PARQUE INDUSTRIAL DE ITULCACHI


SECTOR OYAMBARO
POZO OYAMBARO PRUEBA DE BOMBEO No 1
FECHA HORA TIEMPO Q PORF DEL AS AS Q dist pozo obs r
min (lit/seg) AGUA m m lit/seg r= 0.1
prom m parcial NE = 6.83
7/27/2016 8:30 - 18.00 6.83
8:31 1.00 9.21 2.38 2.38
8:32 1.50 10.05 3.22 3.22
8:33 2.00 11.00 4.17 4.17
8:34 2.50 11.12 4.29 4.29
8:35 3.00 11.21 4.38 4.38 18
8:36 3.50 11.26 4.43 4.43
8:37 4.00 11.34 4.51 4.51
8:38 4.50 11.37 4.54 4.54
8:39 5.00 11.43 4.60 4.60
8:40 6.00 11.46 4.63 4.63
8:42 7.00 11.52 4.69 4.69 18
8:44 8.00 11.54 4.71 4.71
8:46 9.00 11.59 4.76 4.76
8:48 10.00 11.60 4.77 4.77
8:50 12.00 11.64 4.81 4.81 18
8:55 14.00 11.69 4.86 4.86
9:00 16.00 11.71 4.88 4.88
9:05 18.00 11.75 4.92 4.92
9:10 20.00 11.77 4.94 4.94
9:15 25.00 11.83 5.00 5.00
9:20 30.00 11.87 5.04 5.04 18
9:25 35.00 11.92 5.09 5.09
9:25 40.00 11.95 5.12 5.12
9:25 45.00 11.97 5.14 5.14
9:25 50.00 11.97 5.14 5.14
9:25 55.00 11.99 5.16 5.16
9:25 60.00 12.01 5.18 5.18
9:25 70.00 12.05 5.22 5.22
9:25 80.00 12.06 5.23 5.23
9:25 90.00 12.07 5.24 5.24
9:25 100.00 12.09 5.26 5.26
9:25 110.00 12.12 5.29 5.29
9:25 120.00 12.15 5.32 5.32
9:25 130.00 12.18 5.35 5.35
9:25 140.00 12.20 5.37 5.37
9:25 160.00 12.20 5.37 5.37
9:25 180.00 12.23 5.40 5.40
9:25 200.00 12.24 5.41 5.41
9:25 220.00 12.27 5.44 5.44
9:25 240.00 12.30 5.47 5.47
9:25 270.00 12.32 5.49 5.49
9:25 300.00 12.32 5.49 5.49
9:25 330.00 12.35 5.52 5.52
9:25 360.00 12.38 5.55 5.55
9:25 390.00 12.40 5.57 5.57
9:25 420.00 12.41 5.58 5.58
9:25 480.00 12.43 5.60 5.60
9:25 480.00 12.43 5.60 5.60 18.00

BOMBEO1
513479400.xls

CACHI T 6.01E-03 m2/seg 5.20E+02

MBEO No 1 S 2.13E-03 Fecha


OBSERVACIONES
m

Abatimiento (m)
m
Aforos realizados con un POZO OYAMBARO PRUEBA DE BOMBEO No 1
recipiente de 20,00 lt 0.00

tub1" = 91 m 1.00
tub 4" = 94 m
2.00

3.00

4.00
f(x) = 0.237897291280426 ln(x) + 4.18724792344698
5.00

6.00
1.00 10.00 100.00 1000.00
Tiempo minutos

BOTONES PARA AJUSTAR LA RECTA A LOS DATOS

BOMBEO1
513479400.xls

m2/dia

7/27/2016

POZO OYAMBARO PRUEBA DE BOMBEO No 1

) = 0.237897291280426 ln(x) + 4.18724792344698

10.00 100.00 1000.00


Tiempo minutos

BOMBEO1
513479400.xls

NOTA LLENAR DATOS SOLAMENTE QUE ESTAN EN COLOR AZUL


PARQUE INDUSTRIAL DE ITULCACHI
SECTOR OYAMBARO
7/27/2016

Abatimiento (m)

POZO OYAMBARO PRUEBA DE BOMBEO No 1


0.00

1.00

2.00

3.00

4.00
f(x) = 0.237897291280426 ln(x) + 4.18724792344698
5.00

6.00
1.00 10.00 100.00 1000.00
Tiempo minutos

TRANSMISIVIDAD (T)

T = Const x Q 0.183 x m3/seg m2/seg


Δs m

Δs= 0.55 m

Q= 18.00 lit/seg

T= 0.183 18 1.0E-03 6.01E-03 m2/seg


0.55
5.20E+02 m2/dia

COEFICIENTE DE ALMACENAMIENTO (S)

S = 2.25 x T x to 2.25 x m2/seg x seg Adimensional


r2 m2

to = 0.00 minutos to = 0.00 seg

r= 0.1 m r2= 0.0 m2

S= 2.25 6.01E-03 0.00 2.13E-03


0.0

GRAFBOM1
513479400.xls

PARQUE INDUSTRIAL DE ITULCACHI


SECTOR OYAMBARO
PRUEBA DE RECUPERACION 1..
FECHA HORA TIEMPO Q (l/seg) PORF DEL S' S' ttot+t t/t' OBSERVACIONES
min AGUA m m min
m NE = 6.83
9/29/2015 15:30 0.00 18.00 12.43 5.60 5.60 480
1.00 11.00 4.17 4.17 481 481.0
1.50 9.43 2.60 2.60 481.5 321.0
2.00 9.00 2.17 2.17 482 241.0
2.50 8.22 1.39 1.39 482.5 193.0
3.00 8.09 1.26 1.26 483 161.0
3.50 8.04 1.21 1.21 483.5 138.1
4.00 8.00 1.17 1.17 484 121.0
4.50 7.96 1.13 1.13 484.5 107.7
5.00 7.93 1.10 1.10 485 97.0
6.00 7.85 1.02 1.02 486 81.0
7.00 7.81 0.98 0.98 487 69.6
8.00 7.78 0.95 0.95 488 61.0
9.00 7.72 0.89 0.89 489 54.3
10.00 7.69 0.86 0.86 490 49.0
12.00 7.62 0.79 0.79 492 41.0
14.00 7.59 0.76 0.76 494 35.3
16.00 7.56 0.73 0.73 496 31.0
18.00 7.53 0.70 0.70 498 27.7
20.00 7.51 0.68 0.68 500 25.0
25.00 7.46 0.63 0.63 505 20.2
30.00 7.39 0.56 0.56 510 17.0
35.00 7.37 0.54 0.54 515 14.7
40.00 7.31 0.48 0.48 520 13.0
45.00 7.29 0.46 0.46 525 11.7
50.00 7.26 0.43 0.43 530 10.6
55.00 7.24 0.41 0.41 535 9.7
60.00 7.22 0.39 0.39 540 9.0
70.00 7.19 0.36 0.36 550 7.9
80.00 7.16 0.33 0.33 560 7.0
90.00 7.13 0.30 0.30 570 6.3
100.00 7.12 0.29 0.29 580 5.8
110.00 7.10 0.27 0.27 590 5.4
120.00 7.08 0.25 0.25 600 5.0
140.00 7.05 0.22 0.22 620 4.4
160.00 7.02 0.19 0.19 640 4.0
180.00 7.00 0.17 0.17 660 3.7
180.00 7.00 0.17 0.17 660 3.7

ING. RAFAEL ALULEMA MSc

RECUP1
513479400.xls

T 6.99E-03 m2/seg 6.04E+02 m2/dia

BOTONES PARA AJUSTAR LA RECTA A LOS DATOS

POZO 2 A PRUEBA DE RECUPERACION 1


Descenso m

0.00
0.50 f(x) = 0.204776338814924 ln(x) + 0.037603490024068
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
1.00 10.00 100.00 1000.00
Tiempo minutos

fecha 9/29/2015

RECUP1
513479400.xls

PARQUE INDUSTRIAL DE ITULCACHI


SECTOR OYAMBARO
PRUEBA DE RECUPERACION 1..
9/29/2015

POZO 2 A PRUEBA DE RECUPERACION 1


Descenso m

0.00
0.50 f(x) = 0.204776338814924 ln(x) + 0.037603490024068
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
1.00 10.00 100.00 1000.00
Tiempo minutos

TRANSMISIVIDAD (T)

T = Const x Q Const x m3/seg m2/seg


Δs m

Δs= 0.47 m

Q= 18.00 lit/seg

T= 0.183 18 1E-03 7.0E-03 m2/seg


0.47
6.0E+02 m2/dia
ING. RAFAEL ALULEMA MSc

GRAFRECUP1
102.15
102.08
102.02
102.02
102.02
102.02
102.01
102.01
102.01
102.01
102.00
102.00
102.00
102.00
102.00
102.00
101.98
101.95
101.94
101.90
101.88
101.87
101.87
101.85
101.85
101.85
101.83
101.78
101.75
101.75
101.73
101.70
101.67
101.60
101.58
101.55
101.55
101.52
101.50
101.30
101.10
100.95
100.60
100.00
99.85
98.77