Professional Documents
Culture Documents
Vega Jair Jacob IB1
Vega Jair Jacob IB1
xls
BOMBEO1
513479400.xls
Abatimiento (m)
m
Aforos realizados con un POZO OYAMBARO PRUEBA DE BOMBEO No 1
recipiente de 20,00 lt 0.00
tub1" = 91 m 1.00
tub 4" = 94 m
2.00
3.00
4.00
f(x) = 0.237897291280426 ln(x) + 4.18724792344698
5.00
6.00
1.00 10.00 100.00 1000.00
Tiempo minutos
BOMBEO1
513479400.xls
m2/dia
7/27/2016
BOMBEO1
513479400.xls
Abatimiento (m)
1.00
2.00
3.00
4.00
f(x) = 0.237897291280426 ln(x) + 4.18724792344698
5.00
6.00
1.00 10.00 100.00 1000.00
Tiempo minutos
TRANSMISIVIDAD (T)
Δs= 0.55 m
Q= 18.00 lit/seg
GRAFBOM1
513479400.xls
RECUP1
513479400.xls
0.00
0.50 f(x) = 0.204776338814924 ln(x) + 0.037603490024068
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
1.00 10.00 100.00 1000.00
Tiempo minutos
fecha 9/29/2015
RECUP1
513479400.xls
0.00
0.50 f(x) = 0.204776338814924 ln(x) + 0.037603490024068
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
1.00 10.00 100.00 1000.00
Tiempo minutos
TRANSMISIVIDAD (T)
Δs= 0.47 m
Q= 18.00 lit/seg
GRAFRECUP1
102.15
102.08
102.02
102.02
102.02
102.02
102.01
102.01
102.01
102.01
102.00
102.00
102.00
102.00
102.00
102.00
101.98
101.95
101.94
101.90
101.88
101.87
101.87
101.85
101.85
101.85
101.83
101.78
101.75
101.75
101.73
101.70
101.67
101.60
101.58
101.55
101.55
101.52
101.50
101.30
101.10
100.95
100.60
100.00
99.85
98.77