apr-18 -4.2 PS 1 1 Hrs
4 BDT-191 Hino FM260JD 1009.3 500 1000 5-May-18 -9.3 PS 2 1 Hrs
5 BDT-199 Hino FM260JD 1057.7 500 1000 2-May-18 -57.7 PS 2 1 Hrs
6 BDT-200 Hino FM260JD 1022.5 500 1000 5-May-18 -22.5 PS 2 1 Hrs
7 EXC-68 Hitachi ZX 200-5G 7754.1 7500 7750 5-May-18 -4.1 PS 1 1 Hrs
8 EXC-70 Hitachi ZX 210-F 1846.9 1500 1750 2-May-18 -96.9 PS 1 1 Hrs
9 EXC-71 Hitachi ZX 210-F 1815 1500 1750 4-May-18 -65 PS 1 1 Hrs
10 EXC-55 Komatsu PC 300-8 14858 14500 14750 4-May-18 -108 PS 1 1 Hrs
11 LT-03 Hino Hino 130HT 2303.1 1500 2000 2-May-18 -303.1 PS 3 2 Hrs
12 LT-17 Hino Hino D130HD 3005.9 2500 3000 6-May-18 -5.9 PS 2 1 Hrs
13 LT-18 Hino Hino D130HD 3806.2 3000 3500 3-May-18 -306.2 PS 1 1 Hrs
14 WT-72 Hino FM 260 PS (20 Ton) 4165.1 3500 4000 1-May-18 -165.1 PS 4 2 Hrs
15 GN-01 Genset Preparasi Mitsubishi 6D22 5261.4 5000 5250 6-May-18 -11.4 PS 1 1 Hrs
16 GN-03 Genset Workshop Mitsubishi 6D14 5860 5500 5750 1-May-18 -110 PS 1 1 Hrs
17 GN-02 Genset Preparasi Genset Kuning 1500 1750 2000 1-May-18 500 PS 4 2 Hrs
18 LAMP-08 Dosan Tower Light 3000 3500 4000 3-May-18 1000 PS 4 2 Hrs

List Distribution : Service Duration : Prepared by:


- Logistic & Warehouse 250 Hrs Service = 1 Hrs
- Mine Operation 500 Hrs Service = 1 Hrs
Maintenance Department
- Project Manager 1000 Hrs Service = 2 Hrs
2000 Hrs Service = 2 Hrs
PT. SINAR KARYA MUSTIKA
General Contractor, Supplier, Heavy Equipment Rental
Job Site Gebe - Halteng

Weekly PM Service and Backlog Repairs Plan


Maintenance Department Period : 07 May - 13 May 2018

Preventive Maintenance
Current Service Estimate Remaining Unit
No. Unit No Brand Model Last Record Next PM Duration
SMU Date Hours / KM Condition
PM SMU PM SMU
1 BDT-78 Hino FM 260 TI (20 Ton) 14001.9 13500 14000 13-May-18 -1.9 PS 3 2 Hrs
2 BDT-89 Hino FM 260 TI (20 Ton) 12054.7 11500 12000 12-May-18 -54.7 PS 4 2 Hrs
3 BDT-106 Hino FM 260 TI (20 Ton) 6096.5 5500 6000 10-May-18 -96.5 PS 3 2 Hrs
4 BDT-108 Hino FM 285 TI (20 Ton) 4687 4000 4500 9-May-18 -187 PS 1 1 Hrs
5 BDT-111 Hino FM 285 TI (20 Ton) 4597.5 4000 4500 7-May-18 -97.5 PS 1 1 Hrs
6 BDT-191 Hino FM260JD 1091.4 500 1000 10-May-18 -91.4 PS 2 1 Hrs
7 BDT-192 Hino FM260JD 1072 500 1000 13-May-18 -72 PS 2 1 Hrs
8 BDT-196 Hino FM260JD 1074.3 500 1000 12-May-18 -74.3 PS 2 1 Hrs
9 BDT-199 Hino FM260JD 1156.5 500 1000 7-May-18 -156.5 PS 2 1 Hrs
10 EXC-69 Hitachi ZX 200-5G 7586.7 7250 7500 8-May-18 -86.7 PS 2 1 Hrs
11 EXC-59 Komatsu PC 200-8 4467 4250 4500 12-May-18 33 PS 2 1 Hrs
12 EXC-58 Komatsu PC 300-8 8234 8000 8250 8-May-18 16 PS 1 1 Hrs
13 EXC-55 Komatsu PC 300-8 14952 14750 15000 11-May-18 48 PS 3 2 Hrs
14 WL-15 XCMG LW300KN 762.6 500 750 13-May-18 -12.6 PS 1 1 Hrs
15 LT-03 Hino Hino 130HT 2365.7 1500 2000 8-May-18 -365.7 PS 3 2 Hrs
16 LT-17 Hino Hino D130HD 3050 2500 3000 11-May-18 -50 PS 2 1 Hrs
17 LT-18 Hino Hino D130HD 3868.9 3000 3500 9-May-18 -368.9 PS 1 1 Hrs
18 WT-72 Hino FM 260 PS (20 Ton) 4211.9 3500 4000 7-May-18 -211.9 PS 4 2 Hrs
19 GN-02 Genset Workshop Mitsubishi 6D14 5809.02 5500 5750 11-May-18 -59.02 PS 1 1 Hrs
20 GN-03 Genset Workshop Mitsubishi 6D14 5967.17 5500 5750 9-May-18 -217.17 PS 1 1 Hrs

List Distribution : Service Duration : Prepared by:


- Logistic & Warehouse 250 Hrs Service = 1 Hrs
- Mine Operation 500 Hrs Service = 1 Hrs
Maintenance Department
- Project Manager 1000 Hrs Service = 2 Hrs
2000 Hrs Service = 2 Hrs
PT. SINAR KARYA MUSTIKA
General Contractor, Supplier, Heavy Equipment Rental
Job Site Gebe - Halteng

Weekly PM Service and Backlog Repairs Plan


Maintenance Department Period : 14 May - 20 May 2018

Preventive Maintenance
Current Service Estimate Remaining Unit
No. Unit No Brand Model Last Record Next PM Duration
SMU Date Hours / KM Condition
PM SMU PM SMU
1 BDT-101 Hino FM 260 TI (20 Ton) 8990.1 8500 9000 17-May-18 9.9 PS 2 1 Hrs
2 BDT-105 Hino FM 260 TI (20 Ton) 13477.3 13000 13500 20-May-18 22.7 PS 1 1 Hrs
3 EXC-67 Hitachi ZX 200-5G 7250.9 7000 7250 16-May-18 -0.9 PS 1 1 Hrs
4 EXC-70 Hitachi ZX 210-F 2033.3 1750 2000 14-May-18 -33.3 PS 4 2 Hrs
5 EXC-71 Hitachi ZX 210-F 1969.7 1750 2000 20-May-18 30.3 PS 4 2 Hrs
6 EXC-72 Hitachi ZX 210-F 2245 2000 2250 17-May-18 5 PS 1 1 Hrs
7 EXC-50 Komatsu PC 200-8 8483 8250 8500 18-May-18 17 PS 2 1 Hrs
8 EXC-51 Komatsu PC 200-8 10738 10500 10750 17-May-18 12 PS 1 1 Hrs
9 EXC-61 Komatsu PC 200-8 9733.2 9500 9750 19-May-18 16.8 PS 1 1 Hrs
10 EXC-62 Komatsu PC 200-8 10227.2 10000 10250 19-May-18 22.8 PS 1 1 Hrs
11 EXC-03 Komatsu PC 300-8 10258 10000 10250 16-May-18 -8 PS 1 1 Hrs
12 EXC-55 Komatsu PC 300-8 14990 14750 15000 18-May-18 10 PS 3 2 Hrs
13 BD-15 Komatsu D65P 10559 10250 10500 14-May-18 -59 PS 2 1 Hrs
14 LT-17 Hino Hino D130HD 3193.1 2500 3000 15-May-18 -193.1 PS 2 1 Hrs
15 LT-18 Hino Hino D130HD 3887.9 3000 3500 15-May-18 -387.9 PS 1 1 Hrs
16 GN-02 Genset Workshop Mitsubishi 6D14 5809.02 5500 5750 16-May-18 -59.02 PS 1 1 Hrs
17 GN-03 Genset Workshop Mitsubishi 6D14 5967.17 5500 5750 15-May-18 -217.17 PS 1 1 Hrs

List Distribution : Service Duration : Prepared by:


- Logistic & Warehouse 250 Hrs Service = 1 Hrs
- Mine Operation 500 Hrs Service = 1 Hrs
Maintenance Department
- Project Manager 1000 Hrs Service = 2 Hrs
2000 Hrs Service = 2 Hrs
PT. SINAR KARYA MUSTIKA
General Contractor, Supplier, Heavy Equipment Rental
Job Site Gebe - Halteng

Weekly PM Service and Backlog Repairs Plan


Maintenance Department Period : 21 May - 27 May 2018

Preventive Maintenance
Current Service Estimate Remaining Unit
No. Unit No Brand Model Last Record Next PM Duration
SMU Date Hours / KM Condition
PM SMU PM SMU
1 BDT-81 Hino FM 260 TI (20 Ton) 12465.7 12000 12500 26-May-18 34.3 PS 1 1 Hrs
2 BDT-100 Hino FM 260 TI (20 Ton) 3511.3 3000 3500 21-May-18 -11.3 PS 1 1 Hrs
3 BDT-103 Hino FM 260 TI (20 Ton) 9445.5 9000 9500 27-May-18 54.5 PS 1 1 Hrs
4 BDT-110 Hino FM 285 TI (20 Ton) 4512.4 4000 4500 22-May-18 -12.4 PS 1 1 Hrs
5 EXC-69 Hitachi ZX 200-5G 7741.2 7500 7750 26-May-18 8.8 PS 1 1 Hrs
6 EXC-51 Komatsu PC 200-8 10810 10500 10750 21-May-18 -60 PS 1 1 Hrs
7 EXC-11 Komatsu PC 300-8 10502 10250 10500 22-May-18 -2 PS 2 1 Hrs
8 EXC-58 Komatsu PC 300-8 8442 8250 8500 26-May-18 58 PS 2 1 Hrs
9 LT-03 Hino Hino 130HT 2443.5 2000 2500 27-May-18 56.5 PS 1 1 Hrs
10 LT-18 Hino Hino D130HD 3951.1 3500 4000 27-May-18 48.9 PS 4 2 Hrs
11 LV-10 Mitsubitshi Pick-Up - 18-Feb-18 - 24-May-18 - - 1 Hrs
12 LV-47 Toyota Hilux Pick-Up - 19-Feb-18 - 23-May-18 - - 1 Hrs
13 LV-49 Toyota Hilux Pick-Up - 9-Oct-17 - 21-May-18 - - 1 Hrs
14 LV-57 Toyota Hilux Pick-Up - 19-Feb-18 - 24-May-18 - - 1 Hrs
15 LV-53 Isuzu Panther TBR 54F TURBO LM - 15-Jan-18 - 22-May-18 - - 1 Hrs
16 LV-09 Toyota Hilux Pick-Up - 24-Jan-18 - 23-May-18 - - 1 Hrs
17 LV-79 Toyota Hilux Pick-Up - 13-May-18 - 25-May-18 - - 1 Hrs
18 LAMP-01 Ingersoll Rand Tower Light - 15-Mar-18 - 25-May-18 - - 1 Hrs
19 LAMP-05 Ingersoll Rand Tower Light - 26-Mar-18 - 25-May-18 - - 1 Hrs
20 LAMP-09 Dosan Tower Light - 13-Mar-18 - 24-May-18 - - 1 Hrs
21 LAMP-10 Ingersoll Rand Tower Light - 11-Feb-18 - 23-May-18 - - 1 Hrs

List Distribution : Service Duration : Prepared by:


- Logistic & Warehouse 250 Hrs Service = 1 Hrs
- Mine Operation 500 Hrs Service = 1 Hrs
Maintenance Department
- Project Manager 1000 Hrs Service = 2 Hrs
2000 Hrs Service = 2 Hrs
PT. SINAR KARYA MUSTIKA
General Contractor, Supplier, Heavy Equipment Rental
Job Site Gebe - Halteng

Weekly PM Service and Backlog Repairs Plan


Maintenance Department Period : 28 May - 03 Juni 2018

Preventive Maintenance
Current Service Estimate Remaining Unit
No. Unit No Brand Model Last Record Next PM Duration
SMU Date Hours / KM Condition
PM SMU PM SMU
1 BDT-81 Hino FM 260 TI (20 Ton) 12543.8 12000 12500 28-May-18 -43.8 PS 1 1 Hrs
2 BDT-107 Hino FM 260 TI (20 Ton) 5440.6 5000 5500 2-Jun-18 59.4 PS 1 1 Hrs
3 BDT-110 Hino FM 285 TI (20 Ton) 4591.4 4000 4500 28-May-18 -91.4 PS 1 1 Hrs
4 EXC-59 Komatsu PC 200-8 4744.2 4500 4750 29-May-18 5.8 PS 1 1 Hrs
5 EXC-60 Komatsu PC 200-8 9956.3 9750 10000 30-May-18 43.7 PS 4 2 Hrs
6 EXC-58 Komatsu PC 300-8 8520 8250 8500 29-May-18 -20 PS 2 1 Hrs
7 BD-15 Komatsu D65P 10703 10500 10750 2-Jun-18 47 PS 1 1 Hrs
8 BD-25 Komatsu D85ESS 860.6 500 750 28-May-18 -110.6 PS 1 1 Hrs
9 WL-15 XCMG LW300KN 963.2 750 1000 1-Jun-18 36.8 PS 3 2 Hrs
10 LT-03 Hino Hino 130HT 2488.6 2000 2500 31-May-18 11.4 PS 1 1 Hrs
11 LV-10 Mitsubitshi Pick-Up - 18-Feb-18 - 31-May-18 - - 1 Hrs
12 LV-47 Toyota Hilux Pick-Up - 19-Feb-18 - 31-May-18 - - 1 Hrs
13 LV-49 Toyota Hilux Pick-Up - 9-Oct-17 - 29-May-18 - - 1 Hrs
14 LV-57 Toyota Hilux Pick-Up - 19-Feb-18 - 1-Jun-18 - - 1 Hrs
15 LV-53 Isuzu Panther TBR 54F TURBO LM - 15-Jan-18 - 3-Jun-18 - - 1 Hrs
16 LV-09 Toyota Hilux Pick-Up - 24-Jan-18 - 30-May-18 - - 1 Hrs
17 LV-79 Toyota Hilux Pick-Up - 13-May-18 - 3-Jun-18 - - 1 Hrs

List Distribution : Service Duration : Prepared by:


- Logistic & Warehouse 250 Hrs Service = 1 Hrs
- Mine Operation 500 Hrs Service = 1 Hrs
Maintenance Department
- Project Manager 1000 Hrs Service = 2 Hrs
2000 Hrs Service = 2 Hrs
PT. SINAR KARYA MUSTIKA
General Contractor, Supplier, Heavy Equipment Rental
Job Site Gebe - Halteng

Weekly PM Service and Backlog Repairs Plan


Maintenance Department Period : 04 Juni - 10 Juni 2018

Preventive Maintenance
Current Service Estimate Remaining Unit
No. Unit No Brand Model Last Record Next PM Duration
SMU Date Hours / KM Condition
PM SMU PM SMU
1 BDT-107 Hino FM 260 TI (20 Ton) 5502.4 5000 5500 5-Jun-18 -2.4 PS 1 1 Hrs
2 BDT-108 Hino FM 285 TI (20 Ton) 4990.1 4500 5000 6-Jun-18 9.9 PS 2 1 Hrs
3 BDT-109 Hino FM 285 TI (20 Ton) 5007.9 4500 5000 5-Jun-18 -7.9 PS 2 1 Hrs
4 BDT-193 Hino FM260JD 1475.8 1000 1500 7-Jun-18 24.2 PS 1 1 Hrs
5 BDT-195 Hino FM260JD 1436.7 1000 1500 10-Jun-18 63.3 PS 1 1 Hrs
6 BDT-197 Hino FM260JD 1477.7 1000 1500 7-Jun-18 22.3 PS 1 1 Hrs
7 BDT-199 Hino FM260JD 1478.8 1000 1500 6-Jun-18 21.2 PS 1 1 Hrs
8 EXC-71 Hitachi ZX 210-F 2268.2 2000 2250 4-Jun-18 -18.2 PS 1 1 Hrs
9 EXC-106 Hitachi ZX 350-5H 465 - 500 8-Jun-18 35 PS 2 1 Hrs
10 EXC-107 Hitachi ZX 350-5H 520.4 - 500 4-Jun-18 -20.4 PS 2 1 Hrs
11 EXC-51 Komatsu PC 200-8 10924 10750 11000 10-Jun-18 76 PS 3 2 Hrs
12 EXC-61 Komatsu PC 200-8 9933.6 9750 10000 9-Jun-18 66.4 PS 4 2 Hrs
13 EXC-62 Komatsu PC 200-8 10460.2 10250 10500 7-Jun-18 39.8 PS 2 1 Hrs
14 EXC-55 Komatsu PC 300-8 15195 15000 15250 9-Jun-18 55 PS 1 1 Hrs
15 BD-25 Komatsu D85ESS 938 750 1000 10-Jun-18 62 PS 3 2 Hrs
16 VB-06 Bomag BW211D-40 731.4 500 750 6-Jun-18 18.6 PS 1 1 Hrs
17 GN-01 Genset Preparasi Mitsubishi 6D22 5454.9 5250 5500 9-Jun-18 45.1 PS 2 1 Hrs
18 GN-03 Genset Workshop Mitsubishi 6D14 6306.8 6000 6250 4-Jun-18 -56.8 PS 1 1 Hrs
19 LAMP-06 Krisbow Tower Light - 4-Apr-18 - 8-Jun-18 - - 1 Hrs
20 LAMP-07 Krisbow Tower Light - 11-Feb-18 - 5-Jun-18 - - 1 Hrs
21 LAMP-08 Dosan Tower Light - 4-Apr-18 - 8-Jun-18 - - 1 Hrs

List Distribution : Service Duration : Prepared by:


- Logistic & Warehouse 250 Hrs Service = 1 Hrs
- Mine Operation 500 Hrs Service = 1 Hrs
Maintenance Department
- Project Manager 1000 Hrs Service = 2 Hrs
2000 Hrs Service = 2 Hrs
PT. SINAR KARYA MUSTIKA
General Contractor, Supplier, Heavy Equipment Rental
Job Site Gebe - Halteng

Weekly PM Service and Backlog Repairs Plan


Maintenance Department Period : 11 Juni - 17 Juni 2018

Preventive Maintenance
Current Service Estimate Remaining Unit
No. Unit No Brand Model Last Record Next PM Duration
SMU Date Hours / KM Condition
PM SMU PM SMU
1 BDT-106 Hino FM 260 TI (20 Ton) 6409.2 6000 6500 17-Jun-18 90.8 PS 3 2 Hrs
2 BDT-111 Hino FM 285 TI (20 Ton) 4952 4500 5000 15-Jun-18 48 PS 2 1 Hrs
3 BDT-191 Hino FM260JD 1448.1 1000 1500 15-Jun-18 51.9 PS 1 1 Hrs
4 BDT-192 Hino FM260JD 1431.9 1000 1500 16-Jun-18 68.1 PS 1 1 Hrs
5 BDT-195 Hino FM260JD 1499.9 1000 1500 12-Jun-18 0.1 PS 1 1 Hrs
6 BDT-196 Hino FM260JD 1424.5 1000 1500 17-Jun-18 75.5 PS 1 1 Hrs
7 BDT-197 Hino FM260JD 1540.2 1000 1500 11-Jun-18 -40.2 PS 1 1 Hrs
8 BDT-198 Hino FM260JD 1403.9 1000 1500 17-Jun-18 96.1 PS 1 1 Hrs
9 BDT-200 Hino FM260JD 1485 1000 1500 14-Jun-18 15 PS 1 1 Hrs
10 EXC-50 Komatsu PC 200-8 8483 8250 8500 14-Jun-18 17 PS 2 1 Hrs
11 EXC-62 Komatsu PC 200-8 10489.7 10250 10500 13-Jun-18 10.3 PS 2 1 Hrs
12 WT-72 Hino FM 260 PS (20 Ton) 4442.6 4000 4500 16-Jun-18 57.4 PS 1 1 Hrs
13 LAMP-06 Krisbow Tower Light - 4-Apr-2018 - 12-Jun-18 - - 1 Hrs
14 LAMP-07 Krisbow Tower Light - 11-Feb-2018 - 11-Jun-18 - - 1 Hrs
15 LAMP-08 Dosan Tower Light - 4-Apr-2018 - 13-Jun-18 - - 1 Hrs

List Distribution : Service Duration : Prepared by:


- Logistic & Warehouse 250 Hrs Service = 1 Hrs
- Mine Operation 500 Hrs Service = 1 Hrs
Maintenance Department
- Project Manager 1000 Hrs Service = 2 Hrs
2000 Hrs Service = 2 Hrs
PT. SINAR KARYA MUSTIKA
General Contractor, Supplier, Heavy Equipment Rental
Job Site Gebe - Halteng

Weekly PM Service and Backlog Repairs Plan


Maintenance Department Period : 02 Juli - 08 Juli 2018

Preventive Maintenance
Current Service Estimate Remaining Unit
No. Unit No Brand Model Last Record Next PM Duration
SMU Date Hours / KM Condition
PM SMU PM SMU
1 BDT-89 Hino FM 260 TI (20 Ton) 12453.4 12000 12500 8-Jul-18 46.6 PS 1 1 Hrs
2 BDT-91 Hino FM 260 TI (20 Ton) 11056.1 10500 11000 3-Jul-18 -56.1 PS 2 1 Hrs
3 BDT-196 Hino FM260JD 1527.6 1000 1500 4-Jul-18 -27.6 PS 1 1 Hrs
4 BDT-198 Hino FM260JD 1507 1000 1500 5-Jul-18 -7 PS 1 1 Hrs
5 BDT-200 Hino FM260JD 1591.3 1000 1500 2-Jul-18 -91.3 PS 1 1 Hrs
6 EXC-50 Komatsu PC 200-8 8483 8250 8500 7-Jul-18 17 PS 2 1 Hrs
7 EXC-59 Komatsu PC 200-8 5068.1 4750 5000 2-Jul-18 -68.1 PS 3 2 Hrs
8 EXC-60 Komatsu PC 200-8 10209.4 10000 10250 7-Jul-18 40.6 PS 1 1 Hrs
9 BD-15 Komatsu D65P 11033.5 10750 11000 2-Jul-18 -33.5 PS 3 2 Hrs
10 BD-25 Komatsu D85ESS 1200 1000 1250 8-Jul-18 50 PS 1 1 Hrs
11 WL-15 XCMG LW300KN 1257.9 1000 1250 5-Jul-18 -7.9 PS 1 1 Hrs
12 LT-01 Toyota DYNA 130HT (WU342R) 5906.7 5500 6000 8-Jul-18 93.3 PS 3 2 Hrs
13 GN-03 Genset Workshop Mitsubishi 6D14 6548.27 6250 6500 3-Jul-18 -48.27 PS 2 1 Hrs
14 LAMP-01 Ingersoll Rand Tower Light - 26-May-2018 - 6-Jul-18 - - 1 Hrs
15 LAMP-08 Dosan Tower Light - 4-Apr-2018 - 4-Jul-18 - - 1 Hrs
16 LAMP-09 Dosan Tower Light - 26-May-2018 - 6-Jul-18 - - 1 Hrs

List Distribution : Service Duration : Prepared by:


- Logistic & Warehouse 250 Hrs Service = 1 Hrs
- Mine Operation 500 Hrs Service = 1 Hrs
Maintenance Department
- Project Manager 1000 Hrs Service = 2 Hrs
2000 Hrs Service = 2 Hrs
PT. SINAR KARYA MUSTIKA
General Contractor, Supplier, Heavy Equipment Rental
Job Site Gebe - Halteng

Weekly PM Service and Backlog Repairs Plan


Maintenance Department Period : 09 Juli - 15 Juli 2018

Preventive Maintenance
Current Service Estimate Remaining Unit
No. Unit No Brand Model Last Record Next PM Duration
SMU Date Hours / KM Condition
PM SMU PM SMU
1 BDT-80 Hino FM 260 TI (20 Ton) 4007.8 3500 4000 11-Jul-18 -7.8 PS 4 2 Hrs
2 BDT-89 Hino FM 260 TI (20 Ton) 12490.7 12000 12500 12-Jul-18 9.3 PS 1 1 Hrs
3 BDT-105 Hino FM 260 TI (20 Ton) 13913.7 13500 14000 15-Jul-18 86.3 PS 3 2 Hrs
4 BDT-198 Hino FM260JD 1545.8 1000 1500 10-Jul-18 -45.8 PS 1 1 Hrs
5 EXC-50 Komatsu PC 200-8 8483 8250 8500 11-Jul-18 17 PS 2 1 Hrs
6 EXC-59 Komatsu PC 200-8 5116.6 4750 5000 9-Jul-18 -116.6 PS 3 2 Hrs
7 EXC-60 Komatsu PC 200-8 10257 10000 10250 9-Jul-18 -7 PS 1 1 Hrs
8 EXC-62 Komatsu PC 200-8 10662 10500 10750 14-Jul-18 88 PS 1 1 Hrs
9 EXC-11 Komatsu PC 300-8 10674 10500 10750 13-Jul-18 76 PS 1 1 Hrs
10 MH-01 Toyota DYNA 130HT (WU342R) 5943 5500 6000 13-Jul-18 57 PS 3 2 Hrs

List Distribution : Service Duration : Prepared by:


- Logistic & Warehouse 250 Hrs Service = 1 Hrs
- Mine Operation 500 Hrs Service = 1 Hrs
Maintenance Department
- Project Manager 1000 Hrs Service = 2 Hrs
2000 Hrs Service = 2 Hrs
PT. SINAR KARYA MUSTIKA
General Contractor, Supplier, Heavy Equipment Rental
Job Site Gebe - Halteng

Weekly PM Service and Backlog Repairs Plan


Maintenance Department Period : 16 Juli - 22 Juli 2018

Preventive Maintenance
Current Service Estimate Remaining Unit
No. Unit No Brand Model Last Record Next PM Duration
SMU Date Hours / KM Condition
PM SMU PM SMU
1 BDT-80 Hino FM 260 TI (20 Ton) 4027.3 3500 4000 16-Jul-18 -27.3 PS 4 2 Hrs
2 BDT-101 Hino FM 260 TI (20 Ton) 9421.7 9000 9500 22-Jul-18 78.3 PS 1 1 Hrs
3 BDT-105 Hino FM 260 TI (20 Ton) 13966.2 13500 14000 17-Jul-18 33.8 PS 3 2 Hrs
4 BDT-110 Hino FM 285 TI (20 Ton) 4935.9 4500 5000 19-Jul-18 64.1 PS 2 1 Hrs
5 EXC-68 Hitachi ZX 200-5G 8415 8000 8500 22-Jul-18 85 PS 2 1 Hrs
6 EXC-71 Hitachi ZX 210-F 2719.5 2500 2750 17-Jul-18 30.5 PS 1 1 Hrs
7 EXC-107 Hitachi ZX 350-5H 923.1 500 1000 21-Jul-18 76.9 PS 3 2 Hrs
8 EXC-61 Komatsu PC 200-8 10179 10000 10250 20-Jul-18 71 PS 1 1 Hrs
9 EXC-62 Komatsu PC 200-8 10691 10500 10750 18-Jul-18 59 PS 1 1 Hrs
10 GN-03 Genset Workshop Mitsubishi 6D14 6817.59 6500 6750 16-Jul-18 -67.59 PS 1 1 Hrs
11 LAMP-01 Ingersoll Rand Tower Light - 26-May-18 - 18-Jul-18 - 1 Hrs

List Distribution : Service Duration : Prepared by:


- Logistic & Warehouse 250 Hrs Service = 1 Hrs
- Mine Operation 500 Hrs Service = 1 Hrs
Maintenance Department
- Project Manager 1000 Hrs Service = 2 Hrs
2000 Hrs Service = 2 Hrs
PT. SINAR KARYA MUSTIKA
General Contractor, Supplier, Heavy Equipment Rental
Job Site Gebe - Halteng

Weekly PM Service and Backlog Repairs Plan


Maintenance Department Period : 23 Juli - 29 Juli 2018

Preventive Maintenance
Current Service Estimate Remaining Unit
No. Unit No Brand Model Last Record Next PM Duration
SMU Date Hours / KM Condition
PM SMU PM SMU
1 DTH 108 Hino FM 285 TI (20 Ton) 5406.8 5000 5500 29-Jul-18 93.2 PS 1 1 Hrs
2 DTH 109 Hino FM 285 TI (20 Ton) 5403.6 5000 5500 29-Jul-18 96.4 PS 1 1 Hrs
3 EXC 68 Hitachi ZX 200-5G 8494.3 8000 8500 24-Jul-18 5.7 PS 2 1 Hrs
4 EXC 69 Hitachi ZX 200-5G 8161.2 7750 8250 28-Jul-18 88.8 PS 1 1 Hrs
5 EXC 106 Hitachi ZX 350-5H 988 500 1000 24-Jul-18 12 PS 3 2 Hrs
6 EXC 59 Komatsu PC 200-8 5248.7 5000 5250 23-Jul-18 1.3 PS 1 1 Hrs
7 EXC 60 Komatsu PC 200-8 10421.3 10250 10500 27-Jul-18 78.7 PS 2 1 Hrs
8 EXC 55 Komatsu PC 300-8 15477 15250 15500 25-Jul-18 23 PS 2 1 Hrs
9 BD 25 Komatsu D85ESS 1469.4 1250 1500 26-Jul-18 30.6 PS 2 1 Hrs
10 VB 06 Bomag BW211D-40 973.5 750 1000 25-Jul-18 26.5 PS 3 2 Hrs
11 WL 15 XCMG LW300KN 1439.3 1250 1500 27-Jul-18 60.7 PS 2 1 Hrs
12 WT 57 Hino FM 260 PS (20 Ton) 2417.7 2000 2500 28-Jul-18 82.3 PS 1 1 Hrs
13 LV 10 Mitsubitshi Pick-Up - 1-Jun-18 - 26-Jul-18 - 1 Hrs
14 LV 08 Mitsubitshi Pick-Up - 12-Nov-17 - 23-Jul-18 - 1 Hrs

List Distribution : Service Duration : Prepared by:


- Logistic & Warehouse 250 Hrs Service = 1 Hrs
- Mine Operation 500 Hrs Service = 1 Hrs
Maintenance Department
- Project Manager 1000 Hrs Service = 2 Hrs
2000 Hrs Service = 2 Hrs
PT. SINAR KARYA MUSTIKA
General Contractor, Supplier, Heavy Equipment Rental
Job Site Gebe - Halteng

Weekly PM Service and Backlog Repairs Plan


Maintenance Department Period : 30 Juli - 05 Agustus 2018

Preventive Maintenance
Current Service Estimate Remaining Unit
No. Unit No Brand Model Last Record Next PM Duration
SMU Date Hours / KM Condition
PM SMU PM SMU
1 BDT-103 Hino FM 260 TI (20 Ton) 9925.5 9500 10000 4-Aug-18 74.5 PS 3 2 Hrs
2 BDT-107 Hino FM 260 TI (20 Ton) 5906.5 5500 6000 5-Aug-18 93.5 PS 3 2 Hrs
3 BDT-108 Hino FM 285 TI (20 Ton) 5479.6 5000 5500 30-Aug-18 20.4 PS 1 1 Hrs
4 BDT-193 Hino FM260JD 1911.2 1500 2000 3-Aug-18 88.8 PS 3 2 Hrs
5 BDT-197 Hino FM260JD 1925.7 1500 2000 2-Aug-18 74.3 PS 3 2 Hrs
6 BDT-199 Hino FM260JD 1938.6 1500 2000 31-Jul-18 61.4 PS 3 2 Hrs
7 EXC-71 Hitachi ZX 210-F 2936.4 2500 3000 1-Aug-18 63.6 PS 3 2 Hrs
8 WL-15 XCMG LW300KN 1497.4 1250 1500 30-Jul-18 2.6 PS 2 1 Hrs
9 LT-17 Hino Hino D130HD 3409.9 3000 3500 5-Aug-18 90.1 PS 1 1 Hrs
10 WT-57 Hino FM 260 PS (20 Ton) 2453.4 2000 2500 31-Jul-18 46.6 PS 1 1 Hrs

List Distribution : Service Duration : Prepared by:


- Logistic & Warehouse 250 Hrs Service = 1 Hrs
- Mine Operation 500 Hrs Service = 1 Hrs
Maintenance Department
- Project Manager 1000 Hrs Service = 2 Hrs
2000 Hrs Service = 2 Hrs
PT. SINAR KARYA MUSTIKA
General Contractor, Supplier, Heavy Equipment Rental
Job Site Gebe - Halteng

Weekly PM Service and Backlog Repairs Plan


Maintenance Department Period : 06 Agustus - 12 Agustus 2018

Preventive Maintenance
Current Service Estimate Remaining Unit
No. Unit No Brand Model Last Record Next PM Duration
SMU Date Hours / KM Condition
PM SMU PM SMU
1 DTH 81 Hino FM 260 TI (20 Ton) 12955.7 12500 13000 8-Aug-18 44.3 PS 2 1 Hrs
2 DTH 103 Hino FM 260 TI (20 Ton) 10026.2 9500 10000 6-Aug-18 -26.2 PS 3 2 Hrs
3 DTH 107 Hino FM 260 TI (20 Ton) 6003.6 5500 6000 7-Aug-18 -3.6 PS 3 2 Hrs
4 DTH 111 Hino FM 285 TI (20 Ton) 5490.7 5000 5500 8-Aug-18 9.3 PS 1 1 Hrs
5 DTH 191 Hino FM260JD 1931.2 1500 2000 11-Aug-18 68.8 PS 3 2 Hrs
6 DTH 192 Hino FM260JD 1915 1500 2000 12-Aug-18 85 PS 3 2 Hrs
7 DTH 195 Hino FM260JD 1996.7 1500 2000 7-Aug-18 3.3 PS 3 2 Hrs
8 DTH 200 Hino FM260JD 1961.5 1500 2000 8-Aug-18 38.5 PS 3 2 Hrs
9 EXC 67 Hitachi ZX 200-5G 8204.9 7750 8250 10-Aug-18 45.1 PS 1 1 Hrs
10 EXC 70 Hitachi ZX 200-5G 3019.7 2500 3000 6-Aug-18 -19.7 PS 3 2 Hrs
11 EXC 72 Hitachi ZX 210-F 3251.4 2750 3250 6-Aug-18 -1.4 PS 1 1 Hrs
12 EXC 59 Komatsu PC 200-8 5450.5 5250 5500 9-Aug-18 49.5 PS 2 1 Hrs
13 EXC 62 Komatsu PC 200-8 10924.9 10750 11000 11-Aug-18 75.1 PS 3 2 Hrs
14 BD 25 Komatsu D85ESS 1679.7 1500 1750 11-Aug-18 70.3 PS 1 1 Hrs
15 MH 18 Hino Hino D130HD 4464.8 4000 4500 9-Aug-18 35.2 PS 1 1 Hrs
16 GN 02 Genset Workshop Mitsubishi 6D14 6887.94 6500 6750 7-Aug-18 -138 PS 1 1 Hrs
17 GN 03 Genset Workshop Mitsubishi 6D14 7065.64 6750 7000 10-Aug-18 -66 PS 3 2 Hrs
18 TL 43 JCB Tower Light 414 500 12-Aug-18 86 - 1 Hrs
19 TL 08 Dosan Tower Light - 03-Jul-18 - 12-Aug-18 - - 1 Hrs
20 TL 10 Ingersoll Rand Tower Light - 26-May-18 - 9-Aug-18 - - 1 Hrs
21 LV 49 Toyota Hilux Pick-Up - 26-May-18 - 10-Aug-18 - - 1 Hrs

List Distribution : Service Duration : Prepared by:


- Logistic & Warehouse 250 Hrs Service = 1 Hrs
- Mine Operation 500 Hrs Service = 1 Hrs
Maintenance Department
- Project Manager 1000 Hrs Service = 2 Hrs
2000 Hrs Service = 2 Hrs
PT. SINAR KARYA MUSTIKA
General Contractor, Supplier, Heavy Equipment Rental
Job Site Gebe - Halteng

Weekly PM Service and Backlog Repairs Plan


Maintenance Department Period : 13 Agustus - 19 Agustus 2018

Preventive Maintenance
Current Service Estimate Remaining Unit
No. Unit No Brand Model Last Record Next PM Duration
SMU Date Hours / KM Condition
PM SMU PM SMU
1 DTH 196 Hino FM260JD 1957.2 1500 2000 15-Aug-18 42.8 PS 3 2 Hrs
2 DTH 198 Hino FM260JD 1944.7 1500 2000 18-Aug-18 55.3 PS 3 2 Hrs
3 EXC 51 Komatsu PC 200-8 11171 11000 11250 19-Aug-18 79 PS 1 1 Hrs
4 EXC 61 Komatsu PC 200-8 10439.4 10250 10500 19-Aug-18 60.6 PS 2 1 Hrs
5 MG 07 Komatsu GD511A-1 2969.9 2750 3000 14-Aug-18 30.1 PS 3 2 Hrs
6 FT 99 Hino FM 260 TI (20 Ton) 607.8 500 13-Aug-18 -107.8 PS 1 1 Hrs
7 GN 01 Genset Preparasi Mitsubishi 6D22 5718.3 5500 5750 16-Aug-18 31.7 PS 1 1 Hrs
8 GN 02 Genset Preparasi Genset Kuning 5718.3 2000 5750 16-Aug-18 31.7 PS 1 1 Hrs
9 TL 01 Ingersoll Rand Tower Light - 26-May-18 - 14-Aug-18 - - 1 Hrs
10 TL 06 Krisbow Tower Light - 04-Apr-18 - 13-Aug-18 - - 1 Hrs
11 TL 09 Dosan Tower Light - 03-Jul-18 - 17-Aug-18 - - 1 Hrs
12 LV 09 Toyota Hilux Pick-Up - 01-Jun-18 - 15-Aug-18 - - 1 Hrs

List Distribution : Service Duration : Prepared by:


- Logistic & Warehouse 250 Hrs Service = 1 Hrs
- Mine Operation 500 Hrs Service = 1 Hrs
Maintenance Department
- Project Manager 1000 Hrs Service = 2 Hrs
2000 Hrs Service = 2 Hrs
PT. SINAR KARYA MUSTIKA
General Contractor, Supplier, Heavy Equipment Rental
Job Site Gebe - Halteng

Weekly PM Service and Backlog Repairs Plan


Maintenance Department Period : 20 Agustus - 26 Agustus 2018

Preventive Maintenance
Current Service Estimate Remaining Unit
No. Unit No Brand Model Last Record Next PM Duration
SMU Date Hours / KM Condition
PM SMU PM SMU
1 DTH 91 Hino FM 260 TI (20 Ton) 11425.8 11000 11500 25-Aug-18 74.2 PS 1 1 Hrs
2 DTH 196 Hino FM260JD 1998.9 1500 2000 20-Aug-18 1.1 PS 3 2 Hrs
3 EXC 69 Hitachi ZX 200-5G 8471.4 8000 8500 22-Aug-18 28.6 PS 2 1 Hrs
4 EXC 106 Hitachi ZX 350-5H 1409 1000 1500 26-Aug-18 91 PS 2 1 Hrs
5 EXC 107 Hitachi ZX 350-5H 1479.8 1000 1500 21-Aug-18 20.2 PS 2 1 Hrs
6 EXC 51 Komatsu PC 200-8 11178 11000 11250 25-Aug-18 72 PS 1 1 Hrs
7 EXC 55 Komatsu PC 300-8 15690 15500 15750 22-Aug-18 60 PS 1 1 Hrs
8 VB 06 Bomag BW211D-40 1184.7 1000 1250 23-Aug-18 65.3 PS 1 1 Hrs
9 WL 15 XCMG LW300KN 1574.2 1250 1500 20-Aug-18 -74.2 PS 2 1 Hrs
10 MH 03 Hino Hino 130HT 2919.2 2500 3000 26-Aug-18 80.8 PS 2 1 Hrs
11 GN 03 Genset Workshop Mitsubishi 6D14 7226.34 7000 7250 21-Aug-18 23.66 PS 1 1 Hrs
12 TL 45 JCB Tower Light 435 500 24-Aug-18 65 PS 1 1 Hrs

List Distribution : Service Duration : Prepared by:


- Logistic & Warehouse 250 Hrs Service = 1 Hrs
- Mine Operation 500 Hrs Service = 1 Hrs
Maintenance Department
- Project Manager 1000 Hrs Service = 2 Hrs
2000 Hrs Service = 2 Hrs
PT. SINAR KARYA MUSTIKA
General Contractor, Supplier, Heavy Equipment Rental
Job Site Gebe - Halteng

Weekly PM Service and Backlog Repairs Plan


Maintenance Department Period : 27 Agustus - 02 September 2018

Preventive Maintenance
Current Service Estimate Remaining Unit
No. Unit No Brand Model Last Record Next PM Duration
SMU Date Hours / KM Condition
PM SMU PM SMU
1 DTH 80 Hino FM 260 TI (20 Ton) 4453.1 4000 4500 29-Aug-18 46.9 PS 1 1 Hrs
2 DTH 105 Hino FM 260 TI (20 Ton) 14427.3 14000 14500 1-Sep-18 72.7 PS 1 1 Hrs
3 EXC 59 Komatsu PC 200-8 5683 5500 5750 31-Aug-18 67 PS 1 1 Hrs
4 EXC 60 Komatsu PC 200-8 10707.7 10500 10750 28-Aug-18 42.3 PS 1 1 Hrs
5 EXC 55 Komatsu PC 300-8 15700.1 15500 15750 30-Aug-18 49.9 PS 1 1 Hrs
6 BD 25 Komatsu D85ESS 1967 1750 2000 27-Aug-18 33 PS 4 2 Hrs

List Distribution : Service Duration : Prepared by:


- Logistic & Warehouse 250 Hrs Service = 1 Hrs
- Mine Operation 500 Hrs Service = 1 Hrs
Maintenance Department
- Project Manager 1000 Hrs Service = 2 Hrs
2000 Hrs Service = 2 Hrs
PT. SINAR KARYA MUSTIKA
General Contractor, Supplier, Heavy Equipment Rental
Job Site Gebe - Halteng

Weekly PM Service and Backlog Repairs Plan


Maintenance Department Period : 03 September - 09 September 2018

Preventive Maintenance
Current Service Estimate Remaining Unit
No. Unit No Brand Model Last Record Next PM Duration
SMU Date Hours / KM Condition
PM SMU PM SMU
1 DTH 106 Hino FM 260 TI (20 Ton) 6932.7 6500 7000 9-Sep-18 67.3 PS 2 1 Hrs
2 DTH 110 Hino FM 285 TI (20 Ton) 5470.3 5000 5500 6-Sep-18 29.7 PS 1 1 Hrs
3 EXC 71 Hitachi ZX 210-F 3475.2 3000 3500 4-Sep-18 24.8 PS 2 1 Hrs
4 EXC 61 Komatsu PC 200-8 10732.5 10500 10750 4-Sep-18 17.5 PS 1 1 Hrs
5 WT 72 Hino FM 260 PS (20 Ton) 4934.2 4500 5000 8-Sep-18 65.8 PS 2 1 Hrs
6 LV 57 Toyota Hilux Pick-Up 49599 45000 50000 7-Sep-18 401 PS 4 2 Hrs
7 GN 01 Genset Preparasi Mitsubishi 6D22 5972.1 5750 6000 5-Sep-18 27.9 PS 4 2 Hrs
8 GN 02 Genset Workshop Mitsubishi 6D14 7244.1 7000 7250 3-Sep-18 5.9 PS 1 1 Hrs
9 GN 02 Genset Preparasi Genset Kuning 5972.1 5750 6000 5-Sep-18 27.9 PS 4 2 Hrs
10 TL 09 Dosan Tower Light - 15-Aug-18 - 3-Sep-18 - PS 2 1 Hrs

List Distribution : Service Duration : Prepared by:


- Logistic & Warehouse 250 Hrs Service = 1 Hrs
- Mine Operation 500 Hrs Service = 1 Hrs
Maintenance Department
- Project Manager 1000 Hrs Service = 2 Hrs
2000 Hrs Service = 2 Hrs
PT. SINAR KARYA MUSTIKA
General Contractor, Supplier, Heavy Equipment Rental
Job Site Gebe - Halteng

Weekly PM Service and Backlog Repairs Plan


Maintenance Department Period : 10 September - 16 September 2018

Preventive Maintenance
Current Service Estimate Remaining Unit
No. Unit No Brand Model Last Record Next PM Duration
SMU Date Hours / KM Condition
PM SMU PM SMU
1 DTH 73 Hino FM 260 PS (20 Ton) 1082.1 500 1000 11-Sep-18 -82.1 PS 3 2 Hrs
2 DTH 78 Hino FM 260 TI (20 Ton) 14001.9 13500 14000 10-Sep-18 -1.9 PS 4 2 Hrs
3 DTH 108 Hino FM 285 TI (20 Ton) 5957.4 5500 6000 15-Sep-18 42.6 PS 4 2 Hrs
4 DTH 109 Hino FM 285 TI (20 Ton) 5939.2 5500 6000 16-Sep-18 60.8 PS 4 2 Hrs
5 EXC 70 Hitachi ZX 200-5G 3491 3000 3500 13-Sep-18 9 PS 1 1 Hrs
6 EXC 72 Hitachi ZX 210-F 3723.4 3250 3750 13-Sep-18 26.6 PS 1 1 Hrs
7 EXC 62 Komatsu PC 200-8 11207.7 11000 11250 14-Sep-18 42.3 PS 2 1 Hrs
8 EXC 03 Komatsu PC 300-8 10258 10000 10250 10-Sep-18 -8 PS 1 1 Hrs
9 EXC 10 Komatsu PC 300-8 9356 9000 9250 12-Sep-18 -106 PS 1 1 Hrs
10 BD 15 Komatsu D65P 11074.8 10750 11000 11-Sep-18 -74.8 PS 2 1 Hrs
11 BD 25 Komatsu D85ESS 2172.1 2000 2250 16-Sep-18 77.9 PS 1 1 Hrs
12 WT 72 Hino FM 260 PS (20 Ton) 4968.9 4500 5000 14-Sep-18 31.1 PS 3 2 Hrs
13 GN 03 Genset Workshop Mitsubishi 6D14 7460.26 7250 7500 15-Sep-18 39.74 PS 2 1 Hrs

List Distribution : Service Duration : Prepared by:


- Logistic & Warehouse 250 Hrs Service = 1 Hrs
- Mine Operation 500 Hrs Service = 1 Hrs
Maintenance Department
- Project Manager 1000 Hrs Service = 2 Hrs
2000 Hrs Service = 2 Hrs