DAFTAR UPAH DAN HARGA BAHAN PEKERJAAN

SATUAN COS HEAT


NO JENIS MATERIAL SATUAN HARGA 0% KETERANGAN
TOKO RP
A UPAH
Mandor Org / Hari 60,000.00 60,000.00
Kepala Tukang Org / Hari 55,000.00 50,000.00
Tukang Kayu Org / Hari 55,000.00 55,000.00
Tukang Batu Org / Hari 55,000.00 55,000.00
Tukang Besi Org / Hari 45,000.00 45,000.00
Tukang Cat Org / Hari 45,000.00 45,000.00
Tukang Leideng Org / Hari 45,000.00 45,000.00
Tukang Listrik Org / Hari 45,000.00 45,000.00
Tukang Las Org / Hari 45,000.00 45,000.00
Penjaga Org / Hari 30,000.00 30,000.00
Pekerja Org / Hari 37,500.00 37,500.00

B BAHAN ALAM
Batu Kali M3 100,000.00 100,000.00
Batu belah 15/20 M3 85,000.00 85,000.00
Batu belah 10/15 M3 70,000.00 70,000.00
Batu belah 5/7 M3 72,500.00 72,500.00
Batu belah 2/3 M3 90,000.00 90,000.00
Batu belah 1/2 M3 100,000.00 100,000.00
Batu Piring Bj 1,750.00 1,600.00
Batu bobos 10 x 20 x 1.50 cm Bj 3,590.00 3,000.00
Kerikil pecah mesin M3 165,000.00 165,000.00
Bataco Uk. 39 x 19 x 10 cm Bj 2,500.00 2,000.00
Roster Bj 7,500.00 7,500.00
Batu merah Bj 420.00 420.00
Sirtu M3 45,000.00 45,000.00
Pasir pasang / cor M3 100,000.00 100,000.00
Pasir urug M3 70,000.00 70,000.00
Tanah urug M3 30,000.00 30,000.00
Tebalan rumput M2 - -

C BAHAN PEREKAT
PC @ 40 Kg Gresik Zak 52,000.00 52,000.00
Semen putih @ 40 Kg Gresik Zak 49,000.00 49,000.00
Semen warna Kg 8,000.00 8,000.00
Semen merah M3 200,000.00 200,000.00
Kapur pasang M3 400,000.00 400,000.00
Kapur Sirih M3 250,000.00 250,000.00

D KAYU ALAM
Papan Bekisting Randu M3 360,000.00 360,000.00
Kayu Tahun Bekisting M3 1,730,000.00 1,730,000.00
Kayu Tahun Lokal Kelas I / Mahoni M3 3,500,000.00 3,500,000.00
Kayu Meranti Papan Klas I M3 4,500,000.00 4,500,000.00
Kayu Meranti Balok Klas II M3 4,300,000.00 4,300,000.00
Kayu Palm Batu Balok Klas I M3 4,250,000.00 4,250,000.00
Kayu Kruing Balok Klas I M3 5,500,000.00 5,500,000.00
Kayu Kruing Papan Klas I M3 5,500,000.00 5,500,000.00
Kayu Bengkirai Balok Klas I M3 4,000,000.00 4,000,000.00
Kayu Bengkirai Papan Klas I M3 4,000,000.00 4,000,000.00
Kayu Kamper Balok Klas I M3 6,000,000.00 6,000,000.00
Kayu Kamper Papan Klas I M3 6,000,000.00 6,000,000.00
Kayu Jati Balok Klas II M3 9,000,000.00 9,000,000.00
Kayu Jati Papan Klas II M3 9,500,000.00 9,500,000.00
Bambu peranca @ 400 cm Ljr 7,500.00 7,500.00
SATUAN COS HEAT
NO JENIS MATERIAL SATUAN HARGA 0% KETERANGAN
TOKO RP
E PENUTUP ATAP GENTENG
Genteng Karang Pilang Ex Bima Ambulu Bh 3,250.00 3,250.00
Bubung Karang Pilang Ex Bima Ambulu Bh 9,000.00 9,000.00
Genteng Model Karang Pilang Ngayur Bh 2,500.00 2,500.00
Bubung Model Karang Pilang Ngayur Bh 5,500.00 5,500.00
Genteng Flame Press Bh 2,750.00 2,750.00
Bubung Flame Press Bh 3,500.00 3,500.00
Genteng Beton Besar Bh 4,000.00 4,000.00
Bubung Beton "Beton Mas" Bh 6,500.00 6,500.00
Genteng Press Beton Tanggung Lokal Bh 2,500.00 2,500.00
Bubungan Press Beton Tanggung Lokal Bh 5,000.00 5,000.00
Genteng Beton Tanggung Model "Monier, Taiwan" Bh 2,800.00 2,800.00
Bubungan Beton Tanggung Model "Monier, Taiwan" Bh 5,700.00 5,700.00

F PENUTUP ATAP ASBES


Asbes Gelombang Kecil uk. 180 x 80 x 0.35 cm (Gresik) Lbr 51,700.00 51,700.00
Asbes Gelombang Kecil uk. 200 x 80 x 0.35 cm (Gresik) Lbr 55,000.00 55,000.00
Asbes Gelombang Kecil uk. 240 x 80 x 0.35 cm (Gresik) Lbr 65,000.00 65,000.00
Asbes Gelombang Kecil uk. 300 x 80 x 0.35 cm (Gresik) Lbr 75,000.00 75,000.00
Bubung Asbes Gelombang Kecil Stel 34,500.00 34,500.00
Asbes Gelombang Besar uk. 200 x 105 x 0.5 cm (Gresik) Lbr 71,800.00 71,800.00
Asbes Gelombang Besar uk. 300 x 105 x 0.5 cm (Gresik) Lbr 105,000.00 105,000.00
Bubung Asbes Gelombang Besar Stel 35,000.00 35,000.00

G PENUTUP ATAP SENG & TALANG


Seng Gelombang BJLS 20 P= 1.80 x 80 cm Lmb 43,100.00 43,100.00
Seng Gelombang BJLS 20 P= 2.40 x 80 cm Lmb 45,000.00 45,000.00
Seng Gelombang BJLS 30 P= 1.80 x 80 cm Lmb 64,500.00 64,500.00
Seng Gelombang BJLS 30 P= 2.40 x 80 cm Lmb 70,000.00 70,000.00
Seng Galvalume KR-5 uk 80-30 M1 47,500.00 47,500.00
Seng Galvalume KR-9 uk 75-30 M1 45,000.00 45,000.00
Bubung Galvalume uk 90 x 250 cm Bh 112,500.00 112,500.00
Seng Talang BJLS 20 Lebar 45 cm M1 12,500.00 12,500.00
Seng Talang BJLS 20 Lebar 60 cm M1 25,000.00 25,000.00
Seng Talang BJLS 20 Lebar 90 cm Ml 30,000.00 30,000.00
Seng Talang BJLS 30 Lebar 45 cm M1 17,500.00 17,500.00
Seng Talang BJLS 30 Lebar 60 cm M1 24,000.00 24,000.00
Seng Talang BJLS 30 Lebar 90 cm M1 33,000.00 33,000.00
Seng Talang BJLS 40 Lebar 60 cm M1 36,000.00 36,000.00
Seng Talang BJLS 40 Lebar 90 cm M1 48,000.00 48,000.00
Talang Karet uk 45 cm M1 5,000.00 5,000.00
Talang Karet uk 60 cm M1 6,500.00 6,500.00
Talang Karet uk 90 cm M1 9,000.00 9,000.00
Fiberglass gelombang uk 80 x 180 Lbr 30,000.00 30,000.00
Fiberglass gelombang uk 80 x 240 Lbr 40,000.00 40,000.00
Fiberglass gelombang uk 80 x 300 Lbr 50,000.00 50,000.00
Polycarbonate uk 210 x 11.70 (SKYLITE) Rol 1,500,000.00 1,500,000.00
Polycarbonate uk 210 x 11.70 (SOLARLITE) Rol 2,000,000.00 2,000,000.00

H PENUTUP LANGIT LANGIT


Gypsum Tebal 9 mm Lbr 64,500.00 64,500.00
Gypsum Tebal 12 mm Lbr 79,000.00 79,000.00
Lis Gypsum C 9 M1 15,000.00 15,000.00
Eternit Cap Jangkar Lbr 8,500.00 8,500.00
Eternit Cap Kerang Lbr 9,500.00 9,500.00
Kalsiboard uk 3 mm 120x240 Lbr 60,000.00 60,000.00
Kalsiboard uk 4.5 mm 120x240 Lbr 75,000.00 75,000.00
Kalsiboard uk 9 mm 100x200 Lbr 120,000.00 120,000.00
Kalsifloor uk 20 mm 100x200 Lbr 435,000.00 435,000.00
Rangka hollo galfalum & papan gypsum 9 mm M2 97,500.00 97,500.00
SATUAN COS HEAT
NO JENIS MATERIAL SATUAN HARGA 0% KETERANGAN
TOKO RP
I PAKU , SEKRUP & DINABOL
Paku Kg 17,500.00 17,500.00
Paku Triplex / Eternit Kg 19,000.00 19,000.00
Paku Sumbat Seng / Fiberglass Bh 300.00 300.00
Paku Gypsum Kg 25,000.00 25,000.00
Paku Skrup Asbes uk pendek Bh 500.00 500.00
Self drilling uk 3 cm Bh 500.00 500.00
Self drilling uk 6 cm Bh 750.00 750.00
Dynabolt 6 mm Bh 1,500.00 1,500.00
Dynabolt 8 mm Bh 2,500.00 2,500.00
Dynabolt 10 mm Bh 4,000.00 4,000.00
Dynabolt 12 mm Bh 6,000.00 6,000.00
Baut mur 14 Bh 600.00 600.00
Baut mur 16 angkur Bh 17,500.00 17,500.00
Jarum keras Bh 15,000.00 15,000.00

H BESI BETON
Besi Beton Polos Kg 17,500.00 17,500.00
Besi Beton Polos 6 SNI Panjang 12 Ljr 23,000.00 23,000.00
Besi Beton Polos 6 Marking Panjang 12 Ljr 25,000.00 25,000.00
Besi Beton Polos 8 Marking Panjang 12 Ljr 42,500.00 42,500.00
Besi Beton Polos 8 SNI Panjang 12 Ljr 40,000.00 40,000.00
Besi Beton Polos 10 SNI Panjang 12 Ljr 60,000.00 60,000.00
Besi Beton Polos 10 Marking Panjang 12 Ljr 65,000.00 65,000.00
Besi Beton Polos 12 SNI Panjang 12 Ljr 90,000.00 90,000.00
Besi Beton Polos 12 Marking Panjang 12 Ljr 95,000.00 95,000.00
Besi Beton Polos 14 AA Panjang 11.5 Ljr 140,000.00 140,000.00
Besi Beton Polos 16 SNI Panjang 12 Ljr 180,000.00 180,000.00
Besi Beton Polos 16 Marking Panjang 12 Ljr 177,500.00 177,500.00
Besi Beton Polos 19 SNI Panjang 12 Ljr - -
Besi Beton Polos 22 SNI Panjang 12 Ljr - -
Kawat Beton Kg 17,500.00 17,500.00
Besi Beton Profit ST. 37 Kg -
SATUAN COS HEAT
NO JENIS MATERIAL SATUAN HARGA 0% KETERANGAN
TOKO RP
I LANTAI TEGEL & KERAMIK
Tegel Grys Warna 20/20 M2 30,000.00 30,000.00
Tegel Abu-Abu Kepala Basah 20/20 Bj 1,300.00 1,300.00
Paving Stone Abu-Abu Tebal 6 cm (kotak) M2 47,500.00 47,500.00
Paving Stone Abu-Abu Tebal 8 cm M2 50,000.00 50,000.00
Paving Stone Warna Tebal 6 cm M2 52,500.00 52,500.00
Paving Stone Warna Tebal 8 cm M2 55,000.00 55,000.00
Canstin (Curbing) M1 15,850.00 15,850.00
Tegel Keramik 40/40 Putih (Asia) M2 42,500.00 42,500.00
Tegel Keramik 40/40 Warna M2 52,000.00 52,000.00
Tegel Keramik 30/30 Putih Polos M2 30,000.00 30,000.00
Tegel Keramik 30/30 Warna M2 37,500.00 37,500.00
Tegel Keramik 20/25 Dinding M2 75,000.00 75,000.00
Tegel Keramik 25/25 Lantai M2 55,000.00 55,000.00
Tegel Keramik 10/20 Dinding M1 32,500.00 32,500.00
Keramik Terakota 5 x 20 cm M2 68,700.00 68,700.00
Keramik Sudut Mozaik M1 7,500.00 7,500.00

J SANITAIR
Bak Mandi Teraso Bh 180,000.00 180,000.00
Bak Mandi Fiber Glass Bh 300,000.00 300,000.00
Closet Jongkok Porselin Ina Bh 165,000.00 165,000.00
Closet Jongkok Porselin TOTO Bh 195,000.00 195,000.00
Closet Duduk KIA Bh 1,500,000.00 1,500,000.00
Closet Duduk TOTO Bh 5,000,000.00 5,000,000.00
Avour Bak Mandi Biasa Bh 27,500.00 27,500.00
Avour Pembuangan Air Kotor Bh 27,500.00 27,500.00
Wastafel Komplit Setara KIA, INA Bh 350,000.00 350,000.00
Wastafel Komplit Setara TOTO Bh 400,000.00 400,000.00
Bak Cuci Piring Teraso Bh 285,000.00 285,000.00
Bak Cuci Piring Logam Bh 235,000.00 235,000.00
Kran Air 0.50" Handle Biasa Bh 27,500.00 27,500.00
Kran Air 0.50" Handle "Silver Star" Bh 42,500.00 42,500.00
Kran Air 0.50" Handle "Duppon Bh 50,000.00 50,000.00
Kran Air 0.50" leher angsa "Duppon Bh 75,000.00 75,000.00
Shoower 0.50" Handle "Duppon Bh 175,000.00 175,000.00
Jet wooser 0.50" Handle "Duppon Bh 75,000.00 75,000.00
Pipa / Slang Spiral Bh 35,000.00 35,000.00
Pompa Listrik Merk "NATIONAL" Bh 1,500,000.00 1,500,000.00
Pompa Listrik Merk "SANYO" Bh 2,500,000.00 2,500,000.00
Pipa PVC Dia 4" "RRJ" M1 25,000.00 25,000.00
Pipa PVC Dia 3" "RRJ" M1 22,500.00 22,500.00
Pipa PVC Dia 2,5" M1 10,000.00 10,000.00
Pipa PVC Dia 2" M1 7,500.00 7,500.00
Pipa PVC Dia 1,5" M1 8,700.00 8,700.00
Pipa PVC Dia 1" M1 5,000.00 5,000.00
Pipa PVC Dia 0,75" M1 4,375.00 4,375.00
Pipa PVC Dia 0,5" M1 3,750.00 3,750.00
Talang PVC Model Kotak "MASPION" M1 12,500.00 12,500.00
Sambungan Talang Kotak Tanpa Lubang Bh 6,800.00 6,800.00
Sambungan Talang Kotak Dengan Lubang Bh 20,600.00 20,600.00
Tutup Samping Talang Kotak PVC Bh 6,800.00 6,800.00
Hak Penggantung Talang Kotak PVC Bh 5,500.00 5,500.00
Klem Talang Tegak PVC Bh 3,300.00 3,300.00
Pipa PVC Dia 6" "RRJ" M1 62,500.00 62,500.00
Pipa PVC Dia 4" "RRJ" M1 17,500.00 17,500.00
Pipa PVC Dia 3" "RRJ" M1 12,500.00 12,500.00
Pipa PVC Dia 2,5" M1 10,000.00 10,000.00
Pipa PVC Dia 2" M1 7,500.00 7,500.00
Pipa PVC Dia 1,5" M1 8,700.00 8,700.00
Pipa PVC Dia 1" M1 5,000.00 5,000.00
Pipa PVC Dia 0,75" M1 4,375.00 4,375.00
Pipa PVC Dia 0,5" M1 3,750.00 3,750.00
Lem PVC Bh 10,000.00 10,000.00
Watermuur / Sockdrat Bh 7,500.00 7,500.00
Rol TBA Rol 2,000.00 2,000.00
SATUAN COS HEAT
NO JENIS MATERIAL SATUAN HARGA 0% KETERANGAN
TOKO RP
K TRIPLEKS
Plywood 4 mm 90 cm x 210 cm Lmb 65,000.00 55,000.00
Plywood 4 mm 120 cm x 240 cm Lmb 70,000.00 68,700.00
Plywood 6 mm 120 cm x 240 cm Lmb 75,000.00 110,000.00
Plywood 9 mm 120 cm x 240 cm Lmb 137,500.00 137,500.00
Plywood 12 mm 120 cm x 240 cm Lmb 165,000.00 165,000.00
Plywood 18 mm 120 cm x 240 cm Lmb 210,000.00 210,000.00
Teakwood 4 mm 90 cm x 210 cm 3mm Lmb 45,000.00 45,000.00
Teakwood 4 mm 120 cm x 240 cm Lmb 96,200.00 96,200.00
Triplex / Aluminium 4mm 90 cm x 210 cm Lmb 89,300.00 89,300.00
Partikel 12 mm 122 cm x 244 cm Lmb 94,000.00 94,000.00
MDF 3 mm 122 cm x 244 cm Lmb 34,000.00 34,000.00
MDF 6 mm 122 cm x 244 cm Lmb 62,000.00 62,000.00
MDF 9 mm 122 cm x 244 cm Lmb 97,000.00 97,000.00
MDF 12 mm 122 cm x 244 cm Lmb 125,000.00 125,000.00
MDF 15 mm 122 cm x 244 cm Lmb 148,000.00 148,000.00
Multiplexs 15 mm 122 cm x 244 cm Lmb 175,000.00 175,000.00
Multiplexs 20 mm 122 cm x 244 cm Lmb 210,000.00 210,000.00

L PENGUNCI
Kunci Tanam Besar Merk "TOOTI" Bh 151,200.00 151,200.00
Kunci Tanam Merk "YALE" Bh 95,000.00 95,000.00
Kunci Tanam Merk "Kuda Terbang / Kodai " Bh 75,000.00 75,000.00
Kunci Tanam Wing "808" Bh 15,000.00 15,000.00
Engsel Pintu Stel 35,000.00 35,000.00
Grendel Pintu Pernekel Biasa Bh 7,500.00 7,500.00
Grendel Tanam Pernekel Stel 41,200.00 41,200.00
Grendel Tanam Coklat/Brown Stel 34,300.00 34,300.00
Engsel Jendela Stel 12,000.00 12,000.00
Grendel Jendela Pernekel Biasa Bh 6,000.00 6,000.00
Hak Angin Lurus Biasa (Berkait) Stel 5,500.00 5,500.00
Hak Angin Lurus (Stel Maju Mundur) Stel 10,200.00 10,200.00
Hak Angin Sikutan Kecil Pernekel (Sakura) Stel 10,000.00 10,000.00
Hak Angin Sikutan Besar Pernekel (Sakura) Stel 17,100.00 17,100.00
Kaca Bening 6 mm M2 85,000.00 85,000.00
Kaca Bening 5 mm M2 65,000.00 65,000.00
Kaca Reyben 5 mm M2 82,500.00 82,500.00
Naco 70 cm Lebar 15 cm Reyben 5 mm Lmb 22,000.00 22,000.00
Kawat Ghass / Harmonika M2 25,000.00 25,000.00
SATUAN COS HEAT
NO JENIS MATERIAL SATUAN HARGA 0% KETERANGAN
TOKO RP
M BAHAN CAT
Cat Tembok Kwalitas Baik Dulux Kg 97,500.00 97,500.00 243,750.00
Cat Tembok Kwalitas Baik Decolith Kg 18,500.00 18,500.00 92,500.00
Plamuur Tembok Kg 12,000.00 12,000.00
Cat Kayu EMCO Biasa Kg 43,500.00 43,500.00
Cat Kayu EMCO Bintang Kg 49,500.00 49,500.00
Cat Genteng setara Mowilex Kg 35,000.00 35,000.00
Plamuur Kayu Kg 18,500.00 18,500.00
Dempul Kg 17,500.00 17,500.00
Meni Kayu Cap "Pedang" Kg 18,500.00 18,500.00
Meni Besi zhincromet Kg 27,500.00 27,500.00
Minyak Cat Biasa (Thinner Biasa) Ltr 8,500.00 8,500.00
Thinner A Special Ltr 25,500.00 25,500.00
Kertas Gosok Lmb 3,500.00 3,500.00
Cat Besi "Brown" Kg 45,000.00 45,000.00
Cat Besi Emco Kg 42,500.00 42,500.00
Teer Ltr 6,500.00 6,500.00
Sirlagh Kg 90,000.00 90,000.00
Spiritus Ltr 17,500.00 17,500.00
Lem Kayu Fox Kg 25,500.00 25,500.00

N LISTRIK
Titik Lampu + Instalasi Ttk 82,500.00 82,500.00
Kabel NYA 1 x 2.50 mm M' 7,000.00 7,000.00
Kabel NY 2 x 2.50 mm M' 9,000.00 9,000.00
Isolasi Bh 3,300.00 3,300.00
Las Dop Bh 200.00 200.00
Fiting Plafond (Hitam) Bh 8,500.00 8,500.00
Tee Doss PVC Bh 1,500.00 1,500.00
Miniswitch 32 Amp Bh 192,500.00 192,500.00
Pipa Pralon 5/8" Ljr 7,500.00 7,500.00
Lampu TL 2 x 20 Watt Bh 140,000.00 140,000.00
Lampu TL 1 x 20 Watt Phillips Bh 115,000.00 115,000.00
Lampu TL 1 x 40 Watt Phillips Bh 175,000.00 175,000.00
Lampu SL 18 Watt Bh 37,500.00 37,500.00
Lampu Pijar 25, 40, 60 Watt Bh 15,000.00 15,000.00
WD Fighting Porselin Bh 20,000.00 20,000.00
Stop Kontak BROCO Bh 17,500.00 17,500.00
Saklar Ganda BROCO Bh 17,500.00 17,500.00
Saklar Tunggal BROCO Bh 17,500.00 17,500.00
Panel Box MCB Bh 85,000.00 85,000.00
MCB 10 Ampere Bh 75,000.00 75,000.00
Elektrode Kg 30,000.00 30,000.00
-
O BUIS BETON -
1 Pipa Besi Galvanis 1.5" M' 47,500.00 47,500.00
2 Pipa Besi Galvanis 1" M' 35,000.00 35,000.00
3 Pipa Besi Galvanis 0,75" M' 25,000.00 25,000.00
4 Pipa Besi Galvanis 0.5" M' 22,500.00 22,500.00
5 Buis Beton U 20 cm x 100 cm Bh 47,500.00 47,500.00
6 Buis Beton U 30 cm x 100 cm Bh 50,000.00 50,000.00
7 Buis Beton U 40 cm x 100 cm Bh 52,500.00 52,500.00
8 Buis Beton U 50 cm x 100 cm Bh 57,500.00 57,500.00
9 Buis Beton U 60 cm x 60 cm Bh 75,000.00 75,000.00
10 Buis Beton U 80 cm x 60 cm Bh 95,000.00 95,000.00

-
SATUAN COS HEAT

C SEWA ALAT

1 Alat Penggetar Beton Jam 13,000.00 13,000.00


2 Alat Pengaduk Beton Jam 26,000.00 26,000.00
3 Pompa Air Jam 19,000.00 19,000.00
4 Alat Bantu (1 set / 3 Alat) Jam 15,000.00 15,000.00
5 Alat Bantu Strous Peil Jam 5,000.00 5,000.00
6 Alat Pemadat (Stamper) Jam 12,000.00 12,000.00
7 Excavator Jam 104,000.00 104,000.00
8 Dump Truck (5 Ton) Jam 100,000.00 100,000.00
9 Mesin Las Jam 24,000.00 24,000.00
10 Sewa Komputer Jam 22,000.00 22,000.00
11 Sewa Alat Cat Jam 26,400.00 26,400.00

A BESI
Besi Beton 6 " 175 #REF! #REF!
Besi Beton 8 " 100 40,000.00 4,000,000.00
Besi Beton 10 " 75 #REF! #REF!
Besi Beton 12 " 135 #REF! #REF!
Besi Beton 14 " 100 140,000.00 14,000,000.00
Bendrat 75 17,500.00 1,312,500.00
Paku 50 17,500.00 875,000.00

B BATU
Batu Pondasi 2 180,000.00 360,000.00
Batu Merah 3000 185.00 555,000.00
Batu Cor 3 425,000.00 1,275,000.00
Pasir Kali 5 175,000.00 875,000.00

C PEREKAT
Semen Gresik a 40 kg 85 26,500.00 2,252,500.00
Semen Tigaroda 90 24,500.00 2,205,000.00
Gamping 3 52,000.00 156,000.00

D PERANCA / KAYU
Kayu Kusen 6 / 15 x 400 25 120,000.00 3,000,000.00
Bambu panjang 4 m ' 600 3,000.00 1,800,000.00
Kayu 4 / 6 x 400 1.5 1,730,000.00 2,595,000.00
Kayu 2 / 20 x 200 (Randu) 600 3,000.00 1,800,000.00
Tripleks 120x240 3mm 8 46,000.00 368,000.00
Tripleks 120x240 3 mm ( Milamen ) 1 65,000.00 65,000.00

E PERALATAN
Cangkul 3 35,000.00 105,000.00
Sekrop 4 25,000.00 100,000.00
Ganjo 2 45,000.00 90,000.00
Linggis 2 35,000.00 70,000.00
Betel 5 7,500.00 37,500.00
Palu 3 20,000.00 60,000.00
Kereta Dorong Arco 1 150,000.00 150,000.00
Timba 40 4,000.00 160,000.00
Benang 4 2,500.00 10,000.00

F LAIN - LAIN
Pembuangan Bekas Bongkaran 12 105,000.00 1,260,000.00
Transportasi 1 250,000.00 250,000.00

G UPAH KERJA
Upah kerja Dalam Minggu 3 2,250,000.00 6,750,000.00

TOTAL KESELURUHAN
SATUAN COS HEAT
A BESI
Besi Beton 6 " 395 12,500.00 4,937,500.00
Besi Beton 8 " 220 40,000.00 8,800,000.00
Besi Beton 10 " 90 #REF! #REF!
Besi Beton 12 " 185 #REF! #REF!
Besi Beton 14 " 100 140,000.00 14,000,000.00
Bendrat 150 17,500.00 2,625,000.00
Paku 150 17,500.00 2,625,000.00

B BATU
Batu Pondasi 2 180,000.00 360,000.00
Batu Merah 4000 185.00 740,000.00
Batu Cor 11 425,000.00 4,675,000.00
Pasir Kali 10 175,000.00 1,750,000.00

C PEREKAT
Semen Gresik a 40 kg 160 26,500.00 4,240,000.00
Semen Tigaroda 340 24,500.00 8,330,000.00
Gamping 3 52,000.00 156,000.00

D PERANCA / KAYU
Kayu Kusen 6 / 15 x 400 25 120,000.00 3,000,000.00
Bambu panjang 4 m ' 600 3,000.00 1,800,000.00
Kayu 4 / 6 x 400 2 1,730,000.00 3,460,000.00
Kayu 2 / 20 x 200 (Randu) 1000 3,000.00 3,000,000.00
Tripleks 120x240 3mm 8 46,000.00 368,000.00
Tripleks 120x240 3 mm ( Milamen ) 1 65,000.00 65,000.00

E PERALATAN
Cangkul 4 35,000.00 140,000.00
Sekrop 8 25,000.00 200,000.00
Ganjo 2 45,000.00 90,000.00
Linggis 2 35,000.00 70,000.00
Betel 8 7,500.00 60,000.00
Palu 3 20,000.00 60,000.00
Kereta Dorong Arco 1 150,000.00 150,000.00
Timba 80 4,000.00 320,000.00
Benang 6 2,500.00 15,000.00

F LAIN - LAIN
Pembuangan Bekas Bongkaran 14 105,000.00 1,470,000.00
Transportasi 1 500,000.00 500,000.00
Instalasi Listrik 1 1,500,000.00 1,500,000.00
Sewa molen dan Vibrator 1 1,000,000.00 1,000,000.00
Ijin Listrik 1 350,000.00 350,000.00

G UPAH KERJA
Upah kerja Dalam Minggu 6 2,500,000.00 15,000,000.00
Upah Kusen 94 7,000.00 658,000.00
Upah Pengecoran 32 80,000.00 2,560,000.00

TOTAL KESELURUHAN
36,000.00
30,000.00
29,000.00
28,000.00
28,000.00
28,000.00
28,000.00
28,000.00

18,000.00
20,000.00

400,000.00 91,000.00
89,200.00
89,200.00
122,000.00
97,000.00
129,900.00
1,600.00
3,000.00

67,200.00
60,400.00
48,100.00
44,000.00
7,700.00

81,300.00

3,500.00
142,500.00
238095.23809524 439,300.00 210000
254,200.00 400,000.00
250.00

1,725,000.00
2,443,700.00
2,802,500.00
2,156,200.00

2,802,500.00
3,018,700.00
3,306,200.00
4,168,700.00
4,096,200.00
4,671,200.00
8,625,000.00
10,062,500.00
3,100.00
8,600.00
2,100.00
5,500.00
700.00
4,200.00
3,600.00
6,700.00

2,800.00
5,700.00

51,700.00

34,500.00

71,800.00
54,600.00

43,100.00

64,600.00

67,000.00

21,500.00

32,200.00
43,100.00

13,600.00

79,000.00
21,500.00
8,600.00
11,700.00
30,000.00
8,100.00
13,700.00
100.00
15,700.00
200.00

10,000.00

47,000.00 47000

127,000.00 127000

205,000.00 205000

12,200.00
11,700.00
63,200.00
65,000.00
57,700.00

48,100.00
53,600.00
68,700.00

178,700.00
288,700.00
144,300.00
185,600.00
1,237,500.00
2,062,500.00
27,500.00
27,500.00
330,000.00
364,300.00
275,000.00
226,800.00
26,200.00
41,200.00

34,300.00
1,200,000.00
2,200,000.00

101,200.00 101,200.00
17,500.00 48,700.00
12,500.00 32,500.00
10,000.00 22,500.00
7,500.00 16,200.00
8,700.00 8,700.00
5,000.00 5,000.00
4,375.00 4,300.00
3,750.00 3,700.00
55,000.00
68,700.00
110,000.00
137,500.00
165,000.00

75,600.00
96,200.00
89,300.00

151,200.00
85,000.00
61,800.00
10,200.00
14,300.00
6,800.00
41,200.00
34,300.00
11,000.00
6,800.00
5,500.00
10,200.00
12,300.00
17,100.00

68,700.00
82,500.00
22,000.00
20,600.00
487,500.00 18,500.00
18,500.00
14,000.00
43,700.00
49,300.00
104,000.00
14,300.00
14,300.00
18,700.00

11,800.00
15,600.00
3,000.00
43,300.00
44,000.00
5,700.00
89,300.00
14,000.00
25,500.00

82,500.00
1,300.00

3,300.00
200.00
6,800.00
1,000.00
192,500.00
4,400.00
137,400.00
68,700.00
96,200.00
50,000.00
10,200.00
19,800.00
20,600.00
24,000.00
20,600.00
171,800.00
41,200.00

47,500.00 40,000.00
35,000.00 28,100.00
25,000.00 18,700.00
22,500.00 13,700.00
35,800.00
43,100.00
50,200.00
64,600.00
69,500.00
93,300.00

6,800.00
20,600.00
6,800.00
5,500.00
4,700.00
8,200.00
3,300.00
4,700.00
84,700.00

13,000.00
26,000.00
19,000.00
15,000.00
5,000.00
12,000.00
104,000.00
100,000.00
24,000.00
22,000.00
26,400.00

#REF!

3,065,000.00

4,613,500.00

9,628,000.00

782,500.00

1,510,000.00

6,750,000.00
#REF!
#REF!

7,525,000.00

12,726,000.00

11,693,000.00

1,105,000.00

4,820,000.00

18,218,000.00
#REF!
101,200.00
48,700.00
32,500.00
22,500.00
16,200.00
8,700.00
5,000.00
4,300.00
3,700.00
40,000.00
28,100.00
18,700.00
13,700.00
DAFTAR ANALISA HARGA SATUAN UPAH DAN BAHAN
KHUSUS BANGUNAN GEDUNG WILAYAH JEMBER TIMUR DAN TENGAH

HARGA SATUAN JML HARGA JML HARGA TOTAL


JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 M' PASANG BOUWPLANK


0.0064 M3 Meranti Papan 4,500,000.00 28,800.00
0.0750 Kg Paku 17,500.00 1,312.50
0.0200 Org Mandor 60,000.00 1,200.00
0.0700 Org Pekerja 37,500.00 2,625.00
Jumlah 30,112.50 3,825.00 33,937.50 33,937.50
Dibulatkan 33,900.00 33,900.00

1 M3 GALIAN TANAH
0.7500 Org Pekerja 37,500.00 28,125.00
0.0250 Org Mandor 60,000.00 1,500.00
Jumlah 29,625.00 29,625.00 29,625.00
Dibulatkan 29,600.00 29,600.00

1 M3 GALIAN TANAH BERBATU


1.5750 Org Pekerja 37,500.00 59,062.50
0.0525 Org Mandor 60,000.00 3,150.00
Jumlah - 62,212.50 62,212.50 62,212.50
Dibulatkan 62,200.00 62,200.00

1 M3 URUGAN TANAH KEMBALI


1 Untuk Gedung 25 % x Ongkos Galian 29,600.00 7,400.00
Jumlah 29,600.00 7,400.00 7,400.00
Dibulatkan 7,400.00 7,400.00

2 Untuk Jembatan 50 % x Ongkos Galian 29,600.00 14,800.00


Jumlah - 29,600.00 14,800.00 14,800.00
Dibulatkan 14,800.00 14,800.00

1 M3 URUGAN PASIR URUG DENGAN PEMADATAN


1.1000 M3 Pasir Urug 70,000.00 77,000.00
0.3300 Org Pekerja 37,500.00 12,375.00
0.0100 Org Mandor 60,000.00 600.00
Jumlah 77,000.00 12,975.00 89,975.00 89,975.00
Dibulatkan 89,900.00 89,900.00

1 M3 URUGAN PASIR PASANG DENGAN PEMADATAN


1.2000 M3 Pasir Pasang 100,000.00 120,000.00
0.3300 Org Pekerja 37,500.00 12,375.00
0.0100 Org Mandor 60,000.00 600.00
Jumlah 120,000.00 12,975.00 132,975.00 132,975.00
Dibulatkan 132,900.00 132,900.00

1 M3 AANSTAMPING
1.1000 M3 Batu Kali 85,000.00 93,500.00
0.4000 M3 Pasir Urug 70,000.00 28,000.00
0.6000 Org Pekerja 37,500.00 22,500.00
0.3000 Org Tukang Batu 55,000.00 16,500.00
0.0300 Org Kepala Tukang 50,000.00 1,500.00
0.0300 Org Mandor 60,000.00 1,800.00
Jumlah 121,500.00 42,300.00 163,800.00 163,800.00
Dibulatkan 163,800.00 163,800.00

1 M3 PASANG PONDASI BATU BELAH CAMP. 1PC : 3 KP : 10 PS


1.2000 M3 Batu Belah 85,000.00 102,000.00
2.2500 Zak PC @ 40 Kg 52,000.00 117,000.00
0.0400 M3 Kapur Pasang 400,000.00 16,000.00
0.5680 M3 Pasir Pasang 100,000.00 56,800.00
1.0000 Org Pekerja 37,500.00 37,500.00
0.4500 Org Tukang Batu 55,000.00 24,750.00
0.0500 Org Kepala Tukang 50,000.00 2,500.00
0.0500 Org Mandor 60,000.00 3,000.00
Jumlah 291,800.00 67,750.00 359,550.00 359,550.00
Dibulatkan 359,500.00 359,500.00

1 M3 PASANG PONDASI BATU BELAH CAMP. 1PC : 8PS


1.2000 M3 Batu Belah 85,000.00 102,000.00
3.5000 Zak PC @ 40 Kg 52,000.00 182,000.00
0.5600 M3 Pasir Pasang 100,000.00 56,000.00
1.0000 Org Pekerja 37,500.00 37,500.00
0.4500 Org Tukang Batu 55,000.00 24,750.00
0.0500 Org Kepala Tukang 50,000.00 2,500.00
0.0500 Org Mandor 60,000.00 3,000.00
Jumlah 340,000.00 67,750.00 407,750.00 407,750.00
Dibulatkan 407,700.00 407,700.00

1 M3 BATU MERAH CAMP. 1PC : 3PS


700.0000 Bj Batu Merah 420.00 294,000.00
3.1480 Zak PC @ 40 Kg 52,000.00 163,696.00
0.3780 M3 Pasir Pasang 100,000.00 37,800.00
4.5000 Org Pekerja 37,500.00 168,750.00
1.5000 Org Tukang Batu 55,000.00 82,500.00
0.1500 Org Kepala Tukang 50,000.00 7,500.00
0.2250 Org Mandor 60,000.00 13,500.00
Jumlah 495,496.00 272,250.00 767,746.00 767,746.00
Dibulatkan 767,700.00 767,700.00

1 M2 BATU MERAH TEBAL 1/2 BATA CAMP. 1PC :4 PS


70.0000 Bj Batu Merah 420.00 29,400.00
0.2980 Zak PC @ 40 Kg 52,000.00 15,496.00
0.0430 M3 Pasir Pasang 100,000.00 4,300.00
0.3200 Org Pekerja 37,500.00 12,000.00
0.1000 Org Tukang Batu 55,000.00 5,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

0.0100 Org Mandor 60,000.00 600.00


Jumlah 49,196.00 18,600.00 67,796.00 67,796.00
Dibulatkan 67,700.00 67,700.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 M2 BATU MERAH CAMP. 1PC : 3KP : 10 PS


70.0000 Bj Batu Merah 420.00 29,400.00
0.0113 M3 Kapur Pasang 400,000.00 4,500.00
0.0675 Zak PC @ 40 Kg 52,000.00 3,510.00
0.0430 M3 Pasir Pasang 100,000.00 4,300.00
0.3200 Org Pekerja 37,500.00 12,000.00
0.1000 Org Tukang Batu 55,000.00 5,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0100 Org Mandor 60,000.00 600.00
Jumlah 41,710.00 18,600.00 60,310.00 60,310.00
Dibulatkan 60,300.00 60,300.00
1 M3 BETON RABAT CAMP. 1PC : 3PS : 5KRL
0.8200 M3 Kerikil Beton 165,000.00 135,300.00
4.0000 Zak PC @ 40 Kg 52,000.00 208,000.00
0.5400 M3 Pasir Cor 100,000.00 54,000.00
3.0000 Org Pekerja 37,500.00 112,500.00
0.3000 Org Tukang Batu 55,000.00 16,500.00
0.0300 Org Kepala Tukang 50,000.00 1,500.00
0.0800 Org Mandor 60,000.00 4,800.00
Jumlah 397,300.00 135,300.00 532,600.00 532,600.00
Dibulatkan 532,600.00 532,600.00

1 BH FOOT PLAT BETON BERTULANG 1,2 x 1,2 x 0.4 M ( Besi dia 12 mm & 14 mm )
1.5000 Ljr Besi Beton Polos Besi 14 140,000.00 210,000.00
1.5000 Ljr Besi Beton Polos Besi 12 95,000.00 142,500.00
1.4400 Kg Kawat Beton 17,500.00 25,200.00
4.6080 Zak PC @ 40 Kg Gresik 52,000.00 239,616.00
0.4723 M3 Kerikil Pecah Mesin 165,000.00 77,932.80
0.3686 M3 Pasir Cor 100,000.00 36,864.00
1.0000 Bh Pembesian 56,655.00 56,655.00
1.0000 Bh Pengecoran 77,932.80 77,932.80
Jumlah 732,112.80 134,587.80 866,700.60 866,700.60
Dibulatkan 866,700.00 866,700.00

1 BH FOOT PLAT BETON BERTULANG 0,8 x 0,8 x 0.4 M ( Besi dia 12 mm )


3.0000 Ljr Besi Beton Polos Besi 10 SNI 60,000.00 180,000.00
1.0000 Kg Kawat Beton 17,500.00 17,500.00
2.0480 Zak PC @ 40 Kg Gresik 52,000.00 106,496.00
0.2099 M3 Kerikil Pecah Mesin 165,000.00 34,636.80
0.1638 M3 Pasir Cor 100,000.00 16,384.00
1.0000 Bh Pembesian 29,625.00 29,625.00
1.0000 Bh Pengecoran 53,835.12 53,835.12
Jumlah 355,016.80 83,460.12 438,476.92 438,476.92
Dibulatkan 438,400.00 438,400.00

1 M2 PLAT LANTAI T = 12 Cm ( Besi 8" - 12.5 & Besi 10 - 12,5 )


0.3819 Lbr Papan Multipleks 15 mm 175,000.00 66,840.28
0.2000 Kg Paku Biasa 2 '' - 5 '' 17,500.00 3,500.00
0.7652 Ljr Besi Beton Polos Besi 8 SNI 40,000.00 30,608.70
0.8609 Ljr Besi Beton Polos Besi 10 SNI 60,000.00 51,652.17
0.3750 Kg Kawat Beton 17,500.00 6,562.50
1.2750 Zak PC @ 40 Kg Gresik 52,000.00 66,300.00
0.1230 M3 Kerikil Pecah Mesin 165,000.00 20,295.00
0.0960 M3 Pasir Cor 100,000.00 9,600.00
0.0092 M3 Kayu 4/6 1,730,000.00 15,985.20
6.0000 Btg Bambu 7,500.00 45,000.00
1.0000 M1 Pembesian 18,464.67 18,464.67
1.0000 M1 Bekisting+Bongkar Cetakan 39,397.64 39,397.64
1.0000 M1 Pengecoran 30,282.26 30,282.26
Jumlah 316,343.85 88,144.57 404,488.42 404,488.42
Dibulatkan 404,400.00 404,400.00
1 M1 SOOF BETON BERTULANG 15/20 ( 4 - 10"+ 6" - 15 )
0.0132 M3 Papan Randu 3/20 360,000.00 4,752.00
0.0597 Kg Paku Biasa 2 '' - 5 '' 17,500.00 1,044.78
0.4783 Ljr Besi Beton Polos Besi 10 SNI 60,000.00 28,695.65
0.3757 Ljr Besi Beton Polos Besi 6 SNI 23,000.00 8,640.00
0.0075 Kg Kawat Beton 17,500.00 131.25
0.2400 Zak PC @ 40 Kg Gresik 52,000.00 12,480.00
0.0246 M3 Kerikil Pecah Mesin 165,000.00 4,059.00
0.0156 M3 Pasir Cor 100,000.00 1,560.00
0.0012 M3 Kayu 3/5 1,730,000.00 2,076.00
1.0000 M1 Pembesian 7,493.38 7,493.38
1.0000 M1 Bekisting+Bongkar Cetakan 2,361.83 2,361.83
1.0000 M1 Pengecoran 4,845.16 4,845.16
Jumlah 63,438.68 14,700.37 78,139.05 78,139.05
Dibulatkan 78,100.00 78,100.00
1 M1 SOOF BETON BERTULANG 20/25 ( 8 - 12"+ 6" - 15 )
0.0132 M3 Papan Randu 3/20 360,000.00 4,752.00
0.1250 Kg Paku Biasa 2 '' - 5 '' 17,500.00 2,187.50
0.7652 Ljr Besi Beton Polos Besi 12 SNI 90,000.00 68,869.57
0.4870 Ljr Besi Beton Polos Besi 6 SNI 23,000.00 11,200.00
0.0150 Kg Kawat Beton 17,500.00 262.50
0.4080 Zak PC @ 40 Kg Gresik 52,000.00 21,216.00
0.0492 M3 Kerikil Pecah Mesin 165,000.00 8,118.00
0.0312 M3 Pasir Cor 100,000.00 3,120.00
0.0012 M3 Kayu 3/5 1,730,000.00 2,076.00
1.0000 M1 Pembesian 12,049.81 12,049.81
1.0000 M1 Bekisting+Bongkar Cetakan 2,704.65 2,704.65
1.0000 M1 Pengecoran 4,845.16 4,845.16
Jumlah 121,801.57 19,599.62 141,401.19 141,401.19
Dibulatkan 141,400.00 141,400.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 M1 SOOF BETON BERTULANG 20/30 ( 8 - 12"+ 6" - 15 )


0.0132 M3 Papan Randu 3/20 360,000.00 4,752.00
0.0597 Kg Paku Biasa 2 '' - 5 '' 17,500.00 1,044.78
0.7652 Ljr Besi Beton Polos Besi 12 SNI 90,000.00 68,869.57
0.4870 Ljr Besi Beton Polos Besi 6 SNI 23,000.00 11,200.00
0.0150 Kg Kawat Beton 17,500.00 262.50
0.4080 Zak PC @ 40 Kg Gresik 52,000.00 21,216.00
0.0492 M3 Kerikil Pecah Mesin 165,000.00 8,118.00
0.0312 M3 Pasir Cor 100,000.00 3,120.00
0.0012 M3 Kayu 3/5 1,730,000.00 2,076.00
1.0000 M1 Pembesian 12,049.81 12,049.81
1.0000 M1 Bekisting+Bongkar Cetakan 2,361.83 2,361.83
1.0000 M1 Pengecoran 4,845.16 4,845.16
Jumlah 120,658.84 19,256.80 139,915.64 139,915.64
Dibulatkan 139,900.00 139,900.00

1 M1 KOLOM BETON BERTULANG PRAKTIS 15/15 ( 4 -10"+ 6" -15)


0.2143 Lbr Papan Multipleks 15 mm 175,000.00 37,500.00
0.0500 Kg Paku Biasa 2 '' - 5 '' 17,500.00 875.00
0.3500 Ljr Besi Beton Polos Besi 10 SNI 60,000.00 21,000.00
0.3500 Ljr Besi Beton Polos Besi 6 SNI 23,000.00 8,050.00
0.1000 Kg Kawat Beton 17,500.00 1,750.00
0.1350 Zak PC @ 40 Kg Gresik 52,000.00 7,020.00
0.0180 M3 Kerikil Pecah Mesin 165,000.00 2,970.00
0.0113 M3 Pasir Cor 100,000.00 1,125.00
0.0018 Btg Kayu 3/5 1,730,000.00 3,114.00
1.0000 M1 Pembesian 3,696.00 3,696.00
1.0000 M1 Bekisting+Bongkar Cetakan 8,297.80 8,297.80
1.0000 M1 Pengecoran 2,700.00 2,700.00
Jumlah 83,404.00 14,693.80 98,097.80 98,097.80
Dibulatkan 98,000.00 98,000.00
1 M1 KOLOM BETON BERTULANG 15/20 ( 4 -10"+ 6" -15)
0.0240 M3 Papan Randu 3/20 360,000.00 8,640.00
0.0750 Kg Paku Biasa 2 '' - 5 '' 17,500.00 1,312.50
0.5739 Ljr Besi Beton Polos Besi 10 SNI 60,000.00 34,434.78
0.5091 Ljr Besi Beton Polos Besi 6 SNI 23,000.00 11,709.09
0.1200 Kg Kawat Beton 17,500.00 2,100.00
0.2400 Zak PC @ 40 Kg Gresik 52,000.00 12,480.00
0.0255 M3 Kerikil Pecah Mesin 30,000.00 765.00
0.0156 M3 Pasir Cor 100,000.00 1,560.00
0.0018 Btg Kayu 3/5 1,730,000.00 3,114.00
1.0000 M1 Pembesian 12,060.97 12,060.97
1.0000 M1 Bekisting+Bongkar Cetakan 3,919.95 3,919.95
1.0000 M1 Pengecoran 4,500.00 4,500.00
Jumlah 76,115.37 20,480.92 96,596.29 96,596.29
Dibulatkan 96,500.00 96,500.00
1 M1 KOLOM BETON BERTULANG 15/25 ( 4 -12"+4-10"+ 6" -15)
0.0240 M3 Papan Randu 3/20 360,000.00 8,640.00
0.0750 Kg Paku Biasa 2 '' - 5 '' 17,500.00 1,312.50
0.3826 Ljr Besi Beton Polos Besi 12 SNI 90,000.00 34,434.78
0.3826 Ljr Besi Beton Polos Besi 10 SNI 60,000.00 22,956.52
0.5565 Ljr Besi Beton Polos Besi 6 SNI 23,000.00 12,800.00
0.0938 Kg Kawat Beton 17,500.00 1,640.63
0.2040 Zak PC @ 40 Kg Gresik 52,000.00 10,608.00
0.0308 M3 Kerikil Pecah Mesin 165,000.00 5,073.75
0.0195 M3 Pasir Cor 100,000.00 1,950.00
0.0018 Btg Kayu 3/5 1,730,000.00 3,114.00
1.0000 M1 Pembesian 14,366.39 14,366.39
1.0000 M1 Bekisting+Bongkar Cetakan 4,573.28 4,573.28
1.0000 M1 Pengecoran 8,815.88 8,815.88
Jumlah 102,530.18 27,755.54 130,285.72 130,285.72
Dibulatkan 130,200.00 130,200.00
1 M1 KOLOM BETON BERTULANG 20/20 ( 4 -12"+ 6" -15)
0.0240 Lbr Papan Multipleks 15 mm 175,000.00 4,200.00
0.0750 Kg Paku Biasa 2 '' - 5 '' 17,500.00 1,312.50
0.3826 Ljr Besi Beton Polos Besi 12 SNI 90,000.00 34,434.78
0.4565 Ljr Besi Beton Polos Besi 6 SNI 23,000.00 10,500.00
0.1000 Kg Kawat Beton 17,500.00 1,750.00
0.3400 Zak PC @ 40 Kg Gresik 52,000.00 17,680.00
0.0328 M3 Kerikil Pecah Mesin 165,000.00 5,412.00
0.0256 M3 Pasir Cor 100,000.00 2,560.00
0.0021 Btg Kayu 3/5 1,730,000.00 3,633.00
1.0000 M1 Pembesian 7,002.72 7,002.72
1.0000 M1 Bekisting+Bongkar Cetakan 2,743.65 2,743.65
1.0000 M1 Pengecoran 7,695.60 7,695.60
Jumlah 81,482.28 17,441.97 98,924.25 98,924.25
Dibulatkan 98,900.00 98,900.00
1 M1 KOLOM BETON BERTULANG 25/25 ( 6-10"+ 6" -15cm)
0.0240 M3 Papan Randu 3/20 360,000.00 8,640.00
0.0750 Kg Paku Biasa 2 '' - 5 '' 17,500.00 1,312.50
0.5739 Ljr Besi Beton Polos Besi 10 SNI 60,000.00 34,434.78
0.4870 Ljr Besi Beton Polos Besi 8 SNI 40,000.00 19,478.26
0.1250 Kg Kawat Beton 17,500.00 2,187.50
0.4375 Zak PC @ 40 Kg Gresik 52,000.00 22,750.00
0.0328 M3 Kerikil Pecah Mesin 165,000.00 5,412.00
0.0117 M3 Pasir Cor 100,000.00 1,170.00
0.0021 Btg Kayu 3/5 1,730,000.00 3,633.00
1.0000 M1 Pembesian 8,415.08 8,415.08
1.0000 M1 Bekisting+Bongkar Cetakan 4,075.65 4,075.65
1.0000 M1 Pengecoran 8,799.60 8,799.60
Jumlah 99,018.04 21,290.33 120,308.38 120,308.38
Dibulatkan 120,300.00 120,300.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 M1 KOLOM BETON BERTULANG 20/25 ( 4 - 12" + 4 -10"+ 6" -15)


0.0330 M3 Papan Randu 3/20 175,000.00 5,775.00
0.1200 Kg Paku Biasa 2 '' - 5 '' 17,500.00 2,100.00
0.3826 Ljr Besi Beton Polos Besi 12 SNI 90,000.00 34,434.78
0.3826 Ljr Besi Beton Polos Besi 10 SNI 60,000.00 22,956.52
0.5478 Ljr Besi Beton Polos Besi 6 SNI 23,000.00 12,600.00
0.1500 Kg Kawat Beton 17,500.00 2,625.00
0.3400 Zak PC @ 40 Kg Gresik 52,000.00 17,680.00
0.0410 M3 Kerikil Pecah Mesin 165,000.00 6,765.00
0.0260 M3 Pasir Cor 100,000.00 2,600.00
0.0050 Btg Kayu 3/5 1,730,000.00 8,563.50
1.0000 M1 Pembesian 14,523.26 14,523.26
1.0000 M1 Bekisting+Bongkar Cetakan 4,931.55 4,931.55
1.0000 M1 Pengecoran 8,113.50 8,113.50
Jumlah 116,099.80 27,568.31 143,668.12 143,668.12
Dibulatkan 143,600.00 143,600.00

1 M1 KOLOM BETON BERTULANG 20/25 ( 4 - 14" + 4 -12"+ 8" -15)


0.0330 M3 Papan Randu 3/20 175,000.00 5,775.00
0.1200 Kg Paku Biasa 2 '' - 5 '' 17,500.00 2,100.00
0.3826 Ljr Besi Beton Polos Besi 14 AA 140,000.00 53,565.22
0.3826 Ljr Besi Beton Polos Besi 12 SNI 90,000.00 34,434.78
0.5478 Ljr Besi Beton Polos Besi 8 SNI 40,000.00 21,913.04
0.1700 Kg Kawat Beton 17,500.00 2,975.00
0.4100 Zak PC @ 40 Kg Gresik 52,000.00 21,320.00
0.0410 M3 Kerikil Pecah Mesin 165,000.00 6,765.00
0.0260 M3 Pasir Cor 100,000.00 2,600.00
0.0050 Btg Kayu 3/5 1,730,000.00 8,563.50
1.0000 M1 Pembesian 22,577.61 22,577.61
1.0000 M1 Bekisting+Bongkar Cetakan 4,931.55 4,931.55
1.0000 M1 Pengecoran 9,205.50 9,205.50
Jumlah 160,011.54 36,714.66 196,726.20 196,726.20
Dibulatkan 196,700.00 196,700.00
1 M1 KOLOM BETON BERTULANG 20/30 ( 4 - 12" + 4 -10"+ 6" -15)
0.0330 M3 Papan Randu 3/20 175,000.00 5,775.00
0.1300 Kg Paku Biasa 2 '' - 5 '' 17,500.00 2,275.00
0.3826 Ljr Besi Beton Polos Besi 12 SNI 90,000.00 34,434.78
0.3826 Ljr Besi Beton Polos Besi 10 SNI 60,000.00 22,956.52
0.4870 Ljr Besi Beton Polos Besi 6 SNI 23,000.00 11,200.00
0.1200 Kg Kawat Beton 17,500.00 2,100.00
0.4920 Zak PC @ 40 Kg Gresik 52,000.00 25,584.00
0.0492 M3 Kerikil Pecah Mesin 165,000.00 8,118.00
0.0312 M3 Pasir Cor 100,000.00 3,120.00
0.0050 Btg Kayu 3/5 1,730,000.00 8,563.50
1.0000 M1 Pembesian 14,138.26 14,138.26
1.0000 M1 Bekisting+Bongkar Cetakan 4,984.05 4,984.05
1.0000 M1 Pengecoran 11,046.60 11,046.60
Jumlah 124,126.80 30,168.91 154,295.72 154,295.72
Dibulatkan 154,200.00 154,200.00
1 M1 KOLOM BETON BERTULANG 20/30 ( 4 - 14" + 4 -12"+ 8" -15)
0.0330 M3 Papan Randu 3/20 360,000.00 11,880.00
0.1200 Kg Paku Biasa 2 '' - 5 '' 17,500.00 2,100.00
0.3826 Ljr Besi Beton Polos Besi 14 AA 140,000.00 53,565.22
0.3826 Ljr Besi Beton Polos Besi 12 SNI 90,000.00 34,434.78
0.6087 Ljr Besi Beton Polos Besi 8 SNI 40,000.00 24,347.83
0.1700 Kg Kawat Beton 17,500.00 2,975.00
0.4920 Zak PC @ 40 Kg Gresik 52,000.00 25,584.00
0.0492 M3 Kerikil Pecah Mesin 165,000.00 8,118.00
0.0312 M3 Pasir Cor 100,000.00 3,120.00
0.0058 Btg Kayu 3/5 1,730,000.00 9,990.75
1.0000 M1 Pembesian 23,064.57 23,064.57
1.0000 M1 Bekisting+Bongkar Cetakan 7,191.23 7,191.23
1.0000 M1 Pengecoran 11,046.60 11,046.60
Jumlah 176,115.58 41,302.39 217,417.97 217,417.97
Dibulatkan 217,400.00 217,400.00
1 M1 KOLOM BETON BERTULANG 25/25 ( 4 - 14" + 4 -12"+ 8" -15)
0.0363 M3 Papan Randu 3/20 360,000.00 13,068.00
0.1500 Kg Paku Biasa 2 '' - 5 '' 17,500.00 2,625.00
0.3826 Ljr Besi Beton Polos Besi 14 AA 140,000.00 53,565.22
0.3826 Ljr Besi Beton Polos Besi 12 SNI 90,000.00 34,434.78
0.6087 Ljr Besi Beton Polos Besi 8 AA 40,000.00 24,347.83
0.1700 Kg Kawat Beton 17,500.00 2,975.00
0.5125 Zak PC @ 40 Kg Gresik 52,000.00 26,650.00
0.0615 M3 Kerikil Pecah Mesin 165,000.00 10,147.50
0.0390 M3 Pasir Cor 100,000.00 3,900.00
0.0053 Btg Kayu 3/5 1,730,000.00 9,134.40
1.0000 M1 Pembesian 23,064.57 23,064.57
1.0000 M1 Bekisting+Bongkar Cetakan 7,448.22 7,448.22
1.0000 M1 Pengecoran 10,174.38 10,174.38
Jumlah 180,847.73 40,687.16 221,534.89 221,534.89
Dibulatkan 221,500.00 221,500.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 M1 KOLOM BETON BERTULANG 30/30 ( 6 - 14" + 4 -12"+ 8" -15)


0.5375 M3 Multipleks 15 mm 175,000.00 94,060.74
0.1200 Kg Paku Biasa 2 '' - 5 '' 17,500.00 2,100.00
0.3826 Ljr Besi Beton Polos Besi 14 140,000.00 53,565.22
0.3826 Ljr Besi Beton Polos Besi 12 SNI 90,000.00 34,434.78
0.6087 Ljr Besi Beton Polos Besi 8 SNI 40,000.00 24,347.83
0.2250 Kg Kawat Beton 17,500.00 3,937.50
0.7380 Zak PC @ 40 Kg Gresik 52,000.00 38,376.00
0.0738 M3 Kerikil Pecah Mesin 165,000.00 12,177.00
0.0468 M3 Pasir Cor 100,000.00 4,680.00
0.0288 M3 Kayu 4/6 1,730,000.00 49,824.00
1.0000 M1 Pembesian 17,442.80 17,442.80
1.0000 M1 Bekisting+Bongkar Cetakan 21,897.71 21,897.71
1.0000 M1 Pengecoran 13,808.25 13,808.25
Jumlah 317,503.06 53,148.76 370,651.82 370,651.82
Dibulatkan 370,600.00 370,600.00
1 M1 KOLOM BETON BERTULANG 30/50 ( 6 - 16" + 6 -14"+ 8" -15)
0.0600 Lbr Papan Randu 3/20 360,000.00 21,600.00
0.1500 Kg Paku Biasa 2 '' - 5 '' 17,500.00 2,625.00
0.5739 Ljr Besi Beton Polos Besi 16 SNI 180,000.00 103,304.35
0.5739 Ljr Besi Beton Polos Besi 14 Marking 140,000.00 80,347.83
0.9009 Ljr Besi Beton Polos Besi 8 SNI 40,000.00 36,034.78
0.3750 Kg Kawat Beton 17,500.00 6,562.50
1.2750 Zak PC @ 40 Kg Gresik 52,000.00 66,300.00
0.1230 M3 Kerikil Pecah Mesin 165,000.00 20,295.00
0.0960 M3 Pasir Cor 100,000.00 9,600.00
0.0288 M3 Kayu 4/6 3,500,000.00 100,800.00
1.0000 M1 Pembesian 33,937.42 33,937.42
1.0000 M1 Bekisting+Bongkar Cetakan 24,480.00 24,480.00
1.0000 M1 Pengecoran 24,048.75 24,048.75
Jumlah 447,469.46 82,466.17 529,935.63 529,935.63
Dibulatkan 529,900.00 529,900.00
1 M1 KOLOM BETON BERTULANG 40/40 ( 4 - 16" +8 -12"+ 8" -15)
0.5375 Lbr Papan multiplexs 175,000.00 94,060.74
0.1500 Kg Paku Biasa 2 '' - 5 '' 17,500.00 2,625.00
0.3826 Ljr Besi Beton Polos Besi 16 SNI 180,000.00 68,869.57
0.7652 Ljr Besi Beton Polos Besi 12 SNI 90,000.00 68,869.57
0.9130 Ljr Besi Beton Polos Besi 8 SNI 40,000.00 36,521.74
0.4000 Kg Kawat Beton 17,500.00 7,000.00
1.3600 Zak PC @ 40 Kg Gresik 52,000.00 70,720.00
0.1312 M3 Kerikil Pecah Mesin 165,000.00 21,648.00
0.1024 M3 Pasir Cor 100,000.00 10,240.00
0.0144 M3 Kayu 4/6 1,730,000.00 24,912.00
1.0000 M1 Pembesian 18,126.09 18,126.09
1.0000 M1 Bekisting+Bongkar Cetakan 11,897.27 11,897.27
1.0000 M1 Pengecoran 19,200.00 19,200.00
Jumlah 405,466.61 49,223.36 454,689.97 454,689.97
Dibulatkan 454,600.00 454,600.00
1 M1 KOLOM BETON BERTULANG 60/70 ( 4 - 16" +10 -12"+ 8" -15)
0.0363 M3 Papan Randu 3/20 175,000.00 6,352.50
0.1500 Kg Paku Biasa 2 '' - 5 '' 17,500.00 2,625.00
0.3826 Ljr Besi Beton Polos Besi 16 SNI 180,000.00 68,869.57
0.9565 Ljr Besi Beton Polos Besi 12 SNI 90,000.00 86,086.96
1.5826 Ljr Besi Beton Polos Besi 8 SNI 40,000.00 63,304.35
1.0500 Kg Kawat Beton 17,500.00 18,375.00
3.5700 Zak PC @ 40 Kg Gresik 52,000.00 185,640.00
0.3444 M3 Kerikil Pecah Mesin 165,000.00 56,826.00
0.2688 M3 Pasir Cor 100,000.00 26,880.00
0.0053 Btg Kayu 3/5 1,730,000.00 9,134.40
1.0000 M1 Pembesian 47,327.17 47,327.17
1.0000 M1 Bekisting+Bongkar Cetakan 5,433.57 5,433.57
1.0000 M1 Pengecoran 80,803.80 80,803.80
Jumlah 524,093.77 133,564.54 657,658.31 657,658.31
Dibulatkan 657,600.00 657,600.00
1 M1 BALOK LATEI BETON BERTULANG 15/20 ( 5 - 10 "+ 6 " -15)
0.0270 M1 Papan Randu 3/20 360,000.00 9,720.00
0.1500 Kg Paku Biasa 2 '' - 5 '' 17,500.00 2,625.00
0.3826 Ljr Besi Beton Polos Besi 10 SNI 60,000.00 22,956.52
0.4261 Ljr Besi Beton Polos Besi 6 SNI 23,000.00 9,800.00
0.1200 Kg Kawat Beton 17,500.00 2,100.00
0.2250 Zak PC @ 40 Kg Gresik 52,000.00 11,700.00
0.0246 M3 Kerikil Pecah Mesin 165,000.00 4,059.00
0.0156 M3 Pasir Cor 100,000.00 1,560.00
0.0050 Btg Kayu 3/5 1,730,000.00 8,563.50
1.0000 M1 Pembesian 5,228.48 5,228.48
1.0000 M1 Bekisting+Bongkar Cetakan 6,272.55 6,272.55
1.0000 M1 Pengecoran 5,195.70 5,195.70
Jumlah 73,084.02 16,696.73 89,780.75 89,780.75
Dibulatkan 89,700.00 89,700.00
1 M1 BALOK LATEI BETON BERTULANG 15/25 ( 5 - 12 ",4-10"+ 8 " -15)
0.0270 M1 Papan Randu 3/20 360,000.00 9,720.00
0.1000 Kg Paku Biasa 2 '' - 5 '' 17,500.00 1,750.00
0.4783 Ljr Besi Beton Polos Besi 12 SNI 90,000.00 43,043.48
0.3826 Ljr Besi Beton Polos Besi 10 SNI 60,000.00 22,956.52
0.5565 Ljr Besi Beton Polos Besi 6 SNI 23,000.00 12,800.00
0.1200 Kg Kawat Beton 17,500.00 2,100.00
0.3075 Zak PC @ 40 Kg Gresik 52,000.00 15,990.00
0.0308 M3 Kerikil Pecah Mesin 165,000.00 5,073.75
0.0195 M3 Pasir Cor 100,000.00 1,950.00
0.0053 Btg Kayu 3/5 3,500,000.00 18,480.00
1.0000 M1 Pembesian 12,135.00 12,135.00
1.0000 M1 Bekisting+Bongkar Cetakan 14,975.00 14,975.00
1.0000 M1 Pengecoran 6,904.13 6,904.13
Jumlah 133,863.75 34,014.13 167,877.88 167,877.88
40,000.00 167,800.00 167,800.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 M1 BALOK RING BETON BERTULANG 15/20 ( 6 -12"+2-10"+ 8 " -15)


0.0180 M1 Papan Randu 3/20 360,000.00 6,480.00
0.0500 Kg Paku Biasa 2 '' - 5 '' 17,500.00 875.00
0.5739 Ljr Besi Beton Polos Besi 12 Marking 95,000.00 54,521.74
0.1913 Ljr Besi Beton Polos Besi 10 Marking 65,000.00 12,434.78
0.4261 Ljr Besi Beton Polos Besi 8 Marking 40,000.00 17,043.48
0.0750 Kg Kawat Beton 17,500.00 1,312.50
0.2460 Zak PC @ 40 Kg Gresik 52,000.00 12,792.00
0.0246 M3 Kerikil Pecah Mesin 165,000.00 4,059.00
0.0156 M3 Pasir Cor 100,000.00 1,560.00
0.0021 M3 Kayu 3/5 1,730,000.00 3,633.00
1.0000 M1 Pembesian 9,237.23 9,237.23
1.0000 M1 Bekisting+Bongkar Cetakan 3,296.40 3,296.40
1.0000 M1 Pengecoran 9,205.50 9,205.50
Jumlah 114,711.50 21,739.13 136,450.63 136,450.63
Dibulatkan 136,400.00 136,400.00
1 M1 BALOK KONSOL BETON BERTULANG 20/30 ( 6 -16"+ 4-12"+ 6" -15)
0.2857 Lbr Papan multiplexs 175,000.00 50,000.00
0.1500 Kg Paku Biasa 2 '' - 5 '' 17,500.00 2,625.00
0.5739 Ljr Besi Beton Polos Besi 16 SNI 180,000.00 103,304.35
0.3826 Ljr Besi Beton Polos Besi 12 SNI 90,000.00 34,434.78
0.5478 Ljr Besi Beton Polos Besi 8 SNI 40,000.00 21,913.04
0.1500 Kg Kawat Beton 17,500.00 2,625.00
0.4920 Zak PC @ 40 Kg Gresik 52,000.00 25,584.00
0.0492 M3 Kerikil Pecah Mesin 165,000.00 8,118.00
0.0312 M3 Pasir Cor 100,000.00 3,120.00
0.0096 Btg Kayu 3/5 1,730,000.00 16,608.00
3.0000 Btg Bambu 7,500.00 22,500.00
1.0000 M1 Pembesian 16,227.72 16,227.72
1.0000 M1 Bekisting+Bongkar Cetakan 13,846.60 13,846.60
1.0000 M1 Pengecoran 11,046.60 11,046.60
Jumlah 290,832.17 41,120.92 331,953.09 331,953.09
Dibulatkan 331,900.00 331,900.00

1 M1 BALOK GANTUNG BETON BERTULANG 20/40 ( 6 - 16" + 4 -12 "+ 8" -15)
0.1980 M1 Papan Randu 3/20 360,000.00 71,280.00
0.0650 Kg Paku Biasa 2 '' - 5 '' 17,500.00 1,137.50
0.5739 Ljr Besi Beton Polos Besi 16 SNI 180,000.00 103,304.35
0.4870 Ljr Besi Beton Polos Besi 12 SNI 90,000.00 43,826.09
0.8826 Ljr Besi Beton Polos Besi 8 SNI 40,000.00 35,304.35
0.2000 Kg Kawat Beton 17,500.00 3,500.00
0.6560 Zak PC @ 40 Kg Gresik 52,000.00 34,112.00
0.0656 M3 Kerikil Pecah Mesin 165,000.00 10,824.00
0.0416 M3 Pasir Cor 100,000.00 4,160.00
0.0096 Btg Kayu 4/6 3,500,000.00 33,600.00
3.0000 Btg Bambu 7,500.00 22,500.00
1.0000 M1 Pembesian 27,890.22 27,890.22
1.0000 M1 Bekisting+Bongkar Cetakan 19,277.63 19,277.63
1.0000 M1 Pengecoran 14,728.80 14,728.80
Jumlah 363,548.28 61,896.64 425,444.93 425,444.93
Dibulatkan 425,400.00 425,400.00

1 M2 PLESTERAN 1 : 3
0.2000 Zak PC @ 40 Kg 52,000.00 10,400.00
0.0194 M3 Pasir Pasang 100,000.00 1,940.00
0.2000 Org Pekerja 37,500.00 7,500.00
0.0600 Org Tukang Batu 55,000.00 3,300.00
0.0120 Org Kepala Tukang 50,000.00 600.00
0.0120 Org Mandor 60,000.00 720.00
Jumlah 12,340.00 12,120.00 24,460.00 24,460.00
Dibulatkan 24,400.00 24,400.00

1 M2 PLESTERAN 1 : 4
0.1600 Zak PC @ 40 Kg 52,000.00 8,320.00
0.0210 M3 Pasir Pasang 100,000.00 2,100.00
0.2000 Org Pekerja 37,500.00 7,500.00
0.0600 Org Tukang Batu 55,000.00 3,300.00
0.0120 Org Kepala Tukang 50,000.00 600.00
0.0120 Org Mandor 60,000.00 720.00
Jumlah 10,420.00 12,120.00 22,540.00 22,540.00
Dibulatkan 22,500.00 22,500.00

1 M2 PLESTERAN 1 : 3 : 10
0.0700 Zak PC @ 40 Kg 52,000.00 3,640.00
0.0070 M3 Kapur 400,000.00 2,800.00
0.0300 M3 Pasir Pasang 100,000.00 3,000.00
0.2000 Org Pekerja 37,500.00 7,500.00
0.0600 Org Tukang Batu 55,000.00 3,300.00
0.0120 Org Kepala Tukang 50,000.00 600.00
0.0120 Org Mandor 60,000.00 720.00
Jumlah 9,440.00 12,120.00 21,560.00 21,560.00
Dibulatkan 21,500.00 21,500.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 M' BENANGAN 1 : 2
0.0086 Zak PC @ 40 Kg 52,000.00 447.20
0.0010 M3 Pasir Pasang 100,000.00 100.00
0.0500 Org Pekerja 37,500.00 1,875.00
0.0700 Org Tukang Batu 55,000.00 3,850.00
0.0065 Org Kepala Tukang 50,000.00 325.00
0.0065 Org Mandor 60,000.00 390.00
Jumlah 547.20 6,440.00 6,987.20 6,987.20
Dibulatkan 6,900.00 6,900.00

1 M' KOL - KOLAN 1 : 3


0.0086 Zak PC @ 40 Kg 52,000.00 447.20
0.0010 M3 Pasir Pasang 100,000.00 100.00
0.0600 Org Pekerja 37,500.00 2,250.00
0.0400 Org Tukang Batu 55,000.00 2,200.00
0.0065 Org Kepala Tukang 50,000.00 325.00
0.0065 Org Mandor 60,000.00 390.00
Jumlah 547.20 5,165.00 5,712.20 5,712.20
Dibulatkan 5,700.00 5,700.00

1 M' BAN - BANAN GENTENG


0.1000 Zak PC @ 40 Kg 52,000.00 5,200.00
0.0085 M3 Pasir Pasang 100,000.00 850.00
0.2400 Org Pekerja 37,500.00 9,000.00
0.1000 Org Tukang Batu 55,000.00 5,500.00
0.0210 Org Kepala Tukang 50,000.00 1,050.00
0.0150 Org Mandor 60,000.00 900.00
Jumlah 6,050.00 16,450.00 22,500.00 22,500.00
Dibulatkan 22,500.00 22,500.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 M2 SETRIKAN / SIARAN 1 : 3
0.1320 Zak PC @ 40 Kg 52,000.00 6,864.00
0.0090 M3 Pasir Pasang 100,000.00 900.00
0.3600 Org Pekerja 37,500.00 13,500.00
0.1200 Org Tukang Batu 55,000.00 6,600.00
0.0120 Org Kepala Tukang 50,000.00 600.00
0.0180 Org Mandor 60,000.00 1,080.00
Jumlah 7,764.00 21,780.00 29,544.00
Dibulatkan 29,500.00

1 M3 KUDA-KUDA DAN GORDING (KAMPER )


1.1000 M3 Kayu Balok Kamper 6,000,000.00 6,600,000.00
0.8000 Kg Paku 17,500.00 14,000.00
6.0000 Org Pekerja 37,500.00 225,000.00
13.0000 Org Tukang Kayu 55,000.00 715,000.00
1.5000 Org Kepala Tukang 50,000.00 75,000.00
0.7000 Org Mandor 60,000.00 42,000.00
Jumlah 6,600,000.00 1,057,000.00 7,657,000.00 7,657,000.00
Dibulatkan 7,657,000.00 7,657,000.00

1 M3 KUDA-KUDA DAN GORDING ( MERANTI )


1.1000 M3 Kayu Balok Meranti 4,300,000.00 4,730,000.00
0.8000 Kg Paku 17,500.00 14,000.00
5.0000 Org Pekerja 37,500.00 187,500.00
11.0000 Org Tukang Kayu 55,000.00 605,000.00
1.1000 Org Kepala Tukang 50,000.00 55,000.00
0.5000 Org Mandor 60,000.00 30,000.00
Jumlah 4,730,000.00 877,500.00 5,607,500.00 5,607,500.00
Dibulatkan 5,607,500.00 5,607,500.00

1 M3 KUDA-KUDA DAN GORDING ( BENGKIRAI )


1.1000 M3 Kayu Balok Bengkirai 4,000,000.00 4,400,000.00
8.0000 Org Pekerja 37,500.00 300,000.00
24.0000 Org Tukang Kayu 55,000.00 1,320,000.00
2.4000 Org Kepala Tukang 50,000.00 120,000.00
0.4000 Org Mandor 60,000.00 24,000.00
Jumlah 4,400,000.00 1,764,000.00 6,164,000.00
Dibulatkan 6,164,000.00

1 M2 PASANG USUK DAN RENG ( KRUING )


0.0077 M3 Kayu Usuk Kruing 5/7 4,500,000.00 34,650.00
0.0045 M3 Kayu Kruing 2/3 4,500,000.00 20,250.00
0.1500 Kg Paku Usuk 17,500.00 2,625.00
0.1000 Kg Paku Reng 17,500.00 1,750.00
0.1500 Org Pekerja 37,500.00 5,625.00
0.1000 Org Tukang Kayu 55,000.00 5,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0050 Org Mandor 60,000.00 300.00
Jumlah 59,275.00 11,925.00 71,200.00 71,200.00
Dibulatkan 71,200.00 71,200.00

1 M2 PASANG USUK DAN RENG ( KRUING )


0.0077 M3 Kayu Usuk Kruing 5/7 4,500,000.00 34,650.00
0.0045 M3 Kayu Kruing 3/5 4,500,000.00 20,250.00
0.1500 Kg Paku Usuk 17,500.00 2,625.00
0.1000 Kg Paku Reng 17,500.00 1,750.00
0.1500 Org Pekerja 37,500.00 5,625.00
0.1000 Org Tukang Kayu 55,000.00 5,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0050 Org Mandor 60,000.00 300.00
Jumlah 59,275.00 11,925.00 71,200.00
Dibulatkan 71,200.00

1 M2 PASANG USUK ( KRUING )


0.0077 M3 Kayu Usuk Kruing 5/7 4,500,000.00 34,650.00
0.1500 Kg Paku Usuk 17,500.00 2,625.00
0.1050 Org Pekerja 37,500.00 3,937.50
0.0700 Org Tukang Kayu 55,000.00 3,850.00
0.0070 Org Kepala Tukang 50,000.00 350.00
0.0035 Org Mandor 60,000.00 210.00
Jumlah 37,275.00 8,347.50 45,622.50
Dibulatkan 45,600.00

1 M2 PASANG RENG ( KRUING ) (0.0033/0.011)


0.0033 M3 Kayu Reng Kruing 2/3 4,500,000.00 14,850.00
0.1000 Kg Paku Reng 17,500.00 1,750.00
0.0450 Org Pekerja 37,500.00 1,687.50
0.0300 Org Tukang Kayu 55,000.00 1,650.00
0.0030 Org Kepala Tukang 50,000.00 150.00
0.0015 Org Mandor 60,000.00 90.00
Jumlah 16,600.00 3,577.50 20,177.50
Dibulatkan 20,100.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 M2 PASANG RENG ( KRUING )


0.0045 M3 Kayu Reng Kruing 3/5 4,500,000.00 20,250.00
0.1000 Kg Paku Reng 17,500.00 1,750.00
0.0450 Org Pekerja 37,500.00 1,687.50
0.0300 Org Tukang Kayu 55,000.00 1,650.00
0.0030 Org Kepala Tukang 50,000.00 150.00
0.0015 Org Mandor 60,000.00 90.00
Jumlah 22,000.00 3,577.50 25,577.50
Dibulatkan 25,500.00

1 M2 PASANG USUK DAN RENG ( MERANTI )


0.0077 M3 Kayu Usuk Meranti 5/7 4,300,000.00 33,110.00
0.0036 M3 Kayu Reng Meranti 2/3 4,250,000.00 15,300.00
0.1500 Kg Paku Usuk 17,500.00 2,625.00
0.1000 Kg Paku Reng 17,500.00 1,750.00
0.1500 Org Pekerja 37,500.00 5,625.00
0.1000 Org Tukang Kayu 55,000.00 5,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0050 Org Mandor 60,000.00 300.00
Jumlah 52,785.00 11,925.00 64,710.00 64,710.00
Dibulatkan 64,700.00 64,700.00

1 M2 PASANG USUK DAN RENG ( MERANTI )


0.0077 M3 Kayu Usuk Meranti 5/7 4,300,000.00 33,110.00
0.0090 M3 Kayu Reng Meranti 3/5 4,250,000.00 38,250.00
0.1500 Kg Paku Usuk 17,500.00 2,625.00
0.1000 Kg Paku Reng 17,500.00 1,750.00
0.1500 Org Pekerja 37,500.00 5,625.00
0.1000 Org Tukang Kayu 55,000.00 5,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0050 Org Mandor 60,000.00 300.00
Jumlah 75,735.00 11,925.00 87,660.00 87,660.00
Dibulatkan 87,600.00 87,600.00

1 M2 PASANG USUK ( MERANTI )


0.0077 M3 Kayu Usuk Meranti 5/7 4,250,000.00 32,725.00
0.1500 Kg Paku Usuk 17,500.00 2,625.00
0.1050 Org Pekerja 37,500.00 3,937.50
0.0700 Org Tukang Kayu 55,000.00 3,850.00
0.0070 Org Kepala Tukang 50,000.00 350.00
0.0035 Org Mandor 60,000.00 210.00
Jumlah 35,350.00 8,347.50 43,697.50
Dibulatkan 43,600.00

1 M2 PASANG RENG ( MERANTI )


0.0033 M3 Kayu Reng Meranti 2/3 4,250,000.00 14,025.00
0.1000 Kg Paku Reng 17,500.00 1,750.00
0.0450 Org Pekerja 37,500.00 1,687.50
0.0300 Org Tukang Kayu 55,000.00 1,650.00
0.0030 Org Kepala Tukang 50,000.00 150.00
0.0015 Org Mandor 60,000.00 90.00
Jumlah 15,775.00 3,577.50 19,352.50
Dibulatkan 19,300.00

1 M2 PASANG RENG ( MERANTI )


0.0045 M3 Kayu Reng Meranti 3/5 4,250,000.00 19,125.00
0.1000 Kg Paku Reng 17,500.00 1,750.00
0.0450 Org Pekerja 37,500.00 1,687.50
0.0300 Org Tukang Kayu 55,000.00 1,650.00
0.0030 Org Kepala Tukang 50,000.00 150.00
0.0015 Org Mandor 60,000.00 90.00
Jumlah 20,875.00 3,577.50 24,452.50
Dibulatkan 24,400.00

1 M2 PASANG USUK LAMA RENG KRUING 2/3


0.0033 M3 Kayu Kruing 2/3 4,500,000.00 14,850.00
0.2500 Kg Paku 17,500.00 4,375.00
0.1500 Org Pekerja 37,500.00 5,625.00
0.1000 Org Tukang Kayu 55,000.00 5,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0050 Org Mandor 60,000.00 300.00
Jumlah 19,225.00 11,925.00 31,150.00
Dibulatkan 31,100.00

1 M2 PASANG USUK 5/7 KRUING, RENG KRUING 3/5


0.0077 M3 Kayu Usuk Kruing 5/7 5,500,000.00 42,350.00
0.0045 M3 Kayu Kruing 3/5 5,500,000.00 24,750.00
0.2500 Kg Paku 17,500.00 4,375.00
0.1500 Org Pekerja 37,500.00 5,625.00
0.1000 Org Tukang Kayu 55,000.00 5,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0050 Org Mandor 60,000.00 300.00
Jumlah 71,475.00 11,925.00 83,400.00
Dibulatkan 83,400.00

1 M2 PASANG USUK LAMA RENG KRUING 3/5


0.0045 M3 Kayu Kruing 3/5 5,500,000.00 24,750.00
0.2500 Kg Paku 17,500.00 4,375.00
0.1500 Org Pekerja 37,500.00 5,625.00
0.1000 Org Tukang Kayu 55,000.00 5,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0050 Org Mandor 60,000.00 300.00
Jumlah 29,125.00 11,925.00 41,050.00
Dibulatkan 41,000.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 M1 PASANG PAPAN REUTER 2/20 MERANTI


0.0040 M3 Papan Meranti Klas II 4,000,000.00 16,000.00
0.0200 Kg Paku 17,500.00 350.00
0.0200 Org Pekerja 37,500.00 750.00
0.0500 Org Tukang Kayu 55,000.00 2,750.00
0.0060 Org Kepala Tukang 50,000.00 300.00
0.0070 Org Mandor 60,000.00 420.00
Jumlah 16,350.00 4,220.00 20,570.00 20,570.00
Dibulatkan 20,500.00 20,500.00

1 M LISPLANK MERANTI 3/25 CM


0.0083 M3 Papan Meranti 4,500,000.00 37,125.00
0.0500 Kg Paku 17,500.00 875.00
0.1500 Org Pekerja 37,500.00 5,625.00
0.2500 Org Tukang Kayu 55,000.00 13,750.00
0.0400 Org Kepala Tukang 50,000.00 2,000.00
0.0140 Org Mandor 60,000.00 840.00
Jumlah 38,000.00 22,215.00 60,215.00 60,215.00
Dibulatkan 60,200.00 60,200.00

1 M LISPLANK KAMPER 3/25 CM


0.0083 M3 Papan Kamper 6,000,000.00 49,500.00
0.0500 Kg Paku 17,500.00 875.00
0.2000 Org Pekerja 37,500.00 7,500.00
0.2500 Org Tukang Kayu 55,000.00 13,750.00
0.0800 Org Kepala Tukang 50,000.00 4,000.00
0.0140 Org Mandor 60,000.00 840.00
Jumlah 50,375.00 26,090.00 76,465.00 76,465.00
Dibulatkan 76,400.00 76,400.00

1 M1 PAPAN KOMPRES 3/10 KAMPER LAPIS SENG


0.0033 M3 Papan Kamper 6,000,000.00 19,800.00
0.5500 M1 Seng Lebar 30 33,000.00 18,150.00
0.1000 Kg Paku 17,500.00 1,750.00
0.2000 Org Pekerja 37,500.00 7,500.00
0.2500 Org Tukang Kayu 55,000.00 13,750.00
0.0800 Org Kepala Tukang 50,000.00 4,000.00
0.0140 Org Mandor 60,000.00 840.00
Jumlah 39,700.00 26,090.00 65,790.00 65,790.00
Dibulatkan 65,700.00 65,700.00

1 M1 PAPAN KOMPRES 3/10 MERANTI LAPIS SENG


0.0033 M3 Papan Kamper 4,500,000.00 14,850.00
0.5500 M1 Seng Lebar 30 33,000.00 18,150.00
0.1000 Kg Paku 17,500.00 1,750.00
0.2000 Org Pekerja 37,500.00 7,500.00
0.2500 Org Tukang Kayu 55,000.00 13,750.00
0.0800 Org Kepala Tukang 50,000.00 4,000.00
0.0140 Org Mandor 60,000.00 840.00
Jumlah 34,750.00 26,090.00 60,840.00 60,840.00
Dibulatkan 60,800.00 60,800.00
1 M1 LISPLANK 3/25, PAPAN KOMPRES 3/10 KAMPER
0.0116 M3 Papan Kamper 6,000,000.00 69,300.00
0.1000 Kg Paku 17,500.00 1,750.00
0.2800 Org Pekerja 37,500.00 10,500.00
0.8000 Org Tukang Kayu 55,000.00 44,000.00
0.0800 Org Kepala Tukang 50,000.00 4,000.00
0.0140 Org Mandor 60,000.00 840.00
Jumlah 71,050.00 59,340.00 130,390.00
Dibulatkan 130,300.00

1 M2 LISPLANK / PAPAN KOMPRES KAMPER TEBAL 2 CM


0.0220 M3 Papan Kamper 6,000,000.00 132,000.00
0.1000 Kg Paku 17,500.00 1,750.00
0.2800 Org Pekerja 37,500.00 10,500.00
0.8000 Org Tukang Kayu 55,000.00 44,000.00
0.0800 Org Kepala Tukang 50,000.00 4,000.00
0.0140 Org Mandor 60,000.00 840.00
Jumlah 133,750.00 59,340.00 193,090.00
Dibulatkan 193,000.00

1 M2 LISPLANK / PAPAN KOMPRES KRUING TEBAL 3 CM


0.0330 M3 Papan Kruing 5,500,000.00 181,500.00
0.1000 Kg Paku 17,500.00 1,750.00
0.2800 Org Pekerja 37,500.00 10,500.00
0.8000 Org Tukang Kayu 55,000.00 44,000.00
0.0800 Org Kepala Tukang 50,000.00 4,000.00
0.0140 Org Mandor 60,000.00 840.00
Jumlah 183,250.00 59,340.00 242,590.00
Dibulatkan 242,500.00

1 M2 LISPLANK / PAPAN KOMPRES MERANTI TEBAL 3 CM


0.0330 M3 Papan Meranti 4,500,000.00 148,500.00
0.1000 Kg Paku 17,500.00 1,750.00
0.2800 Org Pekerja 37,500.00 10,500.00
0.8000 Org Tukang Kayu 55,000.00 44,000.00
0.0800 Org Kepala Tukang 50,000.00 4,000.00
0.0140 Org Mandor 60,000.00 840.00
Jumlah 150,250.00 59,340.00 209,590.00
Dibulatkan 209,500.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 M1 LISPLANK / PAPAN KOMPRES MERANTI TEBAL 2,5 CM


0.0275 M3 Papan Meranti 4,500,000.00 123,750.00
0.1000 Kg Paku 17,500.00 1,750.00
0.2800 Org Pekerja 37,500.00 10,500.00
0.8000 Org Tukang Kayu 55,000.00 44,000.00
0.0800 Org Kepala Tukang 50,000.00 4,000.00
0.0140 Org Mandor 60,000.00 840.00
Jumlah 125,500.00 59,340.00 184,840.00
Dibulatkan 184,800.00

1 M2 LISPLANK / PAPAN KOMPRES MERANTI TEBAL 2 CM


0.0220 M3 Papan Meranti 4,500,000.00 99,000.00
0.1000 Kg Paku 17,500.00 1,750.00
0.2800 Org Pekerja 37,500.00 10,500.00
0.8000 Org Tukang Kayu 55,000.00 44,000.00
0.0800 Org Kepala Tukang 50,000.00 4,000.00
0.0140 Org Mandor 60,000.00 840.00
Jumlah 100,750.00 59,340.00 160,090.00
Dibulatkan 160,000.00

1 M2 LISPLANK / PAPAN KOMPRES LAMA


0.1000 Kg Paku 17,500.00 1,750.00
0.2800 Org Pekerja 37,500.00 10,500.00
0.8000 Org Tukang Kayu 55,000.00 44,000.00
0.0800 Org Kepala Tukang 50,000.00 4,000.00
0.0140 Org Mandor 60,000.00 840.00
Jumlah 1,750.00 59,340.00 61,090.00
Dibulatkan 61,000.00

1 SET PASANG BAUT BEUGEL / KAWEL / U PLAT / PLAT GAPIT


1.0000 Set Baut Beugel/Kawel/Plat Gapit 60,000.00 60,000.00
0.0502 Org Tukang Kayu 55,000.00 2,761.00
Jumlah 60,000.00 2,761.00 62,761.00 62,761.00
Dibulatkan 62,700.00 62,700.00

1 M' SPESI PEREKAT BUBUNGAN


0.5080 m3 Semen Merah 200,000.00 101,600.00
0.5080 m3 Kapur Bubuk 400,000.00 203,200.00
0.5080 m3 Pasir Pasang 100,000.00 50,800.00
Jumlah 355,600.00 - 355,600.00
1 M' Perekat Bubung 10,668.00
Dibulatkan 10,600.00

1 M2 PASANG GENTENG FLAME PRESS


25.0000 Bj Genteng Flame Press 2,750.00 68,750.00
0.2000 Org Pekerja 37,500.00 7,500.00
0.1000 Org Tukang Batu 55,000.00 5,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0100 Org Mandor 60,000.00 600.00
Jumlah 68,750.00 14,100.00 82,850.00
Dibulatkan 82,800.00

1 M' PASANG BUBUNG FLAME PRESS


3.5000 Bj Bubung Flame Press 3,500.00 12,250.00
1.0000 M' Perekat Bubung 10,600.00 10,600.00
0.2000 Org Pekerja 37,500.00 7,500.00
0.1000 Org Tukang Batu 55,000.00 5,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0100 Org Mandor 60,000.00 600.00
Jumlah 22,850.00 14,100.00 36,950.00
Dibulatkan 36,900.00

1 M2 PASANG GENTENG LAMA


0.2000 Org Pekerja 37,500.00 7,500.00
0.1000 Org Tukang Batu 55,000.00 5,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0100 Org Mandor 60,000.00 600.00
Jumlah - 14,100.00 14,100.00
Dibulatkan 14,100.00

1 M2 PASANG GENTENG KARANG PILANG EX.AMBULU


25.0000 Bj Genteng Karang Pilang Bima Ambulu 3,250.00 81,250.00
0.2000 Org Pekerja 37,500.00 7,500.00
0.1000 Org Tukang Batu 55,000.00 5,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0100 Org Mandor 60,000.00 600.00
Jumlah 81,250.00 14,100.00 95,350.00
Dibulatkan 95,300.00

1 M' PASANG BUBUNG KARANG PILANG EX.AMBULU


3.5000 Bj Bubung Karang Pilang Bima Ambulu 9,000.00 31,500.00
1.0000 M' Perekat Bubung 10,600.00 10,600.00
0.2000 Org Pekerja 37,500.00 7,500.00
0.1000 Org Tukang Batu 55,000.00 5,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0100 Org Mandor 60,000.00 600.00
Jumlah 42,100.00 14,100.00 56,200.00
Dibulatkan 56,200.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 M2 PASANG GENTENG KARANG PILANG LOKAL


25.0000 Bj Genteng Karang Pilang Lokal 2,500.00 62,500.00
0.1000 Org Pekerja 37,500.00 3,750.00
0.0400 Org Tukang Batu 55,000.00 2,200.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0100 Org Mandor 60,000.00 600.00
Jumlah 62,500.00 7,050.00 69,550.00 69,550.00
Dibulatkan 69,500.00 69,500.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 M' PASANG BUBUNG KARANG PILANG LOKAL


3.5000 Bj Bubung Karang Pilang Lokal 5,500.00 19,250.00
0.1500 Zak PC @ 40 Kg 52,000.00 7,800.00
0.0320 M3 Pasir 100,000.00 3,200.00
0.2500 Org Pekerja 37,500.00 9,375.00
0.1000 Org Tukang Batu 55,000.00 5,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0100 Org Mandor 60,000.00 600.00
Jumlah 30,250.00 15,975.00 46,225.00 46,225.00
Dibulatkan 46,200.00 46,200.00

1 M2 PASANG GENTENG BETON BESAR "BETON MAS"


9.0000 Bj Genteng Beton Besar "Beton Mas" 7,000.00 63,000.00
0.4000 Org Pekerja 37,500.00 15,000.00
0.2000 Org Tukang Batu 55,000.00 11,000.00
0.0200 Org Kepala Tukang 50,000.00 1,000.00
0.0200 Org Mandor 60,000.00 1,200.00
Jumlah 63,000.00 28,200.00 91,200.00
Dibulatkan 91,200.00

1 M' PASANG BUBUNG BETON BESAR "BETON MAS"


3.5000 Bj Bubung "Beton Mas" 10,000.00 35,000.00
1.0000 M' Perekat Bubung 100,000.00 100,000.00
0.2000 Org Pekerja 37,500.00 7,500.00
0.1000 Org Tukang Batu 55,000.00 5,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0100 Org Mandor 60,000.00 600.00
Jumlah 135,000.00 14,100.00 149,100.00
Dibulatkan 149,100.00

1 M2 PASANG GENTENG BETON TANGGUNG "MODEL MONIER"


11.0000 Bj Genteng Beton Tanggung "Model Monie 3,200.00 35,200.00
0.2000 Org Pekerja 37,500.00 7,500.00
0.1000 Org Tukang Batu 55,000.00 5,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0100 Org Mandor 60,000.00 600.00
Jumlah 35,200.00 14,100.00 49,300.00
Dibulatkan 49,300.00

1 M2 PASANG GENTENG BETON TANGGUNG "MODEL TAIWAN"


11.0000 Bj Genteng Beton Tanggung "Model Taiwa 4,500.00 49,500.00
0.2000 Org Pekerja 37,500.00 7,500.00
0.1000 Org Tukang Batu 55,000.00 5,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0100 Org Mandor 60,000.00 600.00
Jumlah 49,500.00 14,100.00 63,600.00
Dibulatkan 63,600.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 M2 PASANG ASBES GELOMBANG BESAR UK. 180 X 115 X 0,5 CM


0.3158 Lbr Asbes Gelombang Besar 105,000.00 33,157.89
4.0000 Bh Paku Skrup / Sumbat 500.00 2,000.00
0.1000 Org Pekerja 37,500.00 3,750.00
0.2000 Org Tukang Kayu 55,000.00 11,000.00
0.0200 Org Kepala Tukang 50,000.00 1,000.00
0.0050 Org Mandor 60,000.00 300.00
Jumlah 35,157.89 16,050.00 51,207.89 51,207.89
Dibulatkan 51,200.00 51,200.00

1 M' PASANG BUBUNGAN ASBES GELOMBANG BESAR


0.4000 Bh Bubungan Asbes Gelombang Besar 105,000.00 42,000.00
4.0000 Bh Paku Skrup / Sumbat 500.00 2,000.00
0.2500 Org Pekerja 37,500.00 9,375.00
0.2500 Org Tukang Kayu 55,000.00 13,750.00
0.0250 Org Kepala Tukang 50,000.00 1,250.00
Jumlah 44,000.00 24,375.00 68,375.00 68,375.00
Dibulatkan 68,300.00 68,300.00

1 M2 PASANG KEMBALI ASBES GELOMBANG LAMA


4.0000 Bh Paku Skrup / Sumbat 500.00 2,000.00
0.1000 Org Pekerja 37,500.00 3,750.00
0.2000 Org Tukang Kayu 55,000.00 11,000.00
0.0200 Org Kepala Tukang 50,000.00 1,000.00
0.0050 Org Mandor 60,000.00 300.00
Jumlah 2,000.00 16,050.00 18,050.00
Dibulatkan 18,000.00

1 M2 PASANG ASBES GELOMBANG KECIL UK. 180 X 105 X 0,4 CM


0.7500 Lbr Asbes Gelombang Besar - -
4.0000 Bh Paku Skrup / Sumbat 500.00 2,000.00
0.1000 Org Pekerja 37,500.00 3,750.00
0.2000 Org Tukang Kayu 55,000.00 11,000.00
0.0200 Org Kepala Tukang 50,000.00 1,000.00
0.0050 Org Mandor 60,000.00 300.00
Jumlah 2,000.00 16,050.00 18,050.00 18,050.00
Dibulatkan 18,000.00 18,000.00

1 M' PASANG BUBUNGAN ASBES GELOMBANG KECIL


1.0000 Bh Bubungan Asbes Gelombang Kecil 34,500.00 34,500.00
4.0000 Bh Paku Skrup / Sumbat 500.00 2,000.00
0.2500 Org Pekerja 37,500.00 9,375.00
0.2500 Org Tukang Kayu 55,000.00 13,750.00
0.0250 Org Kepala Tukang 50,000.00 1,250.00
Jumlah 36,500.00 24,375.00 60,875.00
Dibulatkan 60,800.00

1 M' PASANG KEMBALI BUBUNGAN ASBES GELOMBANG


4.0000 Bh Paku Skrup / Sumbat 500.00 2,000.00
0.2500 Org Pekerja 37,500.00 9,375.00
0.2500 Org Tukang Kayu 55,000.00 13,750.00
0.0250 Org Kepala Tukang 50,000.00 1,250.00
Jumlah 2,000.00 24,375.00 26,375.00
Dibulatkan 26,300.00

1 M2 PASANG SENG GELOMBANG BJLS 30 UK 180 X 80 CM


0.7500 Lbr Seng Gelombang BJLS 30 64,500.00 48,375.00
4.0000 Bh Paku Skrup / Sumbat 500.00 2,000.00
0.1000 Org Pekerja 37,500.00 3,750.00
0.2000 Org Tukang Batu 55,000.00 11,000.00
0.0200 Org Kepala Tukang 50,000.00 1,000.00
0.0050 Org Mandor 60,000.00 300.00
Jumlah 50,375.00 16,050.00 66,425.00
Dibulatkan 66,400.00
1 M2 PASANG RANGKA LANTAI BAJA
10.0000 Btg Besi I WF 250 4,437,500.00 44,375,000.00
25.0000 Btg Besi C NP 125 #REF! #REF!
3.0000 dos Electroda, dll 125,000.00 375,000.00
18.0000 Org Pekerja 37,500.00 675,000.00
12.0000 Org Tukang Besi 45,000.00 540,000.00
3.0000 Org Kepala Tukang 50,000.00 150,000.00
1.0000 Org Mandor 60,000.00 60,000.00
Jumlah #REF! 1,425,000.00 #REF! #REF!
Dibulatkan #REF! #REF!
#REF!

1 M2 PASANG RANGKA LANTAI BAJA


10.0000 Btg Besi I WF 200 3,200,000.00 32,000,000.00
25.0000 Btg Besi C NP 100 #REF! #REF!
3.0000 dos Electroda, dll 125,000.00 375,000.00
18.0000 Org Pekerja 37,500.00 675,000.00
12.0000 Org Tukang Besi 45,000.00 540,000.00
3.0000 Org Kepala Tukang 50,000.00 150,000.00
1.0000 Org Mandor 60,000.00 60,000.00
Jumlah #REF! 1,425,000.00 #REF! #REF!
Dibulatkan #REF! #REF!
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 M2 PASANG ATAP GALVALUM 30


1.4286 M1 Galvalume 47,500.00 67,857.14
6.0000 Bh Paku Skrup / Sumbat 500.00 3,000.00
0.1000 Org Pekerja 37,500.00 3,750.00
0.1200 Org Tukang Besi 55,000.00 6,600.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0050 Org Mandor 60,000.00 300.00
Jumlah 70,857.14 11,150.00 82,007.14 82,007.14
Dibulatkan 82,000.00 82,000.00

1 M' PASANG BUBUNGAN ATAP GALVALUME BJLS 30


1.0000 Lbr Plat Seng BJLS 20 Lebar 60 47,500.00 47,500.00
6.0000 Bh Paku Skrup / Sumbat 500.00 3,000.00
0.1000 Org Pekerja 37,500.00 3,750.00
0.1000 Org Tukang Batu 55,000.00 5,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0050 Org Mandor 60,000.00 300.00
Jumlah 50,500.00 10,050.00 60,550.00 60,550.00
Dibulatkan 60,500.00 60,500.00

1 M' PASANG TALANG DATAR GALVALUM BJLS 35 LEBAR 90 CM


0.5000 Ls Pangkon siku 4x4 75,000.00 37,500.00
1.0000 M' Talang galvalum 48,000.00 48,000.00
0.1000 Kg Elektroda 30,000.00 3,000.00
1.0000 Ls Peralatan 13,275.00 13,275.00
0.4000 Org Pekerja 37,500.00 15,000.00
0.8000 Org Tukang Las 55,000.00 44,000.00
0.2000 Org Kepala Tukang 50,000.00 10,000.00
0.1000 Org Mandor 60,000.00 6,000.00
Jumlah 101,775.00 75,000.00 176,775.00 176,775.00
Dibulatkan 176,700.00 176,700.00

6 M' PASANG REGGEL SIKU & BESI 12 Lbr 50CM


2.1700 Ljr Canal C 125 185,000.00 401,450.00
1.6667 Ljr Besi beton 12 90,000.00 150,000.00
0.2500 Kg Elektroda 30,000.00 7,500.00
1.0000 Ls Peralatan 27,947.50 27,947.50
3.0000 Org Pekerja 37,500.00 112,500.00
6.0000 Org Tukang Las 45,000.00 270,000.00
1.0000 Org Kepala Tukang 50,000.00 50,000.00
0.5000 Org Mandor 60,000.00 30,000.00
6 M' Pasang reggel Jumlah 586,897.50 462,500.00 1,049,397.50
1 M' Pasang reggel 174,899.58 174,899.58
Dibulatkan 174,800.00 174,800.00

1 M' TALANG TEGAK PVC 4" MASPIONS D


1.0000 M' PVC 4" 17,500.00 17,500.00
0.5000 Bh Klem 3,300.00 1,650.00
0.0500 Bh Lem PVC 10,000.00 500.00
0.1500 Org Tukang 55,000.00 8,250.00
Jumlah 19,650.00 8,250.00 27,900.00 27,900.00
Dibulatkan 27,900.00 27,900.00

10 M' TALANG KOTAK PVC "MASPION"


10.0000 M' Talang Kotak PVC "Maspion" 12,500.00 125,000.00
11.0000 Bj Hak Penggantung Talang 5,500.00 60,500.00
2.0000 Bj Sambungan PVC Tanpa Lubang 6,800.00 13,600.00
2.0000 Bj Sambungan PVC Dengan Lubang 20,600.00 41,200.00
2.0000 Bj Tutup Samping PVC 6,800.00 13,600.00
2.0000 Bh Lem PVC 10,000.00 20,000.00
1.0000 M' PVC 2 1/2" 10,000.00 10,000.00
0.2000 Kg Paku 17,500.00 3,500.00
1.2000 Org Pekerja 37,500.00 45,000.00
1.8000 Org Tukang Kayu 55,000.00 99,000.00
0.1800 Org Kepala Tukang 50,000.00 9,000.00
10 M' Pasang Talang Kotak PVC "Maspion" 287,400.00 153,000.00 287,400.00
1 M' Pasang Talang Kotak PVC "Maspion" 28,740.00 28,740.00
Dibulatkan 28,700.00 28,700.00
1 M2 PASANG RANGKA PLAFOND + CALSIBOARD / GYPSUM
0.0109 M3 Balok Meranti Klas II 4,300,000.00 46,827.00
3 1.0000 M2 Calsiboard 21,500.00 21,500.00 64,500.00
0.1000 Kg Paku 17,500.00 1,750.00
0.0200 Kg Paku Gypsum 25,000.00 500.00
0.1000 Org Pekerja 37,500.00 3,750.00
0.2000 Org Tukang Kayu 55,000.00 11,000.00
0.0200 Org Kepala Tukang 50,000.00 1,000.00
0.0140 Org Mandor 60,000.00 840.00
Jumlah 70,577.00 16,590.00 87,167.00 87,167.00
Dibulatkan 87,100.00 87,100.00
1 M2 PASANG RANGKA HOLLOW + CALSIBOARD / GYPSUM
0.0109 M3 Balok Meranti Klas II - -
3 1.0000 M2 Calsiboard - - -
0.1000 Kg Paku 600.00 60.00
0.0200 Kg Paku Gypsum - -
0.1000 Org Pekerja 165,000.00 16,500.00
0.2000 Org Tukang Kayu 100,000.00 20,000.00
0.0200 Org Kepala Tukang - -
0.0140 Org Mandor - -
Jumlah 60.00 36,500.00 36,560.00 36,560.00
Dibulatkan 36,500.00 36,500.00
1 M2 PASANG RANGKA PLAFOND + ETERNIT KERANG / JANGKAR
1.0000 M2 Rangka hollo 4x4 40,000.00 40,000.00
0.34722 M2 Calsiboard 79,000.00 27,430.56
0.1000 Kg Paku 17,500.00 1,750.00
0.1000 Org Pekerja 37,500.00 3,750.00
0.1000 Org Tukang Kayu 55,000.00 5,500.00
0.0140 Org Mandor 60,000.00 840.00
Jumlah 69,180.56 10,090.00 79,270.56 79,270.56
Dibulatkan 79,200.00 79,200.00

1 M' PASANG LIS GYPSUM


1.0000 M1 List gypsum C9 10,500.00 10,500.00
0.0300 Kg Paku Lis 17,500.00 525.00
0.0100 Org Pekerja 37,500.00 375.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

0.0250 Org Tukang Kayu 55,000.00 1,375.00


0.0040 Org Kepala Tukang 50,000.00 200.00
0.0040 Org Mandor 60,000.00 240.00
Jumlah 11,025.00 2,190.00 13,215.00 13,215.00
Dibulatkan 13,200.00 13,200.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 M2 PASANG TEGEL KERAMIK 20/20 CAMP. 1 : 2


1.0000 M2 Keramik 25/25 55,000.00 55,000.00
0.1770 Zak PC @ 40 Kg 49,000.00 8,673.00
0.2000 Kg Semen Warna 8,000.00 1,600.00
0.0095 M3 Pasir Pasang 100,000.00 950.00
0.1500 Org Pekerja 37,500.00 5,625.00
0.1000 Org Tukang Batu 55,000.00 5,500.00
0.0230 Org Kepala Tukang 50,000.00 1,150.00
0.0200 Org Mandor 60,000.00 1,200.00
Jumlah 66,223.00 13,475.00 79,698.00 79,698.00
Dibulatkan 79,600.00 79,600.00

1 M2 PASANG KERAMIK 30/30 PUTIH POLOS CAMP 1:2


1.0000 M2 Keramik 30/30 37,500.00 37,500.00
0.1200 Zak PC @ 40 Kg 49,000.00 5,880.00
0.2000 Kg Semen Warna 8,000.00 1,600.00
0.0095 M3 Pasir Pasang 100,000.00 950.00
0.1500 Org Pekerja 37,500.00 5,625.00
0.1500 Org Tukang Batu 55,000.00 8,250.00
0.0200 Org Kepala Tukang 50,000.00 1,000.00
0.0150 Org Mandor 60,000.00 900.00
Jumlah 45,930.00 15,775.00 61,705.00 61,705.00
Dibulatkan 61,700.00 61,700.00

1 M2 PASANG KERAMIK 40/40 MOTIF CAMP. 1 : 2


1.0000 M2 Keramik 40/40 55,000.00 55,000.00
0.1770 Zak PC @ 40 Kg 49,000.00 8,673.00
0.2000 Kg Semen Warna 8,000.00 1,600.00
0.0095 M3 Pasir Pasang 100,000.00 950.00
0.1500 Org Pekerja 37,500.00 5,625.00
0.1500 Org Tukang Batu 55,000.00 8,250.00
0.0200 Org Kepala Tukang 50,000.00 1,000.00
0.0150 Org Mandor 60,000.00 900.00
Jumlah 66,223.00 15,775.00 81,998.00 81,998.00
Dibulatkan 81,900.00 81,900.00
1 M1 PASANG TEGEL KERAMIK DINDING PEMBATAS 10/20 CAMP. 1 : 2
1.0000 M2 Keramik Dinding 10/20 32,500.00 32,500.00
0.0200 Zak PC @ 40 Kg 49,000.00 980.00
0.0100 Kg Semen Warna 8,000.00 80.00
0.0050 M3 Pasir Pasang 100,000.00 500.00
0.0500 Org Pekerja 37,500.00 1,875.00
0.0500 Org Tukang Batu 55,000.00 2,750.00
0.0050 Org Kepala Tukang 50,000.00 250.00
0.0050 Org Mandor 60,000.00 300.00
Jumlah 34,060.00 5,175.00 39,235.00 39,235.00
Dibulatkan 39,200.00 39,200.00

1 M2 PASANG TEGEL KERAMIK DINDING 20/20 CAMP. 1 : 2


1.0000 M2 Keramik Dinding 20/20 55,000.00 55,000.00
0.1770 Zak PC @ 40 Kg 49,000.00 8,673.00
0.2000 Kg Semen Warna 8,000.00 1,600.00
0.0095 M3 Pasir Pasang 100,000.00 950.00
1.0000 Org Pekerja 37,500.00 37,500.00
0.5000 Org Tukang Batu 55,000.00 27,500.00
0.0500 Org Kepala Tukang 50,000.00 2,500.00
0.0500 Org Mandor 60,000.00 3,000.00
Jumlah 66,223.00 70,500.00 136,723.00 136,723.00
Dibulatkan 136,700.00 136,700.00

1 M2 PASANG TEGEL KERAMIK DINDING 20/25 CAMP. 1 : 2


1.0000 M2 Keramik Dinding 20/25 75,000.00 75,000.00
0.1200 Zak PC @ 40 Kg 49,000.00 5,880.00
0.2000 Kg Semen Warna 8,000.00 1,600.00
0.0095 M3 Pasir Pasang 100,000.00 950.00
0.3500 Org Pekerja 37,500.00 13,125.00
0.2000 Org Tukang Batu 55,000.00 11,000.00
0.0200 Org Kepala Tukang 50,000.00 1,000.00
0.0150 Org Mandor 60,000.00 900.00
Jumlah 83,430.00 26,025.00 109,455.00 109,455.00
Dibulatkan 109,400.00 109,400.00

1 M1 PASANG PLINT KERAMIK 10/30 CAMP. 1 : 2


1.0000 M1 Keramik 3,500.00 3,500.00
0.0175 Zak PC @ 40 Kg 49,000.00 857.50
0.0050 Kg Semen Warna 8,000.00 40.00
0.0050 M3 Pasir Pasang 100,000.00 500.00
0.0400 Org Pekerja 37,500.00 1,500.00
0.0400 Org Tukang Batu 55,000.00 2,200.00
0.0115 Org Kepala Tukang 50,000.00 575.00
0.0110 Org Mandor 60,000.00 660.00
Jumlah 4,897.50 4,935.00 9,832.50 9,832.50
Dibulatkan 9,800.00 9,800.00

1 M1 PASANG KERAMIK MOZAIK CAMP. 1 : 2


1.0000 M1 Keramik Mozaik 5,000.00 5,000.00
0.0050 Zak PC @ 40 Kg 49,000.00 245.00
0.0050 Kg Semen Warna 8,000.00 40.00
0.0200 Org Pekerja 37,500.00 750.00
0.0500 Org Tukang Batu 55,000.00 2,750.00
0.0020 Org Kepala Tukang 50,000.00 100.00
0.0020 Org Mandor 60,000.00 120.00
Jumlah 5,285.00 3,720.00 9,005.00 9,005.00
Dibulatkan 9,000.00 9,000.00
1 M2 PASANG PAVING STONE ABU - ABU TEBAL 6 CM
1.0000 M2 Paving Stone Abu - Abu Tebal 6 cm 47,500.00 47,500.00
0.0500 M3 Galian Tanah 29,600.00 1,480.00
0.0500 M3 Urugan Pasir 89,900.00 4,495.00
0.3600 Org Pekerja 37,500.00 13,500.00
0.1200 Org Tukang Batu 55,000.00 6,600.00
0.0120 Org Kepala Tukang 50,000.00 600.00
0.0180 Org Mandor 60,000.00 1,080.00
Jumlah 53,475.00 21,780.00 75,255.00 75,255.00
Dibulatkan 75,200.00 75,200.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 M2 PASANG PAVING STONE ABU - ABU TEBAL 8 CM


1.0000 M2 Paving Stone Abu - Abu Tebal 8 cm 50,000.00 50,000.00
0.0500 M3 Galian Tanah 29,600.00 1,480.00
0.0500 M3 Urugan Pasir 89,900.00 4,495.00
0.3600 Org Pekerja 37,500.00 13,500.00
0.1200 Org Tukang Batu 55,000.00 6,600.00
0.0120 Org Kepala Tukang 50,000.00 600.00
0.0180 Org Mandor 60,000.00 1,080.00
Jumlah 55,975.00 21,780.00 77,755.00 77,755.00
Dibulatkan 77,700.00 77,700.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 M2 PASANG ROSTER
23.0000 Bh Roster 7,500.00 172,500.00
0.0403 Zak PC @ 40 Kg 52,000.00 2,095.60
0.0060 M3 Pasir Pasang 100,000.00 600.00
0.0840 Org Pekerja 37,500.00 3,150.00
0.1200 Org Tukang Batu 55,000.00 6,600.00
0.0120 Org Kepala Tukang 50,000.00 600.00
Jumlah 175,195.60 10,350.00 185,545.60 185,545.60
Dibulatkan 185,500.00 185,500.00

1 M1 PASANG KUSEN ALUMINIUM


1.0000 M1 Kusen Aluminium 4x10 (Indal C4) 70,000.00 70,000.00
1.0000 Ls Alat Bantu 1,500.00 1,500.00
1.4000 Ls Upah Kerja 2,500.00 3,500.00
Jumlah 70,000.00 5,000.00 75,000.00 75,000.00
Dibulatkan 75,000.00 75,000.00

1 BH DAUN PINTU KACA / RANGKA ALUMINIUM


1.0000 M1 Daun Pintu Kaca Rangka Aluminium 850,000.00 850,000.00
1.0000 Bh Engsel Pintu 50,000.00 50,000.00
1.0000 Bh Doorcloser 150,000.00 150,000.00
1.0000 Bh Handel Pintu 50,000.00 50,000.00
1.0000 Bh Kunci 65,000.00 65,000.00
1.0000 Ls Alat Bantu 7,500.00 7,500.00
1.0000 Ls Upah Kerja 52,000.00 52,000.00
Jumlah 1,165,000.00 59,500.00 1,224,500.00 1,224,500.00
Dibulatkan 1,224,500.00 1,224,500.00

1 BH DAUN JENDELA KACA RANGKA ALUMINIUM


1.1000 M1 Daun Jendela Kaca Rangka Aluminium 280,000.00 308,000.00
1.0000 Ls Alat Bantu 7,500.00 7,500.00
1.0000 Ls Upah Kerja 25,000.00 25,000.00
Jumlah 308,000.00 32,500.00 340,500.00 340,500.00
Dibulatkan 340,500.00 340,500.00

1 M3 PASANG KUSEN KAMPER


1.1000 M3 Balok Kamper 6,000,000.00 6,600,000.00
0.2000 Kg Paku 17,500.00 3,500.00
9.0000 Org Pekerja 37,500.00 337,500.00
28.0000 Org Tukang Kayu 55,000.00 1,540,000.00
3.0000 Org Kepala Tukang 50,000.00 150,000.00
0.5000 Org Mandor 60,000.00 30,000.00
Jumlah 6,603,500.00 2,057,500.00 8,661,000.00
Dibulatkan 8,661,000.00

1.0000 M1 Kusen 6/15 Jumlah 59,490.99 18,536.04 78,027.03 78,027.03


Dibulatkan 78,000.00 78,000.00

1 M3 PASANG KUSEN MERANTI


1.1000 M3 Balok Meranti Palm Batu 4,500,000.00 4,950,000.00
0.2000 Kg Paku 17,500.00 3,500.00
9.0000 Org Pekerja 37,500.00 337,500.00
28.0000 Org Tukang Kayu 55,000.00 1,540,000.00
3.0000 Org Kepala Tukang 50,000.00 150,000.00
0.5000 Org Mandor 60,000.00 30,000.00
Jumlah 4,953,500.00 2,057,500.00 7,011,000.00
Dibulatkan 7,011,000.00

1.0000 M1 Kusen 6/15 Jumlah 44,626.13 18,536.04 63,162.16 63,162.16


Dibulatkan 63,100.00 63,100.00

1 M2 DAUN PINTU PANIL KAMPER TBL. 3.5 CM


0.0385 M3 Papan Kamper 6,000,000.00 231,000.00
1.5000 Org Pekerja 37,500.00 56,250.00
4.0000 Org Tukang Kayu 55,000.00 220,000.00
0.5000 Org Kepala Tukang 50,000.00 25,000.00
0.1250 Org Mandor 60,000.00 7,500.00
Jumlah 231,000.00 308,750.00 539,750.00 539,750.00
Dibulatkan 539,700.00 539,700.00

1 M2 DAUN PINTU PANIL KAMPER TBL. 4 CM


0.0440 M3 Papan Kamper 6,000,000.00 264,000.00
1.5000 Org Pekerja 37,500.00 56,250.00
4.0000 Org Tukang Kayu 55,000.00 220,000.00
0.5000 Org Kepala Tukang 50,000.00 25,000.00
0.1250 Org Mandor 60,000.00 7,500.00
Jumlah 264,000.00 308,750.00 572,750.00 572,750.00
Dibulatkan 572,700.00 572,700.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 M2 DAUN PINTU PANIL MULTIPLEX RANGKA KAMPER


0.0250 M3 Papan Kamper 6,000,000.00 150,000.00
0.3750 Lmb Multiplex 9 mm 137,500.00 51,562.50
0.5800 Org Pekerja 37,500.00 21,750.00
2.4000 Org Tukang Kayu 55,000.00 132,000.00
0.2400 Org Kepala Tukang 50,000.00 12,000.00
0.0290 Org Mandor 60,000.00 1,740.00
Jumlah 201,562.50 167,490.00 369,052.50 369,052.50
Dibulatkan 369,000.00 369,000.00

1 M2 DAUN PINTU PANIL MULTIPLEX RANGKA MERANTI


0.0250 M3 Papan Meranti 4,500,000.00 112,500.00
0.3750 Lmb Multiplex 9 mm 137,500.00 51,562.50
0.5800 Org Pekerja 37,500.00 21,750.00
2.4000 Org Tukang Kayu 55,000.00 132,000.00
0.2400 Org Kepala Tukang 50,000.00 12,000.00
0.0290 Org Mandor 60,000.00 1,740.00
Jumlah 164,062.50 167,490.00 331,552.50 331,552.50
Dibulatkan 331,500.00 331,500.00

1 BH DAUN PINTU LAPIS DOUBLE TEAKWOOD RANGKA KAMPER Uk 85 / 200


0.0317 M3 Papan Kamper Uk 4/10 6,000,000.00 190,080.00
2.0000 Lmb Teakwood uk. 90 x 210 45,000.00 90,000.00
0.1000 Kg Paku Triplex 19,000.00 1,900.00
0.1000 Kg Lem 25,500.00 2,550.00
0.3000 Org Pekerja 37,500.00 11,250.00
1.5000 Org Tukang Kayu 55,000.00 82,500.00
0.2000 Org Kepala Tukang 50,000.00 10,000.00
0.0500 Org Mandor 60,000.00 3,000.00
Jumlah 284,530.00 106,750.00 391,280.00 391,280.00
Dibulatkan 391,200.00 391,200.00

1 BH DAUN PINTU LAPIS DOUBLE TEAKWOOD RANGKA MERANTI Uk 85 / 200


0.0317 M3 Papan Meranti Uk 4/110 4,500,000.00 142,560.00
2.0000 Lmb Teakwood uk. 90 x 210 45,000.00 90,000.00
0.1000 Kg Paku Triplex 19,000.00 1,900.00
0.1000 Kg Lem 25,500.00 2,550.00
0.3000 Org Pekerja 37,500.00 11,250.00
1.7000 Org Tukang Kayu 55,000.00 93,500.00
0.2000 Org Kepala Tukang 50,000.00 10,000.00
0.0500 Org Mandor 60,000.00 3,000.00
Jumlah 237,010.00 117,750.00 354,760.00 354,760.00
Dibulatkan 354,700.00 354,700.00

1 M2 DAUN PINTU LAPIS DOUBLE TRIPLEK RANGKA KAMPER


0.0190 M3 Papan Kamper 6,000,000.00 114,000.00
0.6940 Lmb Triplek uk. 120 x 240 68,700.00 47,677.80
0.1000 Kg Paku Triplex 19,000.00 1,900.00
0.1500 Kg Lem 25,500.00 3,825.00
0.8500 Org Pekerja 37,500.00 31,875.00
2.6000 Org Tukang Kayu 55,000.00 143,000.00
0.2600 Org Kepala Tukang 50,000.00 13,000.00
0.0430 Org Mandor 60,000.00 2,580.00
Jumlah 167,402.80 190,455.00 357,857.80 357,857.80
Dibulatkan 357,800.00 357,800.00

1 M2 DAUN PINTU LAPIS DOUBLE TRIPLEK RANGKA MERANTI


0.0190 M3 Papan Meranti 4,500,000.00 85,500.00
0.6940 Lmb Triplek uk. 120 x 240 68,700.00 47,677.80
0.1000 Kg Paku Triplex 19,000.00 1,900.00
0.1500 Kg Lem 25,500.00 3,825.00
0.8500 Org Pekerja 37,500.00 31,875.00
2.6000 Org Tukang Kayu 55,000.00 143,000.00
0.2600 Org Kepala Tukang 50,000.00 13,000.00
0.0430 Org Mandor 60,000.00 2,580.00
Jumlah 138,902.80 190,455.00 329,357.80 329,357.80
Dibulatkan 329,300.00 329,300.00

1 M2 DAUN PINTU LAPIS TEAKWOOD/ALUMINIUM RANGKA KAMPER


0.0190 M3 Papan Kamper 6,000,000.00 114,000.00
0.3470 Lmb Teakwood uk. 120 x 240 45,000.00 15,615.00
0.5000 Lmb Triplek Aluminium 89,300.00 44,650.00
0.1000 Kg Paku Triplex 19,000.00 1,900.00
0.1500 Kg Lem 25,500.00 3,825.00
0.8500 Org Pekerja 37,500.00 31,875.00
2.6000 Org Tukang Kayu 55,000.00 143,000.00
0.2600 Org Kepala Tukang 50,000.00 13,000.00
0.0430 Org Mandor 60,000.00 2,580.00
Jumlah 179,990.00 190,455.00 370,445.00 370,445.00
Dibulatkan 370,400.00 370,400.00

1 M2 DAUN PINTU LAPIS TEAKWOOD/ALUMINIUM RANGKA MERANTI


0.0190 M3 Papan Meranti 4,500,000.00 85,500.00
0.3470 Lmb Teakwood uk. 120 x 240 45,000.00 15,615.00
0.5000 Lmb Triplek Aluminium 89,300.00 44,650.00
0.1000 Kg Paku Triplex 19,000.00 1,900.00
0.1500 Kg Lem 25,500.00 3,825.00
0.8500 Org Pekerja 37,500.00 31,875.00
2.6000 Org Tukang Kayu 55,000.00 143,000.00
0.2600 Org Kepala Tukang 50,000.00 13,000.00
0.0430 Org Mandor 60,000.00 2,580.00
Jumlah 151,490.00 190,455.00 341,945.00 341,945.00
Dibulatkan 341,900.00 341,900.00

1 M2 DAUN PINTU LAPIS TRIPLEK/ALUMINIUM RANGKA KAMPER


0.0190 M3 Papan Kamper 6,000,000.00 114,000.00
0.3470 Lmb Triplek uk. 120 x 240 68,700.00 23,838.90
0.5000 Lmb Triplek Aluminium 89,300.00 44,650.00
0.1000 Kg Paku Triplex 19,000.00 1,900.00
0.1500 Kg Lem 25,500.00 3,825.00
0.8500 Org Pekerja 37,500.00 31,875.00
2.6000 Org Tukang Kayu 55,000.00 143,000.00
0.2600 Org Kepala Tukang 50,000.00 13,000.00
0.0430 Org Mandor 60,000.00 2,580.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

Jumlah 188,213.90 190,455.00 378,668.90 378,668.90


Dibulatkan 378,600.00 378,600.00

1 M2 DAUN PINTU LAPIS TRIPLEK/ALUMINIUM RANGKA MERANTI


0.0190 M3 Papan Meranti 4,500,000.00 85,500.00
0.3470 Lmb Triplek uk. 120 x 240 68,700.00 23,838.90
0.5000 Lmb Triplek Aluminium 89,300.00 44,650.00
0.1000 Kg Paku Triplex 19,000.00 1,900.00
0.1500 Kg Lem 25,500.00 3,825.00
0.8500 Org Pekerja 37,500.00 31,875.00
2.6000 Org Tukang Kayu 55,000.00 143,000.00
0.2600 Org Kepala Tukang 50,000.00 13,000.00
0.0430 Org Mandor 60,000.00 2,580.00
Jumlah 159,713.90 190,455.00 350,168.90 350,168.90
Dibulatkan 350,100.00 350,100.00

1 DAUN JENDELA KACA RANGKA MERANTI Uk 60 / 140


0.0121 M3 Slimar Meranti Uk 3/8 4,500,000.00 54,432.00
0.6875 M2 Kaca Bening 5mm 65,000.00 44,687.50
0.2500 Org Pekerja 37,500.00 9,375.00
0.7500 Org Tukang Kayu 55,000.00 41,250.00
0.2000 Org Kepala Tukang 50,000.00 10,000.00
0.0500 Org Mandor 60,000.00 3,000.00
Jumlah 99,119.50 63,625.00 162,744.50 162,744.50
Dibulatkan 162,700.00 162,700.00

1 DAUN JENDELA KACA RANGKA KAMPER Uk 60 / 140


0.0121 M3 Slimar Kamper Uk 3/8 6,000,000.00 72,576.00
0.6875 M2 Kaca Bening 5mm 65,000.00 44,687.50
0.2500 Org Pekerja 37,500.00 9,375.00
0.7500 Org Tukang Kayu 55,000.00 41,250.00
0.2000 Org Kepala Tukang 50,000.00 10,000.00
0.0500 Org Mandor 60,000.00 3,000.00
Jumlah 117,263.50 63,625.00 180,888.50 180,888.50
Dibulatkan 180,800.00 180,800.00

1 M2 DINDING PARTISI TEAKWOOD ( 2 SISI ) RANGKA KAMPER


0.0190 M3 Slimar Kamper 6,000,000.00 114,000.00
0.8000 Lmb Teakwood 120X240 96,200.00 76,960.00
0.4000 Kg Paku 17,500.00 7,000.00
0.0400 Kg Paku Triplek 19,000.00 760.00
Kg Lem 25,500.00 -
0.5000 Org Pekerja 37,500.00 18,750.00
1.4000 Org Tukang Kayu 55,000.00 77,000.00
0.1400 Org Kepala Tukang 50,000.00 7,000.00
0.0250 Org Mandor 60,000.00 1,500.00
Jumlah 198,720.00 104,250.00 302,970.00 302,970.00
Dibulatkan 302,900.00 302,900.00

1 M2 DINDING PARTISI TRIPLEK ( 2 SISI ) RANGKA MERANTI


0.0190 M3 Slimar Meranti 4,500,000.00 85,500.00
0.4000 Lmb Triplek 120X240 55,000.00 22,000.00
0.2500 Kg Paku 17,500.00 4,375.00
0.0400 Kg Paku 19,000.00 760.00
Kg Lem 25,500.00 -
0.2500 Org Pekerja 37,500.00 9,375.00
0.7000 Org Tukang Kayu 55,000.00 38,500.00
0.0700 Org Kepala Tukang 50,000.00 3,500.00
0.0250 Org Mandor 60,000.00 1,500.00
Jumlah 112,635.00 52,875.00 165,510.00 165,510.00
Dibulatkan 165,500.00 165,500.00
1 M2 DINDING PARTISI KALSIBOARD ( 2 SISI ) RANGKA MERANTI
0.0182 M3 Kayu 5/7 Meranti 4,500,000.00 81,900.00
0.6944 Lmb Kalsiboard 10 mm 120X240 64,500.00 44,791.67
0.2500 Kg Paku 17,500.00 4,375.00
0.0400 Kg Paku 19,000.00 760.00
0.2500 Org Pekerja 37,500.00 9,375.00
0.7000 Org Tukang Kayu 55,000.00 38,500.00
0.0700 Org Kepala Tukang 50,000.00 3,500.00
0.0250 Org Mandor 60,000.00 1,500.00
Jumlah 131,826.67 52,875.00 184,701.67 184,701.67
Dibulatkan 184,700.00 184,700.00

1 M2 DINDING PARTISI KALSIBOARD ( 2 SISI )


1.0000 M2 Rangka hollo 40,000.00 40,000.00
0.7639 Lmb Kalsiboard 10 mm 120X240 64,500.00 49,270.83
0.0400 Kg Paku sumbat 19,000.00 760.00
0.1000 Org Pekerja 37,500.00 3,750.00
0.2800 Org Tukang Kayu 55,000.00 15,400.00
0.0280 Org Kepala Tukang 50,000.00 1,400.00
0.0100 Org Mandor 60,000.00 600.00
Jumlah 90,030.83 21,150.00 111,180.83 111,180.83
Dibulatkan 111,100.00 111,100.00

1 M2 PASANG KACA BENING 5 MM


1.0000 M2 Kaca Bening 5 mm 65,000.00 65,000.00
0.3553 Org Tukang Kayu 55,000.00 19,541.50
Jumlah 65,000.00 19,541.50 84,541.50 84,541.50
Dibulatkan 84,500.00 84,500.00

1 M2 PASANG KACA RAYBEN 5 MM


1.0000 M2 Kaca Rayben 5 mm 82,500.00 82,500.00
0.4267 Org Tukang Kayu 55,000.00 23,468.50
Jumlah 82,500.00 23,468.50 105,968.50 105,968.50
Dibulatkan 105,900.00 105,900.00

1 BH PASANG KUNCI TANAM BESAR MERK "TOOTI / SEDERAJAT"


1.0000 Bh Kunci Tanam Merk Tooti 151,200.00 151,200.00
0.1000 Org Pekerja 37,500.00 3,750.00
0.3400 Org Tukang Kayu 55,000.00 18,700.00
Jumlah 151,200.00 22,450.00 173,650.00 173,650.00
Dibulatkan 173,600.00 173,600.00

1 BH PASANG KUNCI TANAM MERK "YALE"


1.0000 Bh Kunci Tanam Merk "Yale" 95,000.00 95,000.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

0.1000 Org Pekerja 37,500.00 3,750.00


0.3400 Org Tukang Kayu 55,000.00 18,700.00
Jumlah 95,000.00 22,450.00 117,450.00 117,450.00
Dibulatkan 117,400.00 117,400.00

1 BH PASANG KUNCI TANAM MERK "KUDA TERBANG"


1.0000 Bh Kunci Tanam Merk "Kuda Terbang" 75,000.00 75,000.00
0.1000 Org Pekerja 37,500.00 3,750.00
0.3300 Org Tukang Kayu 55,000.00 18,150.00
Jumlah 75,000.00 21,900.00 96,900.00 96,900.00
Dibulatkan 96,900.00 96,900.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 BH PASANG KUNCI TANAM KECIL MERK "WING 808"


1.0000 Bh Kunci Tanam Merk "WING 808" 15,000.00 15,000.00
0.0800 Org Pekerja 37,500.00 3,000.00
0.2000 Org Tukang Kayu 55,000.00 11,000.00
Jumlah 15,000.00 14,000.00 29,000.00
Dibulatkan 29,000.00

1 BH PASANG ENGSEL PINTU NYLON EX CINA "727"


0.5000 Set Engsel Pintu Ex Cina "727" 35,000.00 17,500.00
0.0300 Org Pekerja 37,500.00 1,125.00
0.0600 Org Tukang Kayu 55,000.00 3,300.00
Jumlah 17,500.00 4,425.00 21,925.00 21,925.00
Dibulatkan 21,900.00 21,900.00

1 BH PASANG ENGSEL JENDELA NYLON EX CINA "727"


0.5000 Set Engsel Jendela Ex Cina "727" 12,000.00 6,000.00
0.0300 Org Pekerja 37,500.00 1,125.00
0.0600 Org Tukang Kayu 55,000.00 3,300.00
Jumlah 6,000.00 4,425.00 10,425.00 10,425.00
Dibulatkan 10,400.00 10,400.00

1 BH GRENDEL TANAM PERNEKEL


1.0000 Bh Grendel Tanam Pernekel 41,200.00 41,200.00
0.0800 Org Pekerja 37,500.00 3,000.00
0.1400 Org Tukang Kayu 55,000.00 7,700.00
Jumlah 41,200.00 10,700.00 51,900.00 51,900.00
Dibulatkan 51,900.00 51,900.00

1 BH GRENDEL BIASA
1.0000 Bh Grendel Jendela Pernekel Biasa 6,000.00 6,000.00
0.0250 Org Pekerja 37,500.00 937.50
0.0450 Org Tukang Kayu 55,000.00 2,475.00
Jumlah 6,000.00 3,412.50 9,412.50 9,412.50
Dibulatkan 9,400.00 9,400.00

1 BH PASANG HAK ANGIN SIKUTAN KECIL PERNEKEL "SAKURA"


0.5000 Set Hak Angin Sikutan "Sakura" Kecil 10,000.00 5,000.00
0.0250 Org Pekerja 37,500.00 937.50
0.0450 Org Tukang Kayu 55,000.00 2,475.00
Jumlah 5,000.00 3,412.50 8,412.50 8,412.50
Dibulatkan 8,400.00 8,400.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 M2 CAT TEMBOK BARU DULUX


0.2500 Kg Cat Tembok 97,500.00 24,375.00
0.0700 Kg Plamuur Tembok 12,000.00 840.00
0.0500 Lbr Kertas Gosok 3,500.00 175.00
0.2000 Org Pekerja 37,500.00 7,500.00
0.1000 Org Tukang Cat 45,000.00 4,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0050 Org Mandor 60,000.00 300.00
Jumlah 25,390.00 12,800.00 38,190.00 38,190.00
Dibulatkan 38,100.00 38,100.00

1 M2 CAT TEMBOK BARU ( CATYLAG )


0.2500 Kg Cat Tembok 18,500.00 4,625.00
0.3000 Kg Plamuur Tembok 12,000.00 3,600.00
0.1000 Lbr Kertas Gosok 3,500.00 350.00
0.1500 Org Pekerja 37,500.00 5,625.00
0.1000 Org Tukang Cat 45,000.00 4,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0050 Org Mandor 60,000.00 300.00
Jumlah 8,575.00 10,925.00 19,500.00 19,500.00
Dibulatkan 19,500.00 19,500.00

1 M2 CAT TEMBOK BARU UNTUK BANGUNAN LANTAI II - IV


1.0000 M2 Cat Tembok Baru 19,500.00 19,500.00
0.0500 Langsiran 19,500.00 975.00
0.1500 Andang 19,500.00 2,925.00
Jumlah 19,500.00 3,900.00 23,400.00 23,400.00
Dibulatkan 23,400.00 23,400.00

1 M2 CAT TEMBOK LAMA (ULANG)


0.1670 Kg Cat Tembok 18,500.00 3,089.50
0.0400 Lbr Kertas Gosok 3,500.00 140.00
0.1000 Org Pekerja 37,500.00 3,750.00
0.1000 Org Tukang Cat 45,000.00 4,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0050 Org Mandor 60,000.00 300.00
Jumlah 3,229.50 9,050.00 12,279.50 12,279.50
Dibulatkan 12,200.00 12,200.00

1 M2 CAT PLAFOND / ETERNIT


0.2500 Kg Cat Tembok 18,500.00 4,625.00
0.3000 Kg Plamuur Tembok 12,000.00 3,600.00
0.1000 Lbr Kertas Gosok 3,500.00 350.00
0.1500 Org Pekerja 37,500.00 5,625.00
0.1200 Org Tukang Cat 45,000.00 5,400.00
0.0100 Org Kepala Tukang 50,000.00 500.00
0.0050 Org Mandor 60,000.00 300.00
Jumlah 8,575.00 6,200.00 14,775.00 14,775.00
Dibulatkan 14,700.00 14,700.00

1 M2 CAT DASAR / MENI


0.1200 Kg Cat Meni Cap Pedang 18,500.00 2,220.00
0.0020 Ltr Minyak Cat 8,500.00 17.00
0.0500 Org Pekerja 37,500.00 1,875.00
0.0750 Org Tukang Cat 45,000.00 3,375.00
0.0075 Org Kepala Tukang 50,000.00 375.00
0.0025 Org Mandor 60,000.00 150.00
Jumlah 2,237.00 5,775.00 8,012.00 8,012.00
Dibulatkan 8,000.00 8,000.00

1 M2 CAT KAYU BARU


0.1000 Kg Meni Kayu 15,000.00 1,500.00
0.2500 Kg Cat Kayu 43,500.00 10,875.00
0.0800 Kg Plamuur Kayu 18,500.00 1,480.00
0.0800 Ltr Minyak Cat 8,500.00 680.00
0.1000 Lbrr Kertas Gosok 3,500.00 350.00
0.2500 Org Pekerja 37,500.00 9,375.00
0.2500 Org Tukang Cat 45,000.00 11,250.00
0.0040 Org Kepala Tukang 50,000.00 200.00
0.0040 Org Mandor 60,000.00 240.00
Jumlah 13,385.00 21,065.00 34,450.00 34,450.00
Dibulatkan 34,400.00 34,400.00

1 M2 CAT KAYU LAMA (ULANG)


0.2000 Kg Cat Kayu 43,500.00 8,700.00
0.0400 Ltr Minyak Cat 8,500.00 340.00
0.1000 Lbrr Kertas Gosok 3,500.00 350.00
0.0500 Org Pekerja 37,500.00 1,875.00
0.1000 Org Tukang Cat 45,000.00 4,500.00
0.0075 Org Kepala Tukang 50,000.00 375.00
0.00025 Org Mandor 60,000.00 15.00
Jumlah 9,390.00 6,765.00 16,155.00 16,155.00
Dibulatkan 16,100.00 16,100.00

1 M2 CAT BESI "BROWN" (SILVER)


0.2700 Kg Cat Besi Brown 45,000.00 12,150.00
0.0500 Ltr Minyak Cat 8,500.00 425.00
0.1000 Org Pekerja 37,500.00 3,750.00
0.1500 Org Tukang Cat 45,000.00 6,750.00
0.0150 Org Kepala Tukang 50,000.00 750.00
0.0050 Org Mandor 60,000.00 300.00
Jumlah 12,575.00 11,550.00 24,125.00 24,125.00
Dibulatkan 24,100.00 24,100.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 TITIK INSTALASI
11.0000 M' Kabel NYM 2 x 2.5 mm 7,000.00 77,000.00
1.0000 Ljr Pipa Paralon 5/8" 7,500.00 7,500.00
0.5000 Bh Isolasi 3,300.00 1,650.00
1.0000 Bh Las Dop 200.00 200.00
1.0000 Bh T Doos PVC 1,500.00 1,500.00
0.1500 Org Pekerja 37,500.00 5,625.00
0.4000 Org Tukang Listrik 45,000.00 18,000.00
0.0400 Org Kepala Tukang 50,000.00 2,000.00
Jumlah 87,850.00 25,625.00 113,475.00 113,475.00
Dibulatkan 113,400.00 113,400.00

1 BH PASANG STOP KONTAK


1.0000 Bh Stop Kontak 17,500.00 17,500.00
0.1000 Org Tukang Listrik 45,000.00 4,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
Jumlah 17,500.00 5,000.00 22,500.00 22,500.00
Dibulatkan 22,500.00 22,500.00

1 BH PASANG SAKLAR TUNGGAL


1.0000 Bh Saklar tunggal 17,500.00 17,500.00
0.1000 Org Tukang Listrik 45,000.00 4,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
Jumlah 17,500.00 5,000.00 22,500.00 22,500.00
Dibulatkan 22,500.00 22,500.00

1 BH PASANG SAKLAR GANDA


1.0000 Bh Saklar ganda 17,500.00 17,500.00
0.1000 Org Tukang Listrik 45,000.00 4,500.00
0.0100 Org Kepala Tukang 50,000.00 500.00
Jumlah 17,500.00 5,000.00 22,500.00 22,500.00
Dibulatkan 22,500.00 22,500.00

1 BH PASANG LAMPU SL
1.0000 Bh Fitting dowlaight 45,000.00 45,000.00
1.0000 Bh Lampu SL 18 Watt 37,500.00 37,500.00
0.2000 Org Tukang Listrik 45,000.00 9,000.00
0.0500 Org Kepala Tukang 50,000.00 2,500.00
Jumlah 82,500.00 11,500.00 94,000.00 94,000.00
Dibulatkan 94,000.00 94,000.00

1 BH PASANG LAMPU TL
1.0000 Bh Lampu TL komplit 175,000.00 175,000.00
0.2000 Org Tukang Listrik 45,000.00 9,000.00
0.0500 Org Kepala Tukang 50,000.00 2,500.00
Jumlah 175,000.00 11,500.00 186,500.00 186,500.00
Dibulatkan 186,500.00 186,500.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 UNIT PANEL MCB 1 GROUP


1.0000 Bh Panel MCB 85,000.00 85,000.00
1.0000 Bh MCB 10 A 75,000.00 75,000.00
1.0000 Bh Miniswitch 32 Amp 192,500.00 192,500.00
0.5000 Ls Alat Bantu 10,000.00 5,000.00
0.5000 Org Pekerja 37,500.00 18,750.00
0.5000 Org Tukang Listrik 45,000.00 22,500.00
0.0050 Org Kepala Tukang 50,000.00 250.00
Jumlah 352,500.00 46,500.00 399,000.00 399,000.00
Dibulatkan 399,000.00 399,000.00

1 UNIT PANEL MCB 2 GROUP


1.0000 Bh Panel MCB 85,000.00 85,000.00
2.0000 Bh MCB 10 A 75,000.00 150,000.00
1.0000 Bh Miniswitch 32 Amp 192,500.00 192,500.00
1.0000 Ls Alat Bantu 10,000.00 10,000.00
1.0000 Org Pekerja 37,500.00 37,500.00
1.0000 Org Tukang Listrik 45,000.00 45,000.00
0.0050 Org Kepala Tukang 50,000.00 250.00
Jumlah 427,500.00 92,750.00 520,250.00 520,250.00
Dibulatkan 520,200.00 520,200.00

1 UNIT PANEL MCB 3 GROUP


1.0000 Bh Panel MCB 85,000.00 85,000.00
3.0000 Bh MCB 10 Amp 75,000.00 225,000.00
1.0000 Bh Miniswitch 32 Amp 192,500.00 192,500.00
1.0000 Ls Alat Bantu 10,000.00 10,000.00
1.0000 Org Pekerja 37,500.00 37,500.00
1.0000 Org Tukang Listrik 45,000.00 45,000.00
0.0050 Org Kepala Tukang 50,000.00 250.00
Jumlah 502,500.00 92,750.00 595,250.00 595,250.00
Dibulatkan 595,200.00 595,200.00

1 UNIT PANEL MCB 4 GROUP


1.0000 Bh Panel MCB 85,000.00 85,000.00
4.0000 Bh MCB 10 A 75,000.00 300,000.00
1.0000 Ls Alat Bantu 10,000.00 10,000.00
1.0000 Org Pekerja 37,500.00 37,500.00
1.0000 Org Tukang Listrik 45,000.00 45,000.00
0.0050 Org Kepala Tukang 50,000.00 250.00
Jumlah 385,000.00 92,750.00 477,750.00 477,750.00
Dibulatkan 477,700.00 477,700.00

1 BH PEMBUATAN BAK MANDI DAR FIBERGLASS UK. 60 X 60 X 80 CM


BAGIAN LUAR DILAPISI BATU MERAH 1 : 4 DAN TEGEL KERAMIK
1.0000 Bh Bak Mandi Fiberglass 300,000.00 300,000.00
0.1700 M3 Batu Merah 1 : 4 67,700.00 11,509.00
1.6000 M2 Keramik Dinding 10X20 39,200.00 62,720.00
1.0000 Bh Avour 27,500.00 27,500.00
Jumlah - 401,729.00
Dibulatkan 401,700.00

1 BH PASANG BAK MANDI (TERASO) UK. 60 X 60 X 80 CM


1.0000 Bh Bak Mandi Teraso 180,000.00 180,000.00
0.1700 M3 Batu Merah 1 : 4 67,700.00 11,509.00
1.0000 Bh Avour 27,500.00 27,500.00
Jumlah - - 219,009.00
Dibulatkan 219,000.00

1 M' PEMASANGAN PIPA PVC diameter 1/2


1.0000 M' PVC diameter 1/2" 3,750.00 3,750.00
0.0800 Org Tukang Pipa 45,000.00 3,600.00
Jumlah 3,750.00 3,600.00 7,350.00 7,350.00
Dibulatkan 7,300.00 7,300.00

1 M' PEMASANGAN PIPA PVC diameter 3/4


1.0000 M' PVC diameter 3/4" 4,375.00 4,375.00
0.0800 Org Tukang Pipa 45,000.00 3,600.00
Jumlah 4,375.00 3,600.00 7,975.00 7,975.00
Dibulatkan 7,900.00 7,900.00

1 M' PEMASANGAN PIPA PVC diameter 1"


1.0000 M' PVC diameter 1" 5,000.00 5,000.00
0.0800 Org Tukang Pipa 45,000.00 3,600.00
Jumlah 5,000.00 3,600.00 8,600.00 8,600.00
Dibulatkan 8,600.00 8,600.00

1 M' PEMASANGAN PIPA PVC diameter 1,5"


1.0000 M' PVC diameter 1,5" 8,700.00 8,700.00
0.2500 Org Tukang Pipa 45,000.00 11,250.00
Jumlah 8,700.00 11,250.00 19,950.00
Dibulatkan 19,900.00

1 M' PEMASANGAN PIPA PVC diameter 2"


1.0000 M' PVC diameter 2" 7,500.00 7,500.00
0.1000 Org Tukang Pipa 45,000.00 4,500.00
Jumlah 7,500.00 4,500.00 12,000.00 12,000.00
Dibulatkan 12,000.00 12,000.00

1 M' PEMASANGAN PIPA PVC diameter 2,5"


1.0000 M' PVC diameter 2,5" 10,000.00 10,000.00
0.1000 Org Tukang Pipa 45,000.00 4,500.00
Jumlah 10,000.00 4,500.00 14,500.00 14,500.00
Dibulatkan 14,500.00 14,500.00

1 M' PEMASANGAN PIPA PVC diameter 3"


1.0000 M' PVC diameter 3" 12,500.00 12,500.00
0.1000 Org Tukang Pipa 45,000.00 4,500.00
Jumlah 12,500.00 4,500.00 17,000.00 17,000.00
Dibulatkan 17,000.00 17,000.00

1 M' PEMASANGAN PIPA PVC diameter 4"


1.0000 M' PVC diameter 4" 17,500.00 17,500.00
0.1000 Org Tukang Pipa 45,000.00 4,500.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

Jumlah 17,500.00 4,500.00 22,000.00 22,000.00


Dibulatkan 22,000.00 22,000.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 SET CLOSET DUDUK LENGKAP SETARA KIA


1.0000 Set Closet Duduk KIA Lengkap 1,500,000.00 1,500,000.00
0.1000 Org Kepala Tukang 50,000.00 5,000.00
2.0000 Org Tukang Batu 55,000.00 110,000.00
1.0000 Org Pekerja 37,500.00 37,500.00
0.4500 Org Mandor 60,000.00 27,000.00
Jumlah 1,500,000.00 179,500.00 1,679,500.00 1,679,500.00
Dibulatkan 1,679,500.00 1,679,500.00

1 SET CLOSET DUDUK LENGKAP SETARA TOTO


1.0000 Set Closet Duduk TOTO Lengkap 5,000,000.00 5,000,000.00
0.1000 Org Kepala Tukang 50,000.00 5,000.00
2.0000 Org Tukang Batu 55,000.00 110,000.00
1.0000 Org Pekerja 37,500.00 37,500.00
0.4500 Org Mandor 60,000.00 27,000.00
Jumlah 5,000,000.00 179,500.00 5,179,500.00 5,179,500.00
Dibulatkan 5,179,500.00 5,179,500.00

1 BH PASANG CLOSET JONGKOK BIASA TERASO


1.0000 Bh Closet Jongkok Teraso 195,000.00 195,000.00
0.1080 M3 Batu Merah 1 : 3 767,700.00 82,911.60
0.5000 Org Pekerja 37,500.00 18,750.00
1.0000 Org Tukang Batu 55,000.00 55,000.00
0.0600 Org Kepala Tukang 50,000.00 3,000.00
0.0500 Org Mandor 60,000.00 3,000.00
Jumlah 277,911.60 79,750.00 357,661.60 357,661.60
Dibulatkan 357,600.00 357,600.00

1 BH PASANG CLOSET JONGKOK


1.0000 Bh Closet Jongkok Porselin INA 165,000.00 165,000.00
0.1080 M3 Batu Merah 1 : 3 767,700.00 82,911.60
0.5000 Org Pekerja 37,500.00 18,750.00
1.0000 Org Tukang Batu 55,000.00 55,000.00
0.0600 Org Kepala Tukang 50,000.00 3,000.00
0.0500 Org Mandor 60,000.00 3,000.00
Jumlah 247,911.60 79,750.00 327,661.60 327,661.60
Dibulatkan 327,600.00 327,600.00

1 BH PASANG AVOUR BAK MANDI


1.0000 Bh Avour Bak Mandi 27,500.00 27,500.00
0.0600 Org Tukang Batu 55,000.00 3,300.00
0.0300 Org Mandor 60,000.00 1,800.00
Jumlah 27,500.00 5,100.00 32,600.00 32,600.00
Dibulatkan 32,600.00 32,600.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%

1 BH PASANG AVOUR PEMBUANGAN AIR KOTOR


1.0000 Bh Avour Pembuangan Air Kotor 27,500.00 27,500.00
0.0600 Org Tukang Batu 55,000.00 3,300.00
0.0300 Org Mandor 60,000.00 1,800.00
Jumlah 27,500.00 5,100.00 32,600.00 32,600.00
Dibulatkan 32,600.00 32,600.00

1 BH PASANG KRAN AIR 1/2" HANDLE BIASA


1.0000 Bh Kran Air 1/2" Handle Biasa 27,500.00 27,500.00
1.0000 Roll TBA 2,000.00 2,000.00
0.1500 Org Tukang Leideng 45,000.00 6,750.00
0.0500 Org Kepala Tukang 50,000.00 2,500.00
Jumlah 29,500.00 9,250.00 38,750.00 38,750.00
Dibulatkan 38,700.00 38,700.00

1 BH PASANG KRAN AIR 1/2" HANDLE SILVER STAR


1.0000 Bh Kran Air 1/2" Handle Silver Star 42,500.00 42,500.00
1.0000 Roll TBA 2,000.00 2,000.00
0.2000 Org Tukang Leideng 45,000.00 9,000.00
0.1000 Org Kepala Tukang 50,000.00 5,000.00
Jumlah 44,500.00 14,000.00 58,500.00
Dibulatkan 58,500.00

1 BH PASANG KRAN AIR 3/4" HANDLE BIASA


1.0000 Bh Kran Air 3/4" Handle Biasa 42,500.00 42,500.00
1.0000 Roll TBA 2,000.00 2,000.00
0.2000 Org Tukang Leideng 45,000.00 9,000.00
0.1000 Org Kepala Tukang 50,000.00 5,000.00
Jumlah 44,500.00 14,000.00 58,500.00 58,500.00
Dibulatkan 58,500.00 58,500.00

1 UNIT PEMBUATAN SEPTIKTANK UK. 2.00 X 1.00 X 1.25 (RONG)


4.0000 M3 Galian Tanah 62,200.00 248,800.00
2.0200 M3 Pasang Batu Merah 1 : 4 67,700.00 136,754.00
13.6500 M2 Plesteran 1 : 3 24,400.00 333,060.00
0.2100 M3 Plat Beton 1 : 2 : 3 Tb. 8 cm 3,895,600.00 818,076.00
8.0000 M' Pipa PVC Dia 4" 17,500.00 140,000.00
1.0000 Ls Lubang Udara Pipa GI Dia 2" 80,000.00 80,000.00
Jumlah 1,756,690.00 1,756,690.00 1,756,690.00
Dibulatkan 1,756,600.00 1,756,600.00

1 UNIT PEMBUATAN SUMUR RESAPAN DIA 80 CM (RONG) TINGGI 2.50 M'


6.7500 M3 Galian Tanah 62,200.00 419,850.00
1.3500 M3 Batu Merah Kosongan 45,300.00 61,155.00
1.5300 M3 Pasang Batu Merah 1 : 4 67,700.00 103,581.00
1.3000 M3 Urugan Pasir 89,900.00 116,870.00
1.3000 M3 Urugan Grosok 90,000.00 117,000.00
0.1400 M3 Plat Beton Bertulang 1 : 2 : 3 3,895,600.00 545,384.00
4.0000 M' Pipa PVC Dia 3" 12,500.00 50,000.00
1.0000 Ls Lubang Udara Pipa GI Dia 2" 80,000.00 80,000.00
Jumlah - 1,493,840.00 1,493,840.00 1,493,840.00
Dibulatkan 1,493,800.00 1,493,800.00

1 BH PASANG BUIS BETON U = 20 CM


0.2500 M3 Galian Tanah 62,200.00 15,550.00
0.0500 M3 Urugan Pasir 89,900.00 4,495.00
0.1200 M3 Batu Merah 1 : 4 67,700.00 8,124.00
1.0000 Bh Buis Beton U 20 cm 47,500.00 47,500.00
1.3000 M2 Plesteran 1 : 3 24,400.00 31,720.00
2.0000 M' Benangan 1 : 2 6,900.00 13,800.00
Jumlah 47,500.00 73,689.00 121,189.00
Dibulatkan 121,100.00

1 BH PASANG BUIS BETON U = 30 CM


0.2500 M3 Galian Tanah 29,600.00 7,400.00
0.0500 M3 Urugan Pasir 89,900.00 4,495.00
0.4000 M2 Batu Merah 1 : 4 67,700.00 27,080.00
1.0000 Bh Buis Beton U 30 cm 50,000.00 50,000.00
1.3000 M2 Plesteran 1 : 3 22,500.00 29,250.00
2.0000 M' Benangan 1 : 2 6,900.00 13,800.00
Jumlah 50,000.00 82,025.00 132,025.00 132,025.00
Dibulatkan 132,000.00 132,000.00

1 UNIT PEMBUATAN SEPTIKTANK DAN RESAPAN UK. 2.50 X 1.00 X 1.25 (RONG)
3.7500 M3 Galian Tanah 29,600.00 111,000.00
7.5000 M2 Pasang Batu Merah 1 : 4 67,700.00 507,750.00
4.1800 M2 Pasang Batu Merah Kosong 45,300.00 189,354.00
10.8000 M2 Plesteran 1 : 3 22,500.00 243,000.00
0.3180 M3 Plat Beton 1 : 2 : 3 Tb. 8 cm 3,895,600.00 1,238,800.80
1.0000 Ls Lubang Udara Pipa GI Dia 2" 80,000.00 80,000.00
Jumlah - 2,369,904.80 2,369,904.80 2,369,904.80
Dibulatkan 2,369,900.00 2,369,900.00

1 UNIT PEMBUATAN LANTAI KALSIFLOOR RANGKA BAJA


85.7000 M1 WF 200 266,666.67 22,853,333.33
121.0000 M1 WF 150 175,000.00 21,175,000.00
552.0000 M1 CNP 100 #REF! #REF!
83.0000 Lbr Kalsifloor 20 mm 435,000.00 36,105,000.00
3,320.0000 Bh Sekrup 250.00 830,000.00
1.0000 Ls Peralatan 1,000,000.00 1,000,000.00
260.0000 M2 Upah 20,000.00 5,200,000.00
Jumlah #REF! #REF! #REF!
Dibulatkan #REF! #REF!
M2 #REF!
#REF!
`
KEBUTUHAN MATERIAL

PLANT : WONOREJO
PEKERJAAN : GUDANG VULKANISIR
TANGGAL : 12 JUNI 2014

SATUAN JUMLAH
No JENIS PEKERJAAN SAT VOLUME HARGA HARGA
Rp Rp

1 Besi beton 6 mm Ljr 105.00 29,600.00 3,108,000.00


2 Besi beton 10 mm Ljr 14.700 89,900.00 1,321,530.00
JUMLAH 4,429,530.00
B PEKERJAAN JALAN
1 Urugan Sirtu + Pemadatan M3 1068.80 85,000.00 90,848,000.00
2 Pas.Paving Stone Con Block Tbl.8cm M2 1336.000 75,000.00 100,200,000.00
3 Pengadaan Listrik Dalam Tanah Ls 1.00 150,000,000.00 150,000,000.00
JUMLAH 341,048,000.00
JUMLAH TOTAL 345,477,530.00
TIME SHEDULLE

KEGIATAN PEMELIHARAAN KANTOR BCA


PEKERJAAN PEMBANGUNAN PARKING AREA
LOKASI BCA GAJAH MADA

No JENIS PEKERJAAN BOBOT MINGGUMINGGUMINGGUMINGGUMINGGUMINGGUMINGGUMINGGUMINGGUMINGGUMINGGU MINGGU


1 2 3 4 5 6 7 8 9 10 11 12
I PEKERJAAN PERSIAPAN
100
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
II PEKERJAAN TANAH 00
90
#REF! #REF! #REF! #REF! 90
III PEKERJAAN PASANGAN & PLESTERAN 980
90
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
IV PEKERJAAN BETON 70
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 60
V PEKERJAAN RANGKA & PENUTUP ATAP 60
#REF! #REF! #REF! #REF! #REF! #REF! 50
VI PEKERJAAN CAT - CATAN
#REF! #REF! #REF! 40
VII PEKERJAAN INSTALASI LISTRIK
30
#REF! #REF! #REF! #REF!
VIII PEKERJAAN INSTALASI AIR 20
#REF! #REF!
IX PEKERJAAN LAIN-LAIN 10
#REF! #REF! #REF! #REF! #REF! #REF!
0.0
RENCANA PELAKSANAAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
JUMLAH BOBOT #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
REALISASI PELAKSANAAN #REF! #REF! #REF! #REF! #REF! #REF!
JUMLAH BOBOT #REF! #REF! #REF! #REF! #REF!

Mengetahui Jember,12 Oktober 2008


Kabag APK CV.KARYA AGUNG JAYA
SOEDARSONO IMAM BASORI
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : JL.KEDUNG BARUK SURABAYA
NILAI 32,569,965.00
MINGGU I ( SATU )
PERIODE 16 MARET s/d 22 MARET 2014

SATUAN JUMLAH KEMAJUAAN PEK KEMAJUAN PEK


NILAI BOBOT THD BAGIAN THD SELURUH
No JENIS PEKERJAAN SAT VOLUME HARGA HARGA PEKERJAAN PEKERJAAN PEKERJAAN
Rp Rp (%) (%) (%)

A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan bongkar bangunan Ls 1.00 1,000,000.00 1,000,000.00 3.0703 100 3.0703
2 Pasang bauwplank dan pengukuran Ls 1.00 750,000.00 750,000.00 2.3027 100 2.3027
3 Mobilisai Ls 1.00 750,000.00 750,000.00 2.3027 100 2.3027
4 Pembuatan barak karyawan Ls 1.00 250,000.00 250,000.00 0.7676 100 0.7676
JUMLAH 2,750,000.00 8.4434 8.4434
B PEKERJAAN TANAH
1 Galian tanah stroos mixer dan zillo Titik 12.00 360,000.00 4,320,000.00 13.2638 100 13.2638
2 Galian tanah stroos hopper Titik 15.00 40,000.00 600,000.00 1.8422 100 1.8422
3 Galian tanah untuk pondasi hopper M3 14.96 20,000.00 299,200.00 0.9186 100 0.9186
4 Bobok lantai beton rabat Titik 8.00 125,000.00 1,000,000.00 3.0703 100 3.0703
JUMLAH 6,219,200.00 19.0949 19.0949
C PEKERJAAN PASANGAN
1 Pasang batu pondasi hopper M3 72.43 125,000.00 9,053,750.00 27.7978 0 0.0000
2 Pasang beton stroos Φ 40 M3 9.04 700,000.00 6,330,240.00 19.4358 50 9.7179
3 Pasang beton stroos Φ 30 M3 1.06 700,000.00 741,825.00 2.2776 50 1.1388
4 Pasang umpak zillo Uk 45/45x60 M3 0.97 700,000.00 680,400.00 2.0890 0 0.0000
5 Pasang umpak mixer Uk 45/45x45 M3 0.36 700,000.00 255,150.00 0.7834 0 0.0000
6 Pasang kopel sloof mixer 30/45 M3 1.62 700,000.00 1,134,000.00 3.4817 0 0.0000
7 Pasang kopel sloof zillo 30/45 M3 2.38 700,000.00 1,663,200.00 5.1065 0 0.0000
8 Pasang kolom hopper 30/30 M3 2.29 700,000.00 1,600,200.00 4.9131 0 0.0000
9 Pasang balok ring pengikat pondasi M3 3.06 700,000.00 2,142,000.00 6.5766 0 0.0000
JUMLAH 23,600,765.00 72.4617 10.8567

Bobot keseluruhan 100.00 38.39

Biaya upah kerja 12,505,232.50


Total keseluruhan biaya 32,569,965.00
Total biaya keseluruhan barang dan jasa 32,569,965.00

Surabaya , 22 Maret 2014


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON
KRISTANTO HALIM IMAM BASORI

PEKERJAAN : PEMBUATAN PLANT MERAK BETON


LOKASI : JL.KEDUNG BARUK SURABAYA
NILAI 32,569,965.00
MINGGU I I ( DUA )
PERIODE 23 MARET s/d 29 MARET 2014

SATUAN JUMLAH KEMAJUAAN PEK KEMAJUAN PEK


NILAI BOBOT THD BAGIAN THD SELURUH
No JENIS PEKERJAAN SAT VOLUME HARGA HARGA PEKERJAAN PEKERJAAN PEKERJAAN
Rp Rp (%) (%) (%)

A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan bongkar bangunan Ls 1.00 1,000,000.00 1,000,000.00 3.0703 100 3.0703
2 Pasang bauwplank dan pengukuran Ls 1.00 750,000.00 750,000.00 2.3027 100 2.3027
3 Mobilisai Ls 1.00 750,000.00 750,000.00 2.3027 100 2.3027
4 Pembuatan barak karyawan Ls 1.00 250,000.00 250,000.00 0.7676 100 0.7676
JUMLAH 2,750,000.00 8.4434 8.4434
B PEKERJAAN TANAH
1 Galian tanah stroos mixer dan zillo Titik 12.00 360,000.00 4,320,000.00 13.2638 100 13.2638
2 Galian tanah stroos hopper Titik 15.00 40,000.00 600,000.00 1.8422 100 1.8422
3 Galian tanah untuk pondasi hopper M3 14.96 20,000.00 299,200.00 0.9186 100 0.9186
4 Bobok lantai beton rabat Titik 8.00 125,000.00 1,000,000.00 3.0703 100 3.0703
JUMLAH 6,219,200.00 19.0949 19.0949
C PEKERJAAN PASANGAN
1 Pasang batu pondasi hopper M3 72.43 125,000.00 9,053,750.00 27.7978 70 19.4585
2 Pasang beton stroos Φ 40 M3 9.04 700,000.00 6,330,240.00 19.4358 100 19.4358
3 Pasang beton stroos Φ 30 M3 1.06 700,000.00 741,825.00 2.2776 0 0.0000
4 Pasang umpak zillo Uk 45/45x60 M3 0.97 700,000.00 680,400.00 2.0890 100 2.0890
5 Pasang umpak mixer Uk 45/45x45 M3 0.36 700,000.00 255,150.00 0.7834 100 0.7834
6 Pasang kopel sloof mixer 30/45 M3 1.62 700,000.00 1,134,000.00 3.4817 50 1.7409
7 Pasang kopel sloof zillo 30/45 M3 2.38 700,000.00 1,663,200.00 5.1065 100 5.1065
8 Pasang kolom hopper 30/30 M3 2.29 700,000.00 1,600,200.00 4.9131 70 3.4392
9 Pasang balok ring pengikat pondasi M3 3.06 700,000.00 2,142,000.00 6.5766 25 1.6442
JUMLAH 23,600,765.00 72.4617 53.6975

Bobot keseluruhan 100.00 81.24

Biaya upah kerja 26,458,455.00


Total keseluruhan biaya 32,569,965.00
Total biaya keseluruhan barang dan jasa 32,569,965.00

Surabaya , 22 Maret 2014


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON
KRISTANTO HALIM IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN MERAK BETON
LOKASI : PONDASI PAGAR
TANGGAL : 27 AGUSTUS s/d 08 SEPTEMBER 2018

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PERSIAPAN
1 Persiapan Ls 1.00 1.00 1,000,000.00
2 Pembuatan bedeng Ls 1.00 1.00 1,000,000.00
3 Pasang sumur Ls 1.00 1.00 250,000.00
Sub total
II PEKERJAAN PONDASI ZILLO
1 Pengukuran & bauwplank Ls 1.00 1.00 150,000.00
2 Pemeratan tanah M2 (3,5*3,5) 12.25 7,500.00
3 Pembesian & cor sloof M2 (3*4) 12.00 35,000.00
4 Pasang bekisting plat lantai M1 (3,5*4) 14.00 15,000.00
6 Pembesian & Cor plat lantai tebal 15 cm M2 (3,5*3,5) 12.25 35,000.00
7 Pasang bekisting benda uji M1 (3*4) 12.00 30,000.00
8 Pembesian & cor sloof M2 (3*4) 12.00 45,000.00
9 Pasang bekisting kolom 50/50 M1 (1,55*4) 6.20 75,000.00
10 Pembesian & cor kolom 50/50 M1 1,55*4) 6.20 75,000.00
11 Pasang plendes pelek Bh 4.00 4.00 35,000.00
Sub total
III PEKERJAAN TANGKI SOLAR
1 Pengukuran Ls 1.00 1.00 50,000.00
2 Pasang bekisting benda uji Bh 4.00 4.00 35,000.00
3 Pembesian & cor plat 60/60 Bh 4.00 4.00 50,000.00
Sub total
IV PEKERJAAN PONDASI PAGAR
1 Pengukuran & bauwplank Ls 1.00 1.00 500,000.00
2 Perapian galian tanah M1 50.00 50.00 5,000.00
3 Pasang batu pondasi M3 (0,3*1)*50 15.00 150,000.00
Sub total
V PEKERJAAN LAIN LAIN
1 Transportasi Ls 1.00 1.00 500,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 08 September 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 09 SEPTEMBER s/d 23 SEPTEMBER 2018

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PERSIAPAN
1 Pembuatan bedeng tambahan Ls 1.00 1.00 500,000.00
Sub total
II PEKERJAAN KONTAENER
1 Pasang daun jendela sleading Bh 4.00 4.00 125,000.00
2 Pasang daun pintu Bh 1.00 1.00 175,000.00
Sub total
III PEKERJAAN PONDASI PAGAR
Bagian timur
1 Pengukuran & bauwplank Ls 1.00 1.00 500,000.00
2 Perapian galian tanah & perapian M1 (22*5)-50 59.00 5,000.00
3 Galian tanah strous Bh 22.00 22.00 15,000.00
4 Pasang & cor kolom strous Bh 22.00 22.00 50,000.00
5 Pasang batu pondasi M3 (1,00+0,7)/2*1,1*110-(15,0) 87.85 150,000.00
6 Pembesian & cor kolom M1 (1,00*23) 23.00 50,000.00
Bagian selatan
1 Pengukuran & bauwplank Ls 1.00 1.00 500,000.00
2 Perapian galian tanah & perapian M1 25.00 25.00 5,000.00
3 Galian tanah strous Bh 6.00 6.00 15,000.00
4 Pasang & cor kolom strous Bh 6.00 6.00 50,000.00
5 Pasang batu pondasi level 2,00 M3 (1,00*0,7)*25 17.50 150,000.00
6 Pasang batu pondasi M3 (1,00+0,7)/2*1,0*25 21.25 150,000.00
7 Pembesian & cor kolom M1 (1,70*6) 10.20 50,000.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 1.00 750,000.00
2 Langsir material Ls 1.00 1.00 1,500,000.00
3 Transportasi Ls 1.00 1.00 750,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 23 September 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 23 SEPTEMBER s/d 29 SEPTEMBER 2018

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
III PEKERJAAN PONDASI PAGAR
Bagian timur
1 Pasang batu pondasi M3 (1,00+0,7)/2*0,4*110 22.40 150,000.00
2 Pembesian & cor kolom M1 (0,4*23) 9.20 50,000.00
Bagian selatan
1 Pasang batu pondasi M3 (0,7+0,5)/2*0,4*25 6.00 150,000.00
2 Pembesian & cor kolom M1 (0,4*6) 2.40 50,000.00
Bagian selatan bagian 2
1 Pengukuran & bauwplank Ls 1.00 1.00 250,000.00
2 Perapian galian tanah & perapian M1 100.00 100.00 5,000.00
3 Galian tanah strous Bh 20.00 20.00 15,000.00
4 Pasang & cor kolom strous Bh 20.00 20.00 50,000.00
5 Pasang batu pondasi level 2,00 M3 (1,00*0,7)*100 70.00 150,000.00
6 Pembesian & cor kolom M1 (1*20) 20.00 50,000.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 1.00 250,000.00
2 Langsir material Ls 1.00 1.00 500,000.00
3 Transportasi Ls 1.00 1.00 500,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 29 September 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 30 SEPTEMBER s/d 06 OKTOBER 2018

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
III PEKERJAAN PONDASI PAGAR
Bagian timur 1 St 110 - 130 m
1 Galian tanah strous Bh 4.00 4.00 15,000.00
2 Pasang & cor kolom strous Bh 4.00 4.00 50,000.00
3 Pasang batu pondasi M3 (1,00+0,5)/2*1,4*20 21.00 150,000.00
4 Pembesian & cor kolom M1 (1,4*4) 5.60 50,000.00

Bagian selatan bagian 2 panjang 100 m (St 25,0 - 125,0 M )


1 Pasang batu pondasi level 2,00 M3 (1,00+0,4)/2*1,4*100 98.00 150,000.00
2 Pembesian & cor kolom M1 (1,4*20) 28.00 50,000.00

Bagian selatan bagian 3 panjang 25 meter ( St 125,0 - 150,0 )


1 Pengukuran & bauwplank Ls 1.00 1.00 100,000.00
2 Perapian galian tanah & perapian M1 25.00 25.00 5,000.00
3 Galian tanah strous Bh 5.00 5.00 15,000.00
4 Pasang & cor kolom strous Bh 5.00 5.00 50,000.00
5 Pasang batu pondasi level 2,00 M3 (1,00*0,7)*25 17.50 150,000.00

Sub total
IV PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 1.00 250,000.00
2 Langsir material Ls 1.00 1.00 500,000.00
3 Transportasi Ls 1.00 1.00 500,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 06 Oktober 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 07 OKTOBER s/d 20 OKTOBER 2018

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PONDASI PAGAR
Bagian timur 45 M ( St 130 - 175 m)
1 Galian tanah strous Bh 9.00 9.00 15,000.00
2 Pasang & cor kolom strous Bh 9.00 9.00 50,000.00
3 Pasang batu pondasi M3 (1,00+0,5)/2*1,6*35 42.00 150,000.00
4 Pembesian & cor kolom M1 (1,6*9) 14.40 50,000.00

Bagian selatan bagian 3 panjang 25 meter ( St 125,0 - 150,0 )


1 Pasang batu pondasi M3 (1,00+0,5)/2*1,4*25 26.25 150,000.00
2 Pembesian & cor kolom M1 (1,4*5) 7.00 50,000.00
Bagian selatan bagian 4 panjang 35 meter ( St 150- 185,0 )
1 Galian tanah strous Bh 7.00 7.00 15,000.00
2 Pasang & cor kolom strous Bh 7.00 7.00 50,000.00
3 Pasang batu pondasi level M3 (1,00*0,7)*35 24.50 150,000.00
4 Pembesian & cor kolom M1 (1,0*7) 7.00 50,000.00
5 Pasang batu pondasi 2,00 M3 (1,00+0,4)/2*1,4*35 34.30 150,000.00
6 Pembesian & cor kolom M1 (1,4*7) 9.80 50,000.00
Sub total
II PEKERJAAN PAGAR PANEL SEKAT TENGAH
1 Galian tanah Bh 22.00 22.00 30,000.00
2 Pasang pondasi pagar M3 (0,3*0,6*52,5) 9.45 150,000.00
3 Pasang pagar panel M2 (2,5*21) 50.00 60,000.00
Sub total
III PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 1.00 250,000.00
2 Langsir material Ls 1.00 1.00 500,000.00
3 Transportasi Ls 1.00 1.00 500,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 20 Oktober 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 21 OKTOBER s/d 03 NOVEMBER 2018

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PONDASI PAGAR
Bagian timur 1 panjang 110 m (St 0,00 - 110,0 M )
1 Pasang batu pondasi pelunasan M3 (0,5+0,4)/2*0,65*110 32.18 150,000.00
2 Pembesian & cor kolom M1 (0,65*22) 14.30 50,000.00
Bagian timur 45 M ( St 175 - 220 m)
1 Galian tanah strous Bh 9.00 9.00 15,000.00
2 Pasang & cor kolom strous Bh 9.00 9.00 50,000.00
3 Pasang batu pondasi M3 (1,00+0,5)/2*1,6*45 54.00 150,000.00
4 Pembesian & cor kolom M1 (1,6*9) 14.40 50,000.00

Bagian selatan bagian1 panjang 25 meter ( St 0,00 - 25,0 )


1 Pasang batu pondasi pelunasan M3 (0,5+0,4)/2*0,65*25 7.31 150,000.00
2 Pembesian & cor kolom M1 (0,65*6) 3.90 50,000.00
Sub total
II PEKERJAAN PAGAR PANEL SEKAT TENGAH
Bagian timur
1 Pasang tiang panel Bh 30.00 30.00 30,000.00
2 Pasang bekisting sloof 20/20 M1 (2,5*15) 37.50 25,000.00
3 Pasang pembesian & cor sloof 20/20 M1 (2,5*15) 37.50 40,000.00

Bagian selatan
1 Pasang tiang panel Bh 13.00 13.00 30,000.00

Sub total
III PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 1 panjang 25 m (St 0,00 - 25,0 M )
1 Galian tanah strous Bh 6.00 6.00 15,000.00
2 Pasang & cor kolom strous Bh 6.00 6.00 50,000.00
3 Pasang batu pondasi dasar M3 (0,7*0,5)*25 8.75 150,000.00
Sub total

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp

IV PEKERJAAN TANAM POHON RANDU


1 Pembelian pohon randu Bh 400.00 400.00 5,000.00
2 Tanam pohon Bh 400.00 400.00 2,000.00
3 Transportasi Ls 2.00 2.00 250,000.00
4 Harian siram pohon Ls 1.00 1.00 1,200,000.00
Sub total
III PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 1.00 250,000.00
2 Langsir material Ls 1.00 1.00 1,500,000.00
3 Transportasi Ls 1.00 1.00 750,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 03 November 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PEMBUATAN JENDELA & PINTU ALMUNIUM KONTAENER
LOKASI : SEMARANG
TANGGAL : 21 OKTOBER s/d 03 NOVEMBER 2018

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN KONTAENER
1 Pasang daun jendela sleading Bh (4*2) 8.00 125,000.00
2 Pasang daun pintu Bh (1*2) 2.00 175,000.00
Sub total
II PEKERJAAN LAIN LAIN
1 Transportasi Ls 1.00 1.00 200,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 03 November 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 04 NOVEMBER s/d 10 NOVEMBER 2018

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PAGAR PANEL
Bagian timur
1 Pasang tiang panel Bh (56-30) 26.00 30,000.00
2 Pasang bekisting sloof 20/20 M1 (2,5*35) 87.50 25,000.00
3 Pasang pembesian & cor sloof 20/20 M1 (2,5*35) 87.50 40,000.00
4 Pasang daun panel 7 daun M2 (2,5*9) 22.50 45,000.00

Bagian selatan
1 Pasang bekisting sloof 20/20 M1 (2,5*9) 37.50 25,000.00
2 Pasang pembesian & cor sloof 20/20 M1 (2,5*9) 37.50 40,000.00
3 Pasang daun panel 7 daun M2 (2,5*9) 37.50 45,000.00
Sub total
II PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 1 panjang 100 m (St 0,00 - 100,0 M )
1 Galian tanah strous Bh (20-6) 14.00 15,000.00
2 Pasang & cor kolom strous Bh (20-6) 14.00 50,000.00
3 Pasang batu pondasi dasar M3 (0,7*1,20*100)-(0,7*0,5)*25 75.25 150,000.00
4 Pembesian & cor kolom M1 (0,7*20) 14.00 50,000.00
Sub total
III PEKERJAAN LAIN LAIN
1 Siram pohon waru Ls 1.00 1.00 600,000.00
2 Langsir material Ls 1.00 1.00 1,500,000.00
3 Transportasi Ls 1.00 1.00 250,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 10 November 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON
KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 11 NOVEMBER s/d 17 NOVEMBER 2018

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PONDASI PAGAR
Bagian timur 1 panjang 110 m (St 110,00 - 220,0 M )
1 Pasang batu pondasi pelunasan M3 (0,5+0,4)/2*0,60*110 29.70 150,000.00
2 Pembesian & cor kolom M1 (0,60*22) 13.20 50,000.00
Sub total
II PEKERJAAN PAGAR PANEL
Bagian timur
1 Pasang tiang panel Bh (112-56) 56.00 30,000.00
2 Pasang bekisting sloof 20/20 M1 (2,5*70)-(2,5*35) 87.50 25,000.00
3 Pasang pembesian & cor sloof 20/20 M1 (2,5*70)-(2,5*35) 87.50 40,000.00
4 Pasang daun panel 7 daun M2 (40-9)*2,5 80.60 45,000.00

Sub total
III PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 2 panjang 20 m (St 170,00 - 190,0 M )
1 Galian tanah strous Bh 5.00 5.00 15,000.00
2 Pasang & cor kolom strous Bh 5.00 5.00 50,000.00
3 Pasang batu pondasi dasar M3 (0,7*1,20*20) 16.80 150,000.00
4 Pembesian & cor kolom M1 (0,7*5) 3.50 50,000.00
5 Pasang batu pondasi dinding M3 (0,8+1,20)/2*1,0*20 20.00 150,000.00
6 Pembesian & cor kolom M1 (1,0*5) 5.00 50,000.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Siram pohon waru Ls 1.00 1.00 300,000.00
2 Langsir material Ls 1.00 1.00 1,000,000.00
3 Transportasi Ls 1.00 1.00 250,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 17 November 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 18 NOVEMBER s/d 23 NOVEMBER 2018

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PAGAR PANEL
Bagian timur
1 Pasang bekisting sloof 20/20 M1 (2,5*3) 7.50 25,000.00
2 Pasang pembesian & cor sloof 20/20 M1 (2,5*3) 7.50 40,000.00
3 Pasang daun panel 7 daun M2 (30*2,5) 75.00 45,000.00
Sub total
II PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 1 panjang 50 m (St 0,00 - 50,0 M )
1 Pasang batu pondasi dinding M3 (0,8+1,20)/2*1,0*50 50.00 150,000.00
2 Pembesian & cor kolom M1 (1,0*10) 10.00 50,000.00
Sub total
III PEKERJAAN LAIN LAIN
1 Siram pohon waru Ls 1.00 1.00 300,000.00
2 Langsir material Ls 1.00 1.00 500,000.00
3 Transportasi Ls 1.00 1.00 150,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 23 November 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 24 NOVEMBER s/d 30 NOVEMBER 2018

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PAGAR PANEL
Bagian timur
1 Pasang daun panel 7 daun M2 (13*2,5) 32.50 45,000.00
Sub total
II PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 1 panjang 50 m (St 0,50 - 101,5,0 M )
1 Pasang batu pondasi dinding M3 (0,8+1,20)/2*1,0*51,5 51.50 150,000.00
2 Pembesian & cor kolom M1 (1,0*10) 10.00 50,000.00
Bagian Barat 1 panjang 100 m (St 0,00 - 101,5,0 M )
1 Pasang bekisting ring tengah 20/20 M1 (50+51,5) 101.50 25,000.00
2 Pasang pembesian & cor ring tengah 20/20 M1 (50+51,5) 101.50 40,000.00
Bagian Barat 1 panjang 75 m (St 0,00 - 75,0 M )
1 Pasang batu pondasi dinding M3 (0,8+0,5)/2*0,9*75 43.88 150,000.00
2 Pembesian & cor kolom M1 (0,9*10) 9.00 50,000.00
Sub total
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 750,000.00
2 Transportasi Ls 1.00 1.00 150,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 30 November 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 02 DESEMBER s/d 22 DESEMBER 2018

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PAGAR PANEL
Bagian selatan
1 Pasang tiang panel 2M Bh 44.00 32.50 45,000.00
2 Pasang daun panel 3 daun M2 (11*2,5) 32.50 45,000.00
Sub total
II PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat selatan panjang 26,5 m (St 0,00 - 101,5 M )
1 Pasang batu pondasi dinding M3 (0,8+0,5)/2*0,9*26,5 15.50 150,000.00
2 Pembesian & cor kolom M1 (0,9*20) 18.00 50,000.00
Sub total
III PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 2 panjang 20 m (St 170,00 - 190,0 M )
1 Pasang bekisting ring tengah 20/20 M1 20.00 101.50 25,000.00
2 Pasang pembesian & cor ring tengah 20/20 M1 20.00 101.50 40,000.00
3 Pasang batu pondasi dinding M3 (0,4+0,8)/2*1,0*20 20.00 150,000.00
4 Pembesian & cor kolom M1 (0,8*5) 5.00 50,000.00
Sub total
III PEKERJAAN PONDASI SALURAN SISI TIMUR
Bagian Barat 3 panjang 50 m (St 120,00 - 170,0 M )
1 Galian tanah strous Bh 15.00 15.00 15,000.00
2 Pasang & cor kolom strous Bh 15.00 15.00 50,000.00
3 Pasang batu pondasi dasar M3 (0,7*1,20*20) 16.80 150,000.00
4 Pembesian & cor kolom M1 (0,7*5) 3.50 50,000.00
5 Pasang batu pondasi dinding M3 (0,8+1,20)/2*1,0*50 50.00 150,000.00
6 Pembesian & cor kolom M1 (1,0*55) 55.00 50,000.00
8 Pasang bekisting ring tengah 20/20 M1 14.00 14.00 25,000.00
9 Pasang pembesian & cor ring tengah 20/20 M1 14.00 14.00 40,000.00
6 Pasang batu pondasi dinding pelunasan M3 (0,5+0,7)/2*0,6*14 5.04 150,000.00
Sub total

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp

III PEKERJAAN PONDASI SALURAN SISI BARAT


Bagian Barat 3 panjang 14 m
1 Perapian galian M1 14.00 14.00 15,000.00
2 Galian tanah strous Bh 5.00 5.00 15,000.00
3 Pasang & cor kolom strous Bh 5.00 5.00 50,000.00
4 Pasang batu pondasi dasar M3 (1,00*0,6)*14 8.40 150,000.00
5 Pembesian & cor kolom M1 (0,6*5) 3.00 50,000.00
6 Pasang batu pondasi dinding M3 (0,5+0,7)/2*1,4*14 11.76 150,000.00
7 Pembesian & cor kolom M1 (1,6*5) 8.00 50,000.00
8 Pasang bekisting ring tengah 20/20 M1 14.00 14.00 25,000.00
9 Pasang pembesian & cor ring tengah 20/20 M1 14.00 14.00 40,000.00
10 Pasang batu pondasi dinding pelunasan M3 (0,5+0,7)/2*0,6*14 5.04 150,000.00
Sub total
Bagian Barat 4 panjang 14 m
1 Perapian galian M1 14.00 14.00 15,000.00
2 Galian tanah strous Bh 4.00 5.00 15,000.00
3 Pasang & cor kolom strous Bh 4.00 5.00 50,000.00
4 Pasang batu pondasi dasar M3 (1,00*0,6)*14 8.40 150,000.00
5 Pembesian & cor kolom M1 (0,6*4) 3.00 50,000.00
6 Pasang batu pondasi dinding M3 (0,5+0,7)/2*1,4*14 11.76 150,000.00
7 Pembesian & cor kolom M1 (1,6*4) 8.00 50,000.00
8 Pasang bekisting ring tengah 20/20 M1 14.00 14.00 25,000.00
9 Pasang pembesian & cor ring tengah 20/20 M1 14.00 14.00 40,000.00
10 Pasang batu pondasi dinding pelunasan M3 (0,5+0,7)/2*0,6*14 5.04 150,000.00
Sub total
Bagian Barat 4 panjang 7 m
1 Perapian galian M1 7.00 14.00 15,000.00
2 Galian tanah strous Bh 2.00 5.00 15,000.00
3 Pasang & cor kolom strous Bh 2.00 5.00 50,000.00
4 Pasang batu pondasi dasar M3 (1,00*0,6)*7 8.40 150,000.00
5 Pembesian & cor kolom M1 (0,6*4) 3.00 50,000.00
6 Pasang batu pondasi dinding M3 (0,5+0,7)/2*1,4*7 11.76 150,000.00
7 Pembesian & cor kolom M1 (1,6*7) 8.00 50,000.00
8 Pasang bekisting ring tengah 20/20 M1 7.00 14.00 25,000.00
9 Pasang pembesian & cor ring tengah 20/20 M1 7.00 14.00 40,000.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Langsir material 3 minggu Ls 1.00 1.00 3,000,000.00
2 Transportasi Ls 1.00 1.00 500,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong ,22 Desember 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 23 DESEMBER s/d 12 JANUARI 2019

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PAGAR PANEL
Bagian selatan
1 Pasang tiang panel 2M Bh (70-44) 26.00 45,000.00
2 Pasang daun panel 3 daun M2 (42-11)*2,5 77.50 45,000.00
Sub total
II PEKERJAAN PONDASI SALURAN SISI TIMUR
Bagian Barat 3 panjang 50 m (St 120,00 - 170,0 M )
1 Pembesian & cor kolom M1 (0,6*6) 3.60 50,000.00
2 Pasang batu pondasi dinding pelunasan M3 (0,5+0,7)/2*0,6*21 5.04 150,000.00
3 Pembesian ring atas M1 35.00 35.00 25,000.00
Sub total
III PEKERJAAN PONDASI SALURAN SISI BARAT
Bagian Barat 4 panjang 7 m
1 Pasang batu pondasi dinding pelunasan M3 (0,5+0,7)/2*0,6*7 2.52 150,000.00
2 Pembesian & cor kolom M1 (0,6*3) 1.80 50,000.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Langsir material 3 minggu Ls 1.00 1.00 1,000,000.00
2 Turun pagar panel Ls 1.00 1.00 500,000.00
3 Tanam sengon Ls 1.00 1.00 150,000.00
4 Transportasi Ls 1.00 1.00 1,000,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 12 Januari 2019


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 13 JANUARI s/d 19 JANUARI 2019

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PAGAR PANEL
Bagian selatan
1 Pasang tiang panel 2M Bh 30.00 30.00 45,000.00
2 Pasang daun panel 3 daun M2 (35*2,5) 87.50 45,000.00
Sub total
II PEKERJAAN PONDASI SALURAN
1 Pembesian sloof 25/40 M1 (35*2) 70.00 50,000.00
2 Pembesian balok 20./20 M1 (2,5*11) 27.50 30,000.00
3 Pasang bekisting balok sloof M1 (35*2) 70.00 25,000.00
4 Pasang bekisting balok gantung M1 (2,5*11) 27.50 30,000.00
Sub total
III PEKERJAAN LAIN LAIN
1 Langsir material 3 minggu Ls 1.00 1.00 1,500,000.00
2 Turun pagar panel Ls 1.00 1.00 500,000.00
3 Transportasi Ls 1.00 1.00 1,000,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 19 Januari 2019


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 20 JANUARI s/d 31 JANUARI 2019

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
II PEKERJAAN PONDASI SALURAN
1 Cor balok 30/60 M1 (36*2) 72.00 40,000.00
2 Cor balok gantung 20./20 M1 (2,5*11) 27.50 25,000.00
3 Setrikan pondasi bawah pintu masuk M2 (35*2)*1,5 105.00 20,000.00
4 Setrikan pondasi utara jembatan M2 (20*1,7*1) 34.00 20,000.00
5 Pasang batu pondasi tambahan 20 cm M3 (0,5*0,2*20) 4.00 150,000.00
6 Pasang batu pondasi tambahan 20 cm M2 (0,5*0,2*101,5) 10.15 150,000.00
7 Ban banan M1 (20*1)+(36*2) 92.00 20,000.00
Sub total
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 500,000.00
3 Transportasi Ls 1.00 1.00 500,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 31 Januari 2019


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 10 FEBRUARI s/d 16 FEBRUARI 2019

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PONDASI SALURAN
1 Perapian galian M1 3.50 3.50 15,000.00
2 Kuras air Ls 1.00 1.00 50,000.00
3 Galian tanah strous Bh 2.00 2.00 15,000.00
4 Pasang & cor kolom strous Bh 2.00 2.00 50,000.00
5 Pasang batu pondasi dasar M3 (1,00*0,6)*3,5 2.10 150,000.00
6 Pembesian & cor kolom M1 (0,6*2) 1.20 50,000.00
7 Pasang batu pondasi dinding M3 (0,6+1,0)/2*1,4*3,5 3.92 150,000.00
8 Pembesian & cor kolom M1 (1,4*2) 2.80 50,000.00
9 Pasang bekisting ring tengah 20/20 M1 3.50 3.50 25,000.00
10 Pasang pembesian & cor ring tengah 20/20 M1 3.50 3.50 40,000.00
Sub total
II PEKERJAAN BETON RING
1 Pasang bekisting ring atas 20/40 M1 10.00 14.00 25,000.00
2 Pasang pembesian & cor ring atas 20/40 M1 10.00 14.00 40,000.00
Sub total
III PEKERJAAN SETRIKAN
1 Setrikan Pondasi selatan jembatan M2 (40*1,7) 68.00 20,000.00
Sub total
IV PEKERJAAN PAGAR PANEL
1 Pasang tiang panel 2M Bh 6.00 6.00 45,000.00
2 Pasang daun panel 3 daun M2 (14*2,5) 35.00 45,000.00
Sub total
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 500,000.00
2 Transportasi Ls 1.00 1.00 500,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 09 Februari 2019


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 01 FEBRUARI s/d 09 FEBRUARI 2019

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PONDASI SALURAN
saluran bagian barat
1 Perapian galian M1 3.50 3.50 15,000.00
2 Kuras air Ls 1.00 1.00 50,000.00
3 Galian tanah strous Bh 2.00 2.00 15,000.00
4 Pasang & cor kolom strous Bh 2.00 2.00 50,000.00
5 Pasang batu pondasi dasar M3 (1,00*0,6)*3,5 2.10 150,000.00
6 Pembesian & cor kolom M1 (0,6*2) 1.20 50,000.00
7 Pasang batu pondasi dinding M3 (0,6+1,0)/2*1,4*3,5 3.92 150,000.00
8 Pembesian & cor kolom M1 (1,4*2) 2.80 50,000.00
9 Pasang bekisting ring tengah 20/20 M1 3.50 3.50 25,000.00
10 Pasang pembesian & cor ring tengah 20/20 M1 3.50 3.50 40,000.00
saluran bagian barat
1 Pasang batu pondasi dinding M3 0,6*0,45*3,5 0.95 150,000.00
2 Pembesian & cor kolom M1 (0,45*2) 0.90 50,000.00
saluran bagian timur
1 Pasang batu pondasi dinding M3 0,6*0,65*10,5 4.10 150,000.00
2 Pembesian & cor kolom M1 (0,65*10,5) 6.83 50,000.00
Sub total
II PEKERJAAN PONDASI SALURAN TOL
1 Bobok pondasi lama M1 (3*2) 6.00 15,000.00
2 Peninggian pondasi saluran M3 (0,5*0,2*3*2) 0.60 150,000.00
Sub total
III PEKERJAAN SETRIKAN
1 Setrikan Pondasi selatan jembatan M2 (40*1,7) 68.00 20,000.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 700,000.00
2 Transportasi Ls 1.00 1.00 200,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 16 Februari 2019


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON
KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN :
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 17 FEBRUARI s/d 02 MARET 2019

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PONDASI SALURAN
saluran bagian barat
1 Perapian galian M1 15.00 15.00 15,000.00
2 Pasang bekisting balok 40/60 M1 (15*2) 7.00 35,000.00
3 Pembesian & cor balok 40/60 M1 (15*2) 7.00 70,000.00
4 Pasang bekisting balok 25/25 M1 (1,9*5) 7.00 35,000.00
5 Pembesian & cor balok 25/25 M1 (1,9*5) 7.00 70,000.00
6 Setrikan pondasi bawah pintu masuk M2 (15*2)*1,5 105.00 20,000.00
7 Pasang plat beton Bh 26.00 26.00 25,000.00
Sub total
II PEKERJAAN PONDASI SALURAN TOL
1 Pasang bekisting balok 40/70 M1 (7*1) 7.00 35,000.00
2 Pembesian & cor balok 40/70 M1 (7*1) 7.00 70,000.00
3 Pasang bekisting balok 30/70 M1 (3,15*2) 6.30 30,000.00
4 Pembesian & cor balok 30/70 M1 (3,15*2) 6.30 45,000.00
5 Pasang bekisting balok 25/30 M1 2.00 2.00 30,000.00
6 Pembesian & cor balok 25/30 M1 2.00 2.00 45,000.00
Sub total
III PEKERJAAN SETRIKAN
1 Setrikan Pondasi selatan jembatan M3 (20,5*1,7) 34.85 20,000.00
Sub total
IV PEKERJAAN SALURAN YUDIT
Bagian timur
1 Galian tanah & perapian M1 112.50 112.50 10,000.00
2 Pasangan batu dasar saluran M3 (0,1*0,50*112,5) 5.63 100,000.00
3 Rabatan lantai M2 (0,5*112,5) 56.25 19,000.00
4 Pasang yudit 30 M1 48.00 48.00 15,000.00
Sub total
V PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 700,000.00
2 Turunkan yudit Ls 2.00 2.00 150,000.00
3 Transportasi Ls 1.00 1.00 500,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 02 Maret 2019


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON
KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PASANG SALURAN
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 03 MARET s/d 30 MARET 2019

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN SALURAN YUDIT
Bagian timur
1 Galian tanah & perapian M1 (33,36+54,43+22,66+72,19)-112,5 70.14 10,000.00
2 Pasangan batu dasar saluran M3 (0,1*0,50)-(182,64-112,5) 3.51 100,000.00
3 Rabatan lantai M2 (0,5*182,5)-(0,5*112,5) 35.00 19,000.00
4 Pasang yudit 30 M1 182,5-48 134.50 15,000.00
5 Cepitan antara pondasi & yudit M2 182.50 182.50 15,000.00

Bagian barat
1 Galian tanah & perapian M1 (1,6*96) 153.60 10,000.00
2 Pasangan batu dasar saluran M3 (0,1*0,5*96) 4.80 100,000.00
3 Rabatan lantai M2 (0,5*0,96) 0.48 19,000.00
4 Pasang yudit 30 Bh 96.00 96.00 15,000.00
Sub total
II PEKERJAAN LAIN LAIN
1 Pasang bekisting M1 101.50 101.50 25,000.00
2 Pembesian & cor ring M1 101.50 101.50 35,000.00
3 Plesteran & acian M1 (0,6*101,5)*70% 42.63 25,000.00
4 Benangan sudut M1 (101,5*3)*70% 213.15 12,500.00
Sub total
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 750,000.00
2 Transportasi Ls 1.00 1.00 500,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 30 Maret 2019


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PASANG SALURAN
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 01 APRIL s/d 13 APRIL 2019

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN SALURAN YUDIT
Bagian timur
1 Ban banan pondasi & yudit M2 182.50 182.50 22,000.00

Bagian barat
1 Cepitan yudit dan pondasi M1 96.00 96.00 15,000.00
Sub total
II PEKERJAAN PONDASI SALURAN DEPAN
1 Pengukuran & bauwplank M1 6.00 6.00 25,000.00
1 Perapian galian M1 (6*2) 12.00 15,000.00
2 Kuras air Ls 1.00 1.00 150,000.00
3 Galian tanah strous Bh 2.00 2.00 15,000.00
4 Pasang & cor kolom strous Bh (2*2) 4.00 50,000.00
5 Pasang batu pondasi dasar M3 (1,00*0,6)*6*2 7.20 150,000.00
6 Pembesian & cor kolom M1 (0,6*2)*2 2.40 50,000.00
7 Pasang batu pondasi dinding M3 (0,6+1,0)/2*1,4*6*2 13.44 150,000.00
8 Pembesian & cor kolom M1 (1,4*2)*2 5.60 50,000.00
9 Pasang bekisting ring tengah 20/20 M1 (6*2) 12.00 25,000.00
10 Pasang pembesian & cor ring tengah 20/20 M1 (6*2) 12.00 40,000.00
Pondasi dalam 101,5
1 Plesteran & acian M1 (0,6*101,5)*30% 18.27 25,000.00
2 Benangan sudut M1 (101,5*3)*30% 91.35 12,500.00
Sub total
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 750,000.00
2 Transportasi Ls 1.00 1.00 500,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 13 april 2019


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PASANG SALURAN
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 14 APRIL s/d 04 MEI 2019

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PONDASI SALURAN DEPAN
1 Pengukuran & bauwplank L1 1.00 1.00 100,000.00
2 Perapian galian M1 (20*2)-(6*2) 28.00 15,000.00
3 Kuras air Ls 1.00 1.00 150,000.00
4 Galian tanah strous Bh (6*2)-2 10.00 15,000.00
5 Pasang & cor kolom strous Bh (6*2)-4 8.00 50,000.00
6 Pasang batu pondasi dasar M3 (1,00*0,6*20*2)-(1,00*0,6*6*2) 16.80 150,000.00
7 Pembesian & cor kolom M1 (0.6*6*2)-(0,6*2)*2 4.80 50,000.00
8 Pasang batu pondasi dinding M3 ((0,6+1,0)/2*1,4*20*2-(0,6+1,0)/2*1,4*6*2 31.36 150,000.00
9 Pembesian & cor kolom M1 (1,4*6*2)-(1,4*2)*2 11.20 50,000.00
10 Pasang bekisting ring tengah 20/20 M1 (20*2)-(6*2) 28.00 25,000.00
11 Pasang pembesian & cor ring tengah 20/20 M1 (20*2)-(6*2) 28.00 40,000.00
12 Pasang batu pondasi dinding diatas ring tengah M3 0,6*0,65*20*2 15.60 150,000.00
Sub total
II PEKERJAAN PARKIR AREA
Bagian selatan
1 Pengukuran & bauwplank Ls 1.00 1.00 250,000.00
2 Galian tanah untuk pasang paving sekat M1 (4*2)+(1,3+3,2+4)*13*2 229.00 2,500.00
3 Pasang sekat / pembatas paving M1 (4*2)+(1,3+3,2+4)*13*2 229.00 12,500.00
4 Keprasan tanah & perapian M2 (4,0+1,3)/2*3,2*13*2 220.48 7,500.00
5 Pasang besi rakitan M2 (3,1+0,4)/2*3,2*13*2 145.60 10,000.00
6 Cor lantai tebal 10 cm M2 (4,0+1,3)/2*3,2*13*2 220.48 15,000.00
7 Pasang Canstin penahan @ 4 buah Unit (4*13*2) 104.00 12,500.00
Sub total
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 300,000.00
2 Pecah batu Ls 1.00 1.00 200,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 04 Mei 2019


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PASANG SALURAN
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 05 MEI s/d 16 MEI 2019

SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PONDASI SALURAN DEPAN
1 Pengukuran & bauwplank L1 1.00 1.00 100,000.00
2 Perapian galian M1 (20*2)-(6*2) 28.00 15,000.00
3 Kuras air Ls 1.00 1.00 150,000.00
4 Galian tanah strous Bh (6*2)-2 10.00 15,000.00
5 Pasang & cor kolom strous Bh (6*2)-4 8.00 50,000.00
6 Pasang batu pondasi dasar M3 (1,00*0,6*20*2)-(1,00*0,6*6*2) 16.80 150,000.00
7 Pembesian & cor kolom M1 (0.6*6*2)-(0,6*2)*2 4.80 50,000.00
8 Pasang batu pondasi dinding M3 ((0,6+1,0)/2*1,4*20*2-(0,6+1,0)/2*1,4*6*2 31.36 150,000.00
9 Pembesian & cor kolom M1 (1,4*6*2)-(1,4*2)*2 11.20 50,000.00
10 Pasang bekisting ring tengah 20/20 M1 (20*2)-(6*2) 28.00 25,000.00
11 Pasang pembesian & cor ring tengah 20/20 M1 (20*2)-(6*2) 28.00 40,000.00
12 Pasang batu pondasi dinding diatas ring tengah M3 0,6*0,65*20*2 15.60 150,000.00
Sub total
II PEKERJAAN PARKIR AREA
Bagian selatan
1 Pengukuran & bauwplank Ls 1.00 1.00 250,000.00
2 Galian tanah untuk pasang paving sekat M1 (4*2)+(1,3+3,2+4)*13*2 229.00 2,500.00
3 Pasang sekat / pembatas paving M1 (4*2)+(1,3+3,2+4)*13*2 229.00 12,500.00
4 Keprasan tanah & perapian M2 (4,0+1,3)/2*3,2*13*2 220.48 7,500.00
5 Pasang besi rakitan M2 (3,1+0,4)/2*3,2*13*2 145.60 10,000.00
6 Cor lantai tebal 10 cm M2 (4,0+1,3)/2*3,2*13*2 220.48 15,000.00
7 Pasang Canstin penahan @ 4 buah Unit (4*13*2) 104.00 12,500.00
Sub total
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 300,000.00
2 Pecah batu Ls 1.00 1.00 200,000.00
Sub total

Total keseluruhan biaya


Total biaya keseluruhan

Pamotan porong , 04 Mei 2019


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PASANG PONDASI
LOKASI : PAMOTAN
TANGGAL : 05 OKTOBER s/d 16 OKTOBER 2019

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI SALURAN DEPAN
1 Pengukuran & bauwplank L1 (18,0+2,50) 20.50 10,000.00
2 Pasang batu pondasi M3 (1,00*0,5)/2*1,70*20,50 8.71 130,000.00
3 Kolom 20/20 M1 (1,70*4) 6.80
Pembesian Kg (4*1,70*0,89 kg)* 4 bh 24.21 4,000.00
Pasang bekisting M2 (0,25*1,70*2 sisi)* 4 bh 3.40 45,000.00
Cor maual M3 (0,2*0,2*1,70)*4 bh 0.27 250,000.00
4 Ban banan pondasi M1 2.50 2.50
Plesteran atas M2 (0,5*2,5) 1.25 20,000.00
Acian M2 (0,5*2,5) 1.25 10,000.00
Benangan M1 (2,5*2) 5.00 12,500.00
Sub total
III PEKERJAAN LAIN LAIN
1 Bongkar semen Ls 1.00 1.00 200,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,16 Oktober 2019


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : LANTAI BETON
LOKASI : PAMOTAN
TANGGAL : 12 NOVEMBER s/d 19 NOVEMBER 2019

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI SALURAN DEPAN
1 Pasang bekisting besi M1 (0,15*18*10*2)+(0,15*30*2) 63.00 45,000.00
2 Pemerataan tanah M2 (18*30)*50% 270.00 5,000.00
3 Pasang wermess M2 (18*30) 540.00 5,000.00
4 Cor lantai tebal 15 cm M3 (18*30)*0,16 86.40 60,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,19 November 2019


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : LANTAI BETON
LOKASI : PAMOTAN
TANGGAL : 20 NOVEMBER s/d 02 DESEMBER 2019

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN LANTAI
1 Pasang bekisting besi M1 (0,15*12*10*2) 36.00 45,000.00
2 Pemerataan tanah M2 (12,0*30) 360.00 5,000.00
3 Pasang wermess M2 (12,0*30) 360.00 5,000.00
4 Cor lantai tebal 15 cm M3 (12,0*30)*0,15 54.00 60,000.00
Sub total
II PEKERJAAN SALURAN YUDITS
1 Pengukuran & bauwplank M1 30.00 30.00 10,000.00
2 Pemerataan tanah M2 (0,60*30) 18.00 5,000.00
3 Rabatan lantai tebal 15 cm M2 (0,50*30) 15.00 5,000.00
4 Pasangan beton yudits M1 30.00 30.00 40,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,02 Desember 2019


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : LANTAI BETON
LOKASI : PAMOTAN
TANGGAL : 03 DESEMBER s/d 24 DESEMBER 2019

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN LANTAI
1 Pasang bekisting besi M1 (0,15*30,30*3)+(0,15*3,0*4) 100% 16.65 45,000.00
2 Pemerataan tanah M2 (3,30*30,0) 100% 99.00 5,000.00
3 Pasang wermess M2 (3,30*30,0) 100% 99.00 5,000.00
4 Cor lantai tebal 15 cm M3 (3,30*30,0)*0,15 100% 14.85 60,000.00
Sub total
II PEKERJAAN LANTAI
1 Pasang batu pondasi M3 (0,30*0,70*12) 100% 2.52 130,000.00
2 Pasang bekisting besi M2 (0,15*14*5)+(0,15*20*2) 100% 16.50 45,000.00
3 Pemerataan tanah M2 (4,0*14)*5 100% 280.00 5,000.00
4 Pasang wermess M2 (4,0*14)*5 100% 280.00 5,000.00
5 Cor lantai tebal 15 cm M3 (4,0*14)*5*0,15 100% 42.00 60,000.00
Sub total
III PEKERJAAN SALURAN YUDITS
1 Pengukuran & bauwplank M1 20.00 100% 30.00 10,000.00
2 Pemerataan tanah M2 (0,60*20) 100% 18.00 5,000.00
3 Rabatan lantai tebal 15 cm M2 (0,60*20) 100% 15.00 15,000.00

Sub total

Total keseluruhan biaya

Pamotan porong ,24 Desember 2019


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : JEMBATAN TKD & SALURAN
LOKASI : PAMOTAN
TANGGAL : 23 APRIL s/d 29 APRIL 2019

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI JEMBATAN TKD SELATAN
1 Pengukuran & bauwplank M1 15.00 100% 15.00 10,000.00
2 Pasang pondasi dasar M3 (1,20*0,70*15,0) 50% 50% 100% 12.60 130,000.00
3 Kolom 25/25 M1 (3,0*7) 21.00
Pembesian Kg (21*6*0,89)+(21*6*1,0*0,40) 162.54 2,000.00
Pasang bekisting M2 (0,40*2,5)*7 100% 7.00 45,000.00
Cor beton manual M3 (0,30*0,30*2,5)*7 100% 1.58 250,000.00
4 Balok ring 25/25 M1 15.00 15.00
Pembesian Kg (16*6*0,89)+(15*6*1,0*0,40) 100% 121.44 2,000.00
Pasang bekisting M2 (0,40*15) 100% 6.00 45,000.00
Cor beton manual M3 (0,30*0,30*15) 100% 1.35 250,000.00
5 Pasang pondasi dinding M3 (1,00 +0,65)/2*1,65*15,00 100% 20.42 130,000.00
6 Langsiran material batu Ls 1.00 100% 1.00 200,000.00
7 Kuras air Ls 1.00 100% 1.00 150,000.00
Sub total
II PEKERJAAN PAGAR PANEL
Pagar bagian barat pintu M1 17.50
1 Pasang pondasi peninggian M3 (0,30*0,40*17,50) 60% 40% 100% 2.10 130,000.00
2 Pasang pagar panel 3 daun M2 (17,50*1,20) 60% 40% 100% 21.00 45,000.00
3 Bobok pondasi Uk 60 x 40*40 Bh 8.00 100% 100% 8.00 25,000.00
4 Balok sloof 20/22 M1 17.50 17.50
Pembesian Kg (17,5*4*0,89)+(17,5*6*0,72*0,40) 60% 40% 100% 92.54 2,000.00
Pasang bekisting M2 (0,22*2*17,50) 60% 40% 100% 7.70 45,000.00
Cor beton manual M3 (0,20*0,22*17,50) 60% 40% 100% 0.77 250,000.00
5 Langsiran material Ls 1.00 100% 100% 1.00 100,000.00
Sub total
III PEKERJAAN PONDASI SALURAN AIR GUDANG SELATAN
1 Pengukuran & bauwplank M1 (6,00*12 Plong) 100% 72.00 10,000.00
2 Galian tanah M3 (0,40*1,30*72,0) 100% 37.44 50,000.00
3 Pemerataan tanah M2 (1,30*72) 100% 93.60 5,000.00
4 Pasang pondasi peninggian M3 (0,45*0,45*72) 100% 14.58 130,000.00
5 Langsiran material Ls 1.00 100% 1.00 200,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,29 April 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : JEMBATAN TKD & SALURAN
LOKASI : PAMOTAN
TANGGAL : 30 APRIL s/d 12 MEI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI JEMBATAN TKD SELATAN
1 Pasang pondasi tambahan peninggian M3 (0,65*0,20*15) 100% 12.60 130,000.00
2 Balok ring 30/50 M1 15.00 15.00
Pembesian Kg (15*8*0,89)+(15*6*1,2*0,40)+(0,75*4*7*0,89) 100% 168.69 2,000.00
Pasang bekisting M2 (0,35*2*15,0) 100% 10.50 45,000.00
Cor beton readymix M3 (0,30*0,50*15) 2.25 160,000.00
3 Langsiran material batu Ls 1.00 100% 1.00 100,000.00
Sub total
II PEKERJAAN PONDASI SALURAN AIR GUDANG SELATAN
1 Pengukuran & bauwplank sta 86,00 s/d 130,00 M1 (130,0-86,0) 100% 44.00 10,000.00
2 Galian tanah M3 (0,40*1,30*44,0) 100% 22.88 50,000.00
3 Pemerataan tanah M2 (1,30*44) 100% 57.20 5,000.00
4 Pasang pondasi peninggian M3 (0,50+0,40)/2*0,50*44 100% 9.90 150,000.00
5 Langsiran material semen & batu Ls 1.00 100% 1.00 400,000.00
Sub total
III PEKERJAAN PLESTERAN & ACIAN DINDING BATU
Sta 0,00 s/d 130,00
1 Plesteran batu dinding atas dan samping M2 (0,50*130,00)+(0,40*130,00) 75% 117.00 40,000.00
2 Acian batu dinding atas dan samping M2 (0,50*130,00)+(0,40*130,00) 75% 117.00 10,000.00
3 Plesteran lantai M2 (0,75*130,00) 75% 97.50 20,000.00
4 Acian lantai M2 (0,75*130,00) 75% 97.50 10,000.00
5 Benang M1 130.00 75% 130.00 12,500.00
6 Langsiran material Ls 1.00 100% 1.00 300,000.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 1.00 250,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,12 Mei 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : JEMBATAN TKD & SALURAN
LOKASI : PAMOTAN
TANGGAL : 27 MEI s/d 02 JUNI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI SALURAN AIR GUDANG SELATAN
1 Pengukuran & bauwplank sta 130,00 s/d 156,00 M1 (18,0+3,10) 100% 21.10 10,000.00
2 Galian tanah M3 (0,50*0,80*21,0) 100% 8.40 50,000.00
3 Pemerataan tanah M2 (0,80*21,00) 100% 16.80 5,000.00
4 Pasang pondasi peninggian M3 (0,30*0,50*21,00) 100% 3.15 150,000.00
5 Langsiran material semen & batu Ls 1.00 100% 1.00 250,000.00
6 Buang tanah galian M3 (0,50*0,80*21,0) 100% 8.40 50,000.00
Sub total
II PEKERJAAN PLESTERAN & ACIAN DINDING BATU
Sta 0,00 s/d 130,00
1 Plesteran batu dinding atas dan samping M2 (0,50*130,00)+(0,40*130,00) 75% 117.00 40,000.00
2 Acian batu dinding atas dan samping M2 (0,50*130,00)+(0,40*130,00) 75% 117.00 10,000.00
3 Plesteran lantai M2 (0,75*130,00) 75% 25% 100% 97.50 20,000.00
4 Acian lantai M2 (0,75*130,00) 75% 25% 100% 97.50 10,000.00
5 Benang M1 130.00 75% 130.00 12,500.00
6 Langsiran material Ls 1.00 100% 1.00 300,000.00
Sub total
III PEKERJAAN PLESTERAN & ACIAN DINDING BATU
Sta 130,00 s/d 156,00
1 Plesteran batu dinding atas dan samping utara M2 (0,5+0,20)*25,0 17.50 40,000.00
Plesteran batu dinding atas dan samping selatan M2 (0,10+0,90)*26,0 26.00 40,000.00
2 Acian batu dinding atas dan samping utara M2 (0,5+0,20)*25,0 17.50 10,000.00
Acian batu dinding atas dan samping selatan M2 (0,10+0,90)*26,0 26.00 10,000.00
3 Plesteran lantai M2 (0,60*26) 100% 15.60 20,000.00
4 Acian lantai M2 (0,60*26) 100% 15.60 10,000.00
5 Benang M1 (25*2) 50.00 12,500.00
Sub total
IV PEKERJAAN LANTAI COR
1 Pengukuran & bauwplank M1 (18,0*2) 100% 36.00 10,000.00
2 Pemerataan tanah galian M2 (4,00*18,00) 100% 72.00 5,000.00
3 Pasang besi wermess tunggal M2 (4,00*18,00) 100% 72.00 5,000.00
4 Pasang bekisting M2 (0,15*18,00) 100% 2.70 45,000.00
5 Cor rabatan sta 9,10 s/d sta akhir barat M2 (0,15*4,00*18,00) 10.80 15,000.00
Sub total
V PEKERJAAN LAIN LAIN
1 Pasang pagar panel 1 plong M2 (2,40*2,80) 100% 6.72 45,000.00
1 Pembersihan Ls 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 02 Juni 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : JEMBATAN TKD & SALURAN
LOKASI : PAMOTAN
TANGGAL : 03 JUNII s/d 09 JUNI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PLESTERAN & ACIAN DINDING BATU
Sta 130,00 s/d 156,00
1 Plesteran batu dinding atas dan samping utara M2 (0,5+0,20)*25,0 100% 17.50 40,000.00
Plesteran batu dinding atas dan samping selatan M2 (0,15+0,75)*26,0 100% 23.40 40,000.00
2 Acian batu dinding atas dan samping utara M2 (0,5+0,20)*25,0 100% 17.50 10,000.00
Acian batu dinding atas dan samping selatan M2 (0,15+0,75)*26,0 100% 23.40 10,000.00
3 Plesteran lantai M2 (0,60*26) 100% 15.60 20,000.00
4 Acian lantai M2 (0,60*26) 100% 15.60 10,000.00
5 Benang M1 (25*2) 100% 50.00 12,500.00
Sub total
II PEKERJAAN PLESTERAN & ACIAN DINDING BATU
Sta 0,00 s/d 130,00
1 Plesteran batu dinding atas dan samping M2 (0,50*130,00)+(0,40*130,00) 75% 117.00 40,000.00
2 Acian batu dinding atas dan samping M2 (0,50*130,00)+(0,40*130,00) 75% 117.00 10,000.00
3 Plesteran lantai M2 (0,75*130,00) 100% 97.50 20,000.00
4 Acian lantai M2 (0,75*130,00) 100% 97.50 10,000.00
5 Benang M1 130.00 75% 130.00 12,500.00
6 Langsiran material Ls 1.00 1.00 300,000.00
Sub total
III PEKERJAAN PLESTERAN & ACIAN DINDING BATU
Sta 130,00 s/d 156,00
1 Plesteran batu dinding atas dan samping utara M2 (0,5+0,20)*25,0 100% 17.50 40,000.00
Plesteran batu dinding atas dan samping selatan M2 (0,15+0,75)*26,0 100% 23.40 40,000.00
2 Acian batu dinding atas dan samping utara M2 (0,5+0,20)*25,0 100% 17.50 10,000.00
Acian batu dinding atas dan samping selatan M2 (0,15+0,75)*26,0 100% 23.40 10,000.00
3 Plesteran lantai M2 (0,60*26) 100% 15.60 20,000.00
4 Acian lantai M2 (0,60*26) 100% 15.60 10,000.00
5 Benang M1 (25*2) 100% 50.00 12,500.00
Sub total
IV PEKERJAAN PONDASI PENAHAN PINTU MASUK TKD
1 Pengukuran & bauwplank M1 (6*2) 100% 12.00 10,000.00
2 Pemerataan tanah M2 (0,80*6) 100% 4.80 5,000.00
3 Pasang pondasi M3 (0,40+1,0)/2*(1,65+2,0)/2*4,50)) 100% 5.75 130,000.00
M3 (0,40+0,6)/2*(1,65+1,30)/2*1,4 100% 1.03 130,000.00
4 Langsiran material semen & batu Ls 1.00 100% 1.00 200,000.00
Sub total

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
V PEKERJAAN KANTIN
1 Pengukuran & bauwplank M1 (6*8)+(6) 75% 54.00 10,000.00
2 Galian tanah M3 (0,50*0,50*20,00) +(0,40*1,00*3) 75% 6.20 60,000.00
3 Pemerataan tanah galian M2 (1,00*48,6)+(1,00*5,5) 75% 54.10 5,000.00
4 Pasang batu pondasi kecil M2 (0,4*0,40*48,6)+(0,30*0,40*48,6)+(0,10*0,30*48,6) 75% 15.07 150,000.00
Pasang batu pondasi kecil M3 (0,4*0,40*6)+(0,30*0,40*6)+(0,10*0,30*6) 75% 1.86 150,000.00
5 Balok ring 30/50 M1 (48,60+6,0) 75% 54.60
Pembesian Kg (54,6*4*0,60)+(54,6*0,75*6*0,22) 75% 185.09 4,000.00
Pasang bekisting M2 (0,2*2*54,6) 75% 21.84 45,000.00
Cor beton (manual) M3 (0,15*0,20*54,6) 75% 1.64 250,000.00
Sub total
VI PEKERJAAN PONDASI JEMBATAN TKD SELATAN
1 Pengukuran & bauwplank M1 8.00 100% 8.00 10,000.00
2 Pemerataan tanah M2 (1,20*8) 100% 9.60 10,001.00
2 Pasang pondasi dasar M3 (1,20*0,70*8) 100% 6.72 130,000.00
3 Kolom 25/25 M1 (3,0*3) 9.00
Pembesian Kg (9*6*0,89)+(9*6*1,0*0,40) 100% 69.66 2,000.00
Pasang bekisting M2 (0,40*2,5*2)*3 6.00 45,000.00
Cor beton manual M3 (0,30*0,30*2,5)*3 0.68 250,000.00
4 Balok ring 25/25 bawah M1 6.00 6.00
Pembesian Kg (6*6*0,89)+(15*6*1,0*0,40) 68.04 2,000.00
Pasang bekisting M2 (0,40*15) 6.00 45,000.00
Cor beton manual M3 (0,30*0,30*15) 1.35 250,000.00
5 Pasang pondasi dinding M3 (1,00 +0,65)/2*1,65*8,0 10.89 130,000.00
7 Kuras air Ls 1.00 1.00 150,000.00
Sub total
VII PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 500,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,09 Juni 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : GARDU LISTRIK
LOKASI : PAMOTAN
TANGGAL : 03 JUNII s/d 09 JUNI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN GARDU LISTRIK
1 Pengukuran & bauwplank M1 (6,50*2)+(12,5*2) 100% 38.00 10,000.00
2 Pemerataan tanah M2 (0,80*5,0*4)+(0,80*12,0)+(0,60*12,0+(0,80*12,0) 50% 42.40 5,000.00
3 Kolom 25/25 M1 (1,50*4) 6.00
Pembesian Kg (6*6*0,89)+(6*6*1,0*0,40) 50% 46.44 2,000.00
Pasang bekisting M2 (0,30*2*1,5)*4 50% 3.60 45,000.00
Cor beton manual M3 (0,30*0,30*1,50*4) 50% 0.54 250,000.00
4 Foot plat Bh 4.00 4.00
Pembesian Kg (2,0*6*2*0,89*4)+(6*6*0,89)+(6*6*1,0*0,40) 50% 131.88 2,000.00
Pasang bekisting M2 (0,30*0,9*4*4)+(0,30*2*1,50*4) 50% 7.92 45,000.00
Cor beton manual M3 (0,30*0,90*0,90*4)+(0,25*0,25*1,2*4) 50% 1.27 250,000.00
5 Pasang pondasi timur M3 (0,60*1,10*5,0) 100% 3.30 130,000.00
6 Pasang pondasi utara M3 (0,85*1,1*12) 100% 11.22 130,000.00

Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 500,000.00
2 Bantuan transport pemberangkatan orang2 Ls 1.00 100% 1.00 1,500,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,09 Juni 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : JEMBATAN TKD & SALURAN
LOKASI : PAMOTAN
TANGGAL : 10 JUNII s/d 30 JUNI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PLESTERAN & ACIAN DINDING BATU
Sta 0,00 s/d 130,00
1 Plesteran batu dinding atas dan samping M2 (0,50*130,00)+(0,40*130,00) 75% 25% 100% 117.00 40,000.00
2 Acian batu dinding atas dan samping M2 (0,50*130,00)+(0,40*130,00) 75% 25% 100% 117.00 10,000.00
3 Plesteran lantai M2 (0,75*130,00) 100% 100% 97.50 20,000.00
4 Acian lantai M2 (0,75*130,00) 100% 100% 97.50 10,000.00
5 Benang M1 130.00 75% 25% 100% 130.00 12,500.00
6 Langsiran material Ls 1.00 1.00 300,000.00
Sub total
II PEKERJAAN PONDASI JEMBATAN TKD SELATAN
1 Pengukuran & bauwplank M1 8.00 100% 8.00 10,000.00
2 Pemerataan tanah M2 (1,20*8) 100% 9.60 5,000.00
2 Pasang pondasi dasar M3 (1,20*0,70*8) 100% 6.72 130,000.00
3 Kolom 25/25 M1 (3,0*3) 9.00
Pembesian Kg (9*6*0,89)+(9*6*1,0*0,40) 100% 69.66 2,000.00
Pasang bekisting M2 (0,40*2,0*2,5)*3 100% 6.00 45,000.00
Cor beton manual M3 (0,30*0,30*2,5)*3 100% 0.68 250,000.00
4 Balok ring 25/25 bawah M1 8.00 8.00
Pembesian Kg (8*6*0,89)+(8*6*1,0*0,40) 100% 61.92 2,000.00
Pasang bekisting M2 (0,25*2*8) 100% 4.00 45,000.00
Cor beton manual M3 (0,25*0,30*8) 100% 0.60 250,000.00
5 Pasang pondasi dinding M3 (1,00 +0,65)/2*1,80*8 100% 11.88 130,000.00
6 Langsiran material Ls 1.00 100% 1.00 250,000.00
Sub total
PEKERJAAN DINDING BATU MIRING
1 Pengukuran & bauwplank M1 (2,70*7plong) 100% 18.90 10,000.00
2 Pemerataan tanah M2 (1,0*18,9) 100% 18.90 5,000.00
3 Pasang pondasi dasar M3 (0,85*1,0)*18,9 100% 16.07 130,000.00
4 Pasang dinding batu miring M3 (0,30*2,00)*18,90 100% 11.34 150,000.00
5 Kolom praktis M1 (3,0*7) 21.00
Pembesian Kg (21*4*0,60kg)+(21*6*0,40*0,22kg) 100% 61.49 4,000.00
Pasang bekisting M2 (0,20*2*21) 100% 8.40 45,000.00
Cor beton manual M3 (0,15*0,20*21,00) 100% 0.63 250,000.00
Urugan tanah kembali untuk dinding M2 (2,00*21,00) 100% 42.00 10,000.00
6 Langsiran material Ls 1.00 100% 1.00 500,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,30 Juni 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : RUANG KANTIN
LOKASI : PAMOTAN
TANGGAL : 10 JUNII s/d 24 JUNI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN KANTIN
1 Pengukuran & bauwplank M1 (6*8)+(6) 75% 25% 100% 54.00 10,000.00
2 Galian tanah M3 (0,50*0,50*20,00) +(0,40*1,00*3) 75% 25% 100% 6.20 60,000.00
3 Pemerataan tanah galian M2 (1,00*48,6)+(1,00*5,5) 75% 25% 100% 54.10 5,000.00
4 Pasang batu pondasi kecil M2 (0,4*0,40*48,6)+(0,30*0,40*48,6)+(0,10*0,30*48,6) 75% 25% 100% 15.07 150,000.00
Pasang batu pondasi kecil M3 (0,4*0,40*6)+(0,30*0,40*6)+(0,10*0,30*6) 75% 25% 100% 1.86 150,000.00
5 Balok ring 15/20 M1 (48,60+6,0) 75% 25% 100% 54.60
Pembesian Kg (54,6*4*0,60)+(54,6*0,75*6*0,22) 75% 25% 100% 185.09 4,000.00
Pasang bekisting M2 (0,2*2*54,6) 75% 25% 100% 21.84 45,000.00
Cor beton (manual) M3 (0,15*0,20*54,6) 75% 25% 100% 1.64 250,000.00

6 Pemerataan tanah galian timur M2 (1,00*5,5) 100% 5.50 5,000.00


7 Pasang batu pondasi kecil M3 (0,4*0,40*5,5)+(0,30*0,40*5,5)+(0,10*0,30*5,5) 100% 1.71 150,000.00
8 Balok ring 15/20 M1 6.00 100% 6.00
Pembesian Kg (6*4*0,60)+(6*0,75*6*0,22) 100% 20.34 4,000.00
Pasang bekisting M2 (0,2*2*6) 100% 2.40 45,000.00
Cor beton (manual) M3 (0,15*0,20*6) 100% 0.18 250,000.00

Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 500,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,30 Juni 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : GARDU LISTRIK
LOKASI : PAMOTAN
TANGGAL : 10 JUNII s/d 30 JUNI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN GARDU LISTRIK
1 Pengukuran & bauwplank M1 (6,50*2)+(12,5*2) 100% 38.00 10,000.00
2 Pemerataan tanah M2 (0,80*5,0*4)+(0,80*12,0)+(0,60*12,0+(0,80*12,0) 50% 50% 100% 42.40 5,000.00
3 Kolom 25/25 M1 (1,50*4) 6.00
Pembesian Kg (6*6*0,89)+(6*6*1,0*0,40) 50% 50% 100% 46.44 2,000.00
Pasang bekisting M2 (0,30*2*1,5)*4 50% 30% 80% 3.60 45,000.00
Cor beton manual M3 (0,30*0,30*1,50*4) 50% 30% 80% 0.54 250,000.00
4 Foot plat Bh 4.00 4.00
Pembesian Kg (2,0*6*2*0,89*4)+(6*6*0,89)+(6*6*1,0*0,40) 50% 50% 100% 131.88 2,000.00
Pasang bekisting M2 (0,30*0,9*4*4)+(0,30*2*1,50*4) 50% 50% 100% 7.92 45,000.00
Cor beton manual M3 (0,30*0,90*0,90*4)+(0,25*0,25*1,2*4) 50% 50% 100% 1.27 250,000.00
5 Pasang pondasi timur M3 (0,60*1,10*5,0) 100% 3.30 130,000.00
Pasang pondasi utara M3 (0,85*1,1*12) 100% 11.22 130,000.00
Pasang pondasi barat M3 (0,80+0,60)/2*1,10*5,0 100% 3.85 130,000.00
Pasang pondasi selatan M3 (0,80+0,60)/2*1,10*12 100% 9.24 130,000.00
Pasang pondasi sekat tengah M4 (0,60+0,40)/2*1,10*4*2 100% 4.40 130,001.00
Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 500,000.00

Sub total

Total keseluruhan biaya

Pamotan porong ,30 Juni 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : GUDANG (BENGKEL TEGUH)
LOKASI : PAMOTAN
TANGGAL : 10 JUNII s/d 24 JUNI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN LANTAI GUDANG
1 Pengukuran & bauwplank M1 (18,0*2) 100% 36.00 10,000.00
Pemerataan tanah galian M2 (4,00*18,00) 100% 72.00 5,000.00
Pasang besi wermess tunggal M2 (4,00*18,00) 100% 72.00 5,000.00
Pasang bekisting M2 (0,15*18,00) 100% 2.70 45,000.00
Cor lantai tahap 1 M2 (4,00*18,00) 100% 72.00 15,000.00

2 Pemerataan tanah tahap 2 s/d 7 M2 (4,00*18,00)*6 100% 432.00 5,000.00


Pasang besi wermess tunggal M2 (4,00*18,00)*6 100% 432.00 5,000.00
Pasang bekisting M2 (0,15*18,00)*6 100% 16.20 45,000.00
Cor lantai 2 s/d 7 di trowel M2 (4,00*18,00)*6 100% 432.00 15,000.00

3 Pemerataan tanah tahap 8 M2 (5,00*18,00) 100% 90.00 5,000.00


Pasang besi wermess tunggal M2 (5,00*18,00) 100% 90.00 5,000.00
Pasang bekisting M2 (0,15*18,00) 100% 2.70 45,000.00
Cor lantai tahap 8 di trowel M3 (5,00*18,00) 100% 72.00 15,000.00
Pasang bekisting saluran oil M2 (0,55*18) 100% 9.90 45,000.00

Sub total
II PEKERJAAN REL JENTRI
1 Pengukuran & bauwplank M1 33.00 100% 33.00 10,000.00
2 Pemerataan tanah pondasi M2 (0,5*33)*2 100% 33.00 5,000.00
3 Pasang batu pondasi M3 (0,5*0,30*33)*2 100% 9.90 150,000.00
4 Pasang bekiting M2 (0,15*33*2)*2 100% 19.80 45,000.00
5 Cor beton redymix M3 (0,50*0,15*48) 100% 3.60 160,000.00
6 Cor beton manual M3 (0,50*0,15*18) 100% 1.35 250,000.00
7 Cor lantai
Pemerataan tanah M2 (6,00*33,00) 85% 198.00 5,000.00
Pasang besi wermess tunggal M2 (6,00*33,00) 85% 198.00 5,000.00
Pasang bekisting saluran rel M2 (0,10*33,00)*2 85% 6.60 45,000.00
Cor lantai M2 (6,00*33,00) 85% 198.00 15,000.00
8 Benangan M1 (33*2) 85% 66.00 12,500.00
Sub total

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
III PEKERJAAN LIMBAH OLI
1 Pengukuran & bauwplank M1 (4*2)+(1*2) 100% 10.00 10,000.00
2 Pemerataan tanah M2 (1,20*4,2) 100% 5.04 5,000.00
3 Pasang dinding bata M2 (1,00*1,00*5)+(1,00*4,0*2) 100% 13.00 22,000.00
4 Pasang patlah bata M2 (0,75*0,75*4) 100% 2.25 22,000.00
5 Plesteran dinding M2 (0,80*1,00*4sisi*4)+(0,40*1,0*2)+(0,40*4*2) 100% 16.80 20,000.00
M2 (0,15*0,80*5)+(0,15*4,0*2) 100% 1.80 20,000.00
6 Plesteran lantai M2 (0,80*0,80*4) 100% 2.56 20,000.00
7 Acian M2 (0,40*1,0*2)+(0,40*4,0*2)+(0,15*0,80*5)+(0,15*4,0*2) 100% 5.80 10,000.00
8 Benangan sudut M1 (0,80*10)+(4,0*2*2)+(0,4*4) 100% 25.60 12,500.00
9 Pasaeramik dinding M2 (0,75*0,90*4sisi*4)+(0,75*0,75*4) 100% 13.05 60,000.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 250,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,30 Juni 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : BENGKEL PAK NUR
LOKASI : PAMOTAN
TANGGAL : 10 JUNII s/d 16 JUNI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN RUANG BENGKEL 4X20
1 Pengukuran & bauwplank M1 (4*2)+(20*2) 100% 48.00 10,000.00
2 Pekerjaan foot plat
Galian tanah foot plat nempel tiang WF Bh 4 bh 100% 4.00 75,000.00
Pemerataan tanah pondasi foot plat 100x100 M2 (1,00*1,00)*4 bh 100% 4.00 5,000.00
Rabatan lantai dasar M2 (1,00*1,00)*8 bh 100% 8.00 15,000.00
Pembesian Kg (2,0*6*2*0,60*8bh)+(2,50*6*0,60*8bh)+(2*6*1,0*0,40*8bh) 100% 225.60 4,000.00
Pasang bekisting M2 (0,30*1,0*4*4bh)+(0,25*4*2,0*8bh) 100% 20.80 45,000.00
Cor beton manual foot & kolom utara M3 (0,30*0,90*0,90*4bh)+(0,35*0,35*1,60*4 bh) 100% 1.76 250,000.00
Cor beton manual foot & kolom nempel tiang wf (0,30*0,90*0,90*4bh)+(0,35*0,35*1,0*4 bh) 100% 1.46 250,000.00
3 Pekerjaan pondasi M1 (20+4+4) 28.00
Pemerataan tanah pondasi batu M2 (0,50*28) 100% 14.00 130,000.00
Pasang pondasi M3 (0,50*0,50*18)+(0,50*0,50*4,0*2 lajur) 100% 6.50 130,000.00
4 Beton sloof 20/30 M1 (18+4+4) 26.00
Pembesian Kg (26*6*0,60)+(26*6*0,9*0,40) 100% 149.76 2,000.00
Pasang bekisting M2 (0,30*2*26) 100% 15.60 45,000.00
Cor beton manual M3 (0,20*0,30*26) 100% 1.56 250,000.00
5 Beton sloof 15/20 M1 (4+4) 8.00
Pembesian Kg (8*4*0,60)+(8*6*0,6*0,40) 100% 30.72 2,000.00
Pasang bekisting M2 (0,20*2*8) 100% 3.20 45,000.00
Cor beton manual M3 (0,15*0,20*8) 100% 0.24 250,000.00
6 Urugan tanah peninggian M3 (0,2*4*20) 100% 16.00 60,000.00
Pemerataan dan pemadatan tanah di vibro M2 (4,0*18) 100% 72.00 15,000.00
Pasang bekisting M2 (0,15*4*2)+(0,15*18) 100% 3.90 45,000.00
Rabatan lantai M2 (4*18) 100% 72.00 15,000.00
7 Beton kolom 25/25 M1 (4,5*8) 36.00
Pembesian Kg (36*6*0,89)+(36*6*0,9*0,40) 100% 270.00 2,000.00
Pasang bekisting M2 (0,25*4*4,0)*8 bh 70% 32.00 45,000.00
Cor beton manual M3 (0,25*0,25*4,0)*8 bh 70% 2.00 250,000.00
8 Beton kolom Praktis M1 (4,20*6) 25.20
Pembesian Kg (25,*6*0,89)+(36*6*0,9*0,40) 100% 270.00 4,000.00
Pasang bekisting M2 (0,25*4*4,0)*8 bh 100% 32.00 45,000.00
Cor beton manual M3 (0,25*0,25*4,0)*8 bh 100% 2.00 250,000.00
9 Beton balok ring tengah 10/12 M1 (4*4)+(18*1) 34.00
Pembesian Kg (34*6*0,60)+(34*6*0,4*0,22) 100% 140.35 4,000.00
Pasang bekisting M2 (0,15*2*34) 100% 10.20 45,000.00
Cor beton manual M3 (0,10*0,15*34) 100% 0.51 250,000.00
10 Pasang bata ringan 0,00 s/d 2,00 M2 (2,05*4,0*4)+(2,05*18) - (1,0*2,0*3)+(1,20*1,20*3) 100% 68.02 22,500.00
11 Pasang bata ringan 2,00 s/d 3,45 M2 (1,45*4,0*4)+(1,45*18) 70% 49.30 25,000.00

Sub total

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
II PEKERJAAN PENINGGIAN SALURAN AIR
1 Pengukuran & bauwplank M1 (33*2) 100% 66.00 10,000.00
2 Galian tanah timur M3 (0,30*0,30*33) 100% 2.97 60,000.00
Galian tanah barat M3 (0,30*0,30*33) 100% 2.97 60,000.00
3 Pasang pondasi peninggian timur M3 (0,30*0,60*33) 100% 5.94 150,000.00
Pasang pondasi peninggian barat M3 (0,30*0,60*33)*2 100% 11.88 150,000.00
4 Plesteran timur M2 (0,60*33)*1 100% 19.80 40,000.00
Plesteran barat M2 (0,60*33)*2 100% 39.60 40,000.00
5 Acian timur M2 (0,60*33)*1 100% 19.80 10,000.00
Acian barat M2 (0,60*33)*2 100% 39.60 10,000.00
6 Pembersihan saluran M1 (33,0*2) 200% 66.00 5,000.00
Sub total
III PEKERJAAN PONDASI FOOTPLAT JENTRY
Pemerataan tanah pondasi foot plat 100x100 M2 (1,00*1,00)*2 Bh 100% 2.00 5,000.00
Rabatan lantai dasar M2 (1,00*1,00)*2 bh 100% 2.00 15,000.00
Pembesian Kg (2,0*6*2*0,89*2bh)+(2,50*6*0,89*2bh) 100% 69.42 4,000.00
Pasang bekisting M2 (0,30*1,0*4*4bh)+(0,45*4*2,0*2bh) 100% 12.00 45,000.00
Cor beton manual foot & kolom utara M3 (0,30*0,90*0,90*2bh)+(0,50*0,50*1,60*2 bh) 100% 1.29 250,000.00
Sub total
III PEKERJAAN COR LANTAI
1 Pengukuran & bauwplank M1 (30*2) 100% 60.00 10,000.00
Pemerataan tanah galian M2 (5,40*26,2,00)*2 100% 282.96 5,000.00
Pasang besi wermess tunggal M2 (5,40*26,2,00)*2 100% 282.96 5,000.00
Pasang bekisting M2 (0,15*26,20)*3 100% 11.79 45,000.00
Cor lantai tahap 1 M2 (5,4,00*26,2)*1 100% 141.48 15,000.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Langsiran material Batu , semen Ls 1.00 100% 1.00 1,500,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,30 Juni 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : REL PINTU TKD , SALURAN , PAVING
LOKASI : PAMOTAN
TANGGAL : 10 JUNII s/d 30 JUNI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN SETRIKAN DINDING PONDASI

1 Setrikan dinding pondasi M2 (1,40*6)*7 100% 58.80 40,000.00


2 Benangan sudut M1 (6*7) 100% 42.00 12,500.00
3 Rabatan lantai M2 (0,1*6*7) 100% 4.20 15,000.00
4 Pembersihan M2 (3,00*42) 100% 126.00 5,000.00
5 Langsiran material Ls 1.00 100% 1.00 300,000.00
Sub total
II PEKERJAAN PONDASI REL PINTU MASUK TKD
1 Pengukuran & bauwplank M1 20.00 50% 20.00 10,000.00
2 Pemerataan tanah M2 (1,20*20) 50% 24.00 5,000.00
3 Pasang pondasi M3 (0,35*1,00*10,0) 50% 3.50 130,000.00
4 Balok 25x100 M1 20.00 20.00
Pembesian Kg (20*8*0,89)+(20*6*2,0*0,40) 238.40 2,000.00
Pasang bekisting M2 (0,25*20)+(0,25*1,00*2) 5.50 45,000.00
Cor beton readymix M3 (0,25*1,00*20) 5.00 160,000.00
Pasang pipa pvc 6 dim M1 20.00 50% 20.00 5,000.00
5 Langsiran material Ls 1.00 1.00 150,000.00
Sub total
III PEKERJAAN LANTAI BETON TEPI PAVING
1 Bongkar paving dan perbaikan M2 (0,70*78) 100% 54.60 10,000.00
2 Galian tanah & Pemerataan tanah M2 (0,35*78) 100% 27.30 5,000.00
3 Pembesian Kg (78*2*0,22)+(78*4*0,50*0,22) 100% 68.64 4,000.00
Pasang bekisting M2 (0,20*78) 100% 15.60 45,000.00
Cor beton readymix M3 (0,20*0,40*30)+(0,20*0,35*48) 100% 5.76 160,000.00
4 Rabatan lantai tepi saluran dan dinding M2 (0,15*42)+(0,40*6) 100% 8.70 15,000.00
5 Pembersihan saluran M1 78.00 100% 78.00 5,000.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Langsiran material Batu , semen Ls 1.00 100% 1.00 400,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,30 Juni 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : JEMBATAN TKD & SALURAN
LOKASI : PAMOTAN
TANGGAL : 1 JULI s/d 07 JULI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
PEKERJAAN DINDING BATU MIRING
1 Pengukuran & bauwplank M1 (2,70*4plong) 100% 10.80 10,000.00
3 Pasang pondasi dasar M3 (0,5*0,30)*10,8 100% 1.62 130,000.00
4 Pasang dinding batu miring M3 (0,30*3,00)*10,80 100% 9.72 150,000.00
5 Kolom praktis M1 (3,5*4) 14.00
Pembesian Kg (14*4*0,60kg)+(14*6*0,40*0,22kg) 100% 40.99 4,000.00
Pasang bekisting M2 (0,20*2*14) 100% 5.60 45,000.00
Cor beton manual M3 (0,15*0,20*14,00) 100% 0.42 250,000.00
Urugan tanah kembali untuk dinding M2 (3,00*10,8) 100% 32.40 10,000.00
6 Langsiran material Ls 1.00 100% 1.00 150,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,07 Juli 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : GARDU LISTRIK
LOKASI : PAMOTAN
TANGGAL : 1 JULI s/d 07 JULI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN GARDU LISTRIK
1 Pengukuran & bauwplank M1 (6,50*2)+(12,5*2) 100% 38.00 10,000.00
2 Pemerataan tanah M2 (0,80*5,0*4)+(0,80*12,0)+(0,60*12,0+(0,80*12,0) 100% 42.40 5,000.00
3 Kolom 25/25 M1 (1,50*4) 6.00
Pembesian Kg (6*6*0,89)+(6*6*1,0*0,40) 100% 46.44 2,000.00
Pasang bekisting M2 (0,30*2*1,5)*4 80% 20% 100% 3.60 45,000.00
Cor beton manual M3 (0,30*0,30*1,50*4) 80% 20% 100% 0.54 250,000.00
4 Foot plat Bh 4.00 4.00
Pembesian Kg (2,0*6*2*0,89*4)+(6*6*0,89)+(6*6*1,0*0,40) 100% 131.88 2,000.00
Pasang bekisting M2 (0,30*0,9*4*4)+(0,30*2*1,50*4) 100% 7.92 45,000.00
Cor beton manual M3 (0,30*0,90*0,90*4)+(0,25*0,25*1,2*4) 100% 1.27 250,000.00
5 Pasang pondasi timur tambahan 35 cm M3 (0,40*0,35*5,0) 100% 0.60 130,000.00
Pasang pondasi utara tambah 35 cm M3 (0,85*0,35*12) 100% 3.06 130,000.00
Pasang pondasi barat 35 cm M3 (0,,40*0,35*5,00) 100% 0.60 130,000.00
Pasang pondasi selatan tambahan 35 cm M3 (0,4*0,35*12) 100% 1.44 130,000.00
Pasang pondasi sekat tengah tambahan 35 m M3 (0,4*0,35*4*2) 100% 0.96 130,001.00
Pasang pondasi saluran kabel M3 (0,35*0,80*11) 100% 3.08 130,002.00
3 Sloof 20/30 M1 (5*4)+(12*2) 44.00
Pembesian Kg (44,5*6*0,89)+(44,5*6*1,0*0,40) 100% 344.43 2,000.00
Pasang bekisting M2 (0,30*2*44) 26.40 45,000.00
Cor beton manual M3 (0,20*0,30*44) 2.64 250,000.00

Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 100,000.00

Sub total

Total keseluruhan biaya

Pamotan porong ,07 Juli 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : GUDANG (BENGKEL TEGUH)
LOKASI : PAMOTAN
TANGGAL : 1 JULI s/d 07 JULI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN REL JENTRI
1 Cor lantai
Pemerataan tanah M2 (6,00*33,00) 85% 15% 100% 198.00 5,000.00
Pasang besi wermess tunggal M2 (6,00*33,00) 85% 15% 100% 198.00 5,000.00
2 Pasang bekisting saluran rel M2 (0,10*33,00)*2 85% 15% 100% 6.60 45,000.00
Cor lantai M2 (6,00*33,00) 85% 15% 100% 198.00 15,000.00
Benangan rel M1 (33*2) 85% 15% 100% 66.00 12,500.00
3 Pasang bekisting saluran oli M2 (0,15+0,15+0,1)*6 100% 6.60 45,000.00
Benangan saluran oli M1 (6*2)*2 100% 66.00 12,500.00
Sub total
II PEKERJAAN LAIN LAIN
1 Pembersihan tanah Ls 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,07 Juli 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : BENGKEL PAK NUR
LOKASI : PAMOTAN
TANGGAL : 1 JULI s/d 07 JULI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN RUANG BENGKEL 4X20
7 Beton kolom 25/25 M1 (4,5*8) 36.00
Pembesian Kg (36*6*0,89)+(36*6*0,9*0,40) 100% 270.00 2,000.00
Pasang bekisting M2 (0,25*4*4,0)*8 bh 70% 30% 32.00 45,000.00
Cor beton manual M3 (0,25*0,25*4,0)*8 bh 70% 30% 2.00 250,000.00
8 Beton kolom Praktis M1 (4,20*6) 25.20
Pembesian Kg (25,*6*0,89)+(36*6*0,9*0,40) 100% 270.00 4,000.00
Pasang bekisting M2 (0,25*4*4,0)*8 bh 100% 32.00 45,000.00
Cor beton manual M3 (0,25*0,25*4,0)*8 bh 100% 2.00 250,000.00
9 Beton balok ring tengah 10/12 M1 (4*4)+(18*1) 34.00
Pembesian Kg (34*6*0,60)+(34*6*0,4*0,22) 100% 140.35 4,000.00
Pasang bekisting M2 (0,15*2*34) 100% 10.20 45,000.00
Cor beton manual M3 (0,10*0,15*34) 100% 0.51 250,000.00
10 Pasang bata ringan 0,00 s/d 2,00 M2 (2,05*4,0*4)+(2,05*18) - (1,0*2,0*3)+(1,20*1,20*3) 100% 68.02 22,500.00
11 Pasang bata ringan 2,00 s/d 3,45 M2 (1,45*4,0*4)+(1,45*18) 70% 30% 100% 49.30 25,000.00

Sub total
II PEKERJAAN PONDASI FOOTPLAT JENTRY
Pasang pelek Bh 2.00 100% 2.00 25,000.00
Pasang bekisting M2 (0,20*0,60*4)*2 100% 0.96 45,000.00
Cor betonpedestal M3 (0,45*0,50*0,20)*2 100% 0.09 250,000.00
Sub total
III PEKERJAAN COR LANTAI
Cor lantai tahap 2 M2 (5,4,00*26,2) 100% 141.48 15,000.00
Pemerataan tanah tahap 3 L 85 cm M2 (0,85*26,2,00) 100% 22.27 5,000.00
Pasang besi wermess tunggal tahap 3 M2 (0,85*26,2,00) 100% 22.27 5,000.00
Pasang bekisting tahap 3 M2 (0,15*26,20)*2 100% 7.86 45,000.00
Cor lantai tahap 3 M2 (0,85*26,2)*1 100% 22.27 15,000.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,07 Juli 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : REL PINTU TKD , SALURAN , PAVING
LOKASI : PAMOTAN
TANGGAL : 1 JULI s/d 07 JULI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN SETRIKAN DINDING PONDASI
Plong 8 s/d 13 6 plong
1 Setrikan dinding pondasi M2 (1,40*6)*6 100% 50.40 40,000.00
2 Benangan sudut M1 (6*6) 100% 36.00 10,000.00
3 Rabatan lantai M2 (0,1*6*6) 100% 3.60 20,000.00
4 Pembersihan M2 (2,00*36) 100% 72.00 5,000.00
5 Langsiran material Ls 1.00 100% 1.00 150,000.00
Sub total
II PEKERJAAN PONDASI REL PINTU MASUK TKD
1 Pengukuran & bauwplank M1 20.00 50% 20.00 10,000.00
2 Pemerataan tanah M2 (1,20*20) 50% 24.00 5,000.00
3 Pasang pondasi M3 (0,35*1,00*10,0) 50% 50% 3.50 130,000.00
Pasang pondasi M3 (0,35*1,00*7) 100% 2.45 130,000.00
4 Balok 25x100 M1 20.00 20.00
Pembesian Kg (20*8*0,89)+(20*6*2,0*0,40) 238.40 2,000.00
Pasang bekisting M2 (0,25*20)+(0,25*1,00*2) 5.50 45,000.00
Cor beton readymix M3 (0,25*1,00*20) 5.00 160,000.00
Pasang pipa pvc 6 dim M1 20.00 50% 20.00 15,000.00
5 Langsiran material Ls 1.00 1.00 150,000.00
Sub total
III PEKERJAAN LANTAI BETON TEPI PAVING
1 Bongkar paving dan perbaikan M2 (0,50*18) 100% 9.00 10,000.00
2 Galian tanah M3 (0,35*0,15*18) 100% 0.95 5,000.00
3 Pembesian Kg (18*2*0,22)+(18*4*0,50*0,22) 100% 15.84 4,000.00
Pasang bekisting M2 (0,20*18) 100% 3.60 45,000.00
Cor beton manual M3 (0,20*0,35*18) 100% 1.26 160,000.00
4 Rabatan lantai tepi saluran dan dinding M2 (0,15*18) 100% 2.70 15,000.00
5 Pembersihan saluran M1 18.00 100% 18.00 5,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,07 Juli 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : PONDASI KOLAM
LOKASI : PAMOTAN
TANGGAL : 1 JULI s/d 07 JULI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI
Sebelah barat
1 Pengukuran & bauwplank M1 26.30 100% 26.30 40,000.00
2 Galian tanah M3 (0,40*0,40*26,30) 100% 4.21 50,000.00
3 Pasang batu pondasi M3 (0,40*0,50)*26,30 100% 5.26 20,000.00
Sebelah utara
1 Pengukuran & bauwplank M1 20.30 100% 20.30 40,000.00
2 Galian tanah M3 (0,60*0,50*10) 100% 3.00 50,000.00
Galian tanah M3 (0,60*0,80*10,2) 100% 4.90 50,000.00
3 Pasang batu pondasi M3 (0,60*2,50*12,00) 50% 18.00 130,000.00
Pasang batu pondasi M3 (0,60*2,0*10,00) 50% 12.00 130,000.00
4 Gaian strous dalam 1,00 Bh 7.00 100% 7.00 45,000.00
5 Beton kolom 25/30 sta 0,00 s/d sta 24,00 M1 (2,5*5)+(2*2) 16.50
Pembesian Kg (16,5*6*0,89 kg)+(16,5*6*0,8*0,22 kg) 50% 66.92 4,000.00
Cor beton (manual) M3 (0,30*0,25*16,5) 50% 1.24 250,000.00

Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran material batu M3 (5,62+18+12) 50% 35.62 35,000.00
2 Langsiran material tanah urug M3 (3,00*2,00*17)+(0,90*3*3) 25% 110.10 35,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,07 Juli 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : JEMBATAN TKD & SALURAN
LOKASI : PAMOTAN
TANGGAL : 8 JULI s/d 14 JULI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
PEKERJAAN DINDING BATU MIRING
1 Pengukuran & bauwplank M1 (2,70*8) 100% 21.60 10,000.00
2 Pasang pondasi dasar M3 (0,5*0,30)*21,6 100% 3.24 130,000.00
3 Pasang dinding batu miring M3 (0,30*3,30)*21,6 100% 21.38 150,000.00
4 Kolom praktis M1 (4,0*8) 32.00
Pembesian Kg (32*4*0,60kg)+(32*6*0,40*0,22kg) 100% 93.70 4,000.00
Pasang bekisting M2 (0,20*2*32) 100% 12.80 45,000.00
Cor beton manual M3 (0,15*0,20*32,00) 100% 0.96 250,000.00
5 Urugan tanah kembali untuk dinding M2 (3,5021,6) 100% 96.00 10,000.00
6 Langsiran material Ls 1.00 100% 1.00 250,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,14 Juli 2020


Dibuat Oleh
oke

BON UPAH KERJA


PEKERJAAN : GUDANG (BENGKEL TEGUH)
LOKASI : PAMOTAN
TANGGAL : 8 JULI s/d 14 JULI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN COR LANTAI
1 Cor lantai timur jentri
Pemerataan tanah M2 (5,40*33,00) 50% 178.20 5,000.00
Pasang besi wermess tunggal M2 (5,40*33,00) 100% 178.20 5,000.00
2 Pasang bekisting satu sisi M2 (0,15*33)+(0,15*5,40) 100% 5.76 45,000.00
Cor lantai M2 (5,40*33,00) 100% 178.20 15,000.00
3 Pasang bekisting saluran oli M2 (0,15+0,15+0,1)*5,4 100% 2.16 45,000.00
Benangan saluran oli M1 (5,4*2)*2 100% 21.60 12,500.00
Benangan rel jentri M1 (33*1) 100% 21.60 12,501.00
Sub total
II PEKERJAAN LAIN LAIN
1 Pembersihan tanah Ls 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,14 Juli 2020


Dibuat Oleh

oke

BON UPAH KERJA


PEKERJAAN : BENGKEL PAK NUR
LOKASI : PAMOTAN
TANGGAL : 8 JULI s/d 14 JULI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN RUANG BENGKEL 4X20
7 Beton kolom 25/25 M1 (4,5*8) 36.00
Pembesian Kg (36*6*0,89)+(36*6*0,9*0,40) 100% 270.00 2,000.00
Pasang bekisting M2 (0,25*4*4,0)*8 bh 70% 30% 32.00 45,000.00
Cor beton manual M3 (0,25*0,25*4,0)*8 bh 70% 30% 2.00 250,000.00
8 Beton kolom Praktis M1 (4,20*6) 25.20
Pembesian Kg (25,*6*0,89)+(36*6*0,9*0,40) 100% 270.00 4,000.00
Pasang bekisting M2 (0,25*4*4,0)*8 bh 100% 32.00 45,000.00
Cor beton manual M3 (0,25*0,25*4,0)*8 bh 100% 2.00 250,000.00
9 Beton balok ring tengah 10/12 M1 (4*4)+(18*1) 34.00
Pembesian Kg (34*6*0,60)+(34*6*0,4*0,22) 100% 140.35 4,000.00
Pasang bekisting M2 (0,15*2*34) 100% 10.20 45,000.00
Cor beton manual M3 (0,10*0,15*34) 100% 0.51 250,000.00
10 Pasang bata ringan 0,00 s/d 2,00 M2 (2,05*4,0*4)+(2,05*18) - (1,0*2,0*3)+(1,20*1,20*3) 100% 68.02 22,500.00
11 Pasang bata ringan 2,00 s/d 3,45 M2 (1,45*4,0*4)+(1,45*18) 70% 30% 100% 49.30 25,000.00

Sub total
III PEKERJAAN COR LANTAI
Cor lantai tahap 4 & 5
Pemerataan tanah tahap 4 L 1,65 cm M2 (1,65*26,20) 100% 43.23 5,000.00
Pemerataan tanah tahap 5 L 5,40 cm M2 (5,40*26,20) 100% 141.48 5,000.00
Pasang besi wermess tunggal tahap 4 M2 (1,65*26,20) 100% 43.23 5,000.00
Pasang besi wermess tunggal tahap 5 M2 (5,40*26,20) 100% 141.48 5,000.00
Pasang bekisting tahap 3 M2 (0,15*26,20)*2 100% 7.86 45,000.00
Cor lantai tahap 4 M2 (1,65*26,2) 100% 43.23 15,000.00
Cor lantai tahap 5 M2 (5,40*26,2) 100% 141.48 15,000.00
Benangan saluran M1 (5,40*26,2) 100% 141.48 15,001.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 14 Juli 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : REL PINTU TKD , SALURAN , PAVING
LOKASI : PAMOTAN
TANGGAL : 8 JULI s/d 14 JULI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN SETRIKAN DINDING PONDASI
Plong 14 s/d 21 8 plong
1 Setrikan dinding pondasi M2 (1,40*6)*8 100% 67.20 40,000.00
Benangan sudut M1 (8*6) 100% 48.00 12,500.00

2 Setrikan dinding pondasi bawah pagar panel M2 (1,30*12,50) 100% 16.25 40,000.00
Benangan sudut M1 12.50 100% 12.50 12,500.00
3 Setrikan dinding pondasi tanjakan pintu masuk M2 (0,80+1,30)/2*6,0 100% 6.30 40,000.00
4 Langsiran material Ls 1.00 100% 1.00 150,000.00
Sub total
II PEKERJAAN PONDASI REL PINTU MASUK TKD
1 Pengukuran & bauwplank M1 20.00 50% 20.00 10,000.00
2 Pemerataan tanah M2 (1,20*20) 50% 24.00 5,000.00
3 Pasang pondasi M3 (0,35*1,00*7) 100% 2.45 130,000.00
4 Balok 25x100 M1 21.00 21.00
Pembesian Kg (21*8*0,89)+(21*6*2,0*0,40) 75% 250.32 2,000.00
Pasang bekisting M2 (0,30*21)+(0,25*1,00*2)+(0,30*10) 75% 9.80 45,000.00
Cor beton readymix M3 (0,30*1,00*11)+(0,30*1,30*7) 75% 6.03 160,000.00
Pasang pipa pvc 6 dim M1 20.00 50% 20.00 15,000.00
Pembuatan rel pintu 12 m1 M1 12.00 100% 12.00 15,000.00
Pasang real pintu dan angkur M1 18.00 100% 18.00 15,000.00
5 Langsiran material Ls 1.00 1.00 150,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 14 Juli 2020


Dibuat Oleh

oke
BON UPAH KERJA
PEKERJAAN : PONDASI KOLAM
LOKASI : PAMOTAN
TANGGAL : 8 JULI s/d 14 JULI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI
Sebelah timur
1 Pengukuran & bauwplank M1 28.50 100% 28.50 10,000.00
2 Galian tanah M3 (0,20*0,40*28,5) 100% 2.28 50,000.00
3 Pasang batu pondasi M3 (0,40*0,40)*28,5 100% 4.56 130,000.00
Sebelah utara
1 Pengukuran & bauwplank M1 20.30 100% 20.30 10,000.00
2 Galian tanah M3 (0,60*0,50*10) 100% 3.00 50,000.00
Galian tanah M3 (0,60*0,80*10,2) 100% 4.90 50,000.00
3 Pasang batu pondasi M3 (0,60*2,50*12,00) 50% 50% 100% 18.00 130,000.00
Pasang batu pondasi M3 (0,60*2,0*10,00) 50% 50% 100% 12.00 130,000.00
4 Gaian strous dalam 1,00 Bh 7.00 7.00 45,000.00
5 Beton kolom 25/30 sta 0,00 s/d sta 24,00 M1 (2,5*5)+(2*2) 16.50
Pembesian Kg (16,5*6*0,89 kg)+(16,5*6*0,8*0,22 kg) 50% 50% 100% 66.92 4,000.00
Cor beton (manual) M3 (0,30*0,25*16,5) 50% 50% 100% 1.24 250,000.00

Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran material batu M3 (5,62+18+12) 50% 50% 100% 35.62 35,000.00
2 Langsiran material tanah urug M3 (3,00*2,00*17)+(0,90*3*3) 25% 50% 75% 110.10 35,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 14 Juli 2020


Dibuat Oleh

oke

BON UPAH KERJA


PEKERJAAN : DINDING PAGAR PEMBATAS SPBE
LOKASI : PAMOTAN
TANGGAL : 8 JULI s/d 14 JULI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI
1 Pengukuran & bauwplank M1 (3,20*8 plong) 100% 25.60 10,000.00
2 Pemerataan tanah M2 (0,50*25,60) 100% 12.80 5,000.00
3 Pasang batu pondasi M3 (0,30+0,50)/2*1,05*25,6 100% 10.75 130,000.00
4 Beton kolom 15/15 T 4,00 M1 (4,00*7) 28.00
Pembesian Kg (28*4*0,60 kg)+(28*6*0,8*0,22 kg) 100% 96.77 4,000.00
Cor beton (manual) M3 (0,20*0,20*1,15)*7 100% 0.32 250,000.00

Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran material Ls 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 14 Juli 2020


Dibuat Oleh

oke

BON UPAH KERJA


PEKERJAAN : GUDANG (BENGKEL TEGUH)
LOKASI : PAMOTAN
TANGGAL : 15 JULI s/d 28 JULI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN COR LANTAI
1 Cor lantai timur
Pemerataan tanah M2 (12,425*33,00) 100% 410.03 5,000.00
Pasang besi wermess tunggal M2 (12,425*33,00) 100% 410.03 5,000.00
Pasang bekisting satu sisi M2 (0,15*33)*3+(12,425*1) 100% 27.28 45,000.00
Cor lantai M2 (12,425*33,00)*0,15 100% 61.50 60,000.00
Pasang bekisting saluran oli M2 (0,15+0,15+0,1)*12,425 100% 4.97 45,000.00
Benangan saluran oli M1 (12,425*2)*2 100% 49.70 12,500.00

2 Cor lantai barat jentri


Pemerataan tanah M2 (6,05*33,00) 50% 199.65 5,000.00
Pasang besi wermess tunggal M2 (6,05*33,00) 100% 199.65 5,000.00
Pasang bekisting satu sisi M2 (0,15*6)*2 100% 1.80 45,000.00
Cor lantai M2 (6,05*33,00)*0,15 100% 29.95 60,000.00
Pasang bekisting saluran oli M2 (0,15+0,15+0,1)*6,0 100% 2.40 45,000.00
Benangan saluran oli M1 (6,0*2)*2 100% 24.00 12,500.00
Benangan rel jentri M1 (33*1) 100% 33.00 12,501.00
Sub total
II PEKERJAAN LAIN LAIN
1 Pembersihan tanah Ls 1.00 100% 1.00 200,000.00

Sub total

Total keseluruhan biaya


Pamotan porong , 28 Juli 2020
Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : BENGKEL PAK NUR
LOKASI : PAMOTAN
TANGGAL : 8 JULI s/d 14 JULI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN RUANG BENGKEL 4X20
1 Beton Balok 20/25 M1 (20+18,2+4,0)+(5,5*7 bh) 80.70
Pembesian Kg (80,70*8*0,89)+(80,70*6*0,9*0,40) 100% 748.90 2,000.00
Pasang bekisting M2 (0,20+0,15+0,15)*80,70 100% 40.35 45,000.00
Pasang peranca M2 80.71 100% 80.70 20,000.00
2 Beton plat dak M1 (5,5*18,20)+(1,80*2,0)+(0,9*3,5) 106.85
Pembesian Kg ((5,5/0,125*20*0,4)+(19/0,125*5,5*0,4))*2 100% 1372.80 4,000.00
Pasang bekisting M2 106.85 100% 106.85 45,000.00
Pasang peranca M2 106.85 100% 106.85 20,000.00
3 Beton lisplank 5 x 30 M2 (19+3,2+0,9+2) 25.10
Pembesian Kg (25/0,20*0,50*0,40kg)+(25,0*3*0,40kg) 100% 55.00 4,000.00
Pasang bekisting M2 (0,15+0,05+0,30)*(19+3,2+0,9+2) 100% 12.55 45,000.00
Cor beton readymix M3 18.50 100% 18.50 160,000.00
Sub total
II PEKERJAAN PAGAR PEMBATAS
1 Bongkar pagar panel 4 daun Plong 13.00 100% 13.00 35,000.00
Sub total
III PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 100% 1.00 200,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 28 Juli 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : PONDASI KOLAM
LOKASI : PAMOTAN
TANGGAL : 15 JULI s/d 28 JULI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI
Sebelah barat
1 Beton sloof 15/40 M1 26.30 26.30
Pembesian Kg (26,30*6*0,60 kg)+(26,30*6*1,0*0,22 kg) 100% 129.40 4,000.00
Bekisting M2 (0,15*2*26,30) 100% 7.89 45,000.00
Cor beton (manual) M3 (0,15*0,40*26,30) 100% 1.58 250,000.00
sudut utara
1 Pasang pondasi M3 (0,50*0,50*2,50) 100% 0.63 130,000.00
2 Beton sloof 15/40 M1 2.50 2.50
Pembesian Kg (2,5*4*0,60 kg)+(2,5*6*0,8*0,22 kg) 100% 8.64 4,000.00
Bekisting M2 (0,15*2*2,5) 100% 0.75 45,000.00
Cor beton (manual) M3 (0,15*0,40*2,5) 100% 0.15 250,000.00
Sub total
II PEKERJAAN KOLAM LELE
1 Pengukuran & bauwplank M1 (2*2)+(3*2) 100% 10.00 10,000.00
2 Beton sloof 15/15 M1 (2,50*2)+(1,50*2) 8.00
Pembesian Kg (8,0*4*0,60 kg)+(8,0*6*0,65*0,22 kg) 100% 26.06 4,000.00
Bekisting M2 (0,15*2*8,0) 100% 2.40 45,000.00
Cor beton (manual) M3 (0,15*0,0,15*8,0) 100% 0.18 250,000.00
3 Pasang bata merah M1 (0,8*8) 100% 6.40 25,000.00
4 Plesteran M2 (1,10*8,0*2)+(0,15*8) 100% 18.80 20,000.00
Acian M2 (1,10*8,0*2)+(0,15*8) 100% 18.80 10,000.00
Benangan M3 (8*2) 100% 16.00 12,500.00
Sub total
III PEKERJAAN KOLAM ANGSA & PAGAR
1 Pengukuran & bauwplank M1 (3,5*2)+(5,5*2) 100% 18.00 10,000.00
2 Galian tanah pondasi kolam M3 (0,40*0,70*5,40)+(0,20*0,40*5,40) 100% 1.94 50,000.00
Galian tanah pondasi pagar M3 (0,20*0,40*10,50)+(0,2*0,4*2,50) 100% 1.04 50,000.00
3 Pasang pondasi kolam M3 (0,40*0,7*5,40*2)+(0,40*0,70*2,90) 100% 3.84 130,000.00
Pasang pondasi pagar M3 (0,40*0,40*10,50)+(0,40*0,40*2,50) 100% 1.68 130,000.00
Pasang pondasi patlah M3 (2,90*5,40)*0,20 100% 3.13 130,000.00
4 Beton sloof 15/20 M1 15.90 15.90
Pembesian Kg (15,90*4*0,60 kg)+(15,40*6*0,65*0,22 kg) 100% 51.37 4,000.00
Bekisting M2 (0,15*2*15,90) 100% 4.77 45,000.00
Cor beton (manual) M3 (0,15*0,40*15,90) 100% 0.95 250,000.00
5 Plesteran batu M2 (0,40+0,70)/2*5,5*2+(0,70*2,90)+(2,90*5,50)+(0,40*8,30) 100% 27.35 40,000.00
Acian M2 (0,40+0,70)/2*5,5*2+(0,70*2,90)+(2,90*5,50)+(0,40*8,30) 100% 27.35 10,000.00
Benangan M3 (8,80*2*2) 100% 35.20 12,500.00
6 Langsiran material Ls 0:00 100% 1.00 200,000.00
Sub total

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
IV PEKERJAAN PASANG BALOK TAHU
1 Pemerataan tanah dudukan balok tahu M1 (1,00*30 ) 100% 30.00 5,000.00
Pemerataan tanah taman sebelah barat M2 (3,75*26) 100% 97.50 5,000.00
Pasang balok tahu Bh 25 100% 25.00 25,000.00
Pembersihan Ls 1 100% 1.00 100,000.00
Sub total
V PEKERJAAN KAMAR MANDI
1 Pengukuran & bauwplank M1 (2,5*2)+(1,50*2) 100% 8.00 10,000.00
2 Pasang batu pondasi M3 (0,40*1,0*1,50*2)+(0,40*1,0*2,50*2) 100% 3.20 130,000.00
Sub total
1 Langsiran material tanah urug M3 (3,00*2,00*17)+(0,90*3*3) 75% 25% 100% 110.10 35,000.00
Sub total
Total keseluruhan biaya

Pamotan porong , 28 Juli 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : DINDING PAGAR PEMBATAS SPBE
LOKASI : PAMOTAN
TANGGAL : 15 JULI s/d 28 JULI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI
1 Pengukuran & bauwplank M1 (41,70-25,6) 100% 16.10 10,000.00
2 Pemerataan tanah M2 (0,50*16,10) 100% 8.05 5,000.00
3 Pasang batu pondasi M3 (0,30+0,50)/2*1,05*16,1 100% 6.76 130,000.00
4 Beton kolom 15/15 T 4,00 M1 (4,00*6) 24.00
Pembesian Kg (24*4*0,60 kg)+(24*6*0,8*0,22 kg) 100% 82.94 4,000.00
Cor beton (manual) M3 (0,20*0,20*1,15)*6 100% 0.28 250,000.00
5 Beton sloof 15/20 M1 40.00 40.00
Pembesian Kg (40*4*0,60 kg)+(40*6*0,8*0,22 kg) 100% 138.24 4,000.00
Bekisting M2 (0,20*2*40) 100% 16.00 45,000.00
Cor beton (manual) M3 (0,15*0,20*40) 100% 1.20 250,000.00

Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran material Ls 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 28 Juli 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : GARDU LISTRIK
LOKASI : PAMOTAN
TANGGAL : 15 JULI s/d 28 JULI 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN GARDU LISTRIK
1 Galian tanah pondasi teras M3 (0,20*0,40*13,40) 100% 0.60 130,000.00
2 Pasang pondasi teras M3 (0,40+0,30)/2*1,1*13,40 100% 3.06 130,000.00
Pasang pondasi sekat tengah tambahan 25 cm M3 (0,35*0,25*12) 100% 0.96 130,000.00
Pasang pondasi saluran kabel M3 (0,50*0,25*12) 100% 3.08 130,000.00
3 Kolom 20/20 M1 (1,2*4) 4.80
Pembesian Kg (4,80*4*0,60)+(4,8*6*0,8*0,40) 100% 20.74 2,000.00
Cor beton manual M3 (0,20*0,20*4,8) 100% 0.19 250,000.00
3 Sloof 20/30 M1 (5*4)+(12*2) 44.00
Pembesian Kg (44,5*6*0,89)+(44,5*6*1,0*0,40) 100% 344.43 2,000.00
Pasang bekisting M2 (0,30*2*44) 100% 26.40 45,000.00
Cor beton M3 (0,20*0,30*44) 100% 2.64 160,000.00

Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 100,000.00

Sub total

Total keseluruhan biaya

Pamotan porong ,08 Juli 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : PONDASI KOLAM
LOKASI : PAMOTAN
TANGGAL : 29 JULI s/d 04 AGUSTUS 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
PROGRES PERIODE PERIODE SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI
Sebelah barat
1 Beton sloof 15/40 M1 26.30 26.30
Pembesian Kg (26,30*6*0,60 kg)+(26,30*6*1,0*0,22 kg) 100% 129.40 4,000.00
Bekisting M2 (0,15*2*26,30) 100% 7.89 45,000.00
Cor beton (manual) M3 (0,15*0,40*26,30) 100% 1.58 250,000.00
sudut utara
1 Pasang pondasi M3 (0,50*0,50*2,50) 100% 0.63 130,000.00
2 Beton sloof 15/40 M1 2.50 2.50
Pembesian Kg (2,5*4*0,60 kg)+(2,5*6*0,8*0,22 kg) 100% 8.64 4,000.00
Bekisting M2 (0,15*2*2,5) 100% 0.75 45,000.00
Cor beton (manual) M3 (0,15*0,40*2,5) 100% 0.15 250,000.00
Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,08 Juli 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : DINDING PAGAR PEMBATAS SPBE
LOKASI : PAMOTAN
TANGGAL : 29 JULI s/d 04 AGUSTUS 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI
1 Pengukuran & bauwplank 41,70 s/d 67,5 M1 (67,3-41,70) 100% 25.60 10,000.00
2 Pemerataan tanah M2 (0,50*25,6) 100% 12.80 5,000.00
3 Pasang batu pondasi M3 (0,30+0,50)/2*1,0*25,6 100% 10.24 130,000.00
4 Beton kolom 15/15 T 4,00 M1 (4,00*8) 32.00
Pembesian Kg (32*4*0,60 kg)+(32*6*0,8*0,22 kg) 100% 110.59 4,000.00
Cor beton (manual) M3 (0,20*0,20*1,0)*8 100% 0.32 250,000.00
5 Beton sloof 15/20 M1 27.50 27.50
Pembesian Kg (27,5*4*0,60 kg)+(27,5*6*0,8*0,22 kg) 0% 95.04 4,000.00
Bekisting M2 (0,20*2*27,5) 0% 11.00 45,000.00
Cor beton (manual) M3 (0,15*0,20*27,5) 0% 0.83 250,000.00

Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran material Ls 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,04 Agustus 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : GUDANG (BENGKEL TEGUH)
LOKASI : PAMOTAN
TANGGAL : 29 JULI s/d 04 AGUSTUS 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN POT BUNGA

1 Pengukuran & bauwplank M1 100% 18.00 10,000.00


Pasang bata ringan M2 (0,20*16)*2 100% 6.40 20,000.00
Pasang besi rangka cor dinding M2 (0,55+0,40+0,55)*17*2 100% 51.00 7,500.00
Pasang bekisting dinding M2 (0,60*2)*17 *2 100% 40.80 45,000.00
Cor beton bawah manual M3 (0,15*0,15*17,00)+(0,4*0,15*17) 100% 1.40 250,000.00
Cor beton dinding manual M3 (0,05*0,55*17,0)*2 100% 0.94 250,000.00
Plesteran dinding luar M2 (0,60*17)*2 60% 20.40 20,000.00
Plesteran dinding dalam M2 (0,40*17,0*2) 60% 13.60 20,000.00
Benangan M1 (17*3)*2 60% 102.00 12,500.00

Sub total
II PEKERJAAN LAIN LAIN
1 Pembersihan tanah Ls 1.00 100% 1.00 200,000.00

Sub total

Total keseluruhan biaya

Pamotan porong , 04 Agustus 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : PONDASI KOLAM
LOKASI : PAMOTAN
TANGGAL : 05 AGUSTUS s/d 18 AGUSTUS 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI
Pondasi utara
1 Beton sloof 15/40 M1 20.30 20.30
Pembesian Kg (20,30*4*0,60 kg)+(20,30*6*0,8*0,22 kg) 100% 70.16 4,000.00
Bekisting M2 (0,15*2*20,30) 100% 6.09 45,000.00
Cor sloof manual M3 (0,15*0,40*20,30) 100% 1.22 250,000.00
2 Urugan tanah peninggian M3 (0,20*3,50*20,30) 100% 14.21 70,000.00
3 Langsiran material urugan dari dalam gudang Ls 1 100% 14.21 20,000.00
Sub total
II PEKERJAAN KAMAR MANDI
1 Pengukuran & bauwplank M1 (2,50*2)+2,3*2) 19.30
2 Pasang pondasi M3 (0,40*0,80*2,20*2)+(0,40*0,80*2,30*3) 100% 2.19 130,000.00
3 Beton sloof 15/40 M1 (2,0*2)+(2,4*2) 8.80
Pembesian Kg (8,8*4*0,60 kg)+(8,80*6*0,8*0,22 kg) 100% 70.16 4,000.00
Bekisting M2 (0,15*2*8,80) 100% 6.09 45,000.00
Cor sloof manual M3 (0,15*0,15*8,80) 100% 1.22 250,000.00
4 Beton kolom 25/15 M1 (3,5*4) 14.00
Pembesian Kg (14*4*0,60 kg)+(14,0*6*0,8*0,22 kg) 100% 48.38 4,000.00
Bekisting M2 (0,15*2*14) 20% 4.20 45,000.00
Cor sloof manual M3 (0,15*0,15*14) 20% 0.32 250,000.00
5 Plesteran dinding batu M2 (0,70*2*4 sisi)+(0,70*2*2sisi) 100% 8.40 40,000.00
Acian dinding batu M2 (0,70*2*4 sisi)+(0,70*2*2sisi) 100% 8.40 10,000.00
6 Plesteran lantai M2 (2,0*2,0) 100% 4.00 20,000.00
Acian lantai M2 (2,0*2,0) 100% 4.00 10,000.00
Sub total
III PEKERJAAN KOLAM ANGSA & PAGAR
1 Pasang bata ringan M2 (15,90*0,80) 100% 18.00 10,000.00
2 Beton kolom 15/20 M1 (0,80 * 5 bh) 4.00
Pembesian Kg (5,00*4*0,60 kg)+(5,00*6*0,65*0,22 kg) 100% 16.29 4,000.00
Bekisting M2 (0,25*2*8) 100% 4.00 45,000.00
Cor beton (manual) M3 (0,15*0,20*8) 100% 0.24 250,000.00

1 Pengukuran & bauwplank sebelah selatan M1 13.70 100% 13.70 10,000.00


2 Galian tanah pondasi pagar M3 (0,20*0,40*13,70) 100% 1.10 50,000.00
Pasang pondasi pagar M3 (0,40*0,40*13,70) 100% 2.19 130,000.00
3 Beton sloof 15/20 M1 13.70 13.70
Pembesian Kg (13,70*4*0,60 kg)+(13,70*6*0,65*0,22 kg) 100% 44.63 4,000.00
Bekisting M2 (0,15*2*13,70) 100% 4.11 45,000.00
Cor beton (manual) M3 (0,15*0,40*13,70) 100% 0.82 250,000.00
4 Pasang bata ringan M2 (13,80*0,80) 100% 11.04 10,000.00
5 Beton kolom 15/20 M1 (0,80 * 4 bh) 3.20
Pembesian Kg (5,00*4*0,60 kg)+(5,00*6*0,65*0,22 kg) 100% 16.29 4,000.00
Bekisting M2 (0,25*2*3,60) 100% 1.80 45,000.00
Cor beton (manual) M3 (0,15*0,20*3,60) 100% 0.11 250,000.00
6 Langsiran material Ls 1.00 100% 1.00 200,000.00
Sub total

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
IV PEKERJAAN PAVING
1 Pemerataan tanah urug M2 (3,40*28,0)+(0,80*2,00) 100% 96.80 5,000.00
2 Pasang paving M2 (3,40*28,0)+(0,80*2,00) 100% 96.80 8,000.00
Sub total
V PEKERJAAN TRAAP TANGGA
1 Pengukuran & bauwplank M1 (2*2)*2 100% 8.00 10,000.00
2 Pasang pondasi M3 (0,20*0,30*2,0)*6 trap 100% 0.72 150,000.00
3 Plesteran dinding batu M2 (0,30*2,00*6)+(0,18*2,0*6) 100% 5.76 40,000.00
Acian dinding batu M2 (0,30*2,00*6)+(0,18*2,0*6) 100% 5.76 10,000.00
4 Benangan M1 (2,00*6) 100% 12.00 12,500.00
Sub total
VI PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 100,000.00
2 Pembersihan di bantu Ls 1.00 100% 1.00 200,000.00
Sub total

Total keseluruhan biaya


Pamotan porong ,18 agustus 2020
Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : DINDING PAGAR PEMBATAS SPBE
LOKASI : PAMOTAN
TANGGAL : 05 AGUSTUS s/d 18 AGUSTUS 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI
1 Pengukuran & bauwplank 67,50 s/d 73,30 M1 (73,30-67,50) 100% 5.80 10,000.00
2 Pemerataan tanah M2 (0,50*5,80) 100% 2.90 5,000.00
3 Pasang batu pondasi M3 (0,30+0,50)/2*1,0*5,80 100% 2.32 130,000.00
4 Beton kolom 20/22 T 4,00 M1 (0,80*21 bh)
Pasang bekisting kolom M2 (0,32*0,80*2)*21 100% 10.75 4,000.00
Cor beton (manual) M3 (0,20*0,20*0,80)*21 100% 0.67 250,000.00
5 Beton sloof 15/20 M1 5.60 5.60
Pembesian Kg (5,60*4*0,60 kg)+(5,60*6*0,8*0,22 kg) 100% 19.35 4,000.00
Bekisting M2 (0,20*2*5,60) 100% 2.24 45,000.00
Cor beton (manual) M3 (0,15*0,20*25,60) 100% 0.77 250,000.00
Pasang bata ringan M2 (0,80*73,30)-(0,20*0,80*20) 100% 55.44 20,000.00
Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran material Ls 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,18 Agustus 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : GUDANG (BENGKEL TEGUH)
LOKASI : PAMOTAN
TANGGAL : 05 AGUSTUS s/d 18 AGUSTUS 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN TANDO OLI
1 Pengukuran & bauwplank M1 (2,75*4) 100% 11.00 10,000.00
2 Pasang pondasi batu tebal 30 cm M3 (0,30*0,80*2,75*4) 100% 2.64 130,000.00
3 Beton sloof 15/20 M1 (2,75*4) 11.00
Pembesian Kg (11*4*0,60 kg)+(11*6*0,8*0,22 kg) 100% 38.02 4,000.00
Bekisting M2 (0,20*2*11) 100% 4.40 45,000.00
Cor beton (manual) M3 (0,15*0,20*10) 100% 0.30 250,000.00

Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran material Ls 1.00 100% 1.00 150,000.00

Sub total

Total keseluruhan biaya

Pamotan porong ,18 Agustus 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : BENGKEL PAK NUR
LOKASI : PAMOTAN
TANGGAL : 05 AGUSTUS s/d 18 AGUSTUS 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PAGAR PEMBATAS
1 Beton sloof 15/20 M1 33.00 33.00
Pembesian Kg (33*4*0,60 kg)+(33*6*0,8*0,22 kg) 100% 114.05 4,000.00
Bekisting M2 (0,15*2*33) 100% 9.90 45,000.00
Cor beton (manual) M3 (0,15*0,20*33) 100% 0.99 250,000.00
2 Pasang bata M2 (1,40*2,40)*11 100% 36.96 20,000.00
Sub total
II PEKERJAAN LANTAI COR
1 Pemerataan tanah M2 (2,20*18)+(1,0*18) 100% 57.60 5,000.00
Pasang besi wermess M2 (2,20*18)+(1,0*18) 100% 57.60 5,000.00
Pasang bekisting M2 (0,15*18*3)+(0,15*3,3*2) 100% 9.09 45,000.00
Cor lantai M2 ((2,20*18)+(1,0*18))*0,15 100% 8.64 60,000.00
Sub total
III PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 100% 1.00 200,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 18 agustus 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : GARDU LISTRIK
LOKASI : PAMOTAN
TANGGAL : 05 AGUSTUS s/d 18 AGUSTUS 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN GARDU LISTRIK
1 Pasang bata ringan T 0,0 - 2,0 M2 ((2,00*11,00*2)+(2,0*4,7*4))-(2,45*2,45*6 bh pintu) 100% 45.59 20,000.00
2 Kolom 25/25 M1 (2,00*8 bh) 16.00
Pembesian Kg (16*6*0,89)+(16*6*0,8*0,40) 100% 116.16 2,000.00
Pasang bekisting M2 (0,35*2,00*2 sisi)*8 kolom 100% 11.20 45,000.00
Cor beton manual M3 (0,25*0,25*2,00)*8 100% 1.00 250,000.00
3 Kolom praktis 10/15 Kusen pintu & dinding 20 bh M1 (2,0*4 sisi tengah)+(2,0*2*6 pintu) 32.00
Pembesian Kg (32*6*0,60)+(32*6*0,45*0,22) 100% 134.21 4,000.00
Pasang bekisting M2 (0,15*2,00*2 sisi)*20 kolom 100% 9.60 45,000.00
Cor beton manual M3 (0,10*0,15*2,00)*20 bh 100% 0.48 250,000.00
4 Balok praktis diatas kusen 10/15 M1 (12,0*2) 24.00
Pembesian Kg (24,0*6*0,60)+(24,0*6*0,45*0,22) 100% 100.66 4,000.00
Pasang bekisting M2 (0,15*24,0*2 sisi) 100% 7.20 45,000.00
Cor beton manual M3 (0,10*0,15*24,00) 100% 0.36 250,000.00
Sub total
II PEKERJAAN LAIN LAIN
1 Urugan tanah peninggian& pemerataan distamper M2 (4*12)+(0,60*12) 100% 55.20 15,000.00
2 Langsiran ,material Ls 1.00 100% 1.00 200,000.00

Sub total

Total keseluruhan biaya

Pamotan porong ,18 Agustus 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : KAMAR MANDI & POS SATPAM
LOKASI : PAMOTAN
TANGGAL : 05 AGUSTUS s/d 18 AGUSTUS 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI
1 Pengukuran & bauwplank M1 (4,50*2)+(16,5*2) 100% 42.00 10,000.00
2 Pemerataan tanah M2 ((4,25*3)+(10,25+4,00+4,00))*0,5 100% 15.50 5,000.00
3 Pasang batu pondasi M3 (0,30+0,50)/2*0,70*((4,25*3)+(10,25+4,00+4,00)) 100% 8.68 130,000.00
4 Beton kolom praktis M1 (4,0*7 kolom) 28.00
Pembesian Kg (21,0*6*0,60)+(21,0*6*0,45*0,22) 100% 88.07 4,000.00
Cor beton (manual) dalam pondasi M3 (0,20*0,20*0,80)*7 100% 0.22 250,000.00
5 Beton sloof 15/20 M1 (4,25*3)+(10,25+4,0+4,0) 31.00
Pembesian Kg (31*4*0,60 kg)+(31*6*0,8*0,22 kg) 100% 107.14 4,000.00
Bekisting M2 (0,20*2*31) 100% 12.40 45,000.00
Cor beton (manual) M3 (0,15*0,20*31) 100% 0.93 250,000.00
Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran material Ls 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,18 Agustus 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : ALMUNIUM KUSEN PINTU JENDELA
LOKASI : DEMAK
TANGGAL : 19 AGUSTUS s/d 25 AGUSTUS 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN ALMUNIUM
1 Kusen pintu & daun pintu Unit 6.00
Kusen 4 " M1 (5*6) 100% 30.00 10,000.00
Daun pintu 90x200 Bh 6.00 100% 6.00 100,000.00
100%
2 Jendela sleading 120x120 Unit 4.00 100% 4.00 100,000.00

3 Jendela kaca mati Unit 16.00 100% 16.00


Kusen 4 " M1 (1,20*4)*16 100% 76.80 10,000.00
Pasang acriled M2 (1,1*1,1)*16 100% 19.36 12,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,25 Agustus 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : PONDASI KOLAM
LOKASI : PAMOTAN
TANGGAL : 19 AGUSTUS s/d 25 AGUSTUS 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI
Pondasi timur
1 Keprasan tanah barat pondasi M3 (0,20*0,50*10) 100% 1.00 70,000.00
3 Langsiran material urugan dari dalam gudang Ls 1 100% 1.00 100,000.00
Sub total
II PEKERJAAN KAMAR MANDI
1 Pasang tutup septitank pakai daun panel M2 (2*2) 100% 4.00 50,000.00
2 Plesteran lantai M2 (2*2) 100% 4.00 20,000.00
3 Pasang bata ringan M2 ((2*3,50)+(2*3,80)+(2*3,75*2))-(0,75*2) 100% 28.10 22,500.00
4 Beton kolom 15/15 M1 (3,5*4) 14.00
Pembesian Kg (14*4*0,60 kg)+(14,0*6*0,8*0,22 kg) 100% 48.38 4,000.00
Bekisting M2 (0,15*2*14) 20% 80% 4.20 45,000.00
Cor sloof manual M3 (0,15*0,15*14) 20% 80% 0.32 250,000.00
4 Beton balok ring M1 1.20 14.00
Pembesian Kg (1,2*4*0,60 kg)+(1,20*6*0,8*0,22 kg) 100% 4.15 4,000.00
Bekisting M2 (0,15*2*1,2) 100% 0.36 45,000.00
Cor sloof manual M3 (0,1*0,15*1,2) 100% 0.02 250,000.00
Sub total
III PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,25 agustus 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : DINDING PAGAR PEMBATAS SPBE
LOKASI : PAMOTAN
TANGGAL : 19 AGUSTUS s/d 25 AGUSTUS 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI
1 Pasang bata ringan diatas T 2 m1 M2 (1,20*73,30)-(0,20*0,80*20) 75% 84.76 22,500.00
2 Beton kolom 20/22 T 4,00 M1 (1,20*21 bh)
Pasang bekisting kolom M2 (0,32*1,2*2)*21 75% 16.13 45,000.00
Cor beton (manual) M3 (0,20*0,20*1,20)*21 75% 1.01 250,000.00
Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran material Ls 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,25 Agustus 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : GUDANG (BENGKEL TEGUH)
LOKASI : PAMOTAN
TANGGAL : 19 AGUSTUS s/d 25 AGUSTUS 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN TANDO OLI
1 Plesteran dinding batu M2 (0,90*2,50*4) 100% 9.00 40,000.00
2 Pasang pondasi patlah M3 (0,15*2,50*2,50) 100% 0.94 130,000.00
3 Plesteran lantai M2 (2,50*2,50) 100% 6.25 20,000.00
Sub total
II PEKERJAAN LAIN LAIN
1 Pembersihan galian tanah dan pembuangan 1.00 100% 1.00 1,000,000.00
Pakai picup 4 orang
2 Pemerataan tanah M2 (3,50*20) 100% 70.00 5,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 25 Agustus 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : BENGKEL PAK NUR
LOKASI : PAMOTAN
TANGGAL : 19 AGUSTUS s/d 25 AGUSTUS 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN RUANG BENGKEL 4X20
1 Bongkar bekisting dak M2 (5,5*19) 100% 104.50 20,000.00
2 Plesteran dinding ruang dalam M2 (4,0*4,10*2)+(6,0*4,10)-((1*2)+(1,20*1,20*))*3 ruang 100% 161.88 20,000.00
3 Acian dinding M2 (4,0*4,10*2)+(6,0*4,10)-((1*2)+(1,20*1,20*))*3 ruang 100% 161.88 10,000.00
Sub total
II PEKERJAAN RUANG BENGKEL 4X20 Lt 2
1 Pasang dinding bata ringan diatas lantai M2 (3,60*4,00*4)+(3,60*18,0)-((1,20*1,20*3)+(1,0*2,0*3) 50% 112.08 25,000.00
2 Kolom 25/25 T 3,80 M1 (3,80*8 bh) 30.40
Pembesian Kg (30,40*6*0,89kg)+(30,40*6*0,85*0,40kg) 50% 224.35 4,000.00
Pasang bekisting M2 (0,25+0,25+0,20)*30,40 50% 21.28 45,000.00
Cor beton manual M3 (0,25*0,25*30,40) 50% 1.90 250,000.00
Sub total
III PEKERJAAN LANTAI COR
1 Pasang bata merah peninggian lantai M2 (0,15*35) 100% 5.25 5,000.00
2 Urugan tanah peninggian M3 (0,1*131,75) 100% 13.18 50,000.00
3 Pemerataan tanah M2 (2,50+3,20)/2*4,00 +(3,20+5,10)/2*29,0 100% 131.75 5,000.00
Pasang besi wermess M2 (2,50+3,20)/2*4,00 +(3,20+5,10)/2*29,1 100% 131.75 5,000.00
Pasang bekisting M2 (0,15*33)+(0,15*8)+(0,10*29) 100% 9.05 45,000.00
Cor lantai M3 (131,75*0,11) 100% 14.49 60,000.00
4 Plesteran saluran samping timur M2 (0,17*35) 0% 6.21 20,000.00
Acian M3 (0,17*35) 0% 6.21 10,000.00
Benangan sudut timur & barat M1 (35+29) 0% 64.00 12,500.00
35.000 Sub total
IV PEKERJAAN LAIN LAIN
1 Pembersihan saluran timur Ls 1.00 100% 1.00 100,000.00
2 Pembersihan halaman Ls 1.00 100% 1.00 200,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 25 agustus 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : GARDU LISTRIK
LOKASI : PAMOTAN
TANGGAL : 19 AGUSTUS s/d 25 AGUSTUS 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN GARDU LISTRIK
1 Pasang bata ringan T 2,00 - 4,00 M2 ((2,00*11,00*2)+(2,0*4,7*4))-(2,45*2,45*6 bh pintu) 50% 45.59 22,500.00
2 Kolom 25/25 T 2,00 - 4,00 M1 (2,00*8 bh) 16.00
Pembesian Kg (16*6*0,89)+(16*6*0,8*0,40) 25% 116.16 2,000.00
Pasang bekisting M2 (0,35*2,00*2 sisi)*8 kolom 25% 11.20 45,000.00
Cor beton manual M3 (0,25*0,25*2,00)*8 25% 1.00 250,000.00
3 Kolom praktis 10/15 Kusen pintu & dinding 16 bh M1 (1,8*4 sisi tengah)+(0,5*2*6 pintu) 13.20
Pembesian Kg (13,2*4*0,60)+(13,2*6*0,45*0,22) 25% 134.21 4,000.00
Pasang bekisting M2 (0,15*2*13,2) 25% 9.60 45,000.00
Cor beton manual M3 (0,10*0,15*13,20) 25% 0.48 250,000.00
4 Pasang pondasi teras ( peninggian 20 cm) M3 (0,20*0,30*14) 100% 0.84 130,000.00
Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 100,000.00

Sub total

Total keseluruhan biaya

Pamotan porong ,25 Agustus 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : DINDING PAGAR PEMBATAS SPBE
LOKASI : PAMOTAN
TANGGAL : 26 AGUSTUS s/d 31AGUSTUS 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI
1 Pasang bata ringan diatas T 2 m1 M2 (1,20*73,30)-(0,20*0,80*20) 75% 25% 100% 84.76 22,500.00
2 Beton kolom 20/22 T 4,00 M1 (1,20*21 bh)
Pasang bekisting kolom M2 (0,32*1,2*2)*21 75% 25% 100% 16.13 45,000.00
Cor beton (manual) M3 (0,20*0,20*1,20)*21 75% 25% 100% 1.01 250,000.00
Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran material Ls 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 31 Agustus 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : BENGKEL PAK NUR
LOKASI : PAMOTAN
TANGGAL : 26 AGUSTUS s/d 31 AGUSTUS 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN LANTAI COR
1 Pengukuran Ls (7*2)+(24*2) 100% 62.00 10,000.00
2 Keprasan tanah M2 (7*5)*0,50 50% 17.50 50,000.00
3 Pemerataan tanah M2 (7,5*24) 100% 180.00 5,000.00
4 Pasang besi wermess M2 (7,2*22) 100% 158.40 5,000.00
5 Pasang bekisting M2 (0,15*22)*3+(0,15*7*2) 100% 12.00 45,000.00
6 Cor lantai M3 27.50 100% 27.50 60,000.00
7 Benangan sudut saluran M1 (25*2) 100% 50.00 12,500.00

35.000 Sub total


II PEKERJAAN LAIN LAIN
1 Langsiran material bongkaran Ls 1.00 100% 1.00 200,000.00

Sub total

Total keseluruhan biaya

Pamotan porong , 31 agustus 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : BENGKEL PAK NUR
LOKASI : PAMOTAN
TANGGAL : 01 SEPTEMBER s/d 08 SEPTEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN RUANG BENGKEL 4X20
Lantai bawah
1 Plesteran dinding luar M2 (4,0*4,10*2)+(18*4,10)-((1*2*3)+(1,20*1,20*3)) 75% 96.28 20,000.00
2 Acian dinding M2 (4,0*4,10*2)+(18*4,10)-((1*2*3)+(1,20*1,20*3)) 25% 96.28 10,000.00
Sub total
II PEKERJAAN RUANG BENGKEL 4X20 Lt 2
1 Pasang dinding bata ringan diatas lantai M2 (3,60*4,00*4)+(3,60*18,0)-((1,20*1,20*3)+(1,0*2,0*3) 50% 25% 75% 112.08 25,000.00
2 Kolom 25/25 T 3,80 M1 (3,80*8 bh) 30.40
Pembesian Kg (30,40*6*0,89kg)+(30,40*6*0,85*0,40kg) 50% 25% 75% 224.35 4,000.00
Pasang bekisting M2 (0,25+0,25+0,20)*30,40 50% 25% 75% 21.28 45,000.00
Cor beton manual M3 (0,25*0,25*30,40) 50% 25% 75% 1.90 250,000.00
3 Beton balok ring tengah 10/12 M1 (18*1) 18.00
Pembesian Kg (18*4*0,60)+(18*6*0,4*0,22) 100% 52.70 4,000.00
Pasang bekisting M2 (0,15*2*18) 100% 5.40 45,000.00
Cor beton manual M3 (0,10*0,15*18) 100% 0.27 250,000.00
Sub total
III PEKERJAAN PAGAR PEMBATAS
1 Beton ring tengah 15/20 diatas bata ringan M1 33.00 33.00
Pembesian Kg (33*4*0,60 kg)+(33*6*0,8*0,22 kg) 75% 114.05 4,000.00
Bekisting M2 (0,15*2*33) 75% 9.90 45,000.00
Cor beton (manual) M3 (0,15*0,20*33) 75% 0.99 250,000.00
2 Beton ring tengah 15/20 diatas panel M1 16.60 16.60
Pembesian Kg (16,6*4*0,60 kg)+(16,6*6*0,8*0,22 kg) 75% 57.37 4,000.00
Bekisting M2 (0,20*2*16,6) 75% 6.64 45,000.00
Cor beton (manual) M3 (0,15*0,20*16,6) 75% 0.50 250,000.00
Sub total

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
IV PEKERJAAN LANTAI COR
Lantai tanjakan L 3,0 m
1 Pasang pondasi samping M3 (0,30*0,40*3,0)*2 100% 0.72 150,000.00
2 Pemerataan tanah M2 (3*22) 100% 66.00 5,000.00
Pasang besi wermess M2 (3*22) 100% 66.00 5,000.00
Pasang bekisting M2 (0,15*3*2) 100% 0.90 45,000.00
Cor lantai M3 (3*22*0,15) 100% 9.90 60,000.00
35.000 Sub total
V PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 100% 1.00 100,000.00
2 Langsiran material Ls 1.00 100% 1.00 200,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 08 september 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : GARDU LISTRIK
LOKASI : PAMOTAN
TANGGAL : 01 SEPTEMBER s/d 08 SEPTEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN GARDU LISTRIK
1 Pasang bata ringan T 2,00 - 4,00 M2 ((2,00*11,00*2)+(2,0*4,7*4))-(2,45*2,45*6 bh pintu) 50% 50% 100% 45.59 22,500.00
2 Kolom 25/25 T 2,00 - 4,00 M1 (2,00*8 bh) 16.00
Pembesian Kg (16*6*0,89)+(16*6*0,8*0,40) 25% 75% 100% 116.16 2,000.00
Pasang bekisting M2 (0,35*2,00*2 sisi)*8 kolom 25% 75% 100% 11.20 45,000.00
Cor beton manual M3 (0,25*0,25*2,00)*8 25% 75% 100% 1.00 250,000.00
3 Kolom praktis 10/15 Kusen pintu & dinding 16 bh M1 (1,8*4 sisi tengah)+(0,5*2*6 pintu) 13.20
Pembesian Kg (13,2*4*0,60)+(13,2*6*0,45*0,22) 25% 75% 100% 134.21 4,000.00
Pasang bekisting M2 (0,15*2*13,2) 25% 75% 100% 9.60 45,000.00
Cor beton manual M3 (0,10*0,15*13,20) 25% 75% 100% 0.48 250,000.00
Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 100,000.00

Sub total

Total keseluruhan biaya

Pamotan porong ,08 september 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : PONDASI KOLAM
LOKASI : PAMOTAN
TANGGAL : 08 SEPTEMBER s/d 15 SEPTEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN LANTAI
Lantai diatas kolam
1 Pemerataan tanah M2 (2,44*20) 100% 48.80 5,000.00
2 Pasang wermess M2 (2,44*20) 100% 48.80 5,000.00
3 Pasang bekisting samping M2 (0,10*20,0)+(0,10*3,5) 100% 2.35 45,000.00
4 Rabat lantai tebal 7cm - 8cm M2 (2,44*20) 100% 48.80 15,000.00
Sub total
II PEKERJAAN KOLAM ANGSA & PAGAR
1 Beton balok ring 15/20 sebelah utara M1 15.90 15.90
Pembesian Kg (15,90*4*0,60 kg)+(15,90*6*0,65*0,22 kg) 100% 51.80 4,000.00
Bekisting M2 (0,2*2*15,90) 100% 6.36 45,000.00
Cor beton (manual) M3 (0,15*0,20*15,90) 100% 0.48 250,000.00

2 Beton balok ring 15/20 sebelah selatan M1 13.80 13.80


Pembesian Kg (13,80*4*0,60 kg)+(13,8*6*0,65*0,22 kg) 100% 44.96 4,000.00
Bekisting M2 (0,2*2*13,80) 100% 5.52 45,000.00
Cor beton (manual) M3 (0,15*0,20*13,80) 100% 0.41 250,000.00
Sub total
II PEKERJAAN KAMAR MANDI
1 Beton balok ring atas M1 8.00 8.00
Pembesian Kg (8*4*0,60 kg)+(8*6*0,8*0,22 kg) 100% 27.65 4,000.00
Bekisting M2 (0,15*2*8) 100% 2.40 45,000.00
Cor sloof manual M3 (0,1*0,15*8) 100% 0.12 250,000.00
2 Plesteran dinding t 0,0-1,5 m luar M2 (1,50*2,0*3 sisi)-(0,7*1,5) 100% 7.95 20,000.00
Plesteran dinding t 1,5 m-4,0 m luar M2 (2,0*2,0*3 sisi)-(0,7*0,5) 100% 11.65 22,500.00
Plesteran dinding dalam t 1,5 - 3,5m M2 (2,0*2,0*4 sisi)-(0,7*0,5) 100% 15.65 22,500.00
3 Acian dinding t 0,0-1,5 m luar M2 (1,50*2,0*3 sisi)-(0,7*1,5) 100% 7.95 10,000.00
Acian dinding t 1,5 m-4,0 m luar M2 (2,0*2,0*3 sisi)-(0,7*0,5) 100% 11.65 12,000.00
Acian dinding dalam t 1,5 - 3,5m M2 (2,0*2,0*4 sisi)-(0,7*0,5) 100% 15.65 12,000.00
Sub total
III PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 15 September 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : BENGKEL PAK NUR
LOKASI : PAMOTAN
TANGGAL : 08 SEPTEMBER s/d 15 SEPTEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN RUANG BENGKEL 4X20 Lt 2
1 Pasang dinding bata ringan diatas lantai M2 (3,60*4,00*4)+(3,60*18,0)-((1,20*1,20*3)+(1,0*2,0*3) 75% 25% 100% 112.08 25,000.00
2 Kolom 25/25 T 3,80 M1 (3,80*8 bh) 30.40
Pembesian Kg (30,40*6*0,89kg)+(30,40*6*0,85*0,40kg) 75% 25% 100% 224.35 4,000.00
Pasang bekisting M2 (0,25+0,25+0,20)*30,40 75% 25% 100% 21.28 45,000.00
Cor beton manual M3 (0,25*0,25*30,40) 75% 25% 100% 1.90 250,000.00
3 Beton balok ring tengah 10/12 M1 (18*1) 18.00
Pembesian Kg (18*4*0,60)+(18*6*0,4*0,22) 100% 52.70 4,000.00
Pasang bekisting M2 (0,15*2*18) 100% 5.40 45,000.00
Cor beton manual M3 (0,10*0,15*18) 100% 0.27 250,000.00
Sub total
II PEKERJAAN PAGAR PEMBATAS
1 Beton ring tengah 15/20 diatas bata ringan M1 33.00 33.00
Pembesian Kg (33*4*0,60 kg)+(33*6*0,8*0,22 kg) 75% 25% 100% 114.05 4,000.00
Bekisting M2 (0,15*2*33) 75% 25% 100% 9.90 45,000.00
Cor beton (manual) M3 (0,15*0,20*33) 75% 25% 100% 0.99 250,000.00
2 Beton ring tengah 15/20 diatas panel M1 16.60 16.60
Pembesian Kg (16,6*4*0,60 kg)+(16,6*6*0,8*0,22 kg) 75% 25% 100% 57.37 4,000.00
Bekisting M2 (0,20*2*16,6) 75% 25% 100% 6.64 45,000.00
Cor beton (manual) M3 (0,15*0,20*16,6) 75% 25% 100% 0.50 250,000.00
3 Pasang bata ringan diatas andang T 2 m M2 (29,50*1,00)+(16,6*1,00) 100% 46.10 22,500.00
4 Beton kolom 15/20 T 1,15 M1 (1,15*18) 20.70
Pembesian Kg (20,70*4*0,60 kg)+(20,70*6*0,5*0,22 kg) 75% 63.34 4,000.00
Bekisting M2 (0,25*2*20,70) 75% 12.65 45,000.00
Cor beton (manual) M3 (0,15*0,20*20,70) 75% 0.76 250,000.00
5 Beton kolom 20/300 T 1,15 M1 (1,15*5) 5.75
Pembesian Kg (5,75*4*0,60 kg)+(5,75*6*0,8*0,22 kg) 75% 19.87 4,000.00
Bekisting M2 (0,4*2*5,75) 75% 4.60 45,000.00
Cor beton (manual) M3 (0,15*0,30*5,75) 75% 0.26 250,000.00
Sub total

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
III PEKERJAAN LANTAI COR
Lantai tanjakan L 3,0 m
1 Pasang pondasi samping M3 (0,30*0,40*3,0)*2 100% 0.72 150,000.00
2 Pemerataan tanah M2 (3*22) 100% 66.00 5,000.00
Pasang besi wermess M2 (3*22) 100% 66.00 5,000.00
Pasang bekisting M2 (0,15*3*2) 100% 0.90 45,000.00
Cor lantai M3 (3*22*0,17)+(1,0*5) 100% 11.39 60,000.00
35.000 Sub total
III PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 100% 1.00 100,000.00
2 Langsiran material Ls 1.00 100% 1.00 200,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 15 September 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : BENGKEL LANTAI PAVING
LOKASI : PAMOTAN
TANGGAL : 08 SEPTEMBER s/d 15 SEPTEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I Pasang paving
1 Pasang paving tanjakan ruko M2 (6*6) 100% 36.00 8,000.00

2 Pasang paving M2 (8,8*36) 100% 316.80 8,000.00


Sub total
II Pekerjaan lain
1 Pembersihan Ls 1.00 100% 1.00 100,000.00
2 Langsiran material Ls 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 15 September 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : BENGKEL PAK NUR
LOKASI : PAMOTAN
TANGGAL : 16 SEPTEMBER s/d 22 SEPTEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN RUANG BENGKEL 4X20 Lt 2
1 Pasang dinding bata ringan diatas lantai M2 (3,60*4,00*4)+(3,60*18,0)-((1,20*1,20*3)+(1,0*2,0*3) 100% 112.08 25,000.00
2 Kolom 25/25 T 3,80 M1 (3,80*8 bh) 30.40
Pembesian Kg (30,40*6*0,89kg)+(30,40*6*0,85*0,40kg) 100% 224.35 4,000.00
Pasang bekisting M2 (0,25+0,25+0,20)*30,40 100% 21.28 45,000.00
Cor beton manual M3 (0,25*0,25*30,40) 100% 1.90 250,000.00
3 Beton balok ring atas 10/12 M1 (18,0*1)+(4,0*4 ) 34.00
Pembesian Kg (34,0*4*0,60)+(34,0*6*0,4*0,22) 100% 99.55 4,000.00
Pasang bekisting M2 (0,15*2*34) 100% 10.20 45,000.00
Cor beton manual M3 (0,10*0,15*34) 100% 0.51 250,000.00
Sub total
II PEKERJAAN PAGAR PEMBATAS
1 Beton ring atas 15/20 diatas bata ringan M1 33.00 33.00
Pembesian Kg (33*4*0,60 kg)+(33*6*0,8*0,22 kg) 100% 114.05 4,000.00
Bekisting M2 (0,15*2*33) 100% 9.90 45,000.00
Cor beton (manual) M3 (0,15*0,20*33) 100% 0.99 250,000.00
2 Beton ring atas 15/20 diatas panel M1 16.60 16.60
Pembesian Kg (16,6*4*0,60 kg)+(16,6*6*0,8*0,22 kg) 100% 57.37 4,000.00
Bekisting M2 (0,20*2*16,6) 100% 6.64 45,000.00
Cor beton (manual) M3 (0,15*0,20*16,6) 100% 0.50 250,000.00
3 Beton kolom 15/20 T 1,15 M1 (1,15*18) 20.70
Pembesian Kg (20,70*4*0,60 kg)+(20,70*6*0,5*0,22 kg) 75% 25% 100% 63.34 4,000.00
Bekisting M2 (0,25*2*20,70) 75% 25% 100% 12.65 45,000.00
Cor beton (manual) M3 (0,15*0,20*20,70) 75% 25% 100% 0.76 250,000.00
4 Beton kolom 20/300 T 1,15 M1 (1,15*5) 5.75
Pembesian Kg (5,75*4*0,60 kg)+(5,75*6*0,8*0,22 kg) 75% 25% 100% 19.87 4,000.00
Bekisting M2 (0,4*2*5,75) 75% 25% 100% 4.60 45,000.00
Cor beton (manual) M3 (0,15*0,30*5,75) 75% 25% 100% 0.26 250,000.00
Sub total

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
III PEKERJAAN RUANG PANEL
1 Beton sloof 15/20 diatas saluran M1 1.80 1.80
Pembesian Kg (1,8*4*0,60 kg)+(1,80*6*0,8*0,22 kg) 100% 6.22 4,000.00
Bekisting M2 (0,20*2*1,8) 100% 0.72 45,000.00
Cor beton (manual) M3 (0,15*0,20*1,8) 100% 0.05 250,000.00
2 Beton kolom 15/20 T 1,15 M1 (2,30*2) 4.60
Pembesian Kg (4,60*4*0,60 kg)+(4,60*6*0,5*0,22 kg) 100% 14.08 4,000.00
Bekisting M2 (0,20*2*4,60) 100% 1.84 45,000.00
Cor beton (manual) M3 (0,15*0,20*4,6) 100% 0.14 250,000.00
3 Pasang bata ringan M2 (1,60*2,30) 100% 3.68 20,000.00
35.000 Sub total
III PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 100% 1.00 100,000.00
2 Langsiran material Ls 1.00 100% 1.00 200,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 22 September 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : BENGKEL LANTAI PAVING
LOKASI : PAMOTAN
TANGGAL : 16 SEPTEMBER s/d 22 SEPTEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I Pasang paving
1 Pasang paving tanjakan ruko M2 (6*6) 100% 36.00 8,000.00
2 Pasang paving M2 (8,8*30) 100% 264.00 8,000.00
Sub total
II Pekerjaan lain
1 Rabatan tepi paving M1 60.00 100% 60.00 5,000.00
2 Pasang pagar panel Ls 1 plong iai 7 daun 100% 1.00 100,000.00
3 Langsiran material Ls 1.00 100% 1.00 150,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 22 September 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : BENGKEL PAK NUR
LOKASI : PAMOTAN
TANGGAL : 23 SEPTEMBER s/d 28 SEPTEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN LANTAI
1 Pembersihan M2 (0,80*7,30) 100% 5.84 25,000.00
2 Galian tanah pondasi M3 (0,30*0,30*7,30) 100% 0.66 70,000.00
3 Pasang pondasi M3 (0,30*0,30*7,30) 100% 0.66 150,000.00
4 Urugan peninggian lantai M3 (0,20*0,60*7,30) 100% 0.88 70,000.00
5 Pemerataan tanah dipadatkan stamper M2 (0,80*7,30) 100% 5.84 15,000.00
6 Cor beton maual M3 (0,80*7,30)*0,15 100% 0.88 250,000.00
Sub total
II PEKERJAAN RUANG PANEL
1 Pekerjaan lantai
2 Pembersihan M2 (1,8*4,0) 100% 7.20 5,000.00
3 Pasang bekisting M2 (0,20*4,0)*2 100% 1.60 45,000.00
4 Urugan peninggian M3 (1,80*4,0)*0,10 100% 0.72 60,000.00
5 Plesteran lantai M2 (1,8*4,0) 100% 7.20 20,000.00
6 Acian lantai M2 (1,8*4,0) 100% 7.20 10,000.00
7 Benangan sudut M1 (4,0*3) 100% 12.00 12,500.00
35.000 Sub total
III PEKERJAAN PAVING
1 Pembuangan tanah pakai pic up Ls 1.00 75% 1.00 250,000.00
2 Bongkar paving yang rusak M2 (0,5*18) 75% 9.00 5,000.00
3 Pemerataan tanah dipadatkan stamper M2 (1,5*18)+(4,0*4,0) 75% 43.00 15,000.00
4 Pasang paving M2 (1,5*18)+(4,0*4,0) 75% 43.00 8,000.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Pembersihan saluran & got M1 45.00 100% 45.00 10,000.00
2 Pembersihan areal halaman Ls 1.00 100% 1.00 200,000.00
Sub total
Total keseluruhan biaya

Pamotan porong , 28 September 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : JEMBATAN TKD & SALURAN
LOKASI : PAMOTAN
TANGGAL : 22 SEPTEMBER s/d 29 SEPTEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI JEMBATAN TKD SELATAN
1 Pengukuran & bauwplank M1 14.50 100% 14.50 10,000.00
2 Bongkar pondasi lama Manual Ls (3 orang * 2 hari ) 100% 1.00 600,000.00
3 Pembersihan bongkaran Ls 1.00 100% 1.00 200,000.00
4 Pemerataan tanah M2 (1,20*14,50) 100% 17.40 5,000.00
5 Pasang pondasi dasar M3 (1,20*0,70*14,5) 100% 12.18 130,000.00
6 Kolom 25/25 M1 (3,0*7) 21.00
Pembesian Kg (21*6*0,89)+(21*6*1,0*0,40) 50% 162.54 2,000.00
Pasang bekisting M2 (0,40*2,5)*7 50% 7.00 45,000.00
Cor beton manual M3 (0,30*0,30*2,5)*7 50% 1.58 250,000.00
7 Balok ring 25/25 M1 14.50 14.50
Pembesian Kg (14,5*6*0,89)+(14,5*6*1,0*0,40) 100% 112.23 2,000.00
Pasang bekisting M2 (0,40*14,5) 100% 5.80 45,000.00
Cor beton manual M3 (0,30*0,30*14,5) 100% 1.31 250,000.00
8 Pasang pondasi dinding M3 (1,00 +0,65)/2*1,00*14,5 100% 11.96 130,000.00
9 Langsiran material batu Ls 1.00 100% 1.00 200,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 28 September 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : LANTAI PAVING OPRITAN RUKO & GUDANG TKD
LOKASI : PAMOTAN
TANGGAL : 23 SEPTEMBER s/d 28 SEPTEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I Pasang paving
1 Pasang paving tanjakan ruko M2 (17,0+24,0)/2*6-(6*6) 100% 87.00 8,000.00
2 Pasang pondasi samping tanjakan M3 (0,2+0,40)/2*0,30*6,50*2 100% 1.17 150,000.00
Sub total
II Pekerjaan lain
1 Bongkar paving yg rusak Ls 1.00 100% 1.00 50,000.00
3 Langsiran material Ls 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 28 September 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : LANTAI PAVING GUDANG TKD
LOKASI : PAMOTAN
TANGGAL : 23 SEPTEMBER s/d 28 SEPTEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I Pasang paving
1 Pasang paving dalam M2 (23,30*24,0) 50% 559.20 8,000.00

Sub total

Total keseluruhan biaya

Pamotan porong , 28 September 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : LANTAI PAVING GUDANG TKD
LOKASI : PAMOTAN
TANGGAL : 29 SEPTEMBER s/d 06 OKTOBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I Pasang paving
1 Pasang paving dalam M2 (23,30*22,0) 512.60
Yang opname kemarin M2 (23,30*24,0)*50 % 279.60
Opname sekarang M2 (512,60-279,60) 100% 233.00 9,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 06 oktober 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : JEMBATAN TKD & SALURAN
LOKASI : PAMOTAN
TANGGAL : 29 SEPTEMBER s/d 06 OKTOBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI JEMBATAN TKD SELATAN
1 Kolom 25/25 M1 (3,0*7) 21.00
Pembesian Kg (21*6*0,89)+(21*6*1,0*0,40) 50% 50% 100% 162.54 2,000.00
Pasang bekisting M2 (0,40*2,5)*7 50% 50% 100% 7.00 45,000.00
Cor beton manual M3 (0,30*0,30*2,5)*7 50% 50% 100% 1.58 250,000.00
2 Pasang pondasi dinding M3 (0,50 +0,65)/2*1,10*14,5 100% 9.17 130,000.00
3 Balok ring 30/50 M1 16.20 14.50
Pembesian Kg (16,20*8*0,89)+(16,20*6*1,8*0,40) 100% 112.23 2,000.00
Pasang bekisting M2 (0,30*16,2) 100% 5.80 45,000.00
Cor beton M3 (0,30*0,50*16,20) 1.31 160,000.00
4 Balok gantung 25/25 M1 (2,5*7) 17.50
Pembesian Kg (17,5*6*0,89)+(17,5*6*0,85*0,40) 100% 129.15 2,000.00
Pasang bekisting M2 (0,75*1,90*7) 100% 9.98 45,000.00
Cor beton M3 (0,25*0,25*2,90)*7 1.27 160,000.00
5 Pondasi sayap
Pemeratan M2 (0,50*4,5*2) 100% 4.50 130,000.00
Pasang pondasi utara & selatan M3 (0,50+1,60)/2*0,40*4,35) 100% 2.78 130,001.00
Kolom 25/25 M1 (2,5*1)+(0,75*2) 4.00
Pembesian Kg (4*6*0,89)+(4*6*0,85*0,40) 50% 29.52 2,000.00
Pasang bekisting M2 (0,40*2)*4 50% 3.20 45,000.00
Cor beton manual M3 (0,30*0,30*4,0) 50% 0.36 250,000.00
6 Urugan dan pemerataan M3 (14,5*1,0*1,25) 100% 18.13 50,000.00
Sub total
II PEKERJAAN PIPA AIR
1 Bobok pondasi untuk pipa pembuangan Ls 1.00 100% 1.00 75,000.00
2 Gailan & pemerataan tanah M2 (0,50*15) 100% 7.50 5,000.00
3 Pasang pipa 6 dim M1 16.00 100% 16.00 15,000.00
Sub total
III PEKERJAAN LAIN
3 Langsiran material Ls 3.00 100% 3.00 250,002.00
Sub total

Total keseluruhan biaya

Pamotan porong , 06 0ktober 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : LANTAI PAVING BENGKEL TKD
LOKASI : PAMOTAN
TANGGAL : 29 SEPTEMBER s/d 06 OKTOBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PAVING
1 Pasang paving keseluruhan M2 (77,50*8,8) 682.00
2 Opname tanggal 15 sepotember M2 (36*8,8) 316.80
3 Opname tanggal 22 sepotember M2 (30*8,8) 264.00
4 Sisa opname M2 (682,00-(316,80+264,00) 101.20 8,000.00
Sub total
II Pekerjaan lain
1 Bongkar paving yg rusak Ls 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 06 Oktober 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : BENGKEL PAK NUR
LOKASI : PAMOTAN
TANGGAL : 29 SEPTEMBER s/d 06 OKTOBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN LANTAI
1 Pembersihan M2 (1,0*6,5) 100% 6.50 5,000.00
2 Pemerataan tanah dipadatkan stamper M2 (0,80*7,30) 100% 5.84 15,000.00
3 Pasang bekisting M2 (0,15*6,5)+(0,15*1) 200% 1.13 45,000.00
6 Rabatan lantai M2 (1,0*6,5) 100% 6.50 15,000.00
Sub total
III PEKERJAAN PAVING
1 Pembuangan tanah pakai pic up Ls 1.00 75% 25% 1.00 250,000.00
2 Bongkar paving yang rusak M2 (0,5*18) 75% 25% 9.00 5,000.00
3 Pemerataan tanah dipadatkan stamper M2 (1,5*18)+(4,0*4,0) 75% 25% 43.00 15,000.00
4 Pasang paving M2 (1,5*18)+(4,0*4,0) 75% 25% 43.00 8,000.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Pembersihan saluran & got M1 6.50 100% 6.50 10,000.00
2 Pembersihan areal halaman Ls 1.00 100% 1.00 200,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 06 Oktober2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : JEMBATAN TKD & SALURAN
LOKASI : PAMOTAN
TANGGAL : 07 OKTOBER s/d 13 OKTOBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI JEMBATAN TKD SELATAN
1 Balok ring 30/50 M1 16.20 14.50
Pembesian Kg (16,20*8*0,89)+(16,20*6*1,8*0,40) 100% 112.23 2,000.00
Pasang bekisting M2 (0,30*16,2) 100% 5.80 45,000.00
Cor beton M3 (0,30*0,50*16,20) 100% 1.31 160,000.00
2 Balok gantung 25/25 M1 (2,5*7) 17.50
Pembesian Kg (17,5*6*0,89)+(17,5*6*0,85*0,40) 100% 129.15 2,000.00
Pasang bekisting M2 (0,75*1,90*7) 100% 9.98 45,000.00
Cor beton M3 (0,25*0,25*2,90)*7 100% 1.27 160,000.00
3 Pondasi sayap
Pemeratan M2 (0,50*4,5*2) 100% 4.50 130,000.00
Pasang pondasi utara & selatan M3 (0,50+1,60)/2*0,40*4,35) 100% 2.78 130,001.00
Kolom 25/25 M1 (2,5*1)+(0,75*2) 4.00
Pembesian Kg (4*6*0,89)+(4*6*0,85*0,40) 50% 50% 100% 29.52 2,000.00
Pasang bekisting M2 (0,40*2)*4 50% 50% 100% 3.20 45,000.00
Cor beton manual M3 (0,30*0,30*4,0) 50% 50% 100% 0.36 250,000.00
4 Pondasi sayap perubahan selatan
Pemeratan M2 (0,50*6,0) 100% 4.50 130,000.00
Pasang pondasi selatan perubahan M3 (0,40*1,50)*6,0 100% 3.60 130,000.00
Kolom 25/25 perubahan selatan M1 2.00 1.50
Pembesian Kg (2,0*4*0,89)+(2,0*6*1,0*0,40) 100% 11.92 2,000.00
Pasang bekisting M2 (0,30*2)*1,50 100% 0.90 45,000.00
Cor beton manual M3 (0,30*0,30*1,5) 100% 0.14 250,000.00
Urugan peninggian M3 (0,4*6*1) 100% 2.40 50,000.00
Langsiran material Ls 1.00 100% 1.00 100,000.00
5 Pekerjaan lantai beton
Pemerataan tanah M2 (16,5+25)/2*3,3 100% 68.48 5,000.00
Pasang wermess M2 (16,5+25)/2*3,3 100% 68.48 5,000.00
Pasang bekisting M2 (0,20*16,5)+(0,40*5,5)+(0,40*6,0) 100% 7.90 45,000.00
Cor lantai M3 (16,5+25,0)/2*3,55*0,15 100% 11.05 60,000.00
Sub total
II PEKERJAAN PONDASI TANJAKAN GUDANG TKD
1 pengukuran & bauwpank M1 6.50 100% 6.50 10,000.00
2 Pemerataan tanah M2 (0,50*6,50) 100% 3.25 5,000.00
3 Pasang pondasi M3 (0,50+1,50)/2*0,40*6,50 100% 2.60 130,000.00
4 Langsiran material Ls 1.00 100% 1.00 150,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 13 0ktober 2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : BENGKEL PAK NUR
LOKASI : PAMOTAN
TANGGAL : 07 OKTOBER s/d 13 OKTOBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I KANTOR BAWAH
1 Plesteran kolom M2 (0,40*4,0*6bh)+(0,15*4,0*3 bh)+(0,6*4,0*3 bh) 100% 18.60 20,000.00
Acian kolom dalam M2 (0,40*4,0*6bh)+(0,15*4,0*3 bh)+(0,6*4,0*3 bh) 100% 18.60 10,000.00
Benangan M1 (4,0 *1*6bh)+(4,0*1*3bh)+(4,0*3*3bh) 100% 72.00 12,500.00
2 Kusen pintu
Plesteran M2 (0,10*3,0*3 bh) 100% 0.90 20,000.00
Acian M2 (0,10*3,0*3 bh) 100% 0.90 10,000.00
Benangan M1 (3,00*2*3bh) 100% 18.00 12,500.00
3 Kusen jendela
Plesteran M2 (0,10*1,20*4*3 bh) 100% 1.44 20,000.00
Acian M2 (0,10*1,20*4*3 bh) 100% 1.44 10,000.00
Benangan M1 (1,2*4*2*3bh) 100% 28.80 12,500.00

4 Plesteran dinding luar opname tgl 8 sept 2020 M2 (4,0*4,10*2)+(18*4,10)-((1*2*3)+(1,20*1,20*3)) 75% 25% 96.28 20,000.00
Acian dinding M2 (4,0*4,10*2)+(18*4,10)-((1*2*3)+(1,20*1,20*3)) 25% 75% 96.28 10,000.00
Sub total
II RUANG PANEL LISTRIK
1 Plesteran dinding M2 (2,45*1,65)+(0,95*2,45)+(1,25*2,45) 100% 9.43 20,000.00
Acian M2 (2,45*1,65)+(0,95*2,45)+(1,25*2,45) 100% 9.43 10,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 13 Oktober2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : SALURAN
LOKASI : PAMOTAN
TANGGAL : 07 OKTOBER s/d 13 OKTOBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PONDASI PENINGGIAN DIATAS SALURAN
1 Pengukuran & bauwplank M1 30.00 100% 30.00 10,000.00
2 Galian tanah M3 (0,30*0,25*30) 100% 2.25 50,000.00
3 Pasang batu pondasi kecil M3 (0,30*0,30*30) 100% 2.70 150,000.00
4 Langsiran batu & pasir Ls 1.00 100% 1.00 200,000.00
Sub total
II SALURAN YUDIT
1 Pembersihan saluran buntu barat gudang M1 (17,80)+(5,00)+(10) 100% 32.80 15,000.00
Sub total
III SALURAN YUDIT PAGAR TIMUR
Pembersihan tanah saluran yudit pagar timur M1 25.00 100% 25.00 25,000.00
Galian tanah diatas (berem) M3 (0,70*0,30)*25 100% 5.25 70,000.00
Pembuangan tanah pakai picup M1 25.00 100% 25.00 25,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 13 Oktober2020


Dibuat Oleh

BON UPAH KERJA


PEKERJAAN : BENGKEL PAK NUR
LOKASI : PAMOTAN
TANGGAL : 14 OKTOBER s/d 20 OKTOBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN RUANG BENGKEL 4X20 Lt 2
1 Plesteran dinding bata ringan ruang dalam M2 (3,75*3,55*6)+(3,75*5,80,0*3)-((1,20*1,20*3)+(1,0*2,0*3) 70% 134.81 25,000.00
Acian dinding dalam M2 (3,75*3,55*6)+(3,75*5,80,0*3)-((1,20*1,20*3)+(1,0*2,0*3) 134.81 10,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 20 Oktober2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : GUDANG TKD
LOKASI : PAMOTAN
TANGGAL : 14 OKTOBER s/d 20 OKTOBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI TANJAKAN GUDANG TKD
1 pengukuran & bauwpank M1 6.50 100% 6.50 10,000.00
2 Pemerataan tanah M2 (0,50*6,50) 100% 3.25 5,000.00
3 Pasang pondasi M3 (0,50+1,50)/2*0,40*6,50 100% 2.60 130,000.00
4 Langsiran material Ls 1.00 100% 1.00 150,000.00
Sub total
II PEKERJAAN PONDASI TANJAKAN GUDANG TKD
1 pengukuran & bauwpank M1 5.50 100% 5.50 10,000.00
2 Pemerataan tanah M2 (0,50*5,50) 100% 2.75 5,000.00
3 Pasang pondasi M3 (0,50+1,50)/2*0,40*5,50 100% 2.20 130,000.00
4 Langsiran material Ls 1.00 100% 1.00 150,000.00
5 Kolom 25/25 M1 1.50 4.00
Pembesian Kg (4*1,5*0,89)+(1,5*6*0,85*0,40) 100% 8.40 2,000.00
Pasang bekisting M2 (0,40*2)*1,5 100% 1.20 45,000.00
Cor beton manual M3 (0,30*0,30*1,5,0) 100% 0.14 250,000.00
SEBELAH TIMUR
1 pengukuran & bauwpank M1 12.00 100% 12.00 10,000.00
2 Pemerataan tanah M2 (0,50*12,0) 100% 6.00 5,000.00
3 Pasang pondasi M3 (0,40*1,50*12) 100% 7.20 130,000.00
4 Kolom 25/25 M1 (1,5*3) 4.50
Pembesian Kg (4*4,5*0,89)+(4,5*6*0,85*0,40) 100% 25.20 2,000.00
Pasang bekisting M2 (0,40*2)*4,5 100% 3.60 45,000.00
Cor beton manual M3 (0,30*0,30*4,5,0) 100% 0.41 250,000.00
5 Langsiran material Ls 1.00 100% 1.00 150,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 20 Oktober2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : BENGKEL PAK NUR
LOKASI : PAMOTAN
TANGGAL : 21 OKTOBER s/d 27 OKTOBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN RUANG BENGKEL 4X20 Lt 2
1 Plesteran dinding bata ringan ruang dalam M2 (3,75*3,55*6)+(3,75*5,80,0*3)-((1,20*1,20*3)+(1,0*2,0*3) 70% 30% 134.81 25,000.00
Acian dinding dalam M2 (3,75*3,55*6)+(3,75*5,80,0*3)-((1,20*1,20*3)+(1,0*2,0*3) 134.81 10,000.00
2 Plesteran dinding luar M2 (3,75*3,55*2)+(3,75*5,80*3)-((1,20*1,20*3)+(1,0*2,0*3) 81.56 25,000.00
Acian dinding dalam M2 (3,75*3,55*2)+(3,75*5,80*3)-((1,20*1,20*3)+(1,0*2,0*3) 81.56 10,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 27 Oktober2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : JEMBATAN TKD
LOKASI : PAMOTAN
TANGGAL : 21 OKTOBER s/d 27 OKTOBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI JEMBATAN TKD SELATAN
Bobok beton lama buat balok Ls 1.00 100% 1.00 100,000.00
2 Balok gantung 20/25 M1 (3,00+3,00+3,50)+(2,75+1,0) 9.50
Pembesian Kg (9,50*8*0,89)+(9,5*6*1,0*0,40) 100% 90.44 2,000.00
Pasang bekisting M2 (0,75*9,50) 100% 7.13 45,000.00
Cor beton M3 (0,25*0,30)*9,50) 100% 1.27 160,000.00
3 Plat lantai M2 (1,0+2,75)/2*2,50 4.69
Pembesian Kg (4,65*30,0*0,89) 100% 124.16 2,000.00
Pasang bekisting M2 (0,30*8)+(4,69) 100% 7.09 45,000.00
Cor beton M3 (0,25*4,69) 100% 1.17 160,000.00
4 Balok 25/30 M1 (2,75+1,0) 17.50
Pembesian Kg (3,75*8*0,89)+(3,75*6*1,0*0,40) 100% 35.70 2,000.00
Cor beton M3 (0,25*0,30*3,75) 100% 0.28 160,000.00
Sub total
II PEKERJAAN REL PINTU JEMBATAN
1 pengukuran & bauwpank M1 22.00 100% 22.00 10,000.00
2 Galian tanah M3 (0,40*1,00)*20) 100% 8.00 50,000.00
3 Pemerataan tanah M2 (1,0*20) 100% 20.00 5,000.00
4 Pasang pondasi bawah balok M3 (0,40*1,0*13)+(0,20*1,0*7) 100% 6.60 130,000.00
5 Pasang pondasi peninggian M3 (0,40*0,30*7) 100% 0.84 130,000.00
6 Balok 25x80 M1 20.00 20.00
Pembesian Kg (20*8*0,89)+(20*6*2,0*0,40) 100% 238.40 2,000.00
Pasang bekisting M2 (0,25*2*20,0)+(0,25*1,0*2) 0% 10.50 45,000.00
Cor beton M3 (0,25*1,0*20) 0% 5.00 160,000.00
7 Langsiran material Ls 1.00 100% 1.00 200,000.00
Sub total
III PEKERJAAN PONDASI REL PINTU MASUK TKD
1 Pengukuran & bauwplank M1 20.00 50% 50% 100% 20.00 10,000.00
2 Pemerataan tanah M2 (1,20*20) 50% 50% 100% 24.00 5,000.00
3 Pasang pondasi M3 (0,35*1,00*7) 100% 100% 2.45 130,000.00
3 Pasang pondasi lanjutan M3 (0,35*1,00*4) 100% 100% 1.40 130,000.00
4 Balok 25x100 M1 21.00 21.00
Pembesian Kg (21*8*0,89)+(21*6*2,0*0,40) 75% 25% 100% 250.32 2,000.00
Pasang bekisting M2 (0,30*21)+(0,25*1,00*2)+(0,30*10) 75% 25% 100% 9.80 45,000.00
Cor beton readymix M3 (0,30*1,00*11)+(0,30*1,30*7) 75% 25% 100% 6.03 160,000.00
Cor beton readymix (lanjutan) M3 (0,30*1,30*4) 0% 0% 1.56 160,001.00
Pasang pipa pvc 6 dim M1 20.00 50% 50% 100% 20.00 15,000.00
5 Langsiran material Ls 1.00 100% 1.00 150,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 27 Oktober2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : BENGKEL TKD
LOKASI : PAMOTAN
TANGGAL : 21 OKTOBER s/d 27 OKTOBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN DINDING BATA RINGAN
1 Pengukuran & bauwplank M1 (8*4) 75% 32.00 10,000.00
2 Pemerataan tanah M2 (0,20*32) 75% 6.40 5,000.00
3 Cor beton (manual) bawah M3 (0,05*0,20)*32 75% 0.32 250,000.00
4 Pasang bata ringan M3 (2,0*7,7)*4 75% 61.60 20,000.00
5 Beton kolom 15/20 tinggi 2,20 M1 (2,20*2)*4 17.60
Pembesian praktis Kg (17,6*4*0,60 kg)+(17,6*6*0,6*0,22 kg) 75% 56.18 4,000.00
Bekisting M2 (0,25*2*17,60) 75% 8.80 45,000.00
Cor beton (manual) M3 (0,15*0,20*17,60) 75% 0.53 250,000.00
6 Beton kolom praktis di WF tinggi 2,20 M1 (2,20*2)*4 17.60
Pembesian praktis Kg (17,6*4*0,60 kg)+(17,6*6*0,6*0,22 kg) 75% 56.18 4,000.00
Bekisting M2 (0,25*2*17,60) 75% 8.80 45,000.00
Cor beton (manual) M3 (0,15*0,20*17,60) 75% 0.53 250,000.00
7 Beton ring atas 15/20 diatas bata ringan M1 32.00 32.00
Pembesian Kg (32*4*0,60 kg)+(32*6*0,6*0,22 kg) 0% 102.14 4,000.00
Bekisting M2 (0,2*2*32) 0% 12.80 45,000.00
Cor beton (manual) M3 (0,15*0,20*32) 0% 0.96 250,000.00
8 Langsiran material Ls 1.00 75% 1.00 200,000.00
Sub total
II PEKERJAAN PONDASI KONTAENER
1 Pengukuran M1 (2,5+6,0) 100% 8.50 10,000.00
2 Galian tanah M3 (0,30*0,40)*8,5 100% 1.02 50,000.00
3 Pasang pondasi batu M3 (0,30*0,60)*8,5 100% 1.53 130,000.00
4 Pemerataan tanah M2 (0,70*8,5) 100% 5.95 5,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 27 Oktober2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : SALURAN
LOKASI : PAMOTAN
TANGGAL : 21 OKTOBER s/d 27 OKTOBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I SALURAN YUDIT PAGAR BARAT
Pembersihan tanah saluran yudit sebelah barat M1 73.00 100% 73.00 25,000.00
Galian tanah diatas (berem) & pembuangan M3 (0,70*0,20)*73 100% 10.22 50,000.00
Sub total
2 SALURAN YUDIT PAGAR TIMUR
Pembersihan tanah saluran yudit pagar timur M1 154,2- 25,0 100% 129.20 25,000.00
Galian tanah diatas (berem) & pembuangan pakai picup M3 (0,70*0,20)*75 100% 15.75 50,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 27 Oktober2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : BENGKEL PAK NUR
LOKASI : PAMOTAN
TANGGAL : 28 OKTOBER s/d 03 NOVEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN RUANG BENGKEL 4X20 Lt 2
1 Plesteran dinding bata ringan ruang dalam M2 (3,75*3,55*6)+(3,75*5,80,0*3)-((1,20*1,20*3)+(1,0*2,0*3) 100% 134.81 25,000.00
Acian dinding dalam M2 (3,75*3,55*6)+(3,75*5,80,0*3)-((1,20*1,20*3)+(1,0*2,0*3) 134.81 10,000.00
2 Plesteran dinding luar M2 (3,75*3,55*2)+(3,75*5,80*3)-((1,20*1,20*3)+(1,0*2,0*3) 100% 81.56 25,000.00
Acian dinding dalam M2 (3,75*3,55*2)+(3,75*5,80*3)-((1,20*1,20*3)+(1,0*2,0*3) 100% 81.56 10,000.00
Sub total

Total keseluruhan biaya

Pamotan porong ,03 November 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : BENGKEL TKD
LOKASI : PAMOTAN
TANGGAL : 28 OKTOBER s/d 03 NOVEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN DINDING BATA RINGAN
1 Pengukuran & bauwplank ( SANDBLASTING) M1 (8*2) 75% 16.00 10,000.00
2 Pemerataan tanah M2 (0,20*16) 75% 3.20 5,000.00
3 Cor beton (manual) bawah M3 (0,05*0,20)*16 75% 0.16 250,000.00
4 Pasang bata ringan M3 (2,0*7,7)*2 75% 30.80 20,000.00
5 Beton kolom 15/20 tinggi 2,20 M1 (2,20*2)*2 8.80
Pembesian praktis Kg (8,8*4*0,60 kg)+(8,8*6*0,6*0,22 kg) 75% 28.09 4,000.00
Bekisting M2 (0,25*2*8,8) 75% 4.40 45,000.00
Cor beton (manual) M3 (0,15*0,20*8,8) 75% 0.26 250,000.00
6 Beton kolom praktis di WF tinggi 2,20 M1 (2,20*2)*2 8.80
Pembesian praktis Kg (8,8*4*0,60 kg)+(8,8*6*0,6*0,22 kg) 75% 28.09 4,000.00
Bekisting M2 (0,25*2*8,8) 75% 4.40 45,000.00
Cor beton (manual) M3 (0,15*0,20*8,8) 75% 0.26 250,000.00
7 Beton ring atas 15/20 diatas bata ringan M1 32.00 16.00
Pembesian Kg 166*4*0,60 kg)+(16*6*0,6*0,22 kg) 0% 51.07 4,000.00
Bekisting M2 (0,2*2*16) 0% 6.40 45,000.00
Cor beton (manual) M3 (0,15*0,20*16) 0% 0.48 250,000.00
8 Langsiran material Ls 1.00 75% 1.00 200,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 03 November 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : GARDU LISTRIK
LOKASI : PAMOTAN
TANGGAL : 28 OKTOBER s/d 03 NOVEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN GARDU LISTRIK
1 Balok induk 20/30 M1 (13,00*2)+(6,20*2) 38.40
Pembesian Kg (38,4*10*0,89)+(38,4*6*0,9*0,40) 100% 424.70 4,000.00
Pasang bekisting M2 (0,6*38,4) 100% 23.04 45,000.00
Cor beton ( readymix) M3 (0,18*0,20*38,40) 100% 1.38 160,000.00
2 Balok anak M1 13.00 13.00
Pembesian Kg (13,0*6*0,89)+(13,0*6*0,8*0,40) 100% 94.38 4,000.00
Pasang bekisting M2 (0,45*13,0) 100% 5.85 45,000.00
Cor beton ( ready mix) M3 (0,15*0,15*13,0) 100% 0.29 160,000.00
3 Plat lantai M2 (13,0*6,20) 80.60
Pembesian Kg (80,60*10,0*0,6 kg)+(80,60*10,0*0,40) 100% 806.00 4,000.00
Pasang bekisting M2 (13,0*6,20) 100% 80.60 45,000.00
Pasang peranca M2 (13,0*6,20) 100% 80.60 20,000.00
Cor beton (readymix) M3 (13,0*6,20)*0,12 100% 9.67 160,000.00
4 Lisplank M2 (13.0*2)+(6,20*2)+(0,50*2) 39.40
Pembesian Kg (39,40*5,0*0,40kg) 100% 78.80 4,000.00
Pasang bekisting M2 (0,40*2)*39,40) 100% 31.52 45,000.00
Cor beton ( ready mix) M3 (0,05*0,4*39,40) 100% 0.79 160,000.00
Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 100,000.00

Sub total

Total keseluruhan biaya

Pamotan porong , 03 November 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : PONDASI KOLAM
LOKASI : PAMOTAN
TANGGAL : 28 OKTOBER s/d 03 NOVEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN DINDING BATA RINGAN
1 Pengukuran & bauwplank M1 17.00 100% 16.00 10,000.00
2 Pasang bata ringan M2 (1,20*17,0) 100% 30.80 20,000.00
3 Beton kolom 15/20 tinggi 2,20 M1 (1,3*9) 11.70
Pembesian praktis Kg (11,7*4*0,60 kg)+(11,7*6*0,6*0,22 kg) 100% 37.35 4,000.00
Bekisting M2 (0,25*2*11,70) 100% 5.85 45,000.00
Cor beton (manual) M3 (0,15*0,20*11,7) 100% 0.35 250,000.00
4 Beton ring atas 15/20 diatas bata ringan M1 17.00 16.00
Pembesian Kg (17*4*0,60 kg)+(17*6*0,6*0,22 kg) 100% 54.26 4,000.00
Bekisting M2 (0,2*2*17) 100% 6.80 45,000.00
Cor beton (manual) M3 (0,15*0,20*17) 100% 0.51 250,000.00
4 Langsiran material Ls 1.00 100% 1.00 200,000.00
Sub total
II PEKERJAAN KAMAR MANDI
opname terakhir 15 september 20
1 Pasang keramik dinding M2 (1,50)*(1,90+2,0+2,15+2,80) 100% 8.00 50,000.00
Pasang keramik lantai M2 (2,15*2,80) 100% 27.65 50,000.00
2 Benangan sudut pintu M1 (2,0*3)+(0,80*2)+(3,80*1) 100% 2.40 12,500.00
Sub total
III PEKERJAAN DINDING BATA RINGAN PINTU
1 Pengukuran & bauwplank M1 2.00 100% 2.00 10,000.00
2 Galian tanah M3 (0,30*0,20*2,0) 200% 0.12 50,000.00
3 Beton sloof 15/20 M1 2.00 2.00
Pembesian praktis Kg (2,0*4*0,60 kg)+(2,0*6*0,6*0,22 kg) 100% 6.38 4,000.00
Bekisting M2 (0,20*2*2,0) 100% 0.80 45,000.00
Cor beton (manual) M3 (0,15*0,20*2,0) 100% 0.06 250,000.00
4 Pasang bata ringan M2 (0,80*1,8) 100% 1.44 20,000.00
5 Beton kolom 15/20 M1 1.20 1.20
Pembesian praktis Kg (1,2*4*0,60 kg)+(1,2*6*0,6*0,22 kg) 100% 3.83 4,000.00
Bekisting M2 (0,25*2*1,0) 100% 0.50 45,000.00
Cor beton (manual) M3 (0,15*0,20*1,0) 100% 0.03 250,000.00
6 Beton ring atas 15/20 diatas bata ringan M1 2.00 2.00
Pembesian Kg (2*4*0,60 kg)+(2,0*6*0,6*0,22 kg) 100% 6.38 4,000.00
Bekisting M2 (0,2*2*2) 100% 0.80 45,000.00
Cor beton (manual) M3 (0,15*0,20*2) 100% 0.06 250,000.00
7 Langsiran material Ls 1.00 100% 1.00 200,000.00
Sub total
III PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 100% 1.00 100,000.00
2 Perbaikan paving Ls 1.00 100% 1.00 150,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 15 September 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : GUDANG (BENGKEL TEGUH)
LOKASI : PAMOTAN
TANGGAL : 28 OKTOBER s/d 03 NOVEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN TANDO OLI
Opnmae terakhir 25 agustus 20
1 Tes kebocoran dengan pengisian air Ls 1.00 100% 1.00 100,000.00
2 Kuras air dalam bak Ls 1.00 100% 1.00 100,000.00
3 Pasang keramik dinding 30/30 M2 (2,45*2,45)+(0,90*2,45*4) 100% 14.82 50,000.00
4 Plesteran ban banan M2 (0,17*2,50*4) 100% 1.70 20,000.00
5 Acian ban banan M2 (0,17*2,50*4) 100% 1.70 10,000.00
5 Benangan M1 (2,50*4) 100% 10.00 12,500.00
Sub total
II PEKERJAAN PINTU MASUK
1 Pembersihan Ls 1.00
2 Cor kolom Ls 1.00
3 Cor plat dueker Ls 1.00
4 Plesteran kolom Ls 1.00
5 Benangan Ls 1.00

Sub total
II PEKERJAAN LAIN LAIN
1 Pembersihan 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 03 November 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : BENGKEL PAK NUR
LOKASI : PAMOTAN
TANGGAL : 03 NOVEMBER s/d 13 NOVEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN RUANG BENGKEL 4X20 Lt 2
1 Plesteran dinding bata ringan ruang dalam M2 (3,75*3,55*6)+(3,75*5,80,0*3)-((1,20*1,20*3)+(1,0*2,0*3) 100% 134.81 25,000.00
Acian dinding dalam M2 (3,75*3,55*6)+(3,75*5,80,0*3)-((1,20*1,20*3)+(1,0*2,0*3) 100% 134.81 10,000.00
2 Plesteran dinding luar M2 (3,75*3,55*2)+(3,75*5,80*3)-((1,20*1,20*3)+(1,0*2,0*3) 100% 81.56 25,000.00
Acian dinding dalam M2 (3,75*3,55*2)+(3,75*5,80*3)-((1,20*1,20*3)+(1,0*2,0*3) 100% 81.56 10,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 13 November 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : BENGKEL TKD
LOKASI : PAMOTAN
TANGGAL : 03 NOVEMBER s/d 13 NOVEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN DINDING BATA RINGAN
Bengkel mispan
1 Pengukuran & bauwplank (selatan) M1 (8*4) 75% 25% 100% 32.00 10,000.00
2 Pemerataan tanah M2 (0,20*32) 75% 25% 100% 6.40 5,000.00
3 Cor beton (manual) bawah M3 (0,05*0,20)*32 75% 25% 100% 0.32 250,000.00
4 Pasang bata ringan M3 (2,0*7,7)*4 75% 25% 100% 61.60 20,000.00
5 Beton kolom 15/20 tinggi 2,20 M1 (2,20*2)*4 17.60
Pembesian praktis Kg (17,6*4*0,60 kg)+(17,6*6*0,6*0,22 kg) 75% 25% 100% 56.18 4,000.00
Bekisting M2 (0,25*2*17,60) 75% 25% 100% 8.80 45,000.00
Cor beton (manual) M3 (0,15*0,20*17,60) 75% 25% 100% 0.53 250,000.00
6 Beton kolom praktis di WF tinggi 2,20 M1 (2,20*2)*4 17.60
Pembesian praktis Kg (17,6*4*0,60 kg)+(17,6*6*0,6*0,22 kg) 75% 25% 100% 56.18 4,000.00
Bekisting M2 (0,25*2*17,60) 75% 25% 100% 8.80 45,000.00
Cor beton (manual) M3 (0,15*0,20*17,60) 75% 25% 100% 0.53 250,000.00
7 Beton ring atas 15/20 diatas bata ringan M1 32.00 0% 32.00
Pembesian Kg (32*4*0,60 kg)+(32*6*0,6*0,22 kg) 0% 100% 100% 102.14 4,000.00
Bekisting M2 (0,2*2*32) 0% 100% 100% 12.80 45,000.00
Cor beton (manual) M3 (0,15*0,20*32) 0% 100% 100% 0.96 250,000.00
Sub total
1 Galian tanah (tengah ) M3 (0,20*0,3*22,6) 1.36 50,000.00
2 Cor beton (manual) bawah M3 (0,05*0,20)*23 0.23 250,000.00
3 Pasang bata ringan M3 (2,0*7,7* 2 plong)+(2,0*5,20) 41.20 20,000.00
4 Beton kolom 15/20 tinggi 2,20 M1 (2,20*5 bh) 11.00
Pembesian praktis Kg (11*4*0,60 kg)+(11*6*0,6*0,22 kg) 2:41 4,000.00
Bekisting M2 (0,25*2*11) 12:00 45,000.00
Cor beton (manual) M3 (0,15*0,20*11,0) 7:55 250,000.00
5 Beton kolom praktis di WF tinggi 2,20 M1 (2,20*6) 13.20
Pembesian praktis Kg (13,2*4*0,60 kg)+(13,2*6*0,6*0,22 kg) 3:13 4,000.00
Bekisting M2 (0,25*2*13,2) 14:24 45,000.00
Cor beton (manual) M3 (0,15*0,20*13,2) 9:30 250,000.00
6 Beton ring atas 15/20 diatas bata ringan M1 22.60 22.60
Pembesian Kg (22,6*4*0,60 kg)+(32*6*0,6*0,22 kg) 14:00 4,000.00
Bekisting M2 (0,2*2*22,6) 0:57 45,000.00
Cor beton (manual) M3 (0,15*0,20*22,6) 16:16 250,000.00
Sub total
PROGRES PERIODE PERIODE SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN DINDING BATA RINGAN
1 Pengukuran & bauwplank ( SANDBLASTING) M1 (8*2) 75% 25% 100% 16.00 10,000.00
2 Pemerataan tanah selatan M2 (0,20*16) 75% 25% 100% 3.20 5,000.00
3 Cor beton (manual) bawah M3 (0,05*0,20)*16 75% 25% 100% 0.16 250,000.00
4 Pasang bata ringan M3 (2,0*7,7)*2 75% 25% 100% 30.80 20,000.00
5 Beton kolom 15/20 tinggi 2,20 M1 (2,20*2)*2 8.80
Pembesian praktis Kg (8,8*4*0,60 kg)+(8,8*6*0,6*0,22 kg) 75% 25% 100% 28.09 4,000.00
Bekisting M2 (0,25*2*8,8) 75% 25% 100% 4.40 45,000.00
Cor beton (manual) M3 (0,15*0,20*8,8) 75% 25% 100% 0.26 250,000.00
6 Beton kolom praktis di WF tinggi 2,20 M1 (2,20*2)*2 8.80
Pembesian praktis Kg (8,8*4*0,60 kg)+(8,8*6*0,6*0,22 kg) 75% 25% 100% 28.09 4,000.00
Bekisting M2 (0,25*2*8,8) 75% 25% 100% 4.40 45,000.00
Cor beton (manual) M3 (0,15*0,20*8,8) 75% 25% 100% 0.26 250,000.00
7 Beton ring atas 15/20 diatas bata ringan M1 32.00 0% 16.00
Pembesian Kg 166*4*0,60 kg)+(16*6*0,6*0,22 kg) 100% 100% 51.07 4,000.00
Bekisting M2 (0,2*2*16) 100% 100% 6.40 45,000.00
Cor beton (manual) M3 (0,15*0,20*16) 100% 100% 0.48 250,000.00
Sub total
1 Pengukuran & bauwplank ( SANDBLASTING) M1 (7,75*2 plong) 100% 100% 15.50 10,000.00
2 Pemerataan tanah timur M2 (0,20*17,60) 100% 100% 3.20 5,000.00
3 Cor beton (manual) bawah M3 (0,05*0,20)*17,60 100% 100% 0.16 250,000.00
4 Pasang bata ringan M3 (2,0*7,7)*2 60% 60% 30.80 20,000.00
5 Beton kolom 15/20 tinggi 2,20 M1 (2,20*2)*2 8.80
Pembesian praktis Kg (8,8*4*0,60 kg)+(8,8*6*0,6*0,22 kg) 50% 50% 28.09 4,000.00
Bekisting M2 (0,25*2*8,8) 50% 50% 4.40 45,000.00
Cor beton (manual) M3 (0,15*0,20*8,8) 50% 50% 0.26 250,000.00
6 Beton kolom praktis di WF tinggi 2,20 M1 (2,20*2)*2 8.80
Pembesian praktis Kg (8,8*4*0,60 kg)+(8,8*6*0,6*0,22 kg) 50% 50% 28.09 4,000.00
Bekisting M2 (0,25*2*8,8) 50% 50% 4.40 45,000.00
Cor beton (manual) M3 (0,15*0,20*8,8) 50% 50% 0.26 250,000.00
7 Beton ring atas 10/15 diatas bata ringan M1 (7,7*2) 0% 15.40
Pembesian Kg (15,4*4*0,60 kg)+(15,4*6*0,6*0,22 kg) 0% 49.16 4,000.00
Bekisting M2 (0,15*2*15,4) 0% 4.62 45,000.00
Cor beton (manual) M3 (0,10*0,15*15,4) 0% 0.23 250,000.00
8 Langsiran material Ls 1.00 0% 1.00 200,000.00

Total keseluruhan biaya

Pamotan porong , 17 November 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : JEMBATAN TKD
LOKASI : PAMOTAN
TANGGAL : 03 NOVEMBER s/d 13 NOVEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN REL PINTU JEMBATAN
6 Balok 25x80 M1 20.00 20.00
Pembesian Kg (20*8*0,89)+(20*6*2,0*0,40) 100% 238.40 2,000.00
Pasang bekisting M2 (0,25*2*20,0)+(0,25*1,0*2) 100% 10.50 45,000.00
Cor beton M3 (0,25*1,0*20) 100% 5.00 160,000.00

7 Tambahan rel pintu ke selatan 3,00 m M1 3.00


Pasang pondasi peninggian M3 (0,40*0,30*3,00) 100% 0.36 130,000.00
Pasang bekisting plat & balok M2 (1,0*3,0)+(0,35*3,0*2)+(0,35*1,50) 100% 20.00 5,000.00
Pembesian balok 25/35 (6,0+2,5) Kg (8,50*8,0*0,89 kg)+(8,5*6,0*1,10*0,40 kg) 100% 6.60 130,000.00
Pembesian plat Kg (7,00*5*0,60 kg)+(1,50*10*0,60 kg) 100% 0.84 130,000.00
Cor beton M3 (0,30*1,40*3,0) 100% 1.00 200,000.00
Sub total
II PEKERJAAN PONDASI REL PINTU MASUK TKD
1 Pengukuran & bauwplank M1 20.00 100% 20.00 10,000.00
2 Pemerataan tanah M2 (1,20*20) 100% 24.00 5,000.00
3 Pasang pondasi M3 (0,35*1,00*7) 100% 2.45 130,000.00
3 Pasang pondasi lanjutan M3 (0,35*1,00*4) 1.40 130,000.00
4 Balok 25x100 M1 21.00 21.00
Pembesian Kg (21*8*0,89)+(21*6*2,0*0,40) 100% 250.32 2,000.00
Pasang bekisting M2 (0,30*21)+(0,25*1,00*2)+(0,30*10) 100% 9.80 45,000.00
Cor beton readymix M3 (0,30*1,00*11)+(0,30*1,30*7) 100% 6.03 160,000.00
Cor beton readymix (lanjutan) M3 (0,30*1,30*4) 100% 100% 1.56 160,001.00
Pasang pipa pvc 6 dim M1 20.00 100% 20.00 15,000.00
5 Langsiran material Ls 1.00 100% 1.00 150,000.00
Sub total
III PEKERJAAN PAGAR DEPAN TKD SELATAN
1 Balok sloof 15/20 11 plong x 5,16 M1 56.60 56.60
Pembesian Kg (56,6*4*0,60kg)+(56,6*6*0,5*0,22kg) 100% 173.20 2,000.00
Pasang bekisting M2 (0,20*2*56,6) 100% 22.64 45,000.00
Cor beton (manual) M3 (0,15*0,20*56,6) 100% 1.70 250,000.00

Total keseluruhan biaya

Pamotan porong , 13 November 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : GUDANG (BENGKEL TEGUH)
LOKASI : PAMOTAN
TANGGAL : 03 NOVEMBER s/d 13 NOVEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN TANDO OLI
Opnmae terakhir 25 agustus 20
1 Pasang bata ringan M2 (2,7*1,40*1) 100% 3.78 20,000.00
2 Beton kolom praktis T 2,00 4 buah M1 (2,0*2) 4.00
Pembesian praktis Kg (4*4*0,60 kg)+(4*6*0,4*0,22 kg) 100% 17:05 4,000.00
Bekisting M2 (0,20*2*1,6*2) 100% 6:43 45,000.00
Cor beton (manual) M3 (0,10*0,15*1,6*2) 100% 1:09 250,000.00
3 Beton ring atas 10/15 diatas bata ringan M1 (3,0*1) 3.00
Pembesian Kg (3*4*0,60 kg)+(3,0*6*0,6*0,22 kg) 100% 13:49 4,000.00
Bekisting M2 (0,2*2*3) 100% 4:48 45,000.00
Cor beton (manual) M3 (0,10*0,15*3,0) 100% 1:04 250,000.00
4 Plesteran dinding M2 (1,50*3,0*2 sisi) 100% 9.00 20,000.00
5 Acian M2 (1,50*3,0*2 sisi) 100% 9.00 10,000.00
6 Benangan M1 (3,0*2)+(1,50*2) 100% 9.00 12,500.00

7 Pasang saluran tuang untuk oli


Pasang pondasi ,pasang keramik , plesteran Ls 1.00 100% 1.00 250,000.00
Sub total
PROGRES PERIODE PERIODE SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
II PEKERJAAN TEMPAT SAMPAH
1 Pengukuran & bauwplank M1 (3*2) 100% 6.00 10,000.00
2 Beton sloof 15/20 M1 (3,0+2,50) 5.50
Pembesian praktis Kg (5,5*4*0,60 kg)+(5,5*6*0,6*0,22 kg) 100% 17.56 4,000.00
Bekisting M2 (0,20*5,5*2,0) 100% 2.20 45,000.00
Cor beton (manual) M3 (0,15*0,20*5,5) 100% 0.17 250,000.00
3 Pasang bata ringan M2 (2,7*1,40*2) 100% 7.56 20,000.00
4 Beton kolom praktis T 2,00 4 buah M1 (2,0*4) 8.00
Pembesian praktis Kg (8*4*0,60 kg)+(8*6*0,4*0,22 kg) 100% 23.42 4,000.00
Bekisting M2 (0,20*2*8) 100% 3.20 45,000.00
Cor beton (manual) M3 (0,10*0,15*8) 100% 0.12 250,000.00
5 Beton ring atas 10/15 diatas bata ringan M1 (3,0*2) 6.00
Pembesian Kg (6*4*0,60 kg)+(6,0*6*0,6*0,22 kg) 100% 19.15 4,000.00
Bekisting M2 (0,2*2*6) 100% 2.40 45,000.00
Cor beton (manual) M3 (0,10*0,15*6,0) 100% 0.09 250,000.00
6 Plesteran dinding M2 (1,5*3,0)*4 +(1,50*2,50) 100% 21.75 20,000.00
7 Acian M2 (1,5*3,0)*4 +(1,50*2,50) 100% 21.75 10,000.00
8 Benangan M1 (2,75*2*2) 100% 11.00 12,500.00
9 Urugan peninggian lantai M3 (0,15*3,0*2,50) 100% 1.13 50,000.00
10 Rabatan lantai M2 (2,50*3,0) 100% 7.50 15,000.00
11 Acian lantai M2 (2,50*3,0) 100% 7.50 10,000.00
11 Langsiran material Ls 1.00 100% 1.00 200,000.00
Sub total
II PEKERJAAN LAIN LAIN
1 Pembersihan 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 13 November 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : ZILLO SEMEN & COMPRESOR,TANDON AIR
LOKASI : PAMOTAN
TANGGAL : 03 NOVEMBER s/d 13 NOVEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PONDASI ZILLO
1 Pengukuran & bauwplank M1 (3*4) 100% 12.00 10,000.00
2 Pemerataan tanah M2 (3,0*3,0) 100% 9.00 5,000.00
3 Beton sloof 45*45 M1 (2,80*4) 11.20
Pembesian Kg (2,85*10*0,89 kg)+(2,85*6*1,65*0,40 kg) 100% 36.65 2,000.00
Bekisting M2 (0,45*2,85*4)+(0,30*1,85*4) 100% 7.35 45,000.00
Cor beton (readymix) M3 (0,45*0,45*2,85*2)+(0,45*0,45*1,85*2) 100% 1.90 165,000.00
4 Beton kolom 45/45 M1 1,2*4 1.20
Pembesian Kg ((1,2*8*0,89kg)+(1,2*6*1,65*0,40 kg))*4 100% 53.18 2,000.00
Bekisting M2 (0,25*0,45*4)*4 100% 1.80 45,000.00
Cor beton (readymix) M3 (0,70*0,70*0,4)*4 +(0,45*0,45*0,20*4) 100% 0.95 160,000.00
5 Beton lantai M2 (1,85*1,85) 3.42
Pembesian Kg (2,85*11bh*2*0,60kg) 100% 37.62 2,000.00
Cor beton ( ready mix) M3 (0,20*1,85*1,85) 100% 0.68 160,000.00
Pasang pelex Bh 4.00 100% 4.00 25,000.00
Sub total
II PEKERJAAN TEMPAT KOMPRESOR & TANDON
1 Pengukuran & bauwplank M1 (6,3*2)+(1,8*2) 100% 16.20 10,000.00
2 Pasang pondasi peninggian saluran untuk panel M3 (0,20*0,15*6,30)*2 sisi 100% 0.38 50,000.00
3 Pasang plat penutup saluran pakai daun panel 2 lapis M2 (0,45*6,30) 100% 2.84 20,000.00
4 Peninggian lantai patlah batu M3 (0,25*0,60*6,30) 100% 0.95 130,000.00
5 Rabatan lantai tebal 5 cm M2 (1,80*6,30) 100% 11.34 15,000.00
6 Acian lantai M2 (1,80*6,30) 100% 11.34 10,000.00
Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 13 November 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : BENGKEL PAK NUR
LOKASI : PAMOTAN
TANGGAL : 13 NOVEMBER s/d 17 NOVEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN RUANG BENGKEL 4X20 Lt 2
1 Pekerjaan lisplank
1 Pasang bata ringan M2 (0,22*19,25)+(0,22*3,6)+(0,22*1,65) 100% 5.39 25,000.00
2 Beton ring atas 10/15 diatas bata ringan M1 (19,25+3,60+1,65) 24.50
Pembesian Kg (24,50*4*0,60 kg)+(24,50*6*0,6*0,22 kg) 100% 4:53 4,000.00
Bekisting M2 (0,15*2*24,50) 100% 8:24 45,000.00
Cor beton (manual) M3 (0,10*0,15*24,5) 100% 8:49 250,000.00
3 kolom praktis 10/15 M1 (0,96 * 9 bh) 8.64
Pembesian Kg (8,64*4*0,60 kg)+(8,64*6*0,6*0,22 kg) 30% 13:53 4,000.00
Bekisting M2 (0,15*2*28,64) 30% 14:12 45,000.00
Cor beton (manual) M3 (0,10*0,15*8,64) 30% 3:06 250,000.00
4 Plesteran lisplank M2 (0,23+0,075+0,70+0,14+0,36)*24,50 75% 36.87 20,000.00
Acian M2 (0,23+0,075+0,70+0,14+0,36)*24,50 75% 36.87 10,000.00
Benangan sudut M1 (4,00*24,50)+(0,70*3) 75% 98.00 12,500.00
Sub total

Total keseluruhan biaya

Pamotan porong , 17 November 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : GUDANG (BENGKEL TEGUH)
LOKASI : PAMOTAN
TANGGAL : 13 NOVEMBER s/d 17 NOVEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN PAGAR PEMBATAS
SISI BARAT :
1 Plesteran dinding Tinggi 0,00 -1,50 M2 (0,95*1,45)+(2,35*1,45*11) 100% 38.86 20,000.00
2 Plesteran dinding Tinggi 1,51 - 3,00 M2 (0,95*1,05)+(2,35*1,05*11) 100% 28.14 20,000.00
3 Acian dinding Tinggi 0,00 -1,50 M2 (0,95*1,45)+(2,35*1,45*11) 100% 38.86 10,000.00
4 Acian dinding Tinggi 1,51 - 3,00 M2 (0,95*1,05)+(2,35*1,05*11) 100% 28.14 10,000.00
SISI TIMUR :
1 Plesteran dinding Tinggi 0,00 -1,50 M2 (0,95*1,45)+(2,35*1,45*11) 100% 38.86 20,000.00
2 Plesteran dinding Tinggi 1,51 - 3,00 M2 (0,95*1,05)+(2,35*1,05*11) 100% 28.14 20,000.00
3 Acian dinding Tinggi 0,00 -1,50 M2 (0,95*1,45)+(2,35*1,45*11) 100% 38.86 10,000.00
4 Acian dinding Tinggi 1,51 - 3,00 M2 (0,95*1,05)+(2,35*1,05*11) 100% 28.14 10,000.00

Sub total

Pamotan porong , 17 November 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : BENGKEL TKD
LOKASI : PAMOTAN
TANGGAL : 13 NOVEMBER s/d 17 NOVEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN DINDING BATA RINGAN
Bengkel mispan
1 Pengukuran & bauwplank (selatan) M1 (8*4) 100% 32.00 10,000.00
2 Pemerataan tanah M2 (0,20*32) 100% 6.40 5,000.00
3 Cor beton (manual) bawah M3 (0,05*0,20)*32 100% 0.32 250,000.00
4 Pasang bata ringan M3 (2,0*7,7)*4 100% 61.60 20,000.00
5 Beton kolom 15/20 tinggi 2,20 M1 (2,20*2)*4 100% 17.60
Pembesian praktis Kg (17,6*4*0,60 kg)+(17,6*6*0,6*0,22 kg) 100% 56.18 4,000.00
Bekisting M2 (0,25*2*17,60) 100% 8.80 45,000.00
Cor beton (manual) M3 (0,15*0,20*17,60) 100% 0.53 250,000.00
6 Beton kolom praktis di WF tinggi 2,20 M1 (2,20*2)*4 100% 17.60
Pembesian praktis Kg (17,6*4*0,60 kg)+(17,6*6*0,6*0,22 kg) 100% 56.18 4,000.00
Bekisting M2 (0,25*2*17,60) 100% 8.80 45,000.00
Cor beton (manual) M3 (0,15*0,20*17,60) 100% 0.53 250,000.00
7 Beton ring atas 15/20 diatas bata ringan M1 32.00 100% 32.00
Pembesian Kg (32*4*0,60 kg)+(32*6*0,6*0,22 kg) 100% 102.14 4,000.00
Bekisting M2 (0,2*2*32) 100% 12.80 45,000.00
Cor beton (manual) M3 (0,15*0,20*32) 100% 0.96 250,000.00
Sub total
1 Galian tanah (tengah ) M3 (0,20*0,3*22,6) 100% 1.36 50,000.00
2 Cor beton (manual) bawah M3 (0,05*0,20)*23 100% 0.23 250,000.00
3 Pasang bata ringan M3 (2,0*7,7* 2 plong)+(2,0*5,20) 100% 41.20 20,000.00
4 Beton kolom 15/20 tinggi 2,20 M1 (2,20*5 bh) 11.00
Pembesian praktis Kg (11*4*0,60 kg)+(11*6*0,6*0,22 kg) 100% 2:41 4,000.00
Bekisting M2 (0,25*2*11) 100% 12:00 45,000.00
Cor beton (manual) M3 (0,15*0,20*11,0) 100% 7:55 250,000.00
5 Beton kolom praktis di WF tinggi 2,20 M1 (2,20*6) 13.20
Pembesian praktis Kg (13,2*4*0,60 kg)+(13,2*6*0,6*0,22 kg) 100% 3:13 4,000.00
Bekisting M2 (0,25*2*13,2) 100% 14:24 45,000.00
Cor beton (manual) M3 (0,15*0,20*13,2) 100% 9:30 250,000.00
6 Beton ring atas 15/20 diatas bata ringan M1 22.60 22.60
Pembesian Kg (22,6*4*0,60 kg)+(32*6*0,6*0,22 kg) 100% 14:00 4,000.00
Bekisting M2 (0,2*2*22,6) 100% 0:57 45,000.00
Cor beton (manual) M3 (0,15*0,20*22,6) 100% 16:16 250,000.00
Sub total
PROGRES PERIODE PERIODE SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN DINDING BATA RINGAN
1 Pengukuran & bauwplank ( SANDBLASTING) M1 (8*2) 100% 16.00 10,000.00
2 Pemerataan tanah selatan M2 (0,20*16) 100% 3.20 5,000.00
3 Cor beton (manual) bawah M3 (0,05*0,20)*16 100% 0.16 250,000.00
4 Pasang bata ringan M3 (2,0*7,7)*2 100% 30.80 20,000.00
5 Beton kolom 15/20 tinggi 2,20 M1 (2,20*2)*2 8.80
Pembesian praktis Kg (8,8*4*0,60 kg)+(8,8*6*0,6*0,22 kg) 100% 28.09 4,000.00
Bekisting M2 (0,25*2*8,8) 100% 4.40 45,000.00
Cor beton (manual) M3 (0,15*0,20*8,8) 100% 0.26 250,000.00
6 Beton kolom praktis di WF tinggi 2,20 M1 (2,20*2)*2 8.80
Pembesian praktis Kg (8,8*4*0,60 kg)+(8,8*6*0,6*0,22 kg) 100% 28.09 4,000.00
Bekisting M2 (0,25*2*8,8) 100% 4.40 45,000.00
Cor beton (manual) M3 (0,15*0,20*8,8) 100% 0.26 250,000.00
7 Beton ring atas 15/20 diatas bata ringan M1 32.00 16.00
Pembesian Kg 166*4*0,60 kg)+(16*6*0,6*0,22 kg) 100% 51.07 4,000.00
Bekisting M2 (0,2*2*16) 100% 6.40 45,000.00
Cor beton (manual) M3 (0,15*0,20*16) 100% 0.48 250,000.00
Sub total
1 Pengukuran & bauwplank ( SANDBLASTING) M1 (7,75*2 plong) 100% 100% 15.50 10,000.00
2 Pemerataan tanah timur M2 (0,20*17,60) 100% 100% 3.20 5,000.00
3 Cor beton (manual) bawah M3 (0,05*0,20)*17,60 100% 100% 0.16 250,000.00
4 Pasang bata ringan M3 (2,0*7,7)*2 60% 40% 100% 30.80 20,000.00
5 Beton kolom 15/20 tinggi 2,20 M1 (2,20*2)*2 8.80
Pembesian praktis Kg (8,8*4*0,60 kg)+(8,8*6*0,6*0,22 kg) 50% 50% 100% 28.09 4,000.00
Bekisting M2 (0,25*2*8,8) 50% 50% 100% 4.40 45,000.00
Cor beton (manual) M3 (0,15*0,20*8,8) 50% 50% 100% 0.26 250,000.00
6 Beton kolom praktis di WF tinggi 2,20 M1 (2,20*2)*2 8.80
Pembesian praktis Kg (8,8*4*0,60 kg)+(8,8*6*0,6*0,22 kg) 50% 50% 100% 28.09 4,000.00
Bekisting M2 (0,25*2*8,8) 50% 50% 100% 4.40 45,000.00
Cor beton (manual) M3 (0,15*0,20*8,8) 50% 50% 100% 0.26 250,000.00
7 Beton ring atas 15/20 diatas bata ringan M1 (7,7*2) 0% 15.40
Pembesian Kg (15,4*4*0,60 kg)+(15,4*6*0,6*0,22 kg) 100% 100% 49.16 4,000.00
Bekisting M2 (0,2*2*15,4) 100% 100% 6.16 45,000.00
Cor beton (manual) M3 (0,15*0,20*15,4) 100% 100% 0.46 250,000.00
8 Langsiran material Ls 1.00 100% 100% 1.00 200,000.00

Total keseluruhan biaya

Pamotan porong , 17 November 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : PONDASI KOLAM
LOKASI : PAMOTAN
TANGGAL : 13 NOVEMBER s/d 17 NOVEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
I PEKERJAAN DINDING BATA RINGAN
Sisi utara :
1 Plesteran dinding Tinggi 0,00 -1,50 M2 (1,50+3,0+2,85+2,87+2,47+1,57+1,62)*1,17 100% 18.58 20,000.00
2 Acian dinding Tinggi 0,00 -1,50 M2 (1,50+3,0+2,85+2,87+2,47+1,57+1,62)*1,18 100% 18.74 10,000.00
Sisi selatan
1 Plesteran dinding Tinggi 0,00 -1,50 M2 (1,50+3,0+2,85+2,87+2,47+1,57+1,62)*1,30 100% 20.64 20,000.00
2 Acian dinding Tinggi 0,00 -1,50 M2 (1,50+3,0+2,85+2,87+2,47+1,57+1,62)*1,30 100% 20.64 10,000.00

3 Plesteran kolom & balok


Plesteran kolom selatan M2 (0,05+0,20+0,05)*1,30*6 bh+(0,7*1,30*2) 50% 4.16 20,000.00
Plesteran kolom utara M2 (0,05+0,20+0,05)*1,10*6 bh 0% 1.98 20,000.00
Plesteran balok ring atas M2 (0,05+0,12+0,20+0,12+0,05)*17,80 25% 9.61 20,000.00

Acian kolom selatan M2 (0,05+0,20+0,05)*1,30*6 bh+(0,7*1,30*2) 50% 4.16 10,000.00


Acian kolom utara M2 (0,05+0,20+0,05)*1,10*6 bh 0% 1.98 10,000.00
Acian balok ring atas M2 (0,05+0,12+0,20+0,12+0,05)*17,80 25% 9.61 10,000.00
Sub total
Benangan kolom & balok
Benangan kolom M1 (1,10*2*6)+(1,30*2*6)+(1,30*4*2) 25% 39.20 12,500.00
Benangan balok ring atas M1 (17,40*2)*2 25% 69.60 12,500.00
Sub total
II PEKERJAAN PONDASI KOLAM SELATAN
1 Pengukuran & bauwplank M1 15.10 100% 15.10 10,000.00
2 Galian tanah M3 (0,40*0,20)15,10 100% 1.21 70,000.00
3 Pasang batu pondasi M1 (0,40*0,40*15,60) 100% 2.50 130,000.00
4 Langsiran material Ls 1.00 100% 1.00 100,000.00
Sub total

Total keseluruhan biaya

Pamotan porong , 17 November 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : JEMBATAN TKD
LOKASI : PAMOTAN
TANGGAL : 13 NOVEMBER s/d 17 NOVEMBER 2020

PROGRES PERIODE PERIODE SATUAN


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA
SEBELUMNYA INI INI Rp
III PEKERJAAN PAGAR DEPAN TKD SELATAN
1 Balok sloof 15/20 11 plong x 5,16 M1 56.60 56.60
Pembesian Kg (56,6*4*0,60kg)+(56,6*6*0,5*0,22kg) 100% 173.20 2,000.00
Pasang bekisting M2 (0,20*2*56,6) 100% 22.64 45,000.00
Cor beton (manual) M3 (0,15*0,20*56,6) 100% 1.70 250,000.00
2 Pasang bata ringan M2 (0,22*56,6) 100% 12.45 20,000.00
3 Balok ring praktis 11 plong x 5,16 M1 56.60 56.60
Pembesian Kg (56,6*4*0,60kg)+(56,6*6*0,4*0,22kg) 100% 165.72 4,000.00
Pasang bekisting M2 (0,15*2*56,6) 100% 16.98 45,000.00
Cor beton (manual) M3 (0,1*0,15*56,6) 100% 0.85 250,000.00

Total keseluruhan biaya

Pamotan porong , 17 November 2020


Dibuat Oleh
KERJA

JUMLAH
HARGA KETERANGAN
Rp

1,000,000.00
1,000,000.00
250,000.00
2,250,000.00

150,000.00
91,875.00
420,000.00
210,000.00
428,750.00
360,000.00
540,000.00
465,000.00
465,000.00
140,000.00
3,270,625.00

50,000.00
140,000.00
200,000.00
390,000.00

500,000.00
250,000.00
2,250,000.00
3,000,000.00

500,000.00
500,000.00

9,410,625.00
9,410,000.00

Pamotan porong , 08 September 2018

IMAM BASORI

KERJA
JUMLAH
HARGA KETERANGAN
Rp

500,000.00
500,000.00

500,000.00
175,000.00
675,000.00

500,000.00
295,000.00
330,000.00
1,100,000.00
13,177,500.00
1,150,000.00

500,000.00
125,000.00
90,000.00
300,000.00
2,625,000.00
3,187,500.00
510,000.00
23,890,000.00

750,000.00
1,500,000.00
750,000.00
3,000,000.00

28,065,000.00
28,060,000.00

Pamotan porong , 23 September 2018

IMAM BASORI

KERJA

JUMLAH
HARGA KETERANGAN
Rp
3,360,000.00
460,000.00

900,000.00
120,000.00

250,000.00
500,000.00
300,000.00
1,000,000.00
10,500,000.00
1,000,000.00
18,390,000.00

250,000.00
500,000.00
500,000.00
1,250,000.00

19,640,000.00
19,640,000.00

Pamotan porong , 29 September 2018

IMAM BASORI

KERJA

JUMLAH
HARGA KETERANGAN
Rp

60,000.00
200,000.00
3,150,000.00
280,000.00

14,700,000.00
1,400,000.00

100,000.00
125,000.00
75,000.00
250,000.00
2,625,000.00

22,965,000.00

250,000.00
500,000.00
500,000.00
1,250,000.00

24,215,000.00
24,210,000.00

Pamotan porong , 06 Oktober 2018

IMAM BASORI

KERJA

JUMLAH
HARGA KETERANGAN
Rp

135,000.00
450,000.00
6,300,000.00
720,000.00

3,937,500.00
350,000.00

105,000.00
350,000.00
3,675,000.00
350,000.00
5,145,000.00
490,000.00
22,007,500.00

660,000.00
1,417,500.00
3,000,000.00
5,077,500.00
250,000.00
500,000.00
500,000.00
1,250,000.00

28,335,000.00
28,330,000.00

Pamotan porong , 20 Oktober 2018

IMAM BASORI

KERJA

JUMLAH
HARGA KETERANGAN
Rp

4,826,250.00
715,000.00

135,000.00
450,000.00
8,100,000.00
720,000.00

1,096,875.00
195,000.00
16,238,125.00

900,000.00
937,500.00
1,500,000.00

390,000.00

3,727,500.00

90,000.00
300,000.00
1,312,500.00
1,702,500.00

JUMLAH
HARGA KETERANGAN
Rp

2,000,000.00
800,000.00
500,000.00
1,200,000.00
4,500,000.00

250,000.00
1,500,000.00
750,000.00
2,500,000.00

28,668,125.00
28,660,000.00

Pamotan porong , 03 November 2018

IMAM BASORI

KERJA

JUMLAH
HARGA KETERANGAN
Rp

1,000,000.00
350,000.00
1,350,000.00
200,000.00
200,000.00

1,550,000.00
1,550,000.00

Pamotan porong , 03 November 2018

IMAM BASORI

KERJA

JUMLAH
HARGA KETERANGAN
Rp

780,000.00
2,187,500.00
3,500,000.00
1,012,500.00

937,500.00
1,500,000.00
1,687,500.00
11,605,000.00

210,000.00
700,000.00
11,287,500.00
700,000.00
12,897,500.00

600,000.00
1,500,000.00
250,000.00
2,350,000.00

26,852,500.00
26,850,000.00

Pamotan porong , 10 November 2018


IMAM BASORI

KERJA

JUMLAH
HARGA KETERANGAN
Rp

4,455,000.00 100%
660,000.00 SELESAI
5,115,000.00

1,680,000.00
2,187,500.00
3,500,000.00
3,627,000.00

10,994,500.00

75,000.00
250,000.00
2,520,000.00
175,000.00
3,000,000.00
250,000.00
6,270,000.00

300,000.00
1,000,000.00
250,000.00
1,550,000.00

23,929,500.00
23,920,000.00

Pamotan porong , 17 November 2018

IMAM BASORI
KERJA

JUMLAH
HARGA KETERANGAN
Rp

187,500.00 100%
300,000.00 100%
3,375,000.00
3,862,500.00

7,500,000.00
500,000.00
8,000,000.00

300,000.00
500,000.00
150,000.00
950,000.00

12,812,500.00
12,810,000.00

Pamotan porong , 23 November 2018

IMAM BASORI

KERJA

JUMLAH
HARGA KETERANGAN
Rp

1,462,500.00
1,462,500.00

7,725,000.00
500,000.00
2,537,500.00
4,060,000.00

6,581,250.00
450,000.00
21,853,750.00

750,000.00
150,000.00
900,000.00

24,216,250.00
24,210,000.00

Pamotan porong , 30 November 2018

IMAM BASORI

KERJA

JUMLAH
HARGA KETERANGAN
Rp

1,462,500.00
1,462,500.00
1,462,500.00

2,325,375.00
900,000.00
3,225,375.00

2,537,500.00
4,060,000.00
3,000,000.00
250,000.00
9,847,500.00

225,000.00
750,000.00
2,520,000.00
175,000.00
7,500,000.00
2,750,000.00
350,000.00
560,000.00
756,000.00
15,586,000.00

JUMLAH
HARGA KETERANGAN
Rp

210,000.00
75,000.00
250,000.00
1,260,000.00
150,000.00
1,764,000.00
400,000.00
350,000.00
560,000.00
756,000.00
5,775,000.00

210,000.00
75,000.00
250,000.00
1,260,000.00
150,000.00
1,764,000.00
400,000.00
350,000.00
560,000.00
756,000.00
5,775,000.00

210,000.00
75,000.00
250,000.00
1,260,000.00
150,000.00
1,764,000.00
400,000.00
350,000.00
560,000.00
5,019,000.00

3,000,000.00
500,000.00
3,500,000.00

37,933,875.00
37,930,000.00

Pamotan porong ,22 Desember 2018

IMAM BASORI

KERJA

JUMLAH
HARGA KETERANGAN
Rp

1,170,000.00
3,487,500.00
3,487,500.00

180,000.00
756,000.00
875,000.00
1,811,000.00

378,000.00
90,000.00
468,000.00

1,000,000.00
500,000.00
150,000.00
1,000,000.00
2,650,000.00

8,416,500.00
8,410,000.00

Pamotan porong , 12 Januari 2019

IMAM BASORI

KERJA
JUMLAH
HARGA KETERANGAN
Rp

1,350,000.00
3,937,500.00
5,287,500.00

3,500,000.00
825,000.00
1,750,000.00
825,000.00
6,900,000.00

1,500,000.00
500,000.00
1,000,000.00
3,000,000.00

15,187,500.00
15,180,000.00

Pamotan porong , 19 Januari 2019

IMAM BASORI

KERJA

JUMLAH
HARGA KETERANGAN
Rp

2,880,000.00
687,500.00
2,100,000.00
680,000.00
600,000.00
1,522,500.00
1,840,000.00
10,310,000.00

500,000.00
500,000.00
1,000,000.00

11,310,000.00
11,310,000.00

Pamotan porong , 31 Januari 2019

IMAM BASORI

KERJA

JUMLAH
HARGA KETERANGAN
Rp

52,500.00
50,000.00
30,000.00
100,000.00
315,000.00
60,000.00
588,000.00
140,000.00
87,500.00
140,000.00
1,563,000.00

350,000.00
560,000.00
910,000.00

1,360,000.00
1,360,000.00

270,000.00
1,575,000.00
1,845,000.00

500,000.00
500,000.00
1,000,000.00

6,678,000.00
6,670,000.00

Pamotan porong , 09 Februari 2019


IMAM BASORI

KERJA

JUMLAH
HARGA KETERANGAN
Rp

52,500.00
50,000.00
30,000.00
100,000.00
315,000.00
60,000.00
588,000.00
140,000.00
87,500.00
140,000.00

141,750.00
45,000.00

614,250.00
341,250.00
2,705,250.00

90,000.00
90,000.00
180,000.00

1,360,000.00
1,360,000.00

700,000.00
200,000.00
900,000.00

5,145,250.00
5,140,000.00

Pamotan porong , 16 Februari 2019


IMAM BASORI

KERJA

JUMLAH
HARGA KETERANGAN
Rp

225,000.00
245,000.00
490,000.00
245,000.00
490,000.00
2,100,000.00
650,000.00
4,445,000.00

245,000.00
490,000.00
189,000.00
283,500.00
60,000.00
90,000.00
1,357,500.00

697,000.00
697,000.00

1,125,000.00
562,500.00
1,068,750.00
720,000.00
3,476,250.00

700,000.00
300,000.00
500,000.00
1,500,000.00

11,475,750.00
11,470,000.00

Pamotan porong , 02 Maret 2019


IMAM BASORI

KERJA

JUMLAH
HARGA KETERANGAN
Rp

701,400.00
350,700.00
665,000.00
2,017,500.00
2,737,500.00

1,536,000.00
480,000.00
9,120.00
1,440,000.00
9,937,220.00

2,537,500.00
3,552,500.00
1,065,750.00
2,664,375.00
9,820,125.00

750,000.00
500,000.00
1,250,000.00

21,007,345.00
21,000,000.00

Pamotan porong , 30 Maret 2019

IMAM BASORI

KERJA

JUMLAH
HARGA KETERANGAN
Rp
4,015,000.00

1,440,000.00
5,455,000.00

150,000.00
180,000.00
150,000.00
30,000.00
200,000.00
1,080,000.00
120,000.00
2,016,000.00
280,000.00
300,000.00
480,000.00

456,750.00
1,141,875.00
6,584,625.00

750,000.00
500,000.00
1,250,000.00

13,289,625.00
13,280,000.00

Pamotan porong , 13 april 2019

IMAM BASORI

KERJA

JUMLAH
HARGA KETERANGAN
Rp

100,000.00
420,000.00
150,000.00
150,000.00
400,000.00
2,520,000.00
240,000.00
4,704,000.00
560,000.00
700,000.00
1,120,000.00
2,340,000.00
13,404,000.00

250,000.00
572,500.00
2,862,500.00
1,653,600.00
1,456,000.00
3,307,200.00
1,300,000.00
11,401,800.00

300,000.00
200,000.00
500,000.00

25,305,800.00
25,300,000.00

Pamotan porong , 04 Mei 2019

IMAM BASORI

KERJA

JUMLAH
HARGA KETERANGAN
Rp

100,000.00
420,000.00
150,000.00
150,000.00
400,000.00
2,520,000.00
240,000.00
4,704,000.00
560,000.00
700,000.00
1,120,000.00
2,340,000.00
13,404,000.00
250,000.00
572,500.00
2,862,500.00
1,653,600.00
1,456,000.00
3,307,200.00
1,300,000.00
11,401,800.00

300,000.00
200,000.00
500,000.00

25,305,800.00
25,300,000.00

Pamotan porong , 04 Mei 2019

IMAM BASORI

KERJA

JUMLAH
HARGA KETERANGAN
Rp

205,000.00
1,132,625.00

96,832.00
153,000.00
68,000.00

25,000.00
12,500.00
62,500.00
1,755,457.00

200,000.00
200,000.00

1,955,457.00

Pamotan porong ,16 Oktober 2019


KERJA

JUMLAH
HARGA KETERANGAN
Rp

2,835,000.00
1,350,000.00
2,700,000.00
5,184,000.00
12,069,000.00

12,069,000.00

Pamotan porong ,19 November 2019

KERJA

JUMLAH
HARGA KETERANGAN
Rp

1,620,000.00
1,800,000.00
1,800,000.00
3,240,000.00
8,460,000.00

300,000.00
90,000.00
75,000.00
1,200,000.00
1,665,000.00

10,125,000.00

Pamotan porong ,02 Desember 2019


KERJA

JUMLAH
HARGA KETERANGAN
Rp

749,250.00
495,000.00
495,000.00
891,000.00
2,630,250.00
-
327,600.00
742,500.00
1,400,000.00
1,400,000.00
2,520,000.00
6,390,100.00
-
300,000.00
90,000.00
225,000.00
-
615,000.00

9,635,350.00

Pamotan porong ,24 Desember 2019

KERJA

JUMLAH
HARGA KETERANGAN
Rp

-
819,000.00
-
-
315,000.00
393,750.00
-
242,880.00
270,000.00
337,500.00
2,654,437.50
200,000.00 dilangsir
150,000.00 banyak air
5,382,567.50
-
-
109,200.00
378,000.00
200,000.00
-
74,032.00
138,600.00
77,000.00
100,000.00
1,076,832.00
-
720,000.00
1,872,000.00
468,000.00
1,895,400.00
200,000.00
5,155,400.00

11,614,799.50

Pamotan porong ,29 April 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

1,638,000.00
-
337,380.00
472,500.00
-
100,000.00 dilangsir
2,547,880.00
-
440,000.00
1,144,000.00
286,000.00
1,485,000.00 Pondasi kecil tambahan
400,000.00
3,755,000.00
-

3,510,000.00
877,500.00
1,462,500.00
731,250.00
1,218,750.00
300,000.00
8,100,000.00

250,000.00
250,000.00

14,402,880.00

Pamotan porong ,12 Mei 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp
-
211,000.00
420,000.00
84,000.00
472,500.00 Pondasi kecil tambahan
250,000.00
420,000.00
1,857,500.00
-

-
-
487,500.00
243,750.00
-
300,000.00
1,031,250.00
-

-
-
-
-
312,000.00
156,000.00
-
468,000.00

-
-
-
-
-
-

302,400.00
100,000.00
402,400.00

3,759,150.00

Pamotan porong , 02 Juni 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp
-

700,000.00
936,000.00
175,000.00
234,000.00
-
-
625,000.00
2,670,000.00
-

-
-
-
-
-
-
-
-

700,000.00
936,000.00
175,000.00
234,000.00
-
-
625,000.00
2,670,000.00
-
120,000.00
24,000.00
747,337.50
134,225.00
200,000.00
1,225,562.50

JUMLAH
HARGA KETERANGAN
Rp

405,000.00
279,000.00
202,875.00
1,694,925.00 pondasi kecil
209,250.00 pondasi kecil
-
555,282.00
737,100.00
307,125.00
4,390,557.00

80,000.00
96,009.60
873,600.00
-
139,320.00
-
-
-
-
-
-
-
-
1,188,929.60

500,000.00
500,000.00

12,645,049.10

Pamotan porong ,09 Juni 2020

KERJA
JUMLAH
HARGA KETERANGAN
Rp

380,000.00
106,000.00
-
46,440.00
81,000.00
67,500.00
-
131,880.00
178,200.00
159,000.00
429,000.00
1,458,600.00

3,037,620.00

500,000.00
1,500,000.00
2,000,000.00

5,037,620.00

Pamotan porong ,09 Juni 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp
-

1,170,000.00
292,500.00
-
-
406,250.00
-
1,868,750.00

-
-
-
-
-
270,000.00
168,750.00
-
123,840.00
180,000.00
150,000.00
1,544,400.00
250,000.00
2,686,990.00

189,000.00
94,500.00
2,088,450.00
1,701,000.00 pasangan tipis
-
245,952.00 Besi kecil
378,000.00
157,500.00
420,000.00
500,000.00
5,774,402.00

10,330,142.00

Pamotan porong ,30 Juni 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

135,000.00
93,000.00
67,625.00
564,975.00 pondasi kecil
69,750.00 pondasi kecil
-
185,094.00
245,700.00
102,375.00

27,500.00
255,750.00 pondasi kecil
-
81,360.00
108,000.00
45,000.00

1,981,129.00

500,000.00
500,000.00

2,481,129.00

Pamotan porong ,30 Juni 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

-
106,000.00
-
46,440.00
48,600.00
40,500.00
-
131,880.00
178,200.00
159,000.00
-
-
500,500.00
1,201,200.00
572,004.40
2,984,324.40

500,000.00

500,000.00

3,484,324.40

Pamotan porong ,30 Juni 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

-
-
-
-
1,080,000.00

2,160,000.00
2,160,000.00
729,000.00
6,480,000.00

450,000.00
450,000.00
121,500.00
1,080,000.00
445,500.00

15,156,000.00

330,000.00
165,000.00
1,485,000.00
891,000.00
576,000.00
337,500.00

841,500.00
841,500.00
252,450.00
2,524,500.00
701,250.00
8,945,700.00

JUMLAH
HARGA KETERANGAN
Rp

100,000.00
25,200.00
286,000.00
49,500.00
336,000.00
36,000.00
51,200.00
58,000.00
320,000.00
783,000.00
2,044,900.00

250,000.00
250,000.00

26,396,600.00

Pamotan porong ,30 Juni 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

480,000.00
-
300,000.00
20,000.00
120,000.00
902,400.00
936,000.00
439,000.00
365,500.00
-
1,820,000.00
845,000.00

299,520.00
702,000.00
390,000.00

61,440.00
144,000.00
60,000.00
960,000.00
1,080,000.00
175,500.00
1,080,000.00
540,000.00
1,008,000.00
350,000.00

1,080,000.00 pembesin kecil


1,440,000.00
500,000.00

561,408.00 pembesin kecil


459,000.00
127,500.00
1,530,450.00
862,750.00

19,639,468.00

JUMLAH
HARGA KETERANGAN
Rp

660,000.00
178,200.00
178,200.00
891,000.00 pondasi
1,782,000.00
792,000.00
1,584,000.00
198,000.00
396,000.00
660,000.00
7,319,400.00

10,000.00
30,000.00
277,680.00
540,000.00
321,500.00
1,179,180.00

600,000.00
1,414,800.00
1,414,800.00
530,550.00
2,122,200.00
6,082,350.00

1,500,000.00
1,500,000.00

35,720,398.00

Pamotan porong ,30 Juni 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp
-

2,352,000.00
525,000.00
63,000.00
630,000.00
300,000.00
3,870,000.00

100,000.00
60,000.00
227,500.00
-
-
-
-
50,000.00
-
437,500.00

546,000.00
136,500.00
274,560.00 besi kecil
702,000.00
921,600.00
130,500.00
390,000.00
3,101,160.00

400,000.00
400,000.00

7,808,660.00

Pamotan porong ,30 Juni 2020

KERJA
JUMLAH
HARGA KETERANGAN
Rp

108,000.00
210,600.00
1,458,000.00 pasangan tipis
-
163,968.00 Besi kecil
252,000.00
105,000.00
324,000.00
150,000.00
2,771,568.00

2,771,568.00

Pamotan porong ,07 Juli 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

-
-
-
-
32,400.00
27,000.00
-
-
-
-
78,000.00
397,800.00
78,000.00
187,200.00
124,800.96
400,406.16
-
688,860.00
-
-

2,014,467.12

100,000.00

100,000.00

2,114,467.12

Pamotan porong ,07 Juli 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

148,500.00
148,500.00
44,550.00
445,500.00
123,750.00
297,000.00
825,000.00
2,032,800.00

100,000.00
100,000.00

2,132,800.00

Pamotan porong ,07 Juli 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp
-
432,000.00
150,000.00

- pembesin kecil
-
-

- pembesin kecil
-
-
-
369,750.00

951,750.00

50,000.00
43,200.00
22,500.00
115,700.00

2,122,200.00
111,350.00
111,350.00
353,700.00
334,050.00
3,032,650.00

100,000.00
100,000.00

4,200,100.00

Pamotan porong ,07 Juli 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp
-

2,016,000.00
360,000.00
72,000.00
360,000.00
150,000.00
2,958,000.00

-
-
227,500.00
318,500.00
-
-
-
-
150,000.00
-
696,000.00

90,000.00
4,725.00
63,360.00 besi kecil
162,000.00
201,600.00
40,500.00
90,000.00
652,185.00

4,306,185.00

Pamotan porong ,07 Juli 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp
-

1,052,000.00
210,400.00
105,200.00

812,000.00
150,000.00
244,800.00
1,170,000.00
780,000.00
315,000.00
-
133,848.00 besi kecil
154,687.50

5,127,935.50

623,350.00 langsiran
963,375.00 langsiran
1,586,725.00

6,714,660.50

Pamotan porong ,07 Juli 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

216,000.00
421,200.00
3,207,600.00 pasangan tipis
-
374,784.00 Besi kecil
576,000.00
240,000.00
960,000.00
250,000.00
6,245,584.00

6,245,584.00

Pamotan porong ,14 Juli 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp
445,500.00
891,000.00
259,200.00
2,673,000.00
97,200.00
270,000.00
270,021.60
4,635,900.00

100,000.00
100,000.00

4,735,900.00

Pamotan porong ,14 Juli 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

-
432,000.00
150,000.00

- pembesin kecil
-
-

- pembesin kecil
-
-
-
369,750.00

951,750.00

216,150.00
707,400.00
216,150.00
707,400.00
353,700.00
648,450.00
2,122,200.00
2,122,341.48
7,093,791.48

100,000.00
100,000.00

8,145,541.48

Pamotan porong , 14 Juli 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp
-

2,688,000.00
600,000.00

650,000.00
156,250.00
252,000.00
150,000.00
4,496,250.00

-
-
318,500.00
-
375,480.00
330,750.00
723,600.00
150,000.00
180,000.00
270,000.00
-
2,348,330.00

6,844,580.00

Pamotan porong , 14 Juli 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp
-

285,000.00
114,000.00
592,800.00

-
-
-
1,170,000.00
780,000.00
-
-
133,848.00 besi kecil
154,687.50

3,230,335.50

623,350.00 langsiran
1,926,750.00 langsiran
2,550,100.00

5,780,435.50

Pamotan porong , 14 Juli 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp
-
256,000.00
64,000.00
1,397,760.00
-
387,072.00 besi kecil
80,500.00

2,185,332.00

100,000.00 langsiran
100,000.00

2,285,332.00

Pamotan porong , 14 Juli 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

2,050,125.00
2,050,125.00
1,227,375.00
3,690,225.00
223,650.00
621,250.00

499,125.00
998,250.00
81,000.00
1,796,850.00
108,000.00
300,000.00
412,533.00
14,058,508.00

200,000.00

200,000.00

14,258,508.00
Pamotan porong , 28 Juli 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

1,497,792.00
1,815,750.00
1,614,000.00

5,491,200.00 pembesin kecil


4,808,250.00
2,137,000.00

220,000.00 pembesin kecil


564,750.00
2,960,000.00
21,108,742.00

455,000.00 dikerjakan 4 orang


455,000.00

200,000.00
200,000.00

21,763,742.00

Pamotan porong , 28 Juli 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

517,584.00 besi kecil


355,050.00
394,500.00

81,250.00
-
34,560.00 besi kecil
33,750.00
37,500.00
1,454,194.00
-
100,000.00
-
104,256.00 besi kecil
108,000.00
45,000.00
160,000.00
376,000.00 besi kecil
188,000.00
200,000.00
1,281,256.00
-
180,000.00
97,200.00
52,000.00
498,680.00
218,400.00
407,160.00
-
205,492.80 besi kecil
214,650.00
238,500.00
1,094,000.00
273,500.00
440,000.00
200,000.00
4,119,582.80

JUMLAH
HARGA KETERANGAN
Rp
-
150,000.00
487,500.00
625,000.00
100,000.00
1,362,500.00
-
80,000.00
416,000.00
496,000.00
963,375.00 langsiran
963,375.00
9,676,907.80

Pamotan porong , 28 Juli 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp
-
161,000.00
40,250.00
879,060.00
-
331,776.00 besi kecil
69,000.00
-
552,960.00 besi kecil
720,000.00 besi kecil
300,000.00

3,054,046.00

100,000.00 langsiran
100,000.00

3,154,046.00

Pamotan porong , 28 Juli 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp
78,000.00
397,800.00
124,800.00
400,400.00
-
41,472.00
48,000.00
-
-
1,188,000.00
422,400.00

2,700,872.00

100,000.00

100,000.00

2,800,872.00

Pamotan porong ,08 Juli 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp
JUMLAH
HARGA KETERANGAN
Rp

517,584.00 besi kecil


355,050.00
394,500.00

81,250.00
-
34,560.00 besi kecil
33,750.00
37,500.00
1,454,194.00

100,000.00
100,000.00

#REF!

Pamotan porong ,08 Juli 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp
-
256,000.00
64,000.00
1,331,200.00
-
442,368.00 besi kecil
80,000.00
-
- besi kecil
- besi kecil
-

2,173,568.00

100,000.00 langsiran
100,000.00

2,273,568.00

Pamotan porong ,04 Agustus 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

180,000.00
128,000.00
382,500.00
1,836,000.00
350,625.00
233,750.00
244,800.00
163,200.00
765,000.00

4,283,875.00

200,000.00

200,000.00

4,483,875.00

Pamotan porong , 04 Agustus 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

-
280,627.20 besi kecil
274,050.00
304,500.00
994,700.00
284,200.00
2,138,077.20

-
284,960.00
-
280,627.20 besi kecil
274,050.00
304,500.00
-
193,536.00 besi kecil
37,800.00
15,750.00
336,000.00
84,000.00
80,000.00
40,000.00
1,931,223.20
-
180,000.00
-
65,160.00 besi kecil
180,000.00
60,000.00

137,000.00
54,800.00
284,960.00
-
178,538.40 besi kecil
184,950.00
205,500.00
110,400.00
-
65,160.00 besi kecil
81,000.00
27,000.00
200,000.00
2,014,468.40

JUMLAH
HARGA KETERANGAN
Rp

484,000.00
774,400.00
1,258,400.00

80,000.00
108,000.00
230,400.00
57,600.00
150,000.00
626,000.00

100,000.00
200,000.00
300,000.00

8,268,168.80
Pamotan porong ,18 agustus 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp
-
58,000.00
14,500.00
301,600.00
-
43,008.00 besi kecil
168,000.00
-
77,414.40 besi kecil
100,800.00 besi kecil
192,000.00
1,108,800.00
2,064,122.40

100,000.00 langsiran
100,000.00

2,164,122.40

Pamotan porong ,18 Agustus 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

110,000.00
343,200.00
-
152,064.00 besi kecil
198,000.00
75,000.00

878,264.00

150,000.00

150,000.00

1,028,264.00

Pamotan porong ,18 Agustus 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

-
456,192.00 besi kecil
445,500.00
247,500.00
739,200.00
1,888,392.00

288,000.00
288,000.00
409,050.00
518,400.00
1,503,450.00

200,000.00
200,000.00

3,591,842.00

Pamotan porong , 18 agustus 2020

KERJA
JUMLAH
HARGA KETERANGAN
Rp

911,700.00
-
232,320.00
504,000.00
250,000.00
-
536,832.00
432,000.00
120,000.00
-
402,624.00
324,000.00
90,000.00
3,803,476.00

828,000.00
200,000.00

1,028,000.00

4,831,476.00

Pamotan porong ,18 Agustus 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp
-
420,000.00
77,500.00
1,128,400.00
-
352,296.00 besi kecil
56,000.00
-
428,544.00 besi kecil
558,000.00
232,500.00
3,253,240.00

100,000.00 langsiran
100,000.00

3,353,240.00

Pamotan porong ,18 Agustus 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp
-

300,000.00
600,000.00

400,000.00

768,000.00
232,320.00
2,300,320.00

2,300,320.00

Pamotan porong ,25 Agustus 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

70,000.00
100,000.00
170,000.00

200,000.00 2 0rang
80,000.00
632,250.00
-
193,536.00 besi kecil
151,200.00
63,000.00
-
16,588.80 besi kecil
16,200.00
4,500.00
1,357,274.80

100,000.00
100,000.00

1,627,274.80

Pamotan porong ,25 agustus 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp
-
1,430,325.00
-
544,320.00 besi kecil
189,000.00
2,163,645.00

100,000.00 langsiran
100,000.00

2,263,645.00

Pamotan porong ,25 Agustus 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

360,000.00
121,875.00
125,000.00
606,875.00

1,000,000.00
-
350,000.00
1,350,000.00

1,956,875.00

Pamotan porong , 25 Agustus 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

2,090,000.00
3,237,600.00
1,618,800.00
6,946,400.00

1,401,000.00
-
448,704.00
478,800.00
237,500.00 diatas dak
2,566,004.00
26,250.00
658,750.00
658,750.00
658,750.00
407,250.00
869,550.00
-
-
-
3,279,300.00

100,000.00
200,000.00
300,000.00

13,091,704.00

Pamotan porong , 25 agustus 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

512,831.25
-
58,080.00
126,000.00
62,500.00
-
134,208.00
108,000.00
30,000.00
109,200.00
1,140,819.25

100,000.00

100,000.00

1,240,819.25

Pamotan porong ,25 Agustus 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp
-
476,775.00
-
181,440.00 besi kecil
63,000.00
721,215.00

100,000.00 langsiran
100,000.00

821,215.00

Pamotan porong , 31 Agustus 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

620,000.00
437,500.00
900,000.00
792,000.00
540,000.00
1,650,000.00
625,000.00

5,564,500.00

200,000.00

200,000.00

5,764,500.00

Pamotan porong , 31 agustus 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

1,444,200.00
240,700.00
1,684,900.00

700,500.00
-
224,352.00
239,400.00
118,750.00 diatas dak

210,816.00 pembesin kecil


243,000.00
67,500.00
1,804,318.00

-
342,144.00 besi kecil
334,125.00
185,625.00
-
172,108.80 besi kecil
224,100.00
93,375.00
1,351,477.80

JUMLAH
HARGA KETERANGAN
Rp

108,000.00
330,000.00
330,000.00
40,500.00
594,000.00
1,402,500.00

100,000.00
200,000.00
300,000.00

6,543,195.80

Pamotan porong , 08 september 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

512,831.25
-
174,240.00
378,000.00
187,500.00
-
402,624.00
324,000.00
90,000.00
2,069,195.25

100,000.00

100,000.00

2,169,195.25

Pamotan porong ,08 september 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

244,000.00
244,000.00
105,750.00
732,000.00
1,325,750.00
-
-
207,208.80 besi kecil
286,200.00
119,250.00

-
179,841.60 besi kecil
248,400.00
103,500.00
1,144,400.40

110,592.00 besi kecil


108,000.00
30,000.00
159,000.00
262,125.00
352,125.00
79,500.00
139,800.00
187,800.00
1,428,942.00

100,000.00
100,000.00

3,999,092.40

Pamotan porong , 15 September 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

700,500.00
-
224,352.00
239,400.00
118,750.00 diatas dak
-
-
-
1,283,002.00

-
114,048.00 besi kecil
111,375.00
61,875.00
-
57,369.60 besi kecil
74,700.00
31,125.00
1,037,250.00
-
190,026.00 besi kecil
426,937.50
142,312.50
-
59,616.00 besi kecil
155,250.00
48,515.63
2,510,400.23

JUMLAH
HARGA KETERANGAN
Rp

-
-
-
-
683,400.00
683,400.00

100,000.00
200,000.00
300,000.00

4,776,802.23

Pamotan porong , 15 September 2020

KERJA
JUMLAH
HARGA KETERANGAN
Rp

288,000.00

2,534,400.00
2,534,400.00

100,000.00
100,000.00
200,000.00

2,734,400.00

Pamotan porong , 15 September 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

-
-
-
-
- diatas dak

398,208.00
459,000.00
127,500.00
984,708.00

456,192.00 besi kecil


445,500.00
247,500.00

229,478.40 besi kecil


298,800.00
124,500.00

63,342.00 besi kecil


142,312.50
47,437.50

19,872.00 besi kecil


51,750.00
16,171.88
2,142,856.28

JUMLAH
HARGA KETERANGAN
Rp

24,883.20 besi kecil


32,400.00
13,500.00

56,304.00 besi kecil


82,800.00
34,500.00
73,600.00
317,987.20

100,000.00
200,000.00
300,000.00

3,745,551.48

Pamotan porong , 22 September 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

-
2,112,000.00
2,112,000.00

300,000.00
100,000.00
150,000.00
550,000.00

2,662,000.00

Pamotan porong , 22 September 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

146,000.00
45,990.00
98,550.00
61,320.00
87,600.00
219,000.00
658,460.00

36,000.00
72,000.00
43,200.00
144,000.00
72,000.00
150,000.00
517,200.00

187,500.00
33,750.00
483,750.00
258,000.00
963,000.00

450,000.00 Pak pembersihan total


200,000.00
650,000.00
2,788,660.00

Pamotan porong , 28 September 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

145,000.00
600,000.00 bongkar manual
200,000.00
87,000.00
1,583,400.00
-
162,540.00
157,500.00
196,875.00
-
224,460.00
261,000.00
326,250.00
1,555,125.00
200,000.00 dilangsir
5,699,150.00

5,699,150.00

Pamotan porong , 28 September 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

696,000.00
175,500.00
871,500.00

50,000.00
100,000.00
150,000.00

1,021,500.00

Pamotan porong , 28 September 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

2,236,800.00

2,236,800.00

2,236,800.00

Pamotan porong , 28 September 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

-
-
2,097,000.00
-

2,097,000.00

Pamotan porong , 06 oktober 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

-
162,540.00
157,500.00
196,875.00
1,192,262.50
-
224,460.00
261,000.00
-
-
258,300.00
448,875.00
-

585,000.00
361,922.78
-
29,520.00
72,000.00
45,000.00
906,250.00
4,901,505.28

75,000.00
37,500.00
240,000.00
352,500.00

750,006.00
75,000.00

4,976,505.28

Pamotan porong , 06 0ktober 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

809,600.00
809,600.00

100,000.00
100,000.00

909,600.00

Pamotan porong , 06 Oktober 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

32,500.00
87,600.00
101,250.00
97,500.00
318,850.00

62,500.00
11,250.00
161,250.00
86,000.00
321,000.00

65,000.00 Pak pembersihan total


200,000.00
265,000.00

904,850.00

Pamotan porong , 06 Oktober2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

-
-
-
208,800.00
-
-
-
203,000.00

585,000.00
361,922.78
-
29,520.00
72,000.00
45,000.00

585,000.00
468,000.00
-
-
-
-
120,000.00
100,000.00

342,375.00
342,375.00
355,500.00
662,962.50
4,481,455.28

65,000.00
16,250.00
338,000.00
150,000.00
419,250.00

4,900,705.28

Pamotan porong , 13 0ktober 2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

372,000.00
186,000.00
900,000.00
-
18,000.00
9,000.00
225,000.00
-
28,800.00
14,400.00
360,000.00

481,400.00
722,100.00
3,316,700.00

188,650.00
94,325.00
282,975.00

3,599,675.00

Pamotan porong , 13 Oktober2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

300,000.00
112,500.00
405,000.00
200,000.00
1,017,500.00

492,000.00
492,000.00

625,000.00
367,500.00
625,000.00
1,617,500.00

3,127,000.00

Pamotan porong , 13 Oktober2020

KERJA

JUMLAH
HARGA KETERANGAN
Rp

2,359,087.50
-
2,359,087.50

2,359,087.50

Pamotan porong , 20 Oktober2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

55,000.00
13,750.00
286,000.00
150,000.00
-
16,800.00
54,000.00
33,750.00
-
120,000.00
30,000.00
936,000.00
-
50,400.00
162,000.00
101,250.00
150,000.00
2,158,950.00

2,158,950.00

Pamotan porong , 20 Oktober2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

1,011,037.50
-
-
-
1,011,037.50

1,011,037.50

Pamotan porong , 27 Oktober2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

100,000.00
-
180,880.00
320,625.00
203,000.00
-
248,310.00
319,050.00
187,600.00
-
71,400.00
45,000.00
1,675,865.00

220,000.00
400,000.00
100,000.00
858,000.00
109,200.00
-
476,800.00
-
-
200,000.00
2,364,000.00

100,000.00
60,000.00
-
182,000.00
-
125,160.00
110,250.00
241,200.00
-
150,000.00
150,000.00
1,118,610.00

5,158,475.00

Pamotan porong , 27 Oktober2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

240,000.00
24,000.00
60,000.00
924,000.00

168,537.60 besi kecil


297,000.00
99,000.00

168,537.60 besi kecil


297,000.00
99,000.00

- besi kecil
-
-
150,000.00
2,527,075.20

85,000.00
51,000.00
198,900.00
29,750.00
364,650.00

2,891,725.20

Pamotan porong , 27 Oktober2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

1,825,000.00
511,000.00
2,336,000.00

3,230,000.00
787,500.00
4,017,500.00

6,353,500.00

Pamotan porong , 27 Oktober2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

-
-
2,038,875.00
815,550.00
2,854,425.00

2,854,425.00

Pamotan porong ,03 November 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

120,000.00
12,000.00
30,000.00
462,000.00

84,268.80 besi kecil


148,500.00
49,500.00

84,268.80 besi kecil


148,500.00
49,500.00

- besi kecil
-
-
150,000.00
1,338,537.60

1,338,537.60

Pamotan porong , 03 November 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

-
1,698,816.00
1,036,800.00
221,184.00
-
377,520.00
263,250.00
46,800.00
-
3,224,000.00
3,627,000.00
1,612,000.00
1,547,520.00
-
315,200.00
1,418,400.00
126,080.00
15,514,570.00

100,000.00

100,000.00

15,614,570.00

Pamotan porong , 03 November 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

160,000.00
616,000.00

149,385.60 besi kecil


263,250.00
87,750.00

217,056.00 besi kecil


306,000.00
127,500.00
200,000.00
2,126,941.60

400,000.00
1,382,400.00 besi kecil
30,000.00
1,812,400.00

20,000.00
12,000.00

25,536.00 besi kecil


36,000.00
15,000.00
28,800.00

15,321.60 besi kecil


22,500.00
7,500.00

25,536.00 besi kecil


36,000.00
15,000.00
200,000.00
459,193.60

100,000.00
150,000.00
250,000.00

4,648,535.20

Pamotan porong , 15 September 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

100,000.00
100,000.00
741,125.00
34,000.00
17,000.00
125,000.00
1,117,125.00

-
-

-
-

400,000.00

100,000.00
100,000.00

1,617,125.00

Pamotan porong , 03 November 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

-
1,348,050.00
-
-
1,348,050.00

1,348,050.00

Pamotan porong , 13 November 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

80,000.00
8,000.00
20,000.00
308,000.00

56,179.20 besi kecil


99,000.00
33,000.00

56,179.20 besi kecil


99,000.00
33,000.00

408,576.00 besi kecil


576,000.00
240,000.00
2,016,934.40
-
-
-

- besi kecil
-
-

- besi kecil
-
-

- besi kecil
-
-
-
JUMLAH
HARGA KETERANGAN
Rp

40,000.00
4,000.00
10,000.00
154,000.00

28,089.60 besi kecil


49,500.00
16,500.00

28,089.60 besi kecil


49,500.00
16,500.00

204,288.00 besi kecil


288,000.00
120,000.00
1,008,467.20
155,000.00
16,000.00
40,000.00
369,600.00

56,179.20 besi kecil


99,000.00
33,000.00

56,179.20 besi kecil


99,000.00
33,000.00

- besi kecil
-
-
-
956,958.40

3,982,360.00

Pamotan porong , 17 November 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

-
-
472,500.00
800,000.00

-
46,800.00
100,000.00
858,000.00
109,200.00
200,000.00
2,586,500.00

-
-
-
-
-
-
-
-
249,601.56
-
-
249,601.56

-
346,392.00
1,018,800.00
424,500.00
1,789,692.00

4,625,793.56

Pamotan porong , 13 November 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

75,600.00

46,848.00 besi kecil


57,600.00
12,000.00

38,304.00 besi kecil


54,000.00
11,250.00
180,000.00
90,000.00
112,500.00

-
250,000.00
928,102.00
JUMLAH
HARGA KETERANGAN
Rp

60,000.00

70,224.00 besi kecil


99,000.00
41,250.00
151,200.00

93,696.00 besi kecil


144,000.00
30,000.00

76,608.00 besi kecil


108,000.00
22,500.00
435,000.00
217,500.00
137,500.00
56,250.00
112,500.00
75,000.00
200,000.00
2,130,228.00

100,000.00
100,000.00

3,158,330.00

Pamotan porong , 13 November 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

120,000.00
45,000.00

73,302.00
330,750.00
314,077.50

106,368.00
81,000.00
151,360.00
-
75,240.00
109,520.00
100,000.00
1,506,617.50

162,000.00
18,900.00
56,700.00
122,850.00
170,100.00
113,400.00
643,950.00

100,000.00
100,000.00

2,250,567.50

Pamotan porong , 13 November 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

134,750.00

312,816.00 besi kecil


330,750.00
91,875.00

33,094.66 besi kecil


115,992.00
9,720.00
553,087.50
276,543.75
918,750.00
2,777,378.91

2,777,378.91

Pamotan porong , 17 November 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

777,200.00
562,800.00
388,600.00
281,400.00
-
777,200.00
562,800.00
388,600.00
281,400.00

4,020,000.00

Pamotan porong , 17 November 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

-
-
-
-

- besi kecil
-
-

- besi kecil
-
-

- besi kecil
-
-
-
67,800.00
57,500.00
824,000.00

140,448.00 besi kecil


247,500.00
82,500.00

168,537.60 besi kecil


297,000.00
99,000.00

318,336.00 besi kecil


406,800.00
169,500.00
2,878,921.60
JUMLAH
HARGA KETERANGAN
Rp

-
-
-
-

- besi kecil
-
-

- besi kecil
-
-

- besi kecil
-
-
-
-
-
-
246,400.00

56,179.20 besi kecil


99,000.00
33,000.00

56,179.20 besi kecil


99,000.00
33,000.00

196,627.20 besi kecil


277,200.00
115,500.00
200,000.00
1,412,085.60

4,291,007.20

Pamotan porong , 17 November 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

371,592.00
187,384.00
-
412,880.00
206,440.00

41,600.00
-
48,060.00
-
20,800.00
-
24,030.00
1,312,786.00

122,500.00
217,500.00
340,000.00

151,000.00
84,560.00
324,480.00
100,000.00
660,040.00

2,312,826.00

Pamotan porong , 17 November 2020


KERJA

JUMLAH
HARGA KETERANGAN
Rp

-
-
-
-
249,040.00
-
662,899.20
764,100.00
212,250.00
1,888,289.20

1,888,289.20

Pamotan porong , 17 November 2020


ecil tambahan
ecil tambahan
10,330,142.00
2,481,129.00

3,484,324.40
15000 0

60000 0

10000 0
26,396,600.00
35,720,398.00
7,808,660.00

86221253.4
2,771,568.00
2,114,467.12

2,132,800.00
4,200,100.00
4,306,185.00
6,714,660.50

151990092.02

6,245,584.00
4,735,900.00
8,145,541.48

6,844,580.00
5,780,435.50
2,285,332.00

14,258,508.00
21,763,742.00
9,676,907.80

3,154,046.00
2,800,872.00

51,654,075.80
#REF!

2,273,568.00
4,483,875.00

7,173,443.00
8,268,168.80
2,164,122.40
1,028,264.00

3,591,842.00
4,831,476.00
3,353,240.00

2,300,320.00
1,627,274.80

2,263,645.00
1,956,875.00
13,091,704.00

1,240,819.25
821,215.00

5,764,500.00
6,543,195.80

2,169,195.25
3,999,092.40
4,776,802.23
2,734,400.00
3,745,551.48
2,662,000.00

ersihan total
2,788,660.00
1,021,500.00

2,236,800.00
2,097,000.00
909,600.00
ersihan total

904,850.00
3,599,675.00
2,359,087.50
2,158,950.00
1,011,037.50
5,158,475.00
2,891,725.20
2,854,425.00
1,338,537.60
15,614,570.00
4,648,535.20
1,617,125.00
1,348,050.00
3,982,360.00
4,625,793.56
3,158,330.00
2,250,567.50
2,777,378.91
4,291,007.20
2,312,826.00
1,888,289.20
BON UPAH KERJA
PEKERJAAN : PEMBUATAN MERAK BETON
LOKASI : PONDASI PAGAR
TANGGAL : 27 AGUSTUS s/d 08 SEPTEMBER 2018

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PERSIAPAN
1 Persiapan Ls 1.00 1.00 1,000,000.00 1,000,000.00
2 Pembuatan bedeng Ls 1.00 1.00 1,000,000.00 1,000,000.00
3 Pasang sumur Ls 1.00 1.00 250,000.00 250,000.00
Sub total 2,250,000.00
II PEKERJAAN PONDASI ZILLO
1 Pengukuran & bauwplank Ls 1.00 1.00 150,000.00 150,000.00
2 Pemeratan tanah M2 (3,5*3,5) 12.25 7,500.00 91,875.00
3 Pembesian & cor sloof M2 (3*4) 12.00 35,000.00 420,000.00
4 Pasang bekisting plat lantai M1 (3,5*4) 14.00 15,000.00 210,000.00
6 Pembesian & Cor plat lantai tebal 15 cm M2 (3,5*3,5) 12.25 35,000.00 428,750.00
7 Pasang bekisting benda uji M1 (3*4) 12.00 30,000.00 360,000.00
8 Pembesian & cor sloof M2 (3*4) 12.00 45,000.00 540,000.00
9 Pasang bekisting kolom 50/50 M1 (1,55*4) 6.20 75,000.00 465,000.00
10 Pembesian & cor kolom 50/50 M1 1,55*4) 6.20 75,000.00 465,000.00
11 Pasang plendes pelek Bh 4.00 4.00 35,000.00 140,000.00
Sub total 3,270,625.00
III PEKERJAAN TANGKI SOLAR
1 Pengukuran Ls 1.00 1.00 50,000.00 50,000.00
2 Pasang bekisting benda uji Bh 4.00 4.00 35,000.00 140,000.00
3 Pembesian & cor plat 60/60 Bh 4.00 4.00 50,000.00 200,000.00
Sub total 390,000.00
IV PEKERJAAN PONDASI PAGAR
1 Pengukuran & bauwplank Ls 1.00 1.00 500,000.00 500,000.00
2 Perapian galian tanah M1 50.00 50.00 5,000.00 250,000.00
3 Pasang batu pondasi M3 (0,3*1)*50 15.00 150,000.00 2,250,000.00
Sub total 3,000,000.00
V PEKERJAAN LAIN LAIN
1 Transportasi Ls 1.00 1.00 500,000.00 500,000.00
Sub total 500,000.00

Total keseluruhan biaya 9,410,625.00


Total biaya keseluruhan 9,410,000.00

Pamotan porong , 08 September 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 09 SEPTEMBER s/d 23 SEPTEMBER 2018

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PERSIAPAN
1 Pembuatan bedeng tambahan Ls 1.00 1.00 500,000.00 500,000.00
Sub total 500,000.00
II PEKERJAAN KONTAENER
1 Pasang daun jendela sleading Bh 4.00 4.00 125,000.00 500,000.00
2 Pasang daun pintu Bh 1.00 1.00 175,000.00 175,000.00
Sub total 675,000.00
III PEKERJAAN PONDASI PAGAR
Bagian timur
1 Pengukuran & bauwplank Ls 1.00 1.00 500,000.00 500,000.00
2 Perapian galian tanah & perapian M1 (22*5)-50 59.00 5,000.00 295,000.00
3 Galian tanah strous Bh 22.00 22.00 15,000.00 330,000.00
4 Pasang & cor kolom strous Bh 22.00 22.00 50,000.00 1,100,000.00
5 Pasang batu pondasi M3 (1,00+0,7)/2*1,1*110-(15,0) 87.85 150,000.00 13,177,500.00
6 Pembesian & cor kolom M1 (1,00*23) 23.00 50,000.00 1,150,000.00
Bagian selatan
1 Pengukuran & bauwplank Ls 1.00 1.00 500,000.00 500,000.00
2 Perapian galian tanah & perapian M1 25.00 25.00 5,000.00 125,000.00
3 Galian tanah strous Bh 6.00 6.00 15,000.00 90,000.00
4 Pasang & cor kolom strous Bh 6.00 6.00 50,000.00 300,000.00
5 Pasang batu pondasi level 2,00 M3 (1,00*0,7)*25 17.50 150,000.00 2,625,000.00
6 Pasang batu pondasi M3 (1,00+0,7)/2*1,0*25 21.25 150,000.00 3,187,500.00
7 Pembesian & cor kolom M1 (1,70*6) 10.20 50,000.00 510,000.00
Sub total 23,890,000.00
IV PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 1.00 750,000.00 750,000.00
2 Langsir material Ls 1.00 1.00 1,500,000.00 1,500,000.00
3 Transportasi Ls 1.00 1.00 750,000.00 750,000.00
Sub total 3,000,000.00

Total keseluruhan biaya 28,065,000.00


Total biaya keseluruhan 28,060,000.00

Pamotan porong , 23 September 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 23 SEPTEMBER s/d 29 SEPTEMBER 2018

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
III PEKERJAAN PONDASI PAGAR
Bagian timur
1 Pasang batu pondasi M3 (1,00+0,7)/2*0,4*110 22.40 150,000.00 3,360,000.00
2 Pembesian & cor kolom M1 (0,4*23) 9.20 50,000.00 460,000.00
Bagian selatan
1 Pasang batu pondasi M3 (0,7+0,5)/2*0,4*25 6.00 150,000.00 900,000.00
2 Pembesian & cor kolom M1 (0,4*6) 2.40 50,000.00 120,000.00
Bagian selatan bagian 2
1 Pengukuran & bauwplank Ls 1.00 1.00 250,000.00 250,000.00
2 Perapian galian tanah & perapian M1 100.00 100.00 5,000.00 500,000.00
3 Galian tanah strous Bh 20.00 20.00 15,000.00 300,000.00
4 Pasang & cor kolom strous Bh 20.00 20.00 50,000.00 1,000,000.00
5 Pasang batu pondasi level 2,00 M3 (1,00*0,7)*100 70.00 150,000.00 10,500,000.00
6 Pembesian & cor kolom M1 (1*20) 20.00 50,000.00 1,000,000.00
Sub total 18,390,000.00
IV PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 1.00 250,000.00 250,000.00
2 Langsir material Ls 1.00 1.00 500,000.00 500,000.00
3 Transportasi Ls 1.00 1.00 500,000.00 500,000.00
Sub total 1,250,000.00

Total keseluruhan biaya 19,640,000.00


Total biaya keseluruhan 19,640,000.00

Pamotan porong , 29 September 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 30 SEPTEMBER s/d 06 OKTOBER 2018

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
III PEKERJAAN PONDASI PAGAR
Bagian timur 1 St 110 - 130 m
1 Galian tanah strous Bh 4.00 4.00 15,000.00 60,000.00
2 Pasang & cor kolom strous Bh 4.00 4.00 50,000.00 200,000.00
3 Pasang batu pondasi M3 (1,00+0,5)/2*1,4*20 21.00 150,000.00 3,150,000.00
4 Pembesian & cor kolom M1 (1,4*4) 5.60 50,000.00 280,000.00

Bagian selatan bagian 2 panjang 100 m (St 25,0 - 125,0 M )


1 Pasang batu pondasi level 2,00 M3 (1,00+0,4)/2*1,4*100 98.00 150,000.00 14,700,000.00
2 Pembesian & cor kolom M1 (1,4*20) 28.00 50,000.00 1,400,000.00

Bagian selatan bagian 3 panjang 25 meter ( St 125,0 - 150,0 )


1 Pengukuran & bauwplank Ls 1.00 1.00 100,000.00 100,000.00
2 Perapian galian tanah & perapian M1 25.00 25.00 5,000.00 125,000.00
3 Galian tanah strous Bh 5.00 5.00 15,000.00 75,000.00
4 Pasang & cor kolom strous Bh 5.00 5.00 50,000.00 250,000.00
5 Pasang batu pondasi level 2,00 M3 (1,00*0,7)*25 17.50 150,000.00 2,625,000.00

Sub total 22,965,000.00


IV PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 1.00 250,000.00 250,000.00
2 Langsir material Ls 1.00 1.00 500,000.00 500,000.00
3 Transportasi Ls 1.00 1.00 500,000.00 500,000.00
Sub total 1,250,000.00

Total keseluruhan biaya 24,215,000.00


Total biaya keseluruhan 24,210,000.00

Pamotan porong , 06 Oktober 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 07 OKTOBER s/d 20 OKTOBER 2018

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PONDASI PAGAR
Bagian timur 45 M ( St 130 - 175 m)
1 Galian tanah strous Bh 9.00 9.00 15,000.00 135,000.00
2 Pasang & cor kolom strous Bh 9.00 9.00 50,000.00 450,000.00
3 Pasang batu pondasi M3 (1,00+0,5)/2*1,6*35 42.00 150,000.00 6,300,000.00
4 Pembesian & cor kolom M1 (1,6*9) 14.40 50,000.00 720,000.00

Bagian selatan bagian 3 panjang 25 meter ( St 125,0 - 150,0 )


1 Pasang batu pondasi M3 (1,00+0,5)/2*1,4*25 26.25 150,000.00 3,937,500.00
2 Pembesian & cor kolom M1 (1,4*5) 7.00 50,000.00 350,000.00
Bagian selatan bagian 4 panjang 35 meter ( St 150- 185,0 )
1 Galian tanah strous Bh 7.00 7.00 15,000.00 105,000.00
2 Pasang & cor kolom strous Bh 7.00 7.00 50,000.00 350,000.00
3 Pasang batu pondasi level M3 (1,00*0,7)*35 24.50 150,000.00 3,675,000.00
4 Pembesian & cor kolom M1 (1,0*7) 7.00 50,000.00 350,000.00
5 Pasang batu pondasi 2,00 M3 (1,00+0,4)/2*1,4*35 34.30 150,000.00 5,145,000.00
6 Pembesian & cor kolom M1 (1,4*7) 9.80 50,000.00 490,000.00
Sub total 22,007,500.00
II PEKERJAAN PAGAR PANEL SEKAT TENGAH
1 Galian tanah Bh 22.00 22.00 30,000.00 660,000.00
2 Pasang pondasi pagar M3 (0,3*0,6*52,5) 9.45 150,000.00 1,417,500.00
3 Pasang pagar panel M2 (2,5*21) 50.00 60,000.00 3,000,000.00
Sub total 5,077,500.00
III PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 1.00 250,000.00 250,000.00
2 Langsir material Ls 1.00 1.00 500,000.00 500,000.00
3 Transportasi Ls 1.00 1.00 500,000.00 500,000.00
Sub total 1,250,000.00

Total keseluruhan biaya 28,335,000.00


Total biaya keseluruhan 28,330,000.00

Pamotan porong , 20 Oktober 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 21 OKTOBER s/d 03 NOVEMBER 2018

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PONDASI PAGAR
Bagian timur 1 panjang 110 m (St 0,00 - 110,0 M )
1 Pasang batu pondasi pelunasan M3 (0,5+0,4)/2*0,65*110 32.18 150,000.00 4,826,250.00
2 Pembesian & cor kolom M1 (0,65*22) 14.30 50,000.00 715,000.00
Bagian timur 45 M ( St 175 - 220 m)
1 Galian tanah strous Bh 9.00 9.00 15,000.00 135,000.00
2 Pasang & cor kolom strous Bh 9.00 9.00 50,000.00 450,000.00
3 Pasang batu pondasi M3 (1,00+0,5)/2*1,6*45 54.00 150,000.00 8,100,000.00
4 Pembesian & cor kolom M1 (1,6*9) 14.40 50,000.00 720,000.00

Bagian selatan bagian1 panjang 25 meter ( St 0,00 - 25,0 )


1 Pasang batu pondasi pelunasan M3 (0,5+0,4)/2*0,65*25 7.31 150,000.00 1,096,875.00
2 Pembesian & cor kolom M1 (0,65*6) 3.90 50,000.00 195,000.00
Sub total 16,238,125.00
II PEKERJAAN PAGAR PANEL SEKAT TENGAH
Bagian timur
1 Pasang tiang panel Bh 30.00 30.00 30,000.00 900,000.00
2 Pasang bekisting sloof 20/20 M1 (2,5*15) 37.50 25,000.00 937,500.00
3 Pasang pembesian & cor sloof 20/20 M1 (2,5*15) 37.50 40,000.00 1,500,000.00

Bagian selatan
1 Pasang tiang panel Bh 13.00 13.00 30,000.00 390,000.00

Sub total 3,727,500.00


III PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 1 panjang 25 m (St 0,00 - 25,0 M )
1 Galian tanah strous Bh 6.00 6.00 15,000.00 90,000.00
2 Pasang & cor kolom strous Bh 6.00 6.00 50,000.00 300,000.00
3 Pasang batu pondasi dasar M3 (0,7*0,5)*25 8.75 150,000.00 1,312,500.00
Sub total 1,702,500.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp

IV PEKERJAAN TANAM POHON RANDU


1 Pembelian pohon randu Bh 400.00 400.00 5,000.00 2,000,000.00
2 Tanam pohon Bh 400.00 400.00 2,000.00 800,000.00
3 Transportasi Ls 2.00 2.00 250,000.00 500,000.00
4 Harian siram pohon Ls 1.00 1.00 1,200,000.00 1,200,000.00
Sub total 4,500,000.00
III PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 1.00 250,000.00 250,000.00
2 Langsir material Ls 1.00 1.00 1,500,000.00 1,500,000.00
3 Transportasi Ls 1.00 1.00 750,000.00 750,000.00
Sub total 2,500,000.00

Total keseluruhan biaya 28,668,125.00


Total biaya keseluruhan 28,660,000.00

Pamotan porong , 03 November 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN JENDELA & PINTU ALMUNIUM KONTAENER
LOKASI : SEMARANG
TANGGAL : 21 OKTOBER s/d 03 NOVEMBER 2018

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN KONTAENER
1 Pasang daun jendela sleading Bh (4*2) 8.00 125,000.00 1,000,000.00
2 Pasang daun pintu Bh (1*2) 2.00 175,000.00 350,000.00
Sub total 1,350,000.00
II PEKERJAAN LAIN LAIN
1 Transportasi Ls 1.00 1.00 200,000.00 200,000.00
Sub total 200,000.00

Total keseluruhan biaya 1,550,000.00


Total biaya keseluruhan 1,550,000.00

Pamotan porong , 03 November 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 04 NOVEMBER s/d 10 NOVEMBER 2018

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PAGAR PANEL
Bagian timur
1 Pasang tiang panel Bh (56-30) 26.00 30,000.00 780,000.00
2 Pasang bekisting sloof 20/20 M1 (2,5*35) 87.50 25,000.00 2,187,500.00
3 Pasang pembesian & cor sloof 20/20 M1 (2,5*35) 87.50 40,000.00 3,500,000.00
4 Pasang daun panel 7 daun M2 (2,5*9) 22.50 45,000.00 1,012,500.00

Bagian selatan
1 Pasang bekisting sloof 20/20 M1 (2,5*9) 37.50 25,000.00 937,500.00
2 Pasang pembesian & cor sloof 20/20 M1 (2,5*9) 37.50 40,000.00 1,500,000.00
3 Pasang daun panel 7 daun M2 (2,5*9) 37.50 45,000.00 1,687,500.00
Sub total 11,605,000.00
II PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 1 panjang 100 m (St 0,00 - 100,0 M )
1 Galian tanah strous Bh (20-6) 14.00 15,000.00 210,000.00
2 Pasang & cor kolom strous Bh (20-6) 14.00 50,000.00 700,000.00
3 Pasang batu pondasi dasar M3 (0,7*1,20*100)-(0,7*0,5)*25 75.25 150,000.00 11,287,500.00
4 Pembesian & cor kolom M1 (0,7*20) 14.00 50,000.00 700,000.00
Sub total 12,897,500.00
III PEKERJAAN LAIN LAIN
1 Siram pohon waru Ls 1.00 1.00 600,000.00 600,000.00
2 Langsir material Ls 1.00 1.00 1,500,000.00 1,500,000.00
3 Transportasi Ls 1.00 1.00 250,000.00 250,000.00
Sub total 2,350,000.00

Total keseluruhan biaya 26,852,500.00


Total biaya keseluruhan 26,850,000.00

Pamotan porong , 10 November 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 11 NOVEMBER s/d 17 NOVEMBER 2018

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PONDASI PAGAR
Bagian timur 1 panjang 110 m (St 110,00 - 220,0 M )
1 Pasang batu pondasi pelunasan M3 (0,5+0,4)/2*0,60*110 29.70 150,000.00 4,455,000.00 100%
2 Pembesian & cor kolom M1 (0,60*22) 13.20 50,000.00 660,000.00 SELESAI
Sub total 5,115,000.00
II PEKERJAAN PAGAR PANEL
Bagian timur
1 Pasang tiang panel Bh (112-56) 56.00 30,000.00 1,680,000.00
2 Pasang bekisting sloof 20/20 M1 (2,5*70)-(2,5*35) 87.50 25,000.00 2,187,500.00
3 Pasang pembesian & cor sloof 20/20 M1 (2,5*70)-(2,5*35) 87.50 40,000.00 3,500,000.00
4 Pasang daun panel 7 daun M2 (40-9)*2,5 80.60 45,000.00 3,627,000.00

Sub total 10,994,500.00


III PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 2 panjang 20 m (St 170,00 - 190,0 M )
1 Galian tanah strous Bh 5.00 5.00 15,000.00 75,000.00
2 Pasang & cor kolom strous Bh 5.00 5.00 50,000.00 250,000.00
3 Pasang batu pondasi dasar M3 (0,7*1,20*20) 16.80 150,000.00 2,520,000.00
4 Pembesian & cor kolom M1 (0,7*5) 3.50 50,000.00 175,000.00
5 Pasang batu pondasi dinding M3 (0,8+1,20)/2*1,0*20 20.00 150,000.00 3,000,000.00
6 Pembesian & cor kolom M1 (1,0*5) 5.00 50,000.00 250,000.00
Sub total 6,270,000.00
IV PEKERJAAN LAIN LAIN
1 Siram pohon waru Ls 1.00 1.00 300,000.00 300,000.00
2 Langsir material Ls 1.00 1.00 1,000,000.00 1,000,000.00
3 Transportasi Ls 1.00 1.00 250,000.00 250,000.00
Sub total 1,550,000.00

Total keseluruhan biaya 23,929,500.00


Total biaya keseluruhan 23,920,000.00

Pamotan porong , 17 November 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 18 NOVEMBER s/d 23 NOVEMBER 2018

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PAGAR PANEL
Bagian timur
1 Pasang bekisting sloof 20/20 M1 (2,5*3) 7.50 25,000.00 187,500.00 100%
2 Pasang pembesian & cor sloof 20/20 M1 (2,5*3) 7.50 40,000.00 300,000.00 100%
3 Pasang daun panel 7 daun M2 (30*2,5) 75.00 45,000.00 3,375,000.00
Sub total 3,862,500.00
II PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 1 panjang 50 m (St 0,00 - 50,0 M )
1 Pasang batu pondasi dinding M3 (0,8+1,20)/2*1,0*50 50.00 150,000.00 7,500,000.00
2 Pembesian & cor kolom M1 (1,0*10) 10.00 50,000.00 500,000.00
Sub total 8,000,000.00
III PEKERJAAN LAIN LAIN
1 Siram pohon waru Ls 1.00 1.00 300,000.00 300,000.00
2 Langsir material Ls 1.00 1.00 500,000.00 500,000.00
3 Transportasi Ls 1.00 1.00 150,000.00 150,000.00
Sub total 950,000.00

Total keseluruhan biaya 12,812,500.00


Total biaya keseluruhan 12,810,000.00

Pamotan porong , 23 November 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 24 NOVEMBER s/d 30 NOVEMBER 2018

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PAGAR PANEL
Bagian timur
1 Pasang daun panel 7 daun M2 (13*2,5) 32.50 45,000.00 1,462,500.00
Sub total 1,462,500.00
II PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 1 panjang 50 m (St 0,50 - 101,5,0 M )
1 Pasang batu pondasi dinding M3 (0,8+1,20)/2*1,0*51,5 51.50 150,000.00 7,725,000.00
2 Pembesian & cor kolom M1 (1,0*10) 10.00 50,000.00 500,000.00
Bagian Barat 1 panjang 100 m (St 0,00 - 101,5,0 M )
1 Pasang bekisting ring tengah 20/20 M1 (50+51,5) 101.50 25,000.00 2,537,500.00
2 Pasang pembesian & cor ring tengah 20/20 M1 (50+51,5) 101.50 40,000.00 4,060,000.00
Bagian Barat 1 panjang 75 m (St 0,00 - 75,0 M )
1 Pasang batu pondasi dinding M3 (0,8+0,5)/2*0,9*75 43.88 150,000.00 6,581,250.00
2 Pembesian & cor kolom M1 (0,9*10) 9.00 50,000.00 450,000.00
Sub total 21,853,750.00
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 750,000.00 750,000.00
2 Transportasi Ls 1.00 1.00 150,000.00 150,000.00
Sub total 900,000.00

Total keseluruhan biaya 24,216,250.00


Total biaya keseluruhan 24,210,000.00

Pamotan porong , 30 November 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 02 DESEMBER s/d 22 DESEMBER 2018

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PAGAR PANEL
Bagian selatan
1 Pasang tiang panel 2M Bh 44.00 32.50 45,000.00 1,462,500.00
2 Pasang daun panel 3 daun M2 (11*2,5) 32.50 45,000.00 1,462,500.00
Sub total 1,462,500.00
II PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat selatan panjang 26,5 m (St 0,00 - 101,5 M )
1 Pasang batu pondasi dinding M3 (0,8+0,5)/2*0,9*26,5 15.50 150,000.00 2,325,375.00
2 Pembesian & cor kolom M1 (0,9*20) 18.00 50,000.00 900,000.00
Sub total 3,225,375.00
III PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 2 panjang 20 m (St 170,00 - 190,0 M )
1 Pasang bekisting ring tengah 20/20 M1 20.00 101.50 25,000.00 2,537,500.00
2 Pasang pembesian & cor ring tengah 20/20 M1 20.00 101.50 40,000.00 4,060,000.00
3 Pasang batu pondasi dinding M3 (0,4+0,8)/2*1,0*20 20.00 150,000.00 3,000,000.00
4 Pembesian & cor kolom M1 (0,8*5) 5.00 50,000.00 250,000.00
Sub total 9,847,500.00
III PEKERJAAN PONDASI SALURAN SISI TIMUR
Bagian Barat 3 panjang 50 m (St 120,00 - 170,0 M )
1 Galian tanah strous Bh 15.00 15.00 15,000.00 225,000.00
2 Pasang & cor kolom strous Bh 15.00 15.00 50,000.00 750,000.00
3 Pasang batu pondasi dasar M3 (0,7*1,20*20) 16.80 150,000.00 2,520,000.00
4 Pembesian & cor kolom M1 (0,7*5) 3.50 50,000.00 175,000.00
5 Pasang batu pondasi dinding M3 (0,8+1,20)/2*1,0*50 50.00 150,000.00 7,500,000.00
6 Pembesian & cor kolom M1 (1,0*55) 55.00 50,000.00 2,750,000.00
8 Pasang bekisting ring tengah 20/20 M1 14.00 14.00 25,000.00 350,000.00
9 Pasang pembesian & cor ring tengah 20/20 M1 14.00 14.00 40,000.00 560,000.00
6 Pasang batu pondasi dinding pelunasan M3 (0,5+0,7)/2*0,6*14 5.04 150,000.00 756,000.00
Sub total 15,586,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp

III PEKERJAAN PONDASI SALURAN SISI BARAT


Bagian Barat 3 panjang 14 m
1 Perapian galian M1 14.00 14.00 15,000.00 210,000.00
2 Galian tanah strous Bh 5.00 5.00 15,000.00 75,000.00
3 Pasang & cor kolom strous Bh 5.00 5.00 50,000.00 250,000.00
4 Pasang batu pondasi dasar M3 (1,00*0,6)*14 8.40 150,000.00 1,260,000.00
5 Pembesian & cor kolom M1 (0,6*5) 3.00 50,000.00 150,000.00
6 Pasang batu pondasi dinding M3 (0,5+0,7)/2*1,4*14 11.76 150,000.00 1,764,000.00
7 Pembesian & cor kolom M1 (1,6*5) 8.00 50,000.00 400,000.00
8 Pasang bekisting ring tengah 20/20 M1 14.00 14.00 25,000.00 350,000.00
9 Pasang pembesian & cor ring tengah 20/20 M1 14.00 14.00 40,000.00 560,000.00
10 Pasang batu pondasi dinding pelunasan M3 (0,5+0,7)/2*0,6*14 5.04 150,000.00 756,000.00
Sub total 5,775,000.00
Bagian Barat 4 panjang 14 m
1 Perapian galian M1 14.00 14.00 15,000.00 210,000.00
2 Galian tanah strous Bh 4.00 5.00 15,000.00 75,000.00
3 Pasang & cor kolom strous Bh 4.00 5.00 50,000.00 250,000.00
4 Pasang batu pondasi dasar M3 (1,00*0,6)*14 8.40 150,000.00 1,260,000.00
5 Pembesian & cor kolom M1 (0,6*4) 3.00 50,000.00 150,000.00
6 Pasang batu pondasi dinding M3 (0,5+0,7)/2*1,4*14 11.76 150,000.00 1,764,000.00
7 Pembesian & cor kolom M1 (1,6*4) 8.00 50,000.00 400,000.00
8 Pasang bekisting ring tengah 20/20 M1 14.00 14.00 25,000.00 350,000.00
9 Pasang pembesian & cor ring tengah 20/20 M1 14.00 14.00 40,000.00 560,000.00
10 Pasang batu pondasi dinding pelunasan M3 (0,5+0,7)/2*0,6*14 5.04 150,000.00 756,000.00
Sub total 5,775,000.00
Bagian Barat 4 panjang 7 m
1 Perapian galian M1 7.00 14.00 15,000.00 210,000.00
2 Galian tanah strous Bh 2.00 5.00 15,000.00 75,000.00
3 Pasang & cor kolom strous Bh 2.00 5.00 50,000.00 250,000.00
4 Pasang batu pondasi dasar M3 (1,00*0,6)*7 8.40 150,000.00 1,260,000.00
5 Pembesian & cor kolom M1 (0,6*4) 3.00 50,000.00 150,000.00
6 Pasang batu pondasi dinding M3 (0,5+0,7)/2*1,4*7 11.76 150,000.00 1,764,000.00
7 Pembesian & cor kolom M1 (1,6*7) 8.00 50,000.00 400,000.00
8 Pasang bekisting ring tengah 20/20 M1 7.00 14.00 25,000.00 350,000.00
9 Pasang pembesian & cor ring tengah 20/20 M1 7.00 14.00 40,000.00 560,000.00
Sub total 5,019,000.00
IV PEKERJAAN LAIN LAIN
1 Langsir material 3 minggu Ls 1.00 1.00 3,000,000.00 3,000,000.00
2 Transportasi Ls 1.00 1.00 500,000.00 500,000.00
Sub total 3,500,000.00

Total keseluruhan biaya 37,933,875.00


Total biaya keseluruhan 37,930,000.00

Pamotan porong ,22 Desember 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON
KRISTANTO HALIM IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 23 DESEMBER s/d 12 JANUARI 2019

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PAGAR PANEL
Bagian selatan
1 Pasang tiang panel 2M Bh (70-44) 26.00 45,000.00 1,170,000.00
2 Pasang daun panel 3 daun M2 (42-11)*2,5 77.50 45,000.00 3,487,500.00
Sub total 3,487,500.00
II PEKERJAAN PONDASI SALURAN SISI TIMUR
Bagian Barat 3 panjang 50 m (St 120,00 - 170,0 M )
1 Pembesian & cor kolom M1 (0,6*6) 3.60 50,000.00 180,000.00
2 Pasang batu pondasi dinding pelunasan M3 (0,5+0,7)/2*0,6*21 5.04 150,000.00 756,000.00
3 Pembesian ring atas M1 35.00 35.00 25,000.00 875,000.00
Sub total 1,811,000.00
III PEKERJAAN PONDASI SALURAN SISI BARAT
Bagian Barat 4 panjang 7 m
1 Pasang batu pondasi dinding pelunasan M3 (0,5+0,7)/2*0,6*7 2.52 150,000.00 378,000.00
2 Pembesian & cor kolom M1 (0,6*3) 1.80 50,000.00 90,000.00
Sub total 468,000.00
IV PEKERJAAN LAIN LAIN
1 Langsir material 3 minggu Ls 1.00 1.00 1,000,000.00 1,000,000.00
2 Turun pagar panel Ls 1.00 1.00 500,000.00 500,000.00
3 Tanam sengon Ls 1.00 1.00 150,000.00 150,000.00
4 Transportasi Ls 1.00 1.00 1,000,000.00 1,000,000.00
Sub total 2,650,000.00

Total keseluruhan biaya 8,416,500.00


Total biaya keseluruhan 8,410,000.00

Pamotan porong , 12 Januari 2019


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 13 JANUARI s/d 19 JANUARI 2019

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PAGAR PANEL
Bagian selatan
1 Pasang tiang panel 2M Bh 30.00 30.00 45,000.00 1,350,000.00
2 Pasang daun panel 3 daun M2 (35*2,5) 87.50 45,000.00 3,937,500.00
Sub total 5,287,500.00
II PEKERJAAN PONDASI SALURAN
1 Pembesian sloof 25/40 M1 (35*2) 70.00 50,000.00 3,500,000.00
2 Pembesian balok 20./20 M1 (2,5*11) 27.50 30,000.00 825,000.00
3 Pasang bekisting balok sloof M1 (35*2) 70.00 25,000.00 1,750,000.00
4 Pasang bekisting balok gantung M1 (2,5*11) 27.50 30,000.00 825,000.00
Sub total 6,900,000.00
III PEKERJAAN LAIN LAIN
1 Langsir material 3 minggu Ls 1.00 1.00 1,500,000.00 1,500,000.00
2 Turun pagar panel Ls 1.00 1.00 500,000.00 500,000.00
3 Transportasi Ls 1.00 1.00 1,000,000.00 1,000,000.00
Sub total 3,000,000.00

Total keseluruhan biaya 15,187,500.00


Total biaya keseluruhan 15,180,000.00

Pamotan porong , 19 Januari 2019


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 20 JANUARI s/d 31 JANUARI 2019

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
II PEKERJAAN PONDASI SALURAN
1 Cor balok 30/60 M1 (36*2) 72.00 40,000.00 2,880,000.00
2 Cor balok gantung 20./20 M1 (2,5*11) 27.50 25,000.00 687,500.00
3 Setrikan pondasi bawah pintu masuk M2 (35*2)*1,5 105.00 20,000.00 2,100,000.00
4 Setrikan pondasi utara jembatan M2 (20*1,7*1) 34.00 20,000.00 680,000.00
5 Pasang batu pondasi tambahan 20 cm M3 (0,5*0,2*20) 4.00 150,000.00 600,000.00
6 Pasang batu pondasi tambahan 20 cm M2 (0,5*0,2*101,5) 10.15 150,000.00 1,522,500.00
7 Ban banan M1 (20*1)+(36*2) 92.00 20,000.00 1,840,000.00
Sub total 10,310,000.00
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 500,000.00 500,000.00
3 Transportasi Ls 1.00 1.00 500,000.00 500,000.00
Sub total 1,000,000.00

Total keseluruhan biaya 11,310,000.00


Total biaya keseluruhan 11,310,000.00

Pamotan porong , 31 Januari 2019


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 10 FEBRUARI s/d 16 FEBRUARI 2019

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PONDASI SALURAN
1 Perapian galian M1 3.50 3.50 15,000.00 52,500.00
2 Kuras air Ls 1.00 1.00 50,000.00 50,000.00
3 Galian tanah strous Bh 2.00 2.00 15,000.00 30,000.00
4 Pasang & cor kolom strous Bh 2.00 2.00 50,000.00 100,000.00
5 Pasang batu pondasi dasar M3 (1,00*0,6)*3,5 2.10 150,000.00 315,000.00
6 Pembesian & cor kolom M1 (0,6*2) 1.20 50,000.00 60,000.00
7 Pasang batu pondasi dinding M3 (0,6+1,0)/2*1,4*3,5 3.92 150,000.00 588,000.00
8 Pembesian & cor kolom M1 (1,4*2) 2.80 50,000.00 140,000.00
9 Pasang bekisting ring tengah 20/20 M1 3.50 3.50 25,000.00 87,500.00
10 Pasang pembesian & cor ring tengah 20/20 M1 3.50 3.50 40,000.00 140,000.00
Sub total 1,563,000.00
II PEKERJAAN BETON RING
1 Pasang bekisting ring atas 20/40 M1 10.00 14.00 25,000.00 350,000.00
2 Pasang pembesian & cor ring atas 20/40 M1 10.00 14.00 40,000.00 560,000.00
Sub total 910,000.00
III PEKERJAAN SETRIKAN
1 Setrikan Pondasi selatan jembatan M2 (40*1,7) 68.00 20,000.00 1,360,000.00
Sub total 1,360,000.00
IV PEKERJAAN PAGAR PANEL
1 Pasang tiang panel 2M Bh 6.00 6.00 45,000.00 270,000.00
2 Pasang daun panel 3 daun M2 (14*2,5) 35.00 45,000.00 1,575,000.00
Sub total 1,845,000.00
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 500,000.00 500,000.00
2 Transportasi Ls 1.00 1.00 500,000.00 500,000.00
Sub total 1,000,000.00

Total keseluruhan biaya 6,678,000.00


Total biaya keseluruhan 6,670,000.00

Pamotan porong , 09 Februari 2019


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PONDASI PAGAR
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 01 FEBRUARI s/d 09 FEBRUARI 2019

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PONDASI SALURAN
saluran bagian barat
1 Perapian galian M1 3.50 3.50 15,000.00 52,500.00
2 Kuras air Ls 1.00 1.00 50,000.00 50,000.00
3 Galian tanah strous Bh 2.00 2.00 15,000.00 30,000.00
4 Pasang & cor kolom strous Bh 2.00 2.00 50,000.00 100,000.00
5 Pasang batu pondasi dasar M3 (1,00*0,6)*3,5 2.10 150,000.00 315,000.00
6 Pembesian & cor kolom M1 (0,6*2) 1.20 50,000.00 60,000.00
7 Pasang batu pondasi dinding M3 (0,6+1,0)/2*1,4*3,5 3.92 150,000.00 588,000.00
8 Pembesian & cor kolom M1 (1,4*2) 2.80 50,000.00 140,000.00
9 Pasang bekisting ring tengah 20/20 M1 3.50 3.50 25,000.00 87,500.00
10 Pasang pembesian & cor ring tengah 20/20 M1 3.50 3.50 40,000.00 140,000.00
saluran bagian barat
1 Pasang batu pondasi dinding M3 0,6*0,45*3,5 0.95 150,000.00 141,750.00
2 Pembesian & cor kolom M1 (0,45*2) 0.90 50,000.00 45,000.00
saluran bagian timur
1 Pasang batu pondasi dinding M3 0,6*0,65*10,5 4.10 150,000.00 614,250.00
2 Pembesian & cor kolom M1 (0,65*10,5) 6.83 50,000.00 341,250.00
Sub total 2,705,250.00
II PEKERJAAN PONDASI SALURAN TOL
1 Bobok pondasi lama M1 (3*2) 6.00 15,000.00 90,000.00
2 Peninggian pondasi saluran M3 (0,5*0,2*3*2) 0.60 150,000.00 90,000.00
Sub total 180,000.00
III PEKERJAAN SETRIKAN
1 Setrikan Pondasi selatan jembatan M2 (40*1,7) 68.00 20,000.00 1,360,000.00
Sub total 1,360,000.00
IV PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 700,000.00 700,000.00
2 Transportasi Ls 1.00 1.00 200,000.00 200,000.00
Sub total 900,000.00

Total keseluruhan biaya 5,145,250.00


Total biaya keseluruhan 5,140,000.00

Pamotan porong , 16 Februari 2019


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN :
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 17 FEBRUARI s/d 02 MARET 2019

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PONDASI SALURAN
saluran bagian barat
1 Perapian galian M1 15.00 15.00 15,000.00 225,000.00
2 Pasang bekisting balok 40/60 M1 (15*2) 7.00 35,000.00 245,000.00
3 Pembesian & cor balok 40/60 M1 (15*2) 7.00 70,000.00 490,000.00
4 Pasang bekisting balok 25/25 M1 (1,9*5) 7.00 35,000.00 245,000.00
5 Pembesian & cor balok 25/25 M1 (1,9*5) 7.00 70,000.00 490,000.00
6 Setrikan pondasi bawah pintu masuk M2 (15*2)*1,5 105.00 20,000.00 2,100,000.00
7 Pasang plat beton Bh 26.00 26.00 25,000.00 650,000.00
Sub total 4,445,000.00
II PEKERJAAN PONDASI SALURAN TOL
1 Pasang bekisting balok 40/70 M1 (7*1) 7.00 35,000.00 245,000.00
2 Pembesian & cor balok 40/70 M1 (7*1) 7.00 70,000.00 490,000.00
3 Pasang bekisting balok 30/70 M1 (3,15*2) 6.30 30,000.00 189,000.00
4 Pembesian & cor balok 30/70 M1 (3,15*2) 6.30 45,000.00 283,500.00
5 Pasang bekisting balok 25/30 M1 2.00 2.00 30,000.00 60,000.00
6 Pembesian & cor balok 25/30 M1 2.00 2.00 45,000.00 90,000.00
Sub total 1,357,500.00
III PEKERJAAN SETRIKAN
1 Setrikan Pondasi selatan jembatan M3 (20,5*1,7) 34.85 20,000.00 697,000.00
Sub total 697,000.00
IV PEKERJAAN SALURAN YUDIT
Bagian timur
1 Galian tanah & perapian M1 112.50 112.50 10,000.00 1,125,000.00
2 Pasangan batu dasar saluran M3 (0,1*0,50*112,5) 5.63 100,000.00 562,500.00
3 Rabatan lantai M2 (0,5*112,5) 56.25 19,000.00 1,068,750.00
4 Pasang yudit 30 M1 48.00 48.00 15,000.00 720,000.00
Sub total 3,476,250.00
V PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 700,000.00 700,000.00
2 Turunkan yudit Ls 2.00 2.00 150,000.00 300,000.00
3 Transportasi Ls 1.00 1.00 500,000.00 500,000.00
Sub total 1,500,000.00

Total keseluruhan biaya 11,475,750.00


Total biaya keseluruhan 11,470,000.00

Pamotan porong , 02 Maret 2019


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PASANG SALURAN
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 03 MARET s/d 30 MARET 2019

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN SALURAN YUDIT
Bagian timur
1 Galian tanah & perapian M1 (33,36+54,43+22,66+72,19)-112,5 70.14 10,000.00 701,400.00
2 Pasangan batu dasar saluran M3 (0,1*0,50)-(182,64-112,5) 3.51 100,000.00 350,700.00
3 Rabatan lantai M2 (0,5*182,5)-(0,5*112,5) 35.00 19,000.00 665,000.00
4 Pasang yudit 30 M1 182,5-48 134.50 15,000.00 2,017,500.00
5 Cepitan antara pondasi & yudit M2 182.50 182.50 15,000.00 2,737,500.00

Bagian barat
1 Galian tanah & perapian M1 (1,6*96) 153.60 10,000.00 1,536,000.00
2 Pasangan batu dasar saluran M3 (0,1*0,5*96) 4.80 100,000.00 480,000.00
3 Rabatan lantai M2 (0,5*0,96) 0.48 19,000.00 9,120.00
4 Pasang yudit 30 Bh 96.00 96.00 15,000.00 1,440,000.00
Sub total 9,937,220.00
II PEKERJAAN LAIN LAIN
1 Pasang bekisting M1 101.50 101.50 25,000.00 2,537,500.00
2 Pembesian & cor ring M1 101.50 101.50 35,000.00 3,552,500.00
3 Plesteran & acian M1 (0,6*101,5)*70% 42.63 25,000.00 1,065,750.00
4 Benangan sudut M1 (101,5*3)*70% 213.15 12,500.00 2,664,375.00
Sub total 9,820,125.00
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 750,000.00 750,000.00
2 Transportasi Ls 1.00 1.00 500,000.00 500,000.00
Sub total 1,250,000.00

Total keseluruhan biaya 21,007,345.00


Total biaya keseluruhan 21,000,000.00

Pamotan porong , 30 Maret 2019


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PASANG SALURAN
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 01 APRIL s/d 13 APRIL 2019

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN SALURAN YUDIT
Bagian timur
1 Ban banan pondasi & yudit M2 182.50 182.50 22,000.00 4,015,000.00

Bagian barat
1 Cepitan yudit dan pondasi M1 96.00 96.00 15,000.00 1,440,000.00
Sub total 5,455,000.00
II PEKERJAAN PONDASI SALURAN DEPAN
1 Pengukuran & bauwplank M1 6.00 6.00 25,000.00 150,000.00
1 Perapian galian M1 (6*2) 12.00 15,000.00 180,000.00
2 Kuras air Ls 1.00 1.00 150,000.00 150,000.00
3 Galian tanah strous Bh 2.00 2.00 15,000.00 30,000.00
4 Pasang & cor kolom strous Bh (2*2) 4.00 50,000.00 200,000.00
5 Pasang batu pondasi dasar M3 (1,00*0,6)*6*2 7.20 150,000.00 1,080,000.00
6 Pembesian & cor kolom M1 (0,6*2)*2 2.40 50,000.00 120,000.00
7 Pasang batu pondasi dinding M3 (0,6+1,0)/2*1,4*6*2 13.44 150,000.00 2,016,000.00
8 Pembesian & cor kolom M1 (1,4*2)*2 5.60 50,000.00 280,000.00
9 Pasang bekisting ring tengah 20/20 M1 (6*2) 12.00 25,000.00 300,000.00
10 Pasang pembesian & cor ring tengah 20/20 M1 (6*2) 12.00 40,000.00 480,000.00
Pondasi dalam 101,5
1 Plesteran & acian M1 (0,6*101,5)*30% 18.27 25,000.00 456,750.00
2 Benangan sudut M1 (101,5*3)*30% 91.35 12,500.00 1,141,875.00
Sub total 6,584,625.00
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 750,000.00 750,000.00
2 Transportasi Ls 1.00 1.00 500,000.00 500,000.00
Sub total 1,250,000.00

Total keseluruhan biaya 13,289,625.00


Total biaya keseluruhan 13,280,000.00

Pamotan porong , 13 april 2019


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PASANG SALURAN
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 14 APRIL s/d 04 MEI 2019

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PONDASI SALURAN DEPAN
1 Pengukuran & bauwplank L1 1.00 1.00 100,000.00 100,000.00
2 Perapian galian M1 (20*2)-(6*2) 28.00 15,000.00 420,000.00
3 Kuras air Ls 1.00 1.00 150,000.00 150,000.00
4 Galian tanah strous Bh (6*2)-2 10.00 15,000.00 150,000.00
5 Pasang & cor kolom strous Bh (6*2)-4 8.00 50,000.00 400,000.00
6 Pasang batu pondasi dasar M3 (1,00*0,6*20*2)-(1,00*0,6*6*2) 16.80 150,000.00 2,520,000.00
7 Pembesian & cor kolom M1 (0.6*6*2)-(0,6*2)*2 4.80 50,000.00 240,000.00
8 Pasang batu pondasi dinding M3 ((0,6+1,0)/2*1,4*20*2-(0,6+1,0)/2*1,4*6*2 31.36 150,000.00 4,704,000.00
9 Pembesian & cor kolom M1 (1,4*6*2)-(1,4*2)*2 11.20 50,000.00 560,000.00
10 Pasang bekisting ring tengah 20/20 M1 (20*2)-(6*2) 28.00 25,000.00 700,000.00
11 Pasang pembesian & cor ring tengah 20/20 M1 (20*2)-(6*2) 28.00 40,000.00 1,120,000.00
12 Pasang batu pondasi dinding diatas ring tengah M3 0,6*0,65*20*2 15.60 150,000.00 2,340,000.00
Sub total 13,404,000.00
II PEKERJAAN PARKIR AREA
Bagian selatan
1 Pengukuran & bauwplank Ls 1.00 1.00 250,000.00 250,000.00
2 Galian tanah untuk pasang paving sekat M1 (4*2)+(1,3+3,2+4)*13*2 229.00 2,500.00 572,500.00
3 Pasang sekat / pembatas paving M1 (4*2)+(1,3+3,2+4)*13*2 229.00 12,500.00 2,862,500.00
4 Keprasan tanah & perapian M2 (4,0+1,3)/2*3,2*13*2 220.48 7,500.00 1,653,600.00
5 Pasang besi rakitan M2 (3,1+0,4)/2*3,2*13*2 145.60 10,000.00 1,456,000.00
6 Cor lantai tebal 10 cm M2 (4,0+1,3)/2*3,2*13*2 220.48 15,000.00 3,307,200.00
7 Pasang Canstin penahan @ 4 buah Unit (4*13*2) 104.00 12,500.00 1,300,000.00
Sub total 11,401,800.00
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 300,000.00 300,000.00
2 Pecah batu Ls 1.00 1.00 200,000.00 200,000.00
Sub total 500,000.00

Total keseluruhan biaya 25,305,800.00


Total biaya keseluruhan 25,300,000.00

Pamotan porong , 04 Mei 2019


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI

BON UPAH KERJA


PEKERJAAN : PASANG SALURAN
LOKASI : PAMOTAN PORONG BARU
TANGGAL : 05 MEI s/d 16 MEI 2019
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PONDASI SALURAN DEPAN
1 Pengukuran & bauwplank L1 1.00 1.00 100,000.00 100,000.00
2 Perapian galian M1 (20*2)-(6*2) 28.00 15,000.00 420,000.00
3 Kuras air Ls 1.00 1.00 150,000.00 150,000.00
4 Galian tanah strous Bh (6*2)-2 10.00 15,000.00 150,000.00
5 Pasang & cor kolom strous Bh (6*2)-4 8.00 50,000.00 400,000.00
6 Pasang batu pondasi dasar M3 (1,00*0,6*20*2)-(1,00*0,6*6*2) 16.80 150,000.00 2,520,000.00
7 Pembesian & cor kolom M1 (0.6*6*2)-(0,6*2)*2 4.80 50,000.00 240,000.00
8 Pasang batu pondasi dinding M3 ((0,6+1,0)/2*1,4*20*2-(0,6+1,0)/2*1,4*6*2 31.36 150,000.00 4,704,000.00
9 Pembesian & cor kolom M1 (1,4*6*2)-(1,4*2)*2 11.20 50,000.00 560,000.00
10 Pasang bekisting ring tengah 20/20 M1 (20*2)-(6*2) 28.00 25,000.00 700,000.00
11 Pasang pembesian & cor ring tengah 20/20 M1 (20*2)-(6*2) 28.00 40,000.00 1,120,000.00
12 Pasang batu pondasi dinding diatas ring tengah M3 0,6*0,65*20*2 15.60 150,000.00 2,340,000.00
Sub total 13,404,000.00
II PEKERJAAN PARKIR AREA
Bagian selatan
1 Pengukuran & bauwplank Ls 1.00 1.00 250,000.00 250,000.00
2 Galian tanah untuk pasang paving sekat M1 (4*2)+(1,3+3,2+4)*13*2 229.00 2,500.00 572,500.00
3 Pasang sekat / pembatas paving M1 (4*2)+(1,3+3,2+4)*13*2 229.00 12,500.00 2,862,500.00
4 Keprasan tanah & perapian M2 (4,0+1,3)/2*3,2*13*2 220.48 7,500.00 1,653,600.00
5 Pasang besi rakitan M2 (3,1+0,4)/2*3,2*13*2 145.60 10,000.00 1,456,000.00
6 Cor lantai tebal 10 cm M2 (4,0+1,3)/2*3,2*13*2 220.48 15,000.00 3,307,200.00
7 Pasang Canstin penahan @ 4 buah Unit (4*13*2) 104.00 12,500.00 1,300,000.00
Sub total 11,401,800.00
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 300,000.00 300,000.00
2 Pecah batu Ls 1.00 1.00 200,000.00 200,000.00
Sub total 500,000.00

Total keseluruhan biaya 25,305,800.00


Total biaya keseluruhan 25,300,000.00

Pamotan porong , 04 Mei 2019


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PASANG PONDASI
LOKASI : PAMOTAN
TANGGAL : 05 OKTOBER s/d 16 OKTOBER 2019

PROGRES PERIODE PERIODE SATUAN JUMLAH


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA HARGA KETERANGAN
SEBELUMNYA INI INI Rp Rp
I PEKERJAAN PONDASI SALURAN DEPAN
1 Pengukuran & bauwplank L1 (18,0+2,50) 20.50 10,000.00 205,000.00
2 Pasang batu pondasi M3 (1,00*0,5)/2*1,70*20,50 8.71 130,000.00 1,132,625.00
3 Kolom 20/20 M1 (1,70*4) 6.80
Pembesian Kg (4*1,70*0,89 kg)* 4 bh 24.21 4,000.00 96,832.00
Pasang bekisting M2 (0,25*1,70*2 sisi)* 4 bh 3.40 45,000.00 153,000.00
Cor maual M3 (0,2*0,2*1,70)*4 bh 0.27 250,000.00 68,000.00
4 Ban banan pondasi M1 2.50 2.50
Plesteran atas M2 (0,5*2,5) 1.25 20,000.00 25,000.00
Acian M2 (0,5*2,5) 1.25 10,000.00 12,500.00
Benangan M1 (2,5*2) 5.00 12,500.00 62,500.00
Sub total 1,755,457.00
III PEKERJAAN LAIN LAIN
1 Bongkar semen Ls 1.00 1.00 200,000.00 200,000.00
Sub total 200,000.00

Total keseluruhan biaya 1,955,457.00

Pamotan porong ,16 Oktober 2019


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : LANTAI BETON
LOKASI : PAMOTAN
TANGGAL : 12 NOVEMBER s/d 19 NOVEMBER 2019

PROGRES PERIODE PERIODE SATUAN JUMLAH


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA HARGA KETERANGAN
SEBELUMNYA INI INI Rp Rp
I PEKERJAAN PONDASI SALURAN DEPAN
1 Pasang bekisting besi M1 (0,15*18*10*2)+(0,15*30*2) 63.00 45,000.00 2,835,000.00
2 Pemerataan tanah M2 (18*30)*50% 270.00 5,000.00 1,350,000.00
3 Pasang wermess M2 (18*30) 540.00 5,000.00 2,700,000.00
4 Cor lantai tebal 15 cm M3 (18*30)*0,16 86.40 60,000.00 5,184,000.00
Sub total 12,069,000.00

Total keseluruhan biaya 12,069,000.00

Pamotan porong ,19 November 2019


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : LANTAI BETON
LOKASI : PAMOTAN
TANGGAL : 20 NOVEMBER s/d 02 DESEMBER 2019

PROGRES PERIODE PERIODE SATUAN JUMLAH


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA HARGA KETERANGAN
SEBELUMNYA INI INI Rp Rp
I PEKERJAAN LANTAI
1 Pasang bekisting besi M1 (0,15*12*10*2) 36.00 45,000.00 1,620,000.00
2 Pemerataan tanah M2 (12,0*30) 360.00 5,000.00 1,800,000.00
3 Pasang wermess M2 (12,0*30) 360.00 5,000.00 1,800,000.00
4 Cor lantai tebal 15 cm M3 (12,0*30)*0,15 54.00 60,000.00 3,240,000.00
Sub total 8,460,000.00
II PEKERJAAN SALURAN YUDITS
1 Pengukuran & bauwplank M1 30.00 30.00 10,000.00 300,000.00
2 Pemerataan tanah M2 (0,60*30) 18.00 5,000.00 90,000.00
3 Rabatan lantai tebal 15 cm M2 (0,50*30) 15.00 5,000.00 75,000.00
4 Pasangan beton yudits M1 30.00 30.00 40,000.00 1,200,000.00
Sub total 1,665,000.00

Total keseluruhan biaya 10,125,000.00

Pamotan porong ,02 Desember 2019


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : LANTAI BETON
LOKASI : PAMOTAN
TANGGAL : 03 DESEMBER s/d 24 DESEMBER 2019

PROGRES PERIODE PERIODE SATUAN JUMLAH


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA HARGA KETERANGAN
SEBELUMNYA INI INI Rp Rp
I PEKERJAAN LANTAI
1 Pasang bekisting besi M1 (0,15*30,30*3)+(0,15*3,0*4) 100% 16.65 45,000.00 749,250.00
2 Pemerataan tanah M2 (3,30*30,0) 100% 99.00 5,000.00 495,000.00
3 Pasang wermess M2 (3,30*30,0) 100% 99.00 5,000.00 495,000.00
4 Cor lantai tebal 15 cm M3 (3,30*30,0)*0,15 100% 14.85 60,000.00 891,000.00
Sub total 2,630,250.00
II PEKERJAAN LANTAI -
1 Pasang batu pondasi M3 (0,30*0,70*12) 100% 2.52 130,000.00 327,600.00
2 Pasang bekisting besi M2 (0,15*14*5)+(0,15*20*2) 100% 16.50 45,000.00 742,500.00
3 Pemerataan tanah M2 (4,0*14)*5 100% 280.00 5,000.00 1,400,000.00
4 Pasang wermess M2 (4,0*14)*5 100% 280.00 5,000.00 1,400,000.00
5 Cor lantai tebal 15 cm M3 (4,0*14)*5*0,15 100% 42.00 60,000.00 2,520,000.00
Sub total 6,390,100.00
III PEKERJAAN SALURAN YUDITS -
1 Pengukuran & bauwplank M1 20.00 100% 30.00 10,000.00 300,000.00
2 Pemerataan tanah M2 (0,60*20) 100% 18.00 5,000.00 90,000.00
3 Rabatan lantai tebal 15 cm M2 (0,60*20) 100% 15.00 15,000.00 225,000.00
-
Sub total 615,000.00

Total keseluruhan biaya 9,635,350.00

Pamotan porong ,24 Desember 2019


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : JEMBATAN TKD & SALURAN
LOKASI : PAMOTAN
TANGGAL : 23 APRIL s/d 29 APRIL 2019

PROGRES PERIODE PERIODE SATUAN JUMLAH


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA HARGA KETERANGAN
SEBELUMNYA INI INI Rp Rp
I PEKERJAAN PONDASI JEMBATAN TKD SELATAN
1 Pengukuran & bauwplank M1 15.00 100% 15.00 10,000.00 -
2 Pasang pondasi dasar M3 (1,20*0,70*15,0) 50% 50% 100% 12.60 130,000.00 819,000.00
3 Kolom 25/25 M1 (3,0*7) 21.00 -
Pembesian Kg (21*6*0,89)+(21*6*1,0*0,40) 162.54 2,000.00 -
Pasang bekisting M2 (0,40*2,5)*7 100% 7.00 45,000.00 315,000.00
Cor beton manual M3 (0,30*0,30*2,5)*7 100% 1.58 250,000.00 393,750.00
4 Balok ring 25/25 M1 15.00 15.00 -
Pembesian Kg (16*6*0,89)+(15*6*1,0*0,40) 100% 121.44 2,000.00 242,880.00
Pasang bekisting M2 (0,40*15) 100% 6.00 45,000.00 270,000.00
Cor beton manual M3 (0,30*0,30*15) 100% 1.35 250,000.00 337,500.00
5 Pasang pondasi dinding M3 (1,00 +0,65)/2*1,65*15,00 100% 20.42 130,000.00 2,654,437.50
6 Langsiran material batu Ls 1.00 100% 1.00 200,000.00 200,000.00 dilangsir
7 Kuras air Ls 1.00 100% 1.00 150,000.00 150,000.00 banyak air
Sub total 5,382,567.50
II PEKERJAAN PAGAR PANEL -
Pagar bagian barat pintu M1 17.50 -
1 Pasang pondasi peninggian M3 (0,30*0,40*17,50) 60% 40% 100% 2.10 130,000.00 109,200.00
2 Pasang pagar panel 3 daun M2 (17,50*1,20) 60% 40% 100% 21.00 45,000.00 378,000.00
3 Bobok pondasi Uk 60 x 40*40 Bh 8.00 100% 100% 8.00 25,000.00 200,000.00
4 Balok sloof 20/22 M1 17.50 17.50 -
Pembesian Kg (17,5*4*0,89)+(17,5*6*0,72*0,40) 60% 40% 100% 92.54 2,000.00 74,032.00
Pasang bekisting M2 (0,22*2*17,50) 60% 40% 100% 7.70 45,000.00 138,600.00
Cor beton manual M3 (0,20*0,22*17,50) 60% 40% 100% 0.77 250,000.00 77,000.00
5 Langsiran material Ls 1.00 100% 100% 1.00 100,000.00 100,000.00
Sub total 1,076,832.00
III PEKERJAAN PONDASI SALURAN AIR GUDANG SELATAN -
1 Pengukuran & bauwplank M1 (6,00*12 Plong) 100% 72.00 10,000.00 720,000.00
2 Galian tanah M3 (0,40*1,30*72,0) 100% 37.44 50,000.00 1,872,000.00
3 Pemerataan tanah M2 (1,30*72) 100% 93.60 5,000.00 468,000.00
4 Pasang pondasi peninggian M3 (0,45*0,45*72) 100% 14.58 130,000.00 1,895,400.00
5 Langsiran material Ls 1.00 100% 1.00 200,000.00 200,000.00
Sub total 5,155,400.00

Total keseluruhan biaya 11,614,799.50

Pamotan porong ,29 April 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : JEMBATAN TKD & SALURAN
LOKASI : PAMOTAN
TANGGAL : 30 APRIL s/d 12 MEI 2020

PROGRES PERIODE PERIODE SATUAN JUMLAH


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA HARGA KETERANGAN
SEBELUMNYA INI INI Rp Rp
I PEKERJAAN PONDASI JEMBATAN TKD SELATAN
1 Pasang pondasi tambahan peninggian M3 (0,65*0,20*15) 100% 12.60 130,000.00 1,638,000.00
2 Balok ring 30/50 M1 15.00 15.00 -
Pembesian Kg (15*8*0,89)+(15*6*1,2*0,40)+(0,75*4*7*0,89) 100% 168.69 2,000.00 337,380.00
Pasang bekisting M2 (0,35*2*15,0) 100% 10.50 45,000.00 472,500.00
Cor beton readymix M3 (0,30*0,50*15) 2.25 160,000.00 -
3 Langsiran material batu Ls 1.00 100% 1.00 100,000.00 100,000.00 dilangsir
Sub total 2,547,880.00
II PEKERJAAN PONDASI SALURAN AIR GUDANG SELATAN -
1 Pengukuran & bauwplank sta 86,00 s/d 130,00 M1 (130,0-86,0) 100% 44.00 10,000.00 440,000.00
2 Galian tanah M3 (0,40*1,30*44,0) 100% 22.88 50,000.00 1,144,000.00
3 Pemerataan tanah M2 (1,30*44) 100% 57.20 5,000.00 286,000.00
4 Pasang pondasi peninggian M3 (0,50+0,40)/2*0,50*44 100% 9.90 150,000.00 1,485,000.00 Pondasi kecil tambahan
5 Langsiran material semen & batu Ls 1.00 100% 1.00 400,000.00 400,000.00
Sub total 3,755,000.00
III PEKERJAAN PLESTERAN & ACIAN DINDING BATU -
Sta 0,00 s/d 130,00
1 Plesteran batu dinding atas dan samping M2 (0,50*130,00)+(0,40*130,00) 75% 117.00 40,000.00 3,510,000.00
2 Acian batu dinding atas dan samping M2 (0,50*130,00)+(0,40*130,00) 75% 117.00 10,000.00 877,500.00
3 Plesteran lantai M2 (0,75*130,00) 75% 97.50 20,000.00 1,462,500.00
4 Acian lantai M2 (0,75*130,00) 75% 97.50 10,000.00 731,250.00
5 Benang M1 130.00 75% 130.00 12,500.00 1,218,750.00
6 Langsiran material Ls 1.00 100% 1.00 300,000.00 300,000.00
Sub total 8,100,000.00
IV PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 1.00 250,000.00 250,000.00
Sub total 250,000.00

Total keseluruhan biaya 14,402,880.00

Pamotan porong ,12 Mei 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : JEMBATAN TKD & SALURAN
LOKASI : PAMOTAN
TANGGAL : 27 MEI s/d 02 JUNI 2020

PROGRES PERIODE PERIODE SATUAN JUMLAH


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA HARGA KETERANGAN
SEBELUMNYA INI INI Rp Rp
I PEKERJAAN PONDASI SALURAN AIR GUDANG SELATAN -
1 Pengukuran & bauwplank sta 130,00 s/d 156,00 M1 (18,0+3,10) 100% 21.10 10,000.00 211,000.00
2 Galian tanah M3 (0,50*0,80*21,0) 100% 8.40 50,000.00 420,000.00
3 Pemerataan tanah M2 (0,80*21,00) 100% 16.80 5,000.00 84,000.00
4 Pasang pondasi peninggian M3 (0,30*0,50*21,00) 100% 3.15 150,000.00 472,500.00 Pondasi kecil tambahan
5 Langsiran material semen & batu Ls 1.00 100% 1.00 250,000.00 250,000.00
6 Buang tanah galian M3 (0,50*0,80*21,0) 100% 8.40 50,000.00 420,000.00
Sub total 1,857,500.00
II PEKERJAAN PLESTERAN & ACIAN DINDING BATU -
Sta 0,00 s/d 130,00
1 Plesteran batu dinding atas dan samping M2 (0,50*130,00)+(0,40*130,00) 75% 117.00 40,000.00 -
2 Acian batu dinding atas dan samping M2 (0,50*130,00)+(0,40*130,00) 75% 117.00 10,000.00 -
3 Plesteran lantai M2 (0,75*130,00) 75% 25% 100% 97.50 20,000.00 487,500.00
4 Acian lantai M2 (0,75*130,00) 75% 25% 100% 97.50 10,000.00 243,750.00
5 Benang M1 130.00 75% 130.00 12,500.00 -
6 Langsiran material Ls 1.00 100% 1.00 300,000.00 300,000.00
Sub total 1,031,250.00
III PEKERJAAN PLESTERAN & ACIAN DINDING BATU -
Sta 130,00 s/d 156,00
1 Plesteran batu dinding atas dan samping utara M2 (0,5+0,20)*25,0 17.50 40,000.00 -
Plesteran batu dinding atas dan samping selatan M2 (0,10+0,90)*26,0 26.00 40,000.00 -
2 Acian batu dinding atas dan samping utara M2 (0,5+0,20)*25,0 17.50 10,000.00 -
Acian batu dinding atas dan samping selatan M2 (0,10+0,90)*26,0 26.00 10,000.00 -
3 Plesteran lantai M2 (0,60*26) 100% 15.60 20,000.00 312,000.00
4 Acian lantai M2 (0,60*26) 100% 15.60 10,000.00 156,000.00
5 Benang M1 (25*2) 50.00 12,500.00 -
Sub total 468,000.00
IV PEKERJAAN LANTAI COR
1 Pengukuran & bauwplank M1 (18,0*2) 100% 36.00 10,000.00 -
2 Pemerataan tanah galian M2 (4,00*18,00) 100% 72.00 5,000.00 -
3 Pasang besi wermess tunggal M2 (4,00*18,00) 100% 72.00 5,000.00 -
4 Pasang bekisting M2 (0,15*18,00) 100% 2.70 45,000.00 -
5 Cor rabatan sta 9,10 s/d sta akhir barat M2 (0,15*4,00*18,00) 10.80 15,000.00 -
Sub total -
V PEKERJAAN LAIN LAIN
1 Pasang pagar panel 1 plong M2 (2,40*2,80) 100% 6.72 45,000.00 302,400.00
1 Pembersihan Ls 1.00 100% 1.00 100,000.00 100,000.00
Sub total 402,400.00

Total keseluruhan biaya 3,759,150.00

Pamotan porong , 02 Juni 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : JEMBATAN TKD & SALURAN
LOKASI : PAMOTAN
TANGGAL : 03 JUNII s/d 09 JUNI 2020

PROGRES PERIODE PERIODE SATUAN JUMLAH


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA HARGA KETERANGAN
SEBELUMNYA INI INI Rp Rp
I PEKERJAAN PLESTERAN & ACIAN DINDING BATU -
Sta 130,00 s/d 156,00
1 Plesteran batu dinding atas dan samping utara M2 (0,5+0,20)*25,0 100% 17.50 40,000.00 700,000.00
Plesteran batu dinding atas dan samping selatan M2 (0,15+0,75)*26,0 100% 23.40 40,000.00 936,000.00
2 Acian batu dinding atas dan samping utara M2 (0,5+0,20)*25,0 100% 17.50 10,000.00 175,000.00
Acian batu dinding atas dan samping selatan M2 (0,15+0,75)*26,0 100% 23.40 10,000.00 234,000.00
3 Plesteran lantai M2 (0,60*26) 100% 15.60 20,000.00 -
4 Acian lantai M2 (0,60*26) 100% 15.60 10,000.00 -
5 Benang M1 (25*2) 100% 50.00 12,500.00 625,000.00
Sub total 2,670,000.00
II PEKERJAAN PLESTERAN & ACIAN DINDING BATU -
Sta 0,00 s/d 130,00
1 Plesteran batu dinding atas dan samping M2 (0,50*130,00)+(0,40*130,00) 75% 117.00 40,000.00 -
2 Acian batu dinding atas dan samping M2 (0,50*130,00)+(0,40*130,00) 75% 117.00 10,000.00 -
3 Plesteran lantai M2 (0,75*130,00) 100% 97.50 20,000.00 -
4 Acian lantai M2 (0,75*130,00) 100% 97.50 10,000.00 -
5 Benang M1 130.00 75% 130.00 12,500.00 -
6 Langsiran material Ls 1.00 1.00 300,000.00 -
Sub total -
III PEKERJAAN PLESTERAN & ACIAN DINDING BATU -
Sta 130,00 s/d 156,00
1 Plesteran batu dinding atas dan samping utara M2 (0,5+0,20)*25,0 100% 17.50 40,000.00 700,000.00
Plesteran batu dinding atas dan samping selatan M2 (0,15+0,75)*26,0 100% 23.40 40,000.00 936,000.00
2 Acian batu dinding atas dan samping utara M2 (0,5+0,20)*25,0 100% 17.50 10,000.00 175,000.00
Acian batu dinding atas dan samping selatan M2 (0,15+0,75)*26,0 100% 23.40 10,000.00 234,000.00
3 Plesteran lantai M2 (0,60*26) 100% 15.60 20,000.00 -
4 Acian lantai M2 (0,60*26) 100% 15.60 10,000.00 -
5 Benang M1 (25*2) 100% 50.00 12,500.00 625,000.00
Sub total 2,670,000.00
IV PEKERJAAN PONDASI PENAHAN PINTU MASUK TKD -
1 Pengukuran & bauwplank M1 (6*2) 100% 12.00 10,000.00 120,000.00
2 Pemerataan tanah M2 (0,80*6) 100% 4.80 5,000.00 24,000.00
3 Pasang pondasi M3 (0,40+1,0)/2*(1,65+2,0)/2*4,50)) 100% 5.75 130,000.00 747,337.50
M3 (0,40+0,6)/2*(1,65+1,30)/2*1,4 100% 1.03 130,000.00 134,225.00
4 Langsiran material semen & batu Ls 1.00 100% 1.00 200,000.00 200,000.00
Sub total 1,225,562.50
PROGRES PERIODE PERIODE SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA HARGA KETERANGAN
SEBELUMNYA INI INI Rp Rp
V PEKERJAAN KANTIN
1 Pengukuran & bauwplank M1 (6*8)+(6) 75% 54.00 10,000.00 405,000.00
2 Galian tanah M3 (0,50*0,50*20,00) +(0,40*1,00*3) 75% 6.20 60,000.00 279,000.00
3 Pemerataan tanah galian M2 (1,00*48,6)+(1,00*5,5) 75% 54.10 5,000.00 202,875.00
4 Pasang batu pondasi kecil M2 (0,4*0,40*48,6)+(0,30*0,40*48,6)+(0,10*0,30*48,6) 75% 15.07 150,000.00 1,694,925.00 pondasi kecil
Pasang batu pondasi kecil M3 (0,4*0,40*6)+(0,30*0,40*6)+(0,10*0,30*6) 75% 1.86 150,000.00 209,250.00 pondasi kecil
5 Balok ring 30/50 M1 (48,60+6,0) 75% 54.60 -
Pembesian Kg (54,6*4*0,60)+(54,6*0,75*6*0,22) 75% 185.09 4,000.00 555,282.00
Pasang bekisting M2 (0,2*2*54,6) 75% 21.84 45,000.00 737,100.00
Cor beton (manual) M3 (0,15*0,20*54,6) 75% 1.64 250,000.00 307,125.00
Sub total 4,390,557.00
VI PEKERJAAN PONDASI JEMBATAN TKD SELATAN
1 Pengukuran & bauwplank M1 8.00 100% 8.00 10,000.00 80,000.00
2 Pemerataan tanah M2 (1,20*8) 100% 9.60 10,001.00 96,009.60
2 Pasang pondasi dasar M3 (1,20*0,70*8) 100% 6.72 130,000.00 873,600.00
3 Kolom 25/25 M1 (3,0*3) 9.00 -
Pembesian Kg (9*6*0,89)+(9*6*1,0*0,40) 100% 69.66 2,000.00 139,320.00
Pasang bekisting M2 (0,40*2,5*2)*3 6.00 45,000.00 -
Cor beton manual M3 (0,30*0,30*2,5)*3 0.68 250,000.00 -
4 Balok ring 25/25 bawah M1 6.00 6.00 -
Pembesian Kg (6*6*0,89)+(15*6*1,0*0,40) 68.04 2,000.00 -
Pasang bekisting M2 (0,40*15) 6.00 45,000.00 -
Cor beton manual M3 (0,30*0,30*15) 1.35 250,000.00 -
5 Pasang pondasi dinding M3 (1,00 +0,65)/2*1,65*8,0 10.89 130,000.00 -
7 Kuras air Ls 1.00 1.00 150,000.00 -
Sub total 1,188,929.60
VII PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 500,000.00 500,000.00
Sub total 500,000.00

Total keseluruhan biaya 12,645,049.10

Pamotan porong ,09 Juni 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : GARDU LISTRIK
LOKASI : PAMOTAN
TANGGAL : 03 JUNII s/d 09 JUNI 2020

PROGRES PERIODE PERIODE SATUAN JUMLAH


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA HARGA KETERANGAN
SEBELUMNYA INI INI Rp Rp
I PEKERJAAN GARDU LISTRIK
1 Pengukuran & bauwplank M1 (6,50*2)+(12,5*2) 100% 38.00 10,000.00 380,000.00
2 Pemerataan tanah M2 (0,80*5,0*4)+(0,80*12,0)+(0,60*12,0+(0,80*12,0) 50% 42.40 5,000.00 106,000.00
3 Kolom 25/25 M1 (1,50*4) 6.00 -
Pembesian Kg (6*6*0,89)+(6*6*1,0*0,40) 50% 46.44 2,000.00 46,440.00
Pasang bekisting M2 (0,30*2*1,5)*4 50% 3.60 45,000.00 81,000.00
Cor beton manual M3 (0,30*0,30*1,50*4) 50% 0.54 250,000.00 67,500.00
4 Foot plat Bh 4.00 4.00 -
Pembesian Kg (2,0*6*2*0,89*4)+(6*6*0,89)+(6*6*1,0*0,40) 50% 131.88 2,000.00 131,880.00
Pasang bekisting M2 (0,30*0,9*4*4)+(0,30*2*1,50*4) 50% 7.92 45,000.00 178,200.00
Cor beton manual M3 (0,30*0,90*0,90*4)+(0,25*0,25*1,2*4) 50% 1.27 250,000.00 159,000.00
5 Pasang pondasi timur M3 (0,60*1,10*5,0) 100% 3.30 130,000.00 429,000.00
6 Pasang pondasi utara M3 (0,85*1,1*12) 100% 11.22 130,000.00 1,458,600.00

Sub total 3,037,620.00


II PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 500,000.00 500,000.00
2 Bantuan transport pemberangkatan orang2 Ls 1.00 100% 1.00 1,500,000.00 1,500,000.00
Sub total 2,000,000.00

Total keseluruhan biaya 5,037,620.00

Pamotan porong ,09 Juni 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : JEMBATAN TKD & SALURAN
LOKASI : PAMOTAN
TANGGAL : 10 JUNII s/d 30 JUNI 2020

PROGRES PERIODE PERIODE SATUAN JUMLAH


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA HARGA KETERANGAN
SEBELUMNYA INI INI Rp Rp
I PEKERJAAN PLESTERAN & ACIAN DINDING BATU -
Sta 0,00 s/d 130,00
1 Plesteran batu dinding atas dan samping M2 (0,50*130,00)+(0,40*130,00) 75% 25% 100% 117.00 40,000.00 1,170,000.00
2 Acian batu dinding atas dan samping M2 (0,50*130,00)+(0,40*130,00) 75% 25% 100% 117.00 10,000.00 292,500.00
3 Plesteran lantai M2 (0,75*130,00) 100% 100% 97.50 20,000.00 -
4 Acian lantai M2 (0,75*130,00) 100% 100% 97.50 10,000.00 -
5 Benang M1 130.00 75% 25% 100% 130.00 12,500.00 406,250.00
6 Langsiran material Ls 1.00 1.00 300,000.00 -
Sub total 1,868,750.00
II PEKERJAAN PONDASI JEMBATAN TKD SELATAN
1 Pengukuran & bauwplank M1 8.00 100% 8.00 10,000.00 -
2 Pemerataan tanah M2 (1,20*8) 100% 9.60 5,000.00 -
2 Pasang pondasi dasar M3 (1,20*0,70*8) 100% 6.72 130,000.00 -
3 Kolom 25/25 M1 (3,0*3) 9.00 -
Pembesian Kg (9*6*0,89)+(9*6*1,0*0,40) 100% 69.66 2,000.00 -
Pasang bekisting M2 (0,40*2,0*2,5)*3 100% 6.00 45,000.00 270,000.00
Cor beton manual M3 (0,30*0,30*2,5)*3 100% 0.68 250,000.00 168,750.00
4 Balok ring 25/25 bawah M1 8.00 8.00 -
Pembesian Kg (8*6*0,89)+(8*6*1,0*0,40) 100% 61.92 2,000.00 123,840.00
Pasang bekisting M2 (0,25*2*8) 100% 4.00 45,000.00 180,000.00
Cor beton manual M3 (0,25*0,30*8) 100% 0.60 250,000.00 150,000.00
5 Pasang pondasi dinding M3 (1,00 +0,65)/2*1,80*8 100% 11.88 130,000.00 1,544,400.00
6 Langsiran material Ls 1.00 100% 1.00 250,000.00 250,000.00
Sub total 2,686,990.00
PEKERJAAN DINDING BATU MIRING
1 Pengukuran & bauwplank M1 (2,70*7plong) 100% 18.90 10,000.00 189,000.00
2 Pemerataan tanah M2 (1,0*18,9) 100% 18.90 5,000.00 94,500.00
3 Pasang pondasi dasar M3 (0,85*1,0)*18,9 100% 16.07 130,000.00 2,088,450.00
4 Pasang dinding batu miring M3 (0,30*2,00)*18,90 100% 11.34 150,000.00 1,701,000.00 pasangan tipis
5 Kolom praktis M1 (3,0*7) 21.00 -
Pembesian Kg (21*4*0,60kg)+(21*6*0,40*0,22kg) 100% 61.5 4,000.00 245,952.00 Besi kecil
Pasang bekisting M2 (0,20*2*21) 100% 8.4 45,000.00 378,000.00
Cor beton manual M3 (0,15*0,20*21,00) 100% 0.6 250,000.00 157,500.00
Urugan tanah kembali untuk dinding M2 (2,00*21,00) 100% 42.0 10,000.00 420,000.00
6 Langsiran material Ls 1.00 100% 1.0 500,000.00 500,000.00
Sub total 5,774,402.00

Total keseluruhan biaya 10,330,142.00

Pamotan porong ,30 Juni 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : RUANG KANTIN
LOKASI : PAMOTAN
TANGGAL : 10 JUNII s/d 24 JUNI 2020

PROGRES PERIODE PERIODE SATUAN JUMLAH


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA HARGA KETERANGAN
SEBELUMNYA INI INI Rp Rp
I PEKERJAAN KANTIN
1 Pengukuran & bauwplank M1 (6*8)+(6) 75% 25% 100% 54.00 10,000.00 135,000.00
2 Galian tanah M3 (0,50*0,50*20,00) +(0,40*1,00*3) 75% 25% 100% 6.20 60,000.00 93,000.00
3 Pemerataan tanah galian M2 (1,00*48,6)+(1,00*5,5) 75% 25% 100% 54.10 5,000.00 67,625.00
4 Pasang batu pondasi kecil M2 (0,4*0,40*48,6)+(0,30*0,40*48,6)+(0,10*0,30*48,6) 75% 25% 100% 15.07 150,000.00 564,975.00 pondasi kecil
Pasang batu pondasi kecil M3 (0,4*0,40*6)+(0,30*0,40*6)+(0,10*0,30*6) 75% 25% 100% 1.86 150,000.00 69,750.00 pondasi kecil
5 Balok ring 15/20 M1 (48,60+6,0) 75% 25% 100% 54.60 -
Pembesian Kg (54,6*4*0,60)+(54,6*0,75*6*0,22) 75% 25% 100% 185.09 4,000.00 185,094.00
Pasang bekisting M2 (0,2*2*54,6) 75% 25% 100% 21.84 45,000.00 245,700.00
Cor beton (manual) M3 (0,15*0,20*54,6) 75% 25% 100% 1.64 250,000.00 102,375.00

6 Pemerataan tanah galian timur M2 (1,00*5,5) 100% 5.50 5,000.00 27,500.00


7 Pasang batu pondasi kecil M3 (0,4*0,40*5,5)+(0,30*0,40*5,5)+(0,10*0,30*5,5) 100% 1.71 150,000.00 255,750.00 pondasi kecil
8 Balok ring 15/20 M1 6.00 100% 6.00 -
Pembesian Kg (6*4*0,60)+(6*0,75*6*0,22) 100% 20.34 4,000.00 81,360.00
Pasang bekisting M2 (0,2*2*6) 100% 2.40 45,000.00 108,000.00
Cor beton (manual) M3 (0,15*0,20*6) 100% 0.18 250,000.00 45,000.00

Sub total 1,981,129.00


II PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 500,000.00 500,000.00
Sub total 500,000.00

Total keseluruhan biaya 2,481,129.00

Pamotan porong ,30 Juni 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : GARDU LISTRIK
LOKASI : PAMOTAN
TANGGAL : 10 JUNII s/d 30 JUNI 2020

PROGRES PERIODE PERIODE SATUAN JUMLAH


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA HARGA KETERANGAN
SEBELUMNYA INI INI Rp Rp
I PEKERJAAN GARDU LISTRIK
1 Pengukuran & bauwplank M1 (6,50*2)+(12,5*2) 100% 38.00 10,000.00 -
2 Pemerataan tanah M2 (0,80*5,0*4)+(0,80*12,0)+(0,60*12,0+(0,80*12,0) 50% 50% 100% 42.40 5,000.00 106,000.00
3 Kolom 25/25 M1 (1,50*4) 6.00 -
Pembesian Kg (6*6*0,89)+(6*6*1,0*0,40) 50% 50% 100% 46.44 2,000.00 46,440.00
Pasang bekisting M2 (0,30*2*1,5)*4 50% 30% 80% 3.60 45,000.00 48,600.00
Cor beton manual M3 (0,30*0,30*1,50*4) 50% 30% 80% 0.54 250,000.00 40,500.00
4 Foot plat Bh 4.00 4.00 -
Pembesian Kg (2,0*6*2*0,89*4)+(6*6*0,89)+(6*6*1,0*0,40) 50% 50% 100% 131.88 2,000.00 131,880.00
Pasang bekisting M2 (0,30*0,9*4*4)+(0,30*2*1,50*4) 50% 50% 100% 7.92 45,000.00 178,200.00
Cor beton manual M3 (0,30*0,90*0,90*4)+(0,25*0,25*1,2*4) 50% 50% 100% 1.27 250,000.00 159,000.00
5 Pasang pondasi timur M3 (0,60*1,10*5,0) 100% 3.30 130,000.00 -
Pasang pondasi utara M3 (0,85*1,1*12) 100% 11.22 130,000.00 -
Pasang pondasi barat M3 (0,80+0,60)/2*1,10*5,0 100% 3.85 130,000.00 500,500.00
Pasang pondasi selatan M3 (0,80+0,60)/2*1,10*12 100% 9.24 130,000.00 1,201,200.00
Pasang pondasi sekat tengah M4 (0,60+0,40)/2*1,10*4*2 100% 4.40 130,001.00 572,004.40
Sub total 2,984,324.40
II PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 500,000.00 500,000.00

Sub total 500,000.00

Total keseluruhan biaya 3,484,324.40

Pamotan porong ,30 Juni 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : GUDANG (BENGKEL TEGUH)
LOKASI : PAMOTAN
TANGGAL : 10 JUNII s/d 24 JUNI 2020

PROGRES PERIODE PERIODE SATUAN JUMLAH


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA HARGA KETERANGAN
SEBELUMNYA INI INI Rp Rp
I PEKERJAAN LANTAI GUDANG
1 Pengukuran & bauwplank M1 (18,0*2) 100% 36.00 10,000.00 -
Pemerataan tanah galian M2 (4,00*18,00) 100% 72.00 5,000.00 -
Pasang besi wermess tunggal M2 (4,00*18,00) 100% 72.00 5,000.00 -
Pasang bekisting M2 (0,15*18,00) 100% 2.70 45,000.00 -
Cor lantai tahap 1 M3 (0,16*4,00*18,00) 100% 72.00 15,000.00 1,080,000.00

2 Pemerataan tanah tahap 2 s/d 7 M2 (4,00*18,00)*6 100% 432.00 5,000.00 2,160,000.00


Pasang besi wermess tunggal M2 (4,00*18,00)*6 100% 432.00 5,000.00 2,160,000.00
Pasang bekisting M2 (0,15*18,00)*6 100% 16.20 45,000.00 729,000.00
Cor lantai 2 s/d 7 di trowel M3 (4,00*18,00)*0,155*6 100% 66.96 60,000.00 4,017,600.00

3 Pemerataan tanah tahap 8 M2 (5,00*18,00) 100% 90.00 5,000.00 450,000.00


Pasang besi wermess tunggal M2 (5,00*18,00) 100% 90.00 5,000.00 450,000.00
Pasang bekisting M2 (0,15*18,00) 100% 2.70 45,000.00 121,500.00
Cor lantai tahap 8 di trowel M3 (5,00*18,00)*0,16 100% 11.52 60,000.00 691,200.00
Pasang bekisting saluran oil M2 (0,55*18) 100% 9.90 45,000.00 445,500.00

Sub total 12,304,800.00


II PEKERJAAN REL JENTRI
1 Pengukuran & bauwplank M1 33.00 100% 33.00 10,000.00 330,000.00
2 Pemerataan tanah pondasi M2 (0,5*33)*2 100% 33.00 5,000.00 165,000.00
3 Pasang batu pondasi M3 (0,5*0,30*33)*2 100% 9.90 150,000.00 1,485,000.00
4 Pasang bekiting M2 (0,15*33*2)*2 100% 19.80 45,000.00 891,000.00
5 Cor beton redymix M3 (0,50*0,15*48) 100% 3.60 160,000.00 576,000.00
6 Cor beton manual M3 (0,50*0,15*18) 100% 1.35 250,000.00 337,500.00
7 Cor lantai
Pemerataan tanah M2 (6,00*33,00) 85% 198.00 5,000.00 841,500.00
Pasang besi wermess tunggal M2 (6,00*33,00) 85% 198.00 5,000.00 841,500.00
Pasang bekisting saluran rel M2 (0,10*33,00)*2 85% 6.60 45,000.00 252,450.00
Cor lantai M3 (6,00*33,00)*0,16 85% 31.68 60,000.00 1,615,680.00
8 Benangan M1 (33*2) 85% 66.00 12,500.00 701,250.00
Sub total 8,036,880.00
PROGRES PERIODE PERIODE SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA HARGA KETERANGAN
SEBELUMNYA INI INI Rp Rp
III PEKERJAAN LIMBAH OLI
1 Pengukuran & bauwplank M1 (4*2)+(1*2) 100% 10.00 10,000.00 100,000.00
2 Pemerataan tanah M2 (1,20*4,2) 100% 5.04 5,000.00 25,200.00
3 Pasang dinding bata M2 (1,00*1,00*5)+(1,00*4,0*2) 100% 13.00 22,000.00 286,000.00
4 Pasang patlah bata M2 (0,75*0,75*4) 100% 2.25 22,000.00 49,500.00
5 Plesteran dinding M2 (0,80*1,00*4sisi*4)+(0,40*1,0*2)+(0,40*4*2) 100% 16.80 20,000.00 336,000.00
M2 (0,15*0,80*5)+(0,15*4,0*2) 100% 1.80 20,000.00 36,000.00
6 Plesteran lantai M2 (0,80*0,80*4) 100% 2.56 20,000.00 51,200.00
7 Acian M2 (0,40*1,0*2)+(0,40*4,0*2)+(0,15*0,80*5)+(0,15*4,0*2) 100% 5.80 20,001.00 116,005.80
8 Benangan sudut M1 (0,80*10)+(4,0*2*2)+(0,4*4) 100% 25.60 12,500.00 320,000.00
9 Pasaeramik dinding M2 (0,75*0,90*4sisi*4)+(0,75*0,75*4) 100% 13.05 60,000.00 783,000.00
Sub total 2,102,905.80
IV PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 250,000.00 250,000.00
Sub total 250,000.00

Total keseluruhan biaya 22,694,585.80

Pamotan porong ,30 Juni 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : BENGKEL PAK NUR
LOKASI : PAMOTAN
TANGGAL : 10 JUNII s/d 16 JUNI 2020

PROGRES PERIODE PERIODE SATUAN JUMLAH


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA HARGA KETERANGAN
SEBELUMNYA INI INI Rp Rp
I PEKERJAAN RUANG BENGKEL 4X20
1 Pengukuran & bauwplank M1 (4*2)+(20*2) 100% 48.00 10,000.00 480,000.00
2 Pekerjaan foot plat -
Galian tanah foot plat nempel tiang WF Bh 4 bh 100% 4.00 75,000.00 300,000.00
Pemerataan tanah pondasi foot plat 100x100 M2 (1,00*1,00)*4 bh 100% 4.00 5,000.00 20,000.00
Rabatan lantai dasar M2 (1,00*1,00)*8 bh 100% 8.00 15,000.00 120,000.00
Pembesian Kg (2,0*6*2*0,60*8bh)+(2,50*6*0,60*8bh)+(2*6*1,0*0,40*8bh) 100% 225.60 4,000.00 902,400.00
Pasang bekisting M2 (0,30*1,0*4*4bh)+(0,25*4*2,0*8bh) 100% 20.80 45,000.00 936,000.00
Cor beton manual foot & kolom utara M3 (0,30*0,90*0,90*4bh)+(0,35*0,35*1,60*4 bh) 100% 1.76 250,000.00 439,000.00
Cor beton manual foot & kolom nempel tiang wf (0,30*0,90*0,90*4bh)+(0,35*0,35*1,0*4 bh) 100% 1.46 250,000.00 365,500.00
3 Pekerjaan pondasi M1 (20+4+4) 28.00 -
Pemerataan tanah pondasi batu M2 (0,50*28) 100% 14.00 130,000.00 1,820,000.00
Pasang pondasi M3 (0,50*0,50*18)+(0,50*0,50*4,0*2 lajur) 100% 6.50 130,000.00 845,000.00
4 Beton sloof 20/30 M1 (18+4+4) 26.00
Pembesian Kg (26*6*0,60)+(26*6*0,9*0,40) 100% 149.76 2,000.00 299,520.00
Pasang bekisting M2 (0,30*2*26) 100% 15.60 45,000.00 702,000.00
Cor beton manual M3 (0,20*0,30*26) 100% 1.56 250,000.00 390,000.00
5 Beton sloof 15/20 M1 (4+4) 8.00
Pembesian Kg (8*4*0,60)+(8*6*0,6*0,40) 100% 30.72 2,000.00 61,440.00
Pasang bekisting M2 (0,20*2*8) 100% 3.20 45,000.00 144,000.00
Cor beton manual M3 (0,15*0,20*8) 100% 0.24 250,000.00 60,000.00
6 Urugan tanah peninggian M3 (0,2*4*20) 100% 16.00 60,000.00 960,000.00
Pemerataan dan pemadatan tanah di vibro M2 (4,0*18) 100% 72.00 15,000.00 1,080,000.00
Pasang bekisting M2 (0,15*4*2)+(0,15*18) 100% 3.90 45,000.00 175,500.00
Rabatan lantai M2 (4*18) 100% 72.00 15,000.00 1,080,000.00
7 Beton kolom 25/25 M1 (4,5*8) 36.00
Pembesian Kg (36*6*0,89)+(36*6*0,9*0,40) 100% 270.00 2,000.00 540,000.00
Pasang bekisting M2 (0,25*4*4,0)*8 bh 70% 32.00 45,000.00 1,008,000.00
Cor beton manual M3 (0,25*0,25*4,0)*8 bh 70% 2.00 250,000.00 350,000.00
8 Beton kolom Praktis M1 (4,20*6) 25.20
Pembesian Kg (25,*6*0,89)+(36*6*0,9*0,40) 100% 270.00 4,000.00 1,080,000.00 pembesin kecil
Pasang bekisting M2 (0,25*4*4,0)*8 bh 100% 32.00 45,000.00 1,440,000.00
Cor beton manual M3 (0,25*0,25*4,0)*8 bh 100% 2.00 250,000.00 500,000.00
9 Beton balok ring tengah 10/12 M1 (4*4)+(18*1) 34.00
Pembesian Kg (34*6*0,60)+(34*6*0,4*0,22) 100% 140.35 4,000.00 561,408.00 pembesin kecil
Pasang bekisting M2 (0,15*2*34) 100% 10.20 45,000.00 459,000.00
Cor beton manual M3 (0,10*0,15*34) 100% 0.51 250,000.00 127,500.00
10 Pasang bata ringan 0,00 s/d 2,00 M2 (2,05*4,0*4)+(2,05*18) - (1,0*2,0*3)+(1,20*1,20*3) 100% 68.02 22,500.00 1,530,450.00
11 Pasang bata ringan 2,00 s/d 3,45 M2 (1,45*4,0*4)+(1,45*18) 70% 49.30 25,000.00 862,750.00

Sub total 19,639,468.00


PROGRES PERIODE PERIODE SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA HARGA KETERANGAN
SEBELUMNYA INI INI Rp Rp
II PEKERJAAN PENINGGIAN SALURAN AIR
1 Pengukuran & bauwplank M1 (33*2) 100% 66.00 10,000.00 660,000.00
2 Galian tanah timur M3 (0,30*0,30*33) 100% 2.97 60,000.00 178,200.00
Galian tanah barat M3 (0,30*0,30*33) 100% 2.97 60,000.00 178,200.00
3 Pasang pondasi peninggian timur M3 (0,30*0,60*33) 100% 5.94 150,000.00 891,000.00 pondasi
Pasang pondasi peninggian barat M3 (0,30*0,60*33)*2 100% 11.88 150,000.00 1,782,000.00
4 Plesteran timur M2 (0,60*33)*1 100% 19.80 40,000.00 792,000.00
Plesteran barat M2 (0,60*33)*2 100% 39.60 40,000.00 1,584,000.00
5 Acian timur M2 (0,60*33)*1 100% 19.80 10,000.00 198,000.00
Acian barat M2 (0,60*33)*2 100% 39.60 10,000.00 396,000.00
6 Pembersihan saluran M1 (33,0*2) 200% 66.00 5,000.00 660,000.00
Sub total 7,319,400.00
III PEKERJAAN PONDASI FOOTPLAT JENTRY
Pemerataan tanah pondasi foot plat 100x100 M2 (1,00*1,00)*2 Bh 100% 2.00 5,000.00 10,000.00
Rabatan lantai dasar M2 (1,00*1,00)*2 bh 100% 2.00 15,000.00 30,000.00
Pembesian Kg (2,0*6*2*0,89*2bh)+(2,50*6*0,89*2bh) 100% 69.42 4,000.00 277,680.00
Pasang bekisting M2 (0,30*1,0*4*4bh)+(0,45*4*2,0*2bh) 100% 12.00 45,000.00 540,000.00
Cor beton manual foot & kolom utara M3 (0,30*0,90*0,90*2bh)+(0,50*0,50*1,60*2 bh) 100% 1.29 250,000.00 321,500.00
Sub total 1,179,180.00
III PEKERJAAN COR LANTAI
1 Pengukuran & bauwplank M1 (30*2) 100% 60.00 10,000.00 600,000.00
Pemerataan tanah galian M2 (5,40*26,2,00)*2 100% 282.96 5,000.00 1,414,800.00
Pasang besi wermess tunggal M2 (5,40*26,2,00)*2 100% 282.96 5,000.00 1,414,800.00
Pasang bekisting M2 (0,15*26,20)*3 100% 11.79 45,000.00 530,550.00
Cor lantai tahap 1 M2 (0,16*5,4,00*26,2)*1 100% 22.64 60,000.00 1,358,208.00
Sub total 5,318,358.00
IV PEKERJAAN LAIN LAIN
1 Langsiran material Batu , semen Ls 1.00 100% 1.00 1,500,000.00 1,500,000.00
Sub total 1,500,000.00

Total keseluruhan biaya 34,956,406.00

Pamotan porong ,30 Juni 2020


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : REL PINTU TKD , SALURAN , PAVING
LOKASI : PAMOTAN
TANGGAL : 10 JUNII s/d 30 JUNI 2020

PROGRES PERIODE PERIODE SATUAN JUMLAH


No JENIS PEKERJAAN SAT PERHITUNGAN PERIODE MINGGU s/d SAAT VOLUME HARGA HARGA KETERANGAN
SEBELUMNYA INI INI Rp Rp
I PEKERJAAN SETRIKAN DINDING PONDASI -

1 Setrikan dinding pondasi M2 (1,40*6)*7 100% 58.80 40,000.00 2,352,000.00


2 Benangan sudut M1 (6*7) 100% 42.00 10,000.00 420,000.00
3 Rabatan lantai M2 (0,1*6*7) 100% 4.20 20,000.00 84,000.00
4 Pembersihan M2 (3,00*42) 100% 126.00 5,000.00 630,000.00
5 Langsiran material Ls 1.00 100% 1.00 300,000.00 300,000.00
Sub total 3,786,000.00
II PEKERJAAN PONDASI REL PINTU MASUK TKD
1 Pengukuran & bauwplank M1 20.00 50% 20.00 10,000.00 100,000.00
2 Pemerataan tanah M2 (1,20*20) 50% 24.00 5,000.00 60,000.00
3 Pasang pondasi M3 (0,35*1,00*10,0) 50% 3.50 130,000.00 227,500.00
4 Balok 25x100 M1 20.00 20.00 -
Pembesian Kg (20*8*0,89)+(20*6*2,0*0,40) 238.40 2,000.00 -
Pasang bekisting M2 (0,25*20)+(0,25*1,00*2) 5.50 45,000.00 -
Cor beton readymix M3 (0,25*1,00*20) 5.00 160,000.00 -
Pasang pipa pvc 6 dim M1 20.00 50% 20.00 15,000.00 150,000.00
5 Langsiran material Ls 1.00 1.00 150,000.00 -
Sub total 537,500.00
III PEKERJAAN LANTAI BETON TEPI PAVING
1 Bongkar paving dan perbaikan M2 (0,70*78) 100% 54.60 10,000.00 546,000.00
2 Galian tanah & Pemerataan tanah M2 (0,35*78) 100% 27.30 5,000.00 136,500.00
3 Pembesian Kg (78*2*0,22)+(78*4*0,50*0,22) 100% 68.64 4,000.00 274,560.00 besi kecil
Pasang bekisting M2 (0,20*78) 100% 15.60 45,000.00 702,000.00
Cor beton readymix M3 (0,20*0,40*30)+(0,20*0,35*48) 100% 5.76 160,000.00 921,600.00
4 Rabatan lantai tepi saluran dan dinding M2 (0,15*42)+(0,40*6) 100% 8.70 15,000.00 130,500.00
5 Pembersihan saluran M1 78.00 100% 78.00 5,000.00 390,000.00
Sub total 3,101,160.00
IV PEKERJAAN LAIN LAIN
1 Langsiran material Batu , semen Ls 1.00 100% 1.00 400,000.00 400,000.00
Sub total 400,000.00

Total keseluruhan biaya 7,824,660.00

Pamotan porong ,30 Juni 2020


Dibuat Oleh
10,330,142.00
2,481,129.00
3,484,324.40
15000 0

60000 0
10000 0

22,694,585.80
34,956,406.00
7,824,660.00

81771247.2
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : KANTOR BATCHING PLANT POH GADING
TANGGAL : 12 MARET s/d 25 MARET 2017

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp

A PEKERJAAN PERSIAPAN
1 Pegukuran pasang tiang pancang Ls 1.00 1.00 300,000.00 300,000.00
2 Pasang bauwplank M1 (11+13)*2 48.00 5,000.00 240,000.00
3 Mobilisai Ls 1.00 1.00 250,000.00 250,000.00
Sub total 790,000.00
B PEKERJAAN TANAH
1 Bobok tiang pancang Titik 20.00 20.00 10,000.00 200,000.00
2 Galian tanah pondasi leveling M1 (4,9+4,9+1,85+1,85)*2)+(6,68*2+1,85*4)+(4,45*1)+(0,8*2) 53.81 10,000.00 538,100.00
738,100.00
C PEKERJAAN PASANGAN
1 Pasang lantai kerja M1 (4,9+4,9+1,85+1,85)*2)+(6,68*2+1,85*4)+(4,45*1)+(0,8*2) 53.81 15,000.00 807,150.00
2 Pembesian balok sloof 45x 45 M1 (4,9+4,9+2,7+2,7)*2)+(6,68*2+2,7*4)+(4,45*1)+(0,8*2) 60.61 35,000.00 2,121,350.00
3 Pasang bekisting balok M1 (4,9+4,9+2,7+2,7)*2)+(6,68*2+2,7*4)+(4,45*1)+(0,8*2) 60.61 35,000.00 2,121,350.00
4 Pasang bekisting pedestal Bh 20.00 20.00 25,000.00 500,000.00
5 Pasang angkur plat besi 30x 30 dilas tambah angkur Bh 20.00 20.00 20,000.00 400,000.00
6 Cor umpak zillo Uk 45/45x0.15 M3 (0,45*0,45*0,15)*20 0.61 75,000.00 45,562.50
7 Cor balok sloof zillo 45/45 M3 (53,81*0,45*0,45) 10.90 75,000.00 817,239.38
8 Bongkar bekisting M1 60.00 60.00 5,000.00 300,000.00
Sub total 7,112,651.88

Total keseluruhan biaya 8,640,751.88


Total biaya keseluruhan 8,640,000.00

Pasuruan , 25 Maret 2017


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : KANTOR BATCHING PLANT POH GADING
TANGGAL : 26 MARET s/d 08 APRIL 2017

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp

A PEKERJAAN BIN MATERIAL


1 Pegukuran pasang bauwolank Ls 1.00 1.00 100,000.00 100,000.00
2 Bobok tiang pancang Titik (2*6) 12.00 25,000.00 300,000.00
3 Galian tanah pondasi leveling M1 (0,8*3)*6 16.80 10,000.00 168,000.00
4 Pasang batu pondasi M3 (0,5*0,6*3)*6 6.30 95,000.00 598,500.00
5 Pembesian balok sloof 30x 45 M1 (3*6) 18.00 35,000.00 630,000.00
6 Pasang bekisting balok M1 (3*6) 18.00 35,000.00 630,000.00
7 Pasang angkur besi Bh (2*6) 12.00 20,000.00 240,000.00
8 Kuras air Ls 1.00 1.00 100,000.00 100,000.00
Sub total 2,766,500.00
B PEKERJAAN OPRITAN
1 Pegukuran pasang bauwplank Ls 1.00 1.00 150,000.00 150,000.00
2 Bobok tiang pancang Titik (5+2+2) 9.00 25,000.00 225,000.00
3 Pasang batu pondasi M3 (0,9+0,8)/2*1,70*16 24.57 110,000.00 2,702,150.00 Pasangan tinggi
4 Pasang batu pondasi sayap M3 (0,9+0,8)/2*1,0*12*2 20.40 110,000.00 2,244,000.00 Pasangan tinggi
5 Pasang bekisting kolom struktur 25/25 M1 (1,5*5) 7.50 35,000.00 262,500.00
6 Pembesian dan cor kolom struktur 25/25 M1 (1,5*5) 7.50 45,000.00 337,500.00
Sub total 5,921,150.00

Total keseluruhan biaya 8,687,650.00


Total biaya keseluruhan 8,687,000.00

Pasuruan , 08 April 2017


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : KANTOR BATCHING PLANT POH GADING
TANGGAL : 09 APRIL s/d 15 APRIL 2017

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp

A PEKERJAAN BIN MATERIAL


1 Cor balok sloof 30x 45 M1 (3*6)*0,3*0,45 2.43 45,000.00 109,350.00
Sub total 109,350.00
B PEKERJAAN OPRITAN
1 Pasang batu pondasi M3 (0,8+0,6)/2*0,70*16 7.84 110,000.00 862,400.00 Pasangan tinggi
2 Pasang batu pondasi sayap M3 (0,9+0,8)/2*0,7*8*2 9.52 110,000.00 1,047,200.00 Pasangan tinggi
3 Pasang bekisting kolom struktur 25/25 M1 (1,7*4) 6.80 35,000.00 238,000.00
4 Pembesian dan cor kolom struktur 25/25 M1 (1,7*4) 6.80 45,000.00 306,000.00
5 Pasang bekisting balok tengah 25/40 M1 (16+8+8) 32.00 35,000.00 1,120,000.00
6 Pembesian dan cor balok tengah 25/40 M1 (16+8+8) 32.00 45,000.00 1,440,000.00

Sub total 5,013,600.00

Total keseluruhan biaya 5,122,950.00


Total biaya keseluruhan 5,122,000.00

Pasuruan , 15 April 2017


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : KANTOR BATCHING PLANT POH GADING
TANGGAL : 16 APRIL s/d 06 MEI 2017

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp

A PEKERJAAN OPRITAN
1 Pasang batu pondasi M3 (0,6+0,4)/2*1,70*16 14.45 110,000.00 1,589,500.00 Pasangan tinggi
2 Pasang batu pondasi sayap M3 (0,6+0,4)/2*1,7*6*2 15.30 110,000.00 1,683,000.00 Pasangan tinggi
3 Pasang bekisting kolom struktur 25/25 M1 (1,7*5)+(1,7*2*2)+(1,2*2) 17.70 35,000.00 619,500.00
4 Pembesian dan cor kolom struktur 25/25 M1 (1,7*5)+(1,7*2*2)+(1,2*2) 17.70 45,000.00 796,500.00
5 Pasang bekisting balok atas 20/40 M1 (16+12+12) 40.00 35,000.00 1,400,000.00
6 Pembesian dan cor balok tengah 20/40 M1 (16+12+12) 40.00 45,000.00 1,800,000.00
Sub total 7,888,500.00
B PEKERJAAN PASANG DINDING GUDANG
1 Pembersihan Ls 1.00 1.00 150,000.00 150,000.00
2 Pasang bekisting sloof 20/30 M1 (9*8) 72.00 35,000.00 2,520,000.00
3 Pembesian dan cor sloof 20/30 M1 (9*8) 72.00 45,000.00 3,240,000.00
4 Pasang bata ringan M2 (1,6*9*7) 100.80 19,000.00 1,915,200.00
5 Pasang bekisting kolom praktis M1 (1,6*2)*7 22.40 25,000.00 560,000.00
6 Pembesian dan Cor kolom praktis M1 (1,6*2)*7 22.40 30,000.00 672,000.00
Sub total 9,057,200.00

Total keseluruhan biaya 16,945,700.00


Total biaya keseluruhan 16,945,000.00

Pasuruan , 06 Mei 2017


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : KANTOR BATCHING PLANT POH GADING
TANGGAL : 21 MEI s/d 03 JUNI 2017

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp

A PEKERJAAN PASANG DINDING GUDANG


1 Pasang andang Ls 1.00 1.00 250,000.00 250,000.00
2 Pasang bata ringan diatas tinggi 1,60 s/d 2.65 M2 (2,05*9*7) 129.15 19,000.00 2,453,850.00
3 Pasang bekisting kolom praktis tinggi 1,60 s/d 4,72 M1 (3,12*2)*7 43.68 25,000.00 1,092,000.00
4 Pembesian dan Cor kolom praktis M1 (3,12*2)*7 43.68 30,000.00 1,310,400.00
5 Pasang bekisting kolom struktur 20/20 M1 (4,72*2*7) 66.08 35,000.00 2,312,800.00
6 Pembesian dan cor kolom struktur 20/20 M1 (4,72*2*7) 66.08 45,000.00 2,973,600.00
7 Pasang bekisting balok tengah 20/20 M1 (16+8+8) 32.00 35,000.00 1,120,000.00
8 Pembesian dan cor balok tengah 20/20 M1 (16+8+8) 32.00 45,000.00 1,440,000.00
9 Pasang bata ringan diatas tinggi 2,85 s/d 4,72 M2 (1,87*9*7) 117.81 19,000.00 2,238,390.00

Sub total 15,191,040.00

Total keseluruhan biaya 15,191,040.00


Total biaya keseluruhan 15,191,000.00

Pasuruan , 03 Juni 2017


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : KANTOR BATCHING PLANT POH GADING
TANGGAL : 04 JUNI s/d 17 JUNI 2017

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp

A PEKERJAAN PASANG DINDING GUDANG


Pasang bata sisi barat 3 plong
1 Pasang andang Ls 1.00 1.00 250,000.00 250,000.00
2 Pasang bata ringan diatas tinggi 4,72 s/d 5,60 M2 (0,8*9*3) 21.60 19,000.00 410,400.00
3 Pasang bata ringan diatas tinggi 5,60 s/d 7,90 M3 (2,2*9*3) 59.40 21,000.00 1,247,400.00
3 Pasang bekisting kolom praktis tinggi 1,60 s/d 4,72 M1 (3,12*2)*3 18.72 25,000.00 468,000.00
4 Pembesian dan Cor kolom praktis M1 (3,12*2)*3 18.72 30,000.00 561,600.00
5 Pasang bekisting kolom struktur 20/20 M1 (3,12*2)*3 18.72 35,000.00 655,200.00
6 Pembesian dan cor kolom struktur 20/20 M1 (3,12*2)*3 18.72 45,000.00 842,400.00
7 Pasang bekisting balok tengah 20/20 M1 (9*3) 27.00 35,000.00 945,000.00
8 Pembesian dan cor balok tengah 20/20 M1 (9*3) 27.00 45,000.00 1,215,000.00
Sub total 6,595,000.00

Total keseluruhan biaya 6,595,000.00


Total biaya keseluruhan 6,595,000.00

Pasuruan ,17 Juni 2017


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : KANTOR BATCHING PLANT POH GADING
TANGGAL : 02 JULI s/d 29 JULI 2017

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp

A PEKERJAAN PASANG DINDING GUDANG


Pasang bata sisi barat 3 plong
1 Pasang bekisting balok atas 20/20 M1 (9*3) 27.00 35,000.00 945,000.00
2 Pembesian dan cor balok atas 20/20 M1 (9*3) 27.00 45,000.00 1,215,000.00
3 Pasang bata ringan diatas balok atas M2 (0,2*9*3) 5.40 22,500.00 121,500.00
4 Plesteran & acian dinding jepitan atas M2 (0,2*9*3) 5.40 22,500.00 121,500.00
5 Plesteran & acian dinding atas M2 (2,6*9*3) 70.20 22,500.00 1,579,500.00
6 Plesteran & acian dinding tengah M2 (2,6*9*3) 70.20 22,500.00 1,579,500.00
7 Plesteran & acian dinding bawah M2 (2,6*9*3) 70.20 19,000.00 1,333,800.00
8 Benangan balok M1 (9*2*3) 54.00 12,000.00 648,000.00
9 Benangan kolom M1 (7,8*2*2*3) 93.60 12,000.00 1,123,200.00
Sub total 8,667,000.00
B PEKERJAAN LAIN LAIN
1 Pasang andang Ls 1.00 1.00 250,000.00 250,000.00
2 Bongkar andang Ls 1.00 1.00 250,000.00 250,000.00
Sub total 500,000.00

Total keseluruhan biaya 9,167,000.00


Total biaya keseluruhan 9,167,000.00

Pasuruan ,29 Juli 2017


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : KANTOR BATCHING PLANT POH GADING
TANGGAL : 30 JULI s/d 05 AGUSTUS 2017

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp

A PEKERJAAN PASANG DINDING GUDANG


Pasang bata sisi timur 4 plong
1 Pasang bata ringan diatas balok 1 M2 (0,8*9*4) 5.40 22,500.00 121,500.00
2 Pasang bekisting kolom praktis tinggi M1 (0,8*2)*4 6.40 25,000.00 160,000.00
3 Pembesian dan Cor kolom praktis M1 (0,8*2)*4 6.40 30,000.00 192,000.00
4 Pasang bekisting kolom struktur 20/20 M1 (0,8*2)*4 6.40 35,000.00 224,000.00
5 Pembesian dan cor kolom struktur 20/20 M1 (0,8*2)*4 6.40 45,000.00 288,000.00
6 Pasang bekisting balok ke 2 20/20 M1 (9*4) 27.00 35,000.00 945,000.00
7 Pembesian dan cor balok ke 2 20/20 M1 (9*4) 27.00 45,000.00 1,215,000.00
Sub total 3,145,500.00
B PEKERJAAN LAIN LAIN
1 Pasang andang Ls 1.00 1.00 250,000.00 250,000.00
Sub total 250,000.00

Total keseluruhan biaya 3,395,500.00


Total biaya keseluruhan 3,395,000.00

Pasuruan , 05 Agustus 2017


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : KANTOR BATCHING PLANT POH GADING
TANGGAL : 06 AGUSTUS s/d 19 AGUSTUS 2017

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp

A PEKERJAAN PASANG DINDING GUDANG


Pasang bata sisi timur 4 plong
1 Pasang bata ringan diatas balok ring 2 M2 (2,2*9*2)+(1*9*2) 57.60 22,500.00 1,296,000.00
2 Pasang bekisting kolom praktis tinggi M1 (2,2*2)*2 8.80 25,000.00 220,000.00
3 Pembesian dan Cor kolom praktis M1 (2,2*2)*2 8.80 30,000.00 264,000.00
4 Pasang bekisting kolom struktur 20/20 M1 (2,2*2)*2 8.80 35,000.00 308,000.00
5 Pembesian dan cor kolom struktur 20/20 M1 (2,2*2)*2 8.80 45,000.00 396,000.00
6 Pasang bekisting balok ke 3 20/20 M1 (9*1) 9.00 35,000.00 315,000.00
7 Pembesian dan cor balok ke 2 20/20 M1 (9*1) 9.00 45,000.00 405,000.00
8 Plesteran & acian dinding atas M2 (2,2*9*1) 19.80 22,500.00 445,500.00
9 Plesteran & acian dinding tengah M2 (2,6*9*1) 23.40 22,500.00 526,500.00

Sub total 4,176,000.00


B PEKERJAAN LAIN LAIN
1 Pasang andang Ls 1.00 1.00 250,000.00 250,000.00
Sub total 250,000.00

Total keseluruhan biaya 4,426,000.00


Total biaya keseluruhan 4,426,000.00

Pasuruan , 19 Agustus 2017


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : KANTOR BATCHING PLANT POH GADING
TANGGAL : 03 SEPTEMBER s/d 21 SEPTEMBER 2017

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp

A PEKERJAAN PASANG DINDING GUDANG


Pasang bata sisi timur 4 plong
1 Pasang bata ringan diatas balok ring 2 M2 (1,2*9*2) 21.60 22,500.00 486,000.00
2 Pasang bekisting kolom praktis tinggi M1 (2,2*2)*1 4.40 25,000.00 110,000.00
3 Pembesian dan Cor kolom praktis M1 (2,2*2)*1 4.40 30,000.00 132,000.00
4 Pasang bekisting kolom struktur 20/20 M1 (2,2*2)*1 4.40 35,000.00 154,000.00
5 Pembesian dan cor kolom struktur 20/20 M1 (2,2*2)*1 4.40 45,000.00 198,000.00
6 Pasang bekisting balok ke 3 20/20 M1 (9*2) 18.00 35,000.00 630,000.00
7 Pembesian dan cor balok ke3 20/20 M1 (9*2) 18.00 45,000.00 810,000.00
8 Plesteran & acian dinding atas M2 (2,2*9*2) 39.60 22,500.00 891,000.00
9 Plesteran & acian dinding tengah M2 (2,6*9*2) 46.80 22,500.00 1,053,000.00
10 Plesteran & acian dinding bawah M3 (2,6*9*1) 23.40 22,500.00 526,500.00
Sub total 4,990,500.00
B PEKERJAAN LAIN LAIN
1 Pasang andang Ls 1.00 1.00 100,000.00 100,000.00
Sub total 100,000.00

Total keseluruhan biaya 5,090,500.00


Total biaya keseluruhan 5,090,000.00

Pasuruan , 21 September 2017


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : KANTOR BATCHING PLANT POH GADING
TANGGAL : 23 SEPTEMBER s/d 30 SEPTEMBER 2017

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp

A PEKERJAAN PASANG DINDING GUDANG


Pasang bata sisi timur 4 plong
1 Plesteran & acian dinding tengah M2 (2,6*9*1) 23.40 22,500.00 526,500.00
2 Plesteran & acian dinding bawah M2 (2,6*9*3) 70.20 19,000.00 1,333,800.00
3 Plesteran & acian sloof M2 (0,3*9)*2 5.40 22,500.00 121,500.00
4 Plesteran & acian balok tengah M3 (0,3*9*2)*2 10.80 22,500.00 243,000.00
5 Plesteran & acian kolom M3 (0,3*5,2*2)*2 6.24 22,500.00 140,400.00
6 Benangan sloof M1 (9*1)*2 18.00 12,000.00 216,000.00
7 Benangan balok M1 (9*2*2)*2 72.00 12,000.00 864,000.00
8 Benangan kolom M1 (5,2*2*2)*2 41.60 12,000.00 499,200.00
Sub total 3,944,400.00
B PEKERJAAN LAIN LAIN
1 Pasang andang Ls 1.00 1.00 100,000.00 100,000.00
Sub total 100,000.00

Total keseluruhan biaya 4,044,400.00


Total biaya keseluruhan 4,044,000.00

Pasuruan , 30 September 2017


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : KANTOR BATCHING PLANT POH GADING
TANGGAL : 19 OKTOBER S/D 25 NOVEMBER 2017

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp

A PEKERJAAN PASANG DINDING GUDANG


Pasang bata sisi timur 4 plong dalam
1 Plesteran & acian dinding cepitan M2 (0,2*9*3) 5.40 22,500.00 121,500.00
2 Plesteran & acian sloof M2 (0,3*9)*2 5.40 22,500.00 121,500.00
3 Plesteran & acian balok tengah M2 (0,3*9*2)*2 10.80 22,500.00 243,000.00
4 Plesteran & acian balok atas M2 (0,3*9*3) 8.10 22,501.00 182,258.10
5 Plesteran & acian kolom M2 (0,3*5,2*2*2)+(0,3*2,2*2*3) 10.20 22,500.00 229,500.00
6 Benangan sloof M1 (9*1)*2 18.00 12,000.00 216,000.00
7 Benangan balok M1 (9*2*2)*2 72.00 12,000.00 864,000.00
8 Benangan kolom 1,2 M1 (5,2*2*2)*2 41.60 12,000.00 499,200.00
9 Benangan kolom 3 M2 (2,2*2*2)*3 26.40 12,000.00 316,800.00
Sub total 2,355,458.10
B PEKERJAAN PASANG DINDING GUDANG
Pasang bata sisi timur 4 plong luar
1 Plesteran & acian dinding bawah M2 (2,6*9*4) 93.60 22,500.00 2,106,000.00
2 Plesteran & acian dinding tengah M2 (2,6*9*2) 46.80 22,500.00 1,053,000.00
Sub total 3,159,000.00
C PEKERJAAN LAIN LAIN
1 Pasang andang Ls 1.00 1.00 150,000.00 150,000.00
Sub total 150,000.00

Total keseluruhan biaya 5,664,458.10


Total biaya keseluruhan 5,664,000.00

Pasuruan , 25 November 2017


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : KANTOR BATCHING PLANT POH GADING
TANGGAL : 21 JANUARI S/D 03 FEBRUARI 2018

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp

A PEKERJAAN LANTAI PAN MIXER


1 Galian & keprasan tanah M2 (21*6,3)+(4,8*3,7)+(9,5*6,3) 209.91 5,000.00 1,049,550.00
2 Pemerataan tanah M2 (21*6,3)+(4,8*3,7)+(9,5*6,3) 209.91 2,500.00 524,775.00
3 Cor lantai tebal 15 cm M2 (21*6,3)+(4,8*3,7)+(9,5*6,3) 209.91 12,500.00 2,623,875.00
Sub total 3,148,650.00
III PEKERJAAN BAK PENGISIAN SEMEN 2 unit
1 Pasang bata merah M2 ((2,10*1*2)+(1,4*1*2))*2 14.00 19,000.00 266,000.00 100%
2 Urugan peninggian Ls 1 1.00 100,000.00 100,000.00 100%
3 Plesteran & acian Ls ((2,10*1*2)+(1,4*1*2))*2*2 28.00 19,000.00 532,000.00 100%
4 Rabatan lantai bak M2 (2,1*1,4)*2 5.88 19,000.00 111,720.00 200%
5 Benangan M1 (1*4*2)+(1,4*2*2*2)+(2,1*2*2*2) 36.00 10,000.00 360,000.00 300%
Sub total 1,369,720.00
C PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 1.00 150,000.00 150,000.00
2 Transportasi Ls 1.00 1.00 150,000.00 150,000.00
Sub total 300,000.00

Total keseluruhan biaya 4,818,370.00


Total biaya keseluruhan 4,818,000.00

Pasuruan , 03 Februari 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : KANTOR BATCHING PLANT POH GADING
TANGGAL : 21 JANUARI S/D 03 FEBRUARI 2018

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp

I PEKERJAAN LANTAI PAN MIXER


1 Galian & keprasan tanah M2 (21*6,3)+(4,8*3,7)+(9,5*6,3) 209.91 5,000.00 1,049,550.00
2 Pemerataan tanah M2 (21*6,3)+(4,8*3,7)+(9,5*6,3) 209.91 2,500.00 524,775.00
3 Cor lantai tebal 15 cm M2 (21*6,3)+(4,8*3,7)+(9,5*6,3) 209.91 12,500.00 2,623,875.00
Sub total 3,148,650.00
II PEKERJAAN LANTAI ZILLO
1 Urugan dan perapian M2 (1,85*1,85*4)+(1,2*1,85*1) 15.91 10,000.00 159,100.00
2 Pembesian lantai M2 (1,85*1,85*4)+(1,2*1,85*1) 15.91 15,000.00 238,650.00
3 Cor lantai tebal 15 cm M2 (1,85*1,85*4)+(1,2*1,85*1) 15.91 12,500.00 198,875.00
Sub total 437,525.00
III PEKERJAAN BAK PENGISIAN SEMEN Uk 2,15x1,45*1
1 Pasang bata merah M2 ((2,10*1*2)+(1,4*1*2))*2 14.00 19,000.00 266,000.00 100%
2 Urugan peninggian Ls 1 1.00 100,000.00 100,000.00 100%
3 Plesteran & acian Ls ((2,10*1*2)+(1,4*1*2))*2*2 28.00 19,000.00 532,000.00 100%
4 Rabatan lantai bak M2 (2,1*1,4)*2 5.88 19,000.00 111,720.00 200%
5 Benangan M1 (1*4*2)+(1,4*2*2*2)+(2,1*2*2*2) 36.00 10,000.00 360,000.00 300%
Sub total 1,369,720.00
IV PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 1.00 300,000.00 300,000.00
2 Transportasi Ls 1.00 1.00 300,000.00 300,000.00
Sub total 600,000.00

Total keseluruhan biaya 5,555,895.00


Total biaya keseluruhan 5,555,000.00

Pasuruan , 03 Februari 2018


Disetujui Dibuat Oleh
PT. MERAK JAYA BETON

KRISTANTO HALIM IMAM BASORI


BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 17 JAN s/d 23 JAN 2016

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
I PEKERJAAN CRUSSER
1 Bon upah sementara Ls 1.00 1.00 1,000,000.00 1,000,000.00

JUMLAH 1,000,000.00

Total keseluruhan biaya 1,000,000.00


1,000,000.00

Surabaya , 23 Januari 2016


Dibuat Oleh

IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 24 JAN s/d 30 JAN 2016

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
I PEKERJAAN CRUSSER
1 Pembesian sloof 40/50 M1 (8.35*4*2)+(14.9*2*2) 126.40 30,000.00 3,792,000.00

terhitung fisik pekerjaan 40 % x 3.792.000 1,516,800.00


2 Bekisting sloof 40/60 M1 (8.35*4*2)+(14.9*2*2) 126.40 30,000.00 3,792,000.00

terhitung fisik pekerjaan 60 % x 3.792.000 2,275,200.00

JUMLAH 3,792,000.00
I PEKERJAAN GARDU LISTRIK
1 Pengukuran & bauwplank M1 (11+11+5+5) 32.00 5,000.00 160,000.00
2 Galian tanah pondasi Ls (1*1) 1.00 150,000.00 150,000.00
3 Pasang batu pondasi peninggian M1 (10+10+4) 24.00 20,000.00 480,000.00
4 Bekisting beton sloof 20 /40 M1 (4+4+10+10) 28.00 30,000.00 840,000.00
5 Pembesian & cor beton sloof 20/40 M1 (4+4+10+10) 28.00 45,000.00 1,260,000.00

JUMLAH 2,890,000.00

Total keseluruhan biaya 6,682,000.00


Pembulatan 6,680,000.00

Paserepan , 30 Januari 2016


Dibuat Oleh

IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 31 JAN s/d 06 FEBR 2016

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
I PEKERJAAN PONDASI SCREEN
1 Pengukuran dan bauwplank M1 (15*2)+(9*2) 48.00 5,000.00 240,000.00
2 Galian tanah dan perapian M1 (15*2)+(8.5*4) 64.00 10,000.00 640,000.00
3 Pasang pondasi lantai kerja M1 (15*2)+(8.5*4) 64.00 17,500.00 1,120,000.00
4 Pasang pembesian M1 (15*2)+(8.5*4) 64.00 15,000.00 960,000.00

JUMLAH 2,960,000.00
II PEKERJAAN GARDU LISTRIK
1 Bekisting beton kolom struktur 25/25 M1 (4.5*6) 27.00 30,000.00 810,000.00
2 Pembesian & cor beton kolom 25/25 M1 (4.5*6) 27.00 45,000.00 1,215,000.00
JUMLAH 2,025,000.00
III PEKERJAAN LAIN LAIN
1 Bongkar bata ringan Ls 1 1.00 250,000.00 250,000.00
2 Transportasi Ls 1 1.00 250,000.00 250,000.00
JUMLAH 500,000.00

Total keseluruhan biaya 5,485,000.00


Pembulatan 5,480,000.00

Paserepan , 06 Februari 2016


Dibuat Oleh

IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 07 FEBR s/d 13 FEBR 2016

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
I PEKERJAAN PONDASI SCREEN I
1 Pasang bekisting M1 (15*2)+(8.5*4) 64.00 20,000.00 1,280,000.00
2 Cor beton readimix mutu 400 M1 (15*2)+(8.5*4) 64.00 22,500.00 1,440,000.00
3 Pasang pelex angkur Bh 16.00 16.00 15,000.00 240,000.00
4 Bongkar bekisting M2 (15*2)+(8.5*4) 64.00 12,500.00 800,000.00
JUMLAH 3,760,000.00
I PEKERJAAN PONDASI SCREEN II
1 Pengukuran dan bauwplank M1 (15*2)+(9*2) 48.00 5,000.00 240,000.00
2 Galian tanah dan perapian M1 (15*2)+(8.5*4) 64.00 10,000.00 640,000.00
3 Pasang pondasi lantai kerja M1 (15*2)+(8.5*4) 64.00 20,000.00 1,280,000.00
4 Pasang pembesian M1 (15*2)+(8.5*4) 64.00 15,000.00 960,000.00
5 Pasang pelex angkur Bh 16.00 16.00 15,000.00 240,000.00
JUMLAH 3,360,000.00
II PEKERJAAN GARDU LISTRIK
1 Pasang dinding paving M2 (11.5+10+3.5)+(10*2) 45.00 19,000.00 855,000.00
2 Peninggian tanah dan pemerataan Ls 1.00 1.00 200,000.00 200,000.00
3 Pasang patllah dasar lubang kabel Ls 1.00 1.00 150,000.00 150,000.00
JUMLAH 1,205,000.00
III PEKERJAAN LAIN LAIN
1 Sewa pompa air Hari 2 2.00 100,000.00 200,000.00
2 Transportasi Ls 1 1.00 250,000.00 250,000.00
JUMLAH 450,000.00

Total keseluruhan biaya 8,775,000.00


Pembulatan 8,770,000.00

Paserepan , 13 Februari 2016


Dibuat Oleh

IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 14 FEBR s/d 20 FEBR 2016

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
I PEKERJAAN PONDASI SCREEN II
1 Pasang bekisting M1 (15*2)+(8.5*4) 64.00 20,000.00 1,280,000.00
2 Cor beton readimix mutu 400 M1 (15*2)+(8.5*4) 64.00 22,500.00 1,440,000.00
4 Bongkar bekisting M2 (15*2)+(8.5*4) 64.00 12,500.00 800,000.00
JUMLAH 3,520,000.00
II PEKERJAAN GARDU LISTRIK
1 Pasang dinding paving M2 (10*2*0.5) 10.00 19,000.00 190,000.00
2 Peninggian tanah dan pemerataan Ls 1.00 1.00 250,000.00 250,000.00
3 Pasang bata ringan tinggi 0 - 1.5 m M2 (4*3*1.5)+(10*1.5)+(1*1.5*4) 39.00 16,000.00 624,000.00
4 Pasang bata ringantinggi 1.5 -3 m M2 (4*3*1.5)+(10*1.5)+(1*1.5*4) 39.00 19,000.00 741,000.00
5 Pasang bata ringan tinggi 3 - 4 m M2 (4*3*0.75)+(10*0.75)+(10*1) 26.50 20,000.00 530,000.00
6 Pasang bekisting ring balok 10/15 M1 (3.6*3)+(10*1)+(2.7*2) 26.20 30,000.00 786,000.00
7 Pembesian dan cor M1 (3.6*3)+(10*1)+(2.7*2) 26.20 38,000.00 995,600.00
8 Pasang pondasi teras M3 (0.6*0.6*10) 3.60 95,000.00 342,000.00
9 Rabatan lantai M2 (4*10)-(0.5*10) 35.00 12,500.00 437,500.00
10 Plesteran dan acian saluran kabel M2 (0.5*10*2)+(0.6*10) 16.00 19,000.00 304,000.00
JUMLAH 5,200,100.00
III PEKERJAAN PRIMER
1 Pengukuran dan bauwplank M1 (12*2+(7*2) 38.00 5,000.00 190,000.00
2 Pemerataan dengan batu M2 (12*7) 84.00 12,500.00 1,050,000.00
3 Pembesian kolom struktur 27/45 M1 (4*10) 40.00 20,000.00 800,000.00
4 Kuras air Ls 1 1.00 200,000.00 200,000.00
JUMLAH 2,240,000.00
III PEKERJAAN LAIN LAIN
1 Sewa pompa air Hari 4 4.00 100,000.00 400,000.00
2 Transportasi Ls 1 1.00 250,000.00 250,000.00
JUMLAH 650,000.00

Total keseluruhan biaya 11,610,100.00


Pembulatan 11,610,000.00

Paserepan , 20 Februari 2016


Dibuat Oleh

IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 14 FEBR s/d 20 FEBR 2016

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
I PEKERJAAN PONDASI SCREEN II
1 Pasang bekisting M1 (15*2)+(8.5*4) 64.00 20,000.00 1,280,000.00
2 Cor beton readimix mutu 400 M1 (15*2)+(8.5*4) 64.00 22,500.00 1,440,000.00
4 Bongkar bekisting M2 (15*2)+(8.5*4) 64.00 12,500.00 800,000.00
JUMLAH 3,520,000.00
II PEKERJAAN GARDU LISTRIK
1 Pasang dinding paving M2 (10*2*0.5) 10.00 19,000.00 190,000.00
2 Peninggian tanah dan pemerataan Ls 1.00 1.00 250,000.00 250,000.00
3 Pasang bata ringan tinggi 0 - 1.5 m M2 (4*3*1.5)+(10*1.5)+(1*1.5*4) 39.00 16,000.00 624,000.00
4 Pasang bata ringantinggi 1.5 -3 m M2 (4*3*1.5)+(10*1.5)+(1*1.5*4) 39.00 19,000.00 741,000.00
5 Pasang bata ringan tinggi 3 - 4 m M2 (4*3*0.75)+(10*0.75)+(10*1) 26.50 20,000.00 530,000.00
6 Pasang bekisting ring balok 10/15 M1 (3.6*3)+(10*1)+(2.7*2) 26.20 30,000.00 786,000.00
7 Pembesian dan cor M1 (3.6*3)+(10*1)+(2.7*2) 26.20 38,000.00 995,600.00
8 Pasang pondasi teras M3 (0.6*0.6*10) 3.60 95,000.00 342,000.00
9 Rabatan lantai M2 (4*10)-(0.5*10) 35.00 12,500.00 437,500.00
10 Plesteran dan acian saluran kabel M2 (0.5*10*2)+(0.6*10) 16.00 19,000.00 304,000.00
JUMLAH 5,200,100.00
III PEKERJAAN PRIMER
1 Pengukuran dan bauwplank M1 (12*2+(7*2) 38.00 5,000.00 190,000.00
2 Pemerataan dengan batu M2 (12*7) 84.00 12,500.00 1,050,000.00
3 Pembesian kolom struktur 27/45 M1 (4*10) 40.00 20,000.00 800,000.00
4 Kuras air Ls 1 1.00 200,000.00 200,000.00
JUMLAH 2,240,000.00
III PEKERJAAN LAIN LAIN
1 Sewa pompa air Hari 4 4.00 100,000.00 400,000.00
2 Transportasi Ls 1 1.00 250,000.00 250,000.00
JUMLAH 650,000.00

Total keseluruhan biaya 11,610,100.00


Pembulatan 11,610,000.00

Paserepan , 20 Februari 2016


Dibuat Oleh

IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 21 FEBR s/d 05 MARET 2016

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
II PEKERJAAN GARDU LISTRIK
1 Plesteran dan acian luar M2 (3.8*4.2*2)+(9.6*4.2) 72.24 19,000.00 1,372,560.00
2 Plesteran dan acian dalam M3 (3.8*3.7*4)+(9.6*3.7) 91.76 19,000.00 1,743,440.00
3 Pembesian balok ring 10/25 M1 (11.2*2)+(5.2*3) 38.00 25,000.00 950,000.00
4 Pasang bekisting dak dalam M2 (10*5) 50.00 15,000.00 750,000.00
JUMLAH 4,816,000.00
III PEKERJAAN PRIMER
1 Galian tanah bekas longsor Ls 1 1.00 500,000.00 500,000.00
2 Rabatan lantai kerja M2 (7*4) 28.00 19,000.00 532,000.00
3 Pembesian kolom struktur 27/45 terpasang M1 (4*10) 40.00 60,000.00 2,400,000.00
4 Pembesian kolom struktur 27/45 M2 (4*10) 40.00 40,000.00 1,600,000.00
4 Pembesian sloof 25 /45 M1 (4+6.7+4) 14.70 50,000.00 735,000.00
5 Pembesian Pasang wermess M2 (4+6.7+4)*2 29.40 20,000.00 588,000.00
6 Kuras air Ls 1 1.00 200,000.00 200,000.00
JUMLAH 6,555,000.00
III PEKERJAAN LAIN LAIN
1 Transportasi Ls 1 1.00 200,000.00 200,000.00
JUMLAH 200,000.00

Total keseluruhan biaya 11,571,000.00


Pembulatan 11,570,000.00

Paserepan , 05 Maret 2016


Dibuat Oleh

IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 06 MARET s/d 12 MARET 2016

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
II PEKERJAAN GARDU LISTRIK
1 Pasang bekisting samping M2 (0.7*5.4*2)+(0.7*10*2) 21.56 15,000.00 323,400.00
JUMLAH 323,400.00
III PEKERJAAN PRIMER
1 Pasang batu kosongan pertama M3 (6.7*8*0.7)+(6.7*4.5*0.8)+(1*4*0.8) 64.84 45,000.00 2,917,800.00
2 Pasang batu kosongan peninggian M3 (6.7*4.5*0.7)+(0.5*4*0.7) 22.51 45,000.00 1,012,725.00
3 Cor beton pertama M3 (9+45) 54.00 45,000.00 2,430,000.00
4 Cor beton kedua M3 9 9.00 45,000.00 405,000.00
5 Pasang bekisting samping M1 (4+11+6.7) 21.70 15,000.00 325,500.00
6 Pasang bekisting samping M1 (4+11+6.7) 21.70 15,000.00 325,500.00
JUMLAH 7,091,025.00
III PEKERJAAN LAIN LAIN
1 Transportasi Ls 1 1.00 200,000.00 200,000.00
JUMLAH 200,000.00

Total keseluruhan biaya 7,614,425.00


Pembulatan 7,610,000.00

Paserepan , 12 Maret 2016


Dibuat Oleh

IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 13 MARET s/d 26 MARET 2016

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
I PEKERJAAN GARDU LISTRIK
1 Pasang bekisting balok M1 (5.4*3)+(11.4*2) 39.00 30,000.00 1,170,000.00
2 Pasang bekisting lisplank M3 (5.4*2)+(11.4*2) 33.60 25,000.00 840,000.00
3 Pasang bekisting plat M2 (5.4*11.4) 61.56 25,000.00 1,539,000.00
4 Pembesian plat M2 (5.4*11.4) 61.56 15,000.00 923,400.00
5 Pembesian lisplank M2 (5.4*2)+(11.4*2)*0.4 19.92 15,000.00 298,800.00
6 Cor plat dak M2 (5.4*11.4) 61.56 17,500.00 1,077,300.00
7 Cor lisplank M2 (5.4*2)+(11.4*2)*0.4 19.92 17,500.00 348,600.00
JUMLAH 6,197,100.00
II PEKERJAAN PRIMER
1 Pasang batu pondasi M3 (1.4*2.4*4.4)+(1.5*2.4*6.7)+(1.5+0.4)*0.5*2.4*4.1) 48.25 100,000.00 4,825,200.00
2 Pembesian kolom 30/50 M1 (1.7*10) 17.00 45,000.00 765,000.00
3 Pembesian wermess M2 (14.7*1.7) 24.99 15,000.00 374,850.00
4 Bekesting kolom M3 (1.7*10) 17.00 45,000.00 765,000.00
5 Bekisting plat M2 (10.7*1.7) 18.19 40,000.00 727,600.00
6 Cor kolom dan plat dinding M3 22.5 22.50 45,000.00 1,012,500.00
JUMLAH 8,470,150.00
III PEKERJAAN LAIN LAIN
1 Transportasi Ls 1 1.00 200,000.00 200,000.00
JUMLAH 200,000.00

Total keseluruhan biaya 14,867,250.00


Pembulatan 14,860,000.00

Paserepan ,26 Maret 2016


Dibuat Oleh

IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 27 MARET s/d 02 APRIL 2016

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
I PEKERJAAN GARDU LISTRIK
1 Plesteran & acian dak M1 (5.4*11.4) 61.56 19,000.00 1,169,640.00
JUMLAH 1,169,640.00
II PEKERJAAN PRIMER
1 Pasang batu pondasi M3 (1.4*2*4.4)+(1.5*2*6.7)+(0.4+1.5)*0.5*2*4.1) 40.21 120,000.00 4,825,200.00
2 Pembesian ring tengah 30/50 M1 -
3 Bekesting ring tengah M3 -
4 Cor ring tengah M3 -
JUMLAH 4,825,200.00
III PEKERJAAN LAIN LAIN
1 Transportasi Ls 1 1.00 200,000.00 200,000.00
JUMLAH 200,000.00

Total keseluruhan biaya 6,194,840.00


Pembulatan 6,190,000.00

Paserepan , 02 April 2016


Dibuat Oleh

IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 19 MARET s/d 26 MARET 2016
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
III PEKERJAAN HOPPER TRANSSISI
1 Pasang batu pondasi timur M3 (0.5+0.6)/2*1.4*3.9+(0.5+0.6)/2*1.4*2.6*4 11.01 95,000.00 1,046,045.00
3 Pembesian kolom 40/40 barat M1 (5*4) 20.00 40,000.00 800,000.00
4 Pembesian ring balk barat M1 20 20.00 40,000.00 800,000.00
5 Bekisting ring balk barat M1 20 20.00 30,000.00 600,000.00
6 Cor kolom dan ring barat M3 (0.4*0.4*2*5)+(0.45*0.7*20) 10.00 45,000.00 450,000.00

JUMLAH 3,696,045.00

Paserepan ,26 Maret 2016


Dibuat Oleh

IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 27 MARET s/d 02 APRIL 2016
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
PEKERJAAN HOPPER TRANSSISI
1 Pasang batu pondasi timur M3 (0.65+0.8)/2*2.6*3.9+(0.65+0.8)/2*2.6*2.6*4 26.96 90,000.00 2,425,995.00
2 Pasang batu pondasi barat M3 (0.7*1.3*3.9)+(0.7*1.3*2.6*4) 13.01 90,000.00 1,171,170.00
3 Pembesian kolom 40/40 M1 (5*4) 20.00 40,000.00 800,000.00
4 Pembesian ring balk M1 20 20.00 40,000.00 800,000.00
5 Bekisting ring balk M1 20 20.00 30,000.00 600,000.00
6 Cor kolom dan ring M3 (0.4*0.4*2*5)+(0.45*0.7*20) 10.00 45,000.00 450,000.00

JUMLAH 6,247,165.00

Paserepan , 02 April 2016


Dibuat Oleh
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 03 APRIL s/d 09 APRIL 2016

SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
I PEKERJAAN GARDU LISTRIK
1 Pekerjaan bongkaran bekisting Ls 1.00 1.00 250,000.00 250,000.00
JUMLAH 250,000.00
II PEKERJAAN PRIMER
1 Pasang batu pondasi ( T 4.4 s/d T 4.40) M3 (1.4*2*4.4)+(1.5*2*6.7)+(0.4+1.5)*0.5*2*4.1) 40.21 120,000.00 4,825,200.00
2 Pembesian ring tengah 30/50 M1 (4.4+6.7+4.1) 15.20 40,000.00 608,000.00
3 Pembesian wermess M2 (15.2*0.9) 13.68 15,000.00 205,200.00
4 Bekesting ring tengah M3 (4.4+6.7+4.1) 15.20 40,000.00 608,000.00
5 Cor ring tengah M3 (4.4+6.7+4.1)*0.3*0.5 2.28 80,000.00 182,400.00
6 Cor dinding belakang ring tengah M3 (4.4+6.7+4.1)*0.9*0.4 5.47 80,000.00 437,760.00

1 Pembesian kolom 30/50 ( T 2.40 - T 4.10 ) M1 (1.7*10) 17.00 45,000.00 765,000.00


2 Pembesian wermess M2 (15.2*1.7) 25.84 15,000.00 387,600.00
3 Bekesting kolom M3 (1.7*10) 17.00 45,000.00 765,000.00
4 Bekisting plat M2 (10.7*1.7) 18.19 40,000.00 727,600.00
5 Cor kolom dan plat dinding M3 (0.3*0.50*1.7*10)+(0.35*1.7*15.2) 11.59 80,000.00 927,520.00
JUMLAH 10,439,280.00
III PEKERJAAN TIMBANGAN
1 Pekerjaan pengukuran & bauwplank M1 (11+11+12+12) 46.00 5,000.00 230,000.00
2 Pekerjaan keprasan tanah dinding M2 (11+11+12+12) 46.00 5,000.00 230,000.00
3 Pekerjaan leveling tanah M2 (5*10.5)*2 105.00 5,000.00 525,000.00
JUMLAH 985,000.00
IV PEKERJAAN LAIN LAIN
1 Transportasi Ls 1 1.00 150,000.00 150,000.00
JUMLAH 150,000.00

Total keseluruhan biaya 11,824,280.00


Pembulatan 11,820,000.00

Paserepan , 09 April 2016


Dibuat Oleh

IMAM BASORI
#REF!
#REF!

#REF!
JUMLAH
NO JENIS PEKERJAAN HARGA
Rp

#REF! #REF! #REF!

#REF! #REF! #REF!

JUMLAH #REF!
PEMBULATAN #REF!

Jember , 06 Februari 2014

………………………………….
#REF!
JUMLAH
NO JENIS PEKERJAAN HARGA
Rp

#REF! #REF! #REF!

II #REF! #REF!

III #REF! #REF!

IV #REF! #REF!

V #REF! #REF!

VI #REF! #REF!

VII #REF! #REF!

VIII #REF! #REF!

IX #REF! #REF!

X #REF! #REF!

XI #REF! #REF!

XII #REF! #REF!

XIII #REF! #REF!

JUMLAH #REF!
PEMBULATAN #REF!

Jember , 06 Februari 2014


#REF!

JUMLAH
NO JENIS PEKERJAAN HARGA
Rp

I #REF! #REF!

II #REF! #REF!

III #REF! #REF!

IV #REF! #REF!

V #REF! #REF!

VI #REF! #REF!

VII #REF! #REF!

VIII #REF! #REF!

IX #REF! #REF!

X #REF! #REF!

XI #REF! #REF!

XII #REF! #REF!

XIII #REF! #REF!

JUMLAH 100,000,000.00
PEMBULATAN 100,000,000.00

Jember , 06 Februari 2014


BERITA ACARA SERAH TERIMA PERTAMA

Pada hari ini Senin , tanggal Lima Belas bulan Desember tahun Dua Ribu Delapan,
yang bertanda tangan dibawah ini :

1 Nama : Sriningsih Cokrosewojo


Jabatan : Kepala Sistem dan Logistik
Alamat : Jl. Jend. Basuki Rakhmat 70-74. Malang

Dalam hal ini bertindak untuk dan atas nama PT. Bank Central Asia, Tbk .
Selanjutnya disebut sebagai PIHAK PERTAMA.

2 Nama : Imam Basori


Jabatan : Direktur
Alamat : Perum. Tegal Besar Permai I Blok AH no 08. Jember

Dalam hal ini bertindak untuk dan atas nama CV. Karya Agung Jaya .
Selanjutnya disebut sebagai PIHAK KEDUA.

PIHAK PERTAMA dan PIHAK KEDUA secara bersama- sama telah mengadakan
pemeriksaan kembali pekerjaan Pembangunan Ruang Parkir Sepeda Motor di KCU Jember, sesuai
kontrak No 318/SPK/LOGW- VII/2008. Tanggal 26 September 2008 di BCA KCU Jember
Jl. Raya Gajah Mada no 14-18 Jember.

Berdasarkan hasil pemeriksaan , kedua belah pihak telah sepakat dan mempunyai pendapat yang
sama, bahwa pekerjaan tersebut diatas telah selesai / terpasang dan telah berfungsi dengan baik .

Dengan demikian PIHAK KEDUA menyerahkan pekerjaan tersebut kepada PIHAK PERTAMA
untuk pertama kalinya , dan dapat menerima dengan masa free maintenance selama 3 bulan ,
berlaku milai tanggal 13 Desember 2008 s/d 13 Maret 2009.

Demikian berita acara ini dibuat dan ditandatangani oleh kedua belah pihak untuk dapat
dipergunakan seperlunya.

PIHAK PERTAMA PIHAK KEDUA


PT BANK CENTRAL ASIA,Tbk CV. KARYA AGUNG JAYA

Sriningsih Cokrosewojo Imam Basori


Kepala Sistem dan Logistik Pimpinan

Mengetahui

Yohanes Tedja Soedarsono


Pimpinan KCU Kabag APK
0.40
KEGIATAN
PEKERJAAN
LOKASI
MASA KERJA TANGGAL

NO NAMA PEKERJA MASUK PULANG KETERANGAN


0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN PONDASI & KOLAM
LOKASI PAMOTAN
MASA KERJA TANGGAL 02 AGUSTUS S/D 08 1GUSTUS 2020
PERIODE MINGGU KE I ( SATU)

HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 2 3 4 5 6 7 8 2 3 4 5 6 7 8
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH

1 SUKASIR MANDOR 1 1 1 1 1 1 6 0 120,000.00 720,000.00 12,500.00 - 720,000.00


2 KIKIK TUKANG 1 1 1 1 1 5 0 120,000.00 600,000.00 12,500.00 - 600,000.00
3 DAYAT T.BATU 1 1 1 1 1 5 0 100,000.00 500,000.00 12,500.00 - 500,000.00
4 NUR T.BATU 1 1 2 0 90,000.00 180,000.00 12,500.00 - 180,000.00

PEKERJA
1 PAK TA"EK PEKERJA 1 1 1 1 1 1 6 0 85,000.00 510,000.00 10,000.00 - 510,000.00
2 BUARI PEKERJA 1 1 1 1 1 1 1 7 0 85,000.00 595,000.00 10,000.00 - 595,000.00
3 ANDIK PEKERJA 1 1 1 1 1 1 1 7 0 85,000.00 595,000.00 10,000.00 - 595,000.00
4 DIDIK PEKERJA 1 1 1 1 1 5 0 85,000.00 425,000.00 10,000.00 - 425,000.00

PASURUAN
1 JAKIK TUKANG 1 1 2 0 110,000.00 220,000.00 12,500.00 - 220,000.00
2 WARNO TUKANG 1 1 1 1 4 8 8 100,000.00 400,000.00 12,500.00 100,000.00 500,000.00
3 TUKANG 1 1 1 1 4 8 8 100,000.00 400,000.00 12,500.00 100,000.00 500,000.00
4 EDY PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
5 ALI PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
6 EDY PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
7 ALI PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
3 5 7 13 14 13 14

JUMLAH UPAH KERJA DAN LEMBURAN Rp 7,045,000


BIAYA PENGAWASAN 15 % Rp 1,056,750
MOBILISASI & AKOMODASI 5 % Rp 352,250
TOTAL KESELURUHAN Rp 8,454,000
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN PONDASI & KOLAM
LOKASI PAMOTAN
MASA KERJA TANGGAL
PERIODE MINGGU KE

HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH

0 0 0 0 0 0 0

JUMLAH UPAH KERJA DAN LEMBURAN Rp -


BIAYA PENGAWASAN 15 % Rp -
MOBILISASI & AKOMODASI 5 % Rp -
TOTAL KESELURUHAN Rp -
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN PONDASI & KOLAM
LOKASI PAMOTAN
MASA KERJA TANGGAL 02 AGUSTUS S/D 08 1GUSTUS 2020
PERIODE MINGGU KE I ( SATU)

HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 2 3 4 5 6 7 8 2 3 4 5 6 7 8
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH

1 SUKASIR MANDOR 1 1 1 1 1 1 6 0 120,000.00 720,000.00 12,500.00 - 720,000.00


2 KIKIK TUKANG 1 1 1 1 1 5 0 120,000.00 600,000.00 12,500.00 - 600,000.00
3 DAYAT T.BATU 1 1 1 1 1 5 0 100,000.00 500,000.00 12,500.00 - 500,000.00
4 NUR T.BATU 1 1 2 0 90,000.00 180,000.00 12,500.00 - 180,000.00

PEKERJA
1 PAK TA"EK PEKERJA 1 1 1 1 1 1 6 0 85,000.00 510,000.00 10,000.00 - 510,000.00
2 BUARI PEKERJA 1 1 1 1 1 1 1 7 0 85,000.00 595,000.00 10,000.00 - 595,000.00
3 ANDIK PEKERJA 1 1 1 1 1 1 1 7 0 85,000.00 595,000.00 10,000.00 - 595,000.00
4 DIDIK PEKERJA 1 1 1 1 1 5 0 85,000.00 425,000.00 10,000.00 - 425,000.00

PASURUAN
1 JAKIK TUKANG 1 1 2 0 110,000.00 220,000.00 12,500.00 - 220,000.00
2 WARNO TUKANG 1 1 1 1 4 8 8 100,000.00 400,000.00 12,500.00 100,000.00 500,000.00
3 TUKANG 1 1 1 1 4 8 8 100,000.00 400,000.00 12,500.00 100,000.00 500,000.00
4 EDY PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
5 ALI PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
6 EDY PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
7 ALI PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
3 5 7 13 14 13 14

JUMLAH UPAH KERJA DAN LEMBURAN Rp 7,045,000


BIAYA PENGAWASAN 15 % Rp 1,056,750
MOBILISASI & AKOMODASI 5 % Rp 352,250
TOTAL KESELURUHAN Rp 8,454,000
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN PONDASI & KOLAM
LOKASI PAMOTAN
MASA KERJA TANGGAL 02 AGUSTUS S/D 08 1GUSTUS 2020
PERIODE MINGGU KE I ( SATU)

HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 2 3 4 5 6 7 8 2 3 4 5 6 7 8
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH

1 SUKASIR MANDOR 1 1 1 1 1 1 6 0 120,000.00 720,000.00 12,500.00 - 720,000.00


2 KIKIK TUKANG 1 1 1 1 1 5 0 120,000.00 600,000.00 12,500.00 - 600,000.00
3 DAYAT T.BATU 1 1 1 1 1 5 0 100,000.00 500,000.00 12,500.00 - 500,000.00
4 NUR T.BATU 1 1 2 0 90,000.00 180,000.00 12,500.00 - 180,000.00

PEKERJA
1 PAK TA"EK PEKERJA 1 1 1 1 1 1 6 0 85,000.00 510,000.00 10,000.00 - 510,000.00
2 BUARI PEKERJA 1 1 1 1 1 1 1 7 0 85,000.00 595,000.00 10,000.00 - 595,000.00
3 ANDIK PEKERJA 1 1 1 1 1 1 1 7 0 85,000.00 595,000.00 10,000.00 - 595,000.00
4 DIDIK PEKERJA 1 1 1 1 1 5 0 85,000.00 425,000.00 10,000.00 - 425,000.00

PASURUAN
1 JAKIK TUKANG 1 1 2 0 110,000.00 220,000.00 12,500.00 - 220,000.00
2 WARNO TUKANG 1 1 1 1 4 8 8 100,000.00 400,000.00 12,500.00 100,000.00 500,000.00
3 TUKANG 1 1 1 1 4 8 8 100,000.00 400,000.00 12,500.00 100,000.00 500,000.00
4 EDY PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
5 ALI PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
6 EDY PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
7 ALI PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
3 5 7 13 14 13 14

JUMLAH UPAH KERJA DAN LEMBURAN Rp 7,045,000


BIAYA PENGAWASAN 15 % Rp 1,056,750
MOBILISASI & AKOMODASI 5 % Rp 352,250
TOTAL KESELURUHAN Rp 8,454,000
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN SITE PLANT
LOKASI TEMPEH LUMAJANG
MASA KERJA TANGGAL 12 MARET S/D 18 MARET 2017
PERIODE MINGGU KE I ( SATU)

HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 12 13 14 15 16 17 18 12 13 14 15 16 17 18
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH

1 SUTIKNO MANDOR 1 1 1 1 1 1 6 5 100,000.00 600000 25,000.00 125000 725000


2 PON TUKANG 1 1 1 1 1 5 0 80,000.00 400000 10,000.00 0 400000
3 BASHIR T.BATU 1 1 2 0 80,000.00 160000 10,000.00 0 160000
4 UDIN T.BATU

PEKERJA
1 PAIJO PEKERJA 1 1 1 1 1 1 6 0 70,000.00 420000 8,000.00 0 420000
2 HUDA PEKERJA 1 1 2 0 60,000.00 120000 8,000.00 0 120000
3 YUNUS PEKERJA 0 1 1 0 60,000.00 60000 8,000.00 0 60000
4 USNI PEKERJA 1 1 1 1 1 5 0 60,001.00 300005 8,001.00 0 300005
0 2 3 3 3 5 6
JUMLAH UPAH KERJA DAN LEMBURAN Rp 2,185,005
BIAYA PENGAWASAN 10 % Rp 218,501
MOBILISASI & AKOMODASI 5 % Rp 109,250
TOTAL KESELURUHAN Rp 2,512,756
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN SITE PLANT
LOKASI TEMPEH LUMAJANG
MASA KERJA TANGGAL 19 MARET S/D 25 MARET 2017
PERIODE MINGGU KE II ( DUA)

HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 19 20 21 22 23 24 25 19 20 21 22 23 24 25
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH

1 SUTIKNO MANDOR 1 1 1 1 1 1 6 5 100,000.00 600000 25,000.00 125000 725000


2 PON TUKANG 1 1 1 1 1 1 6 0 80,000.00 480000 10,000.00 0 480000
3 BASHIR T.BATU 1 1 1 1 1 1 6 0 80,000.00 480000 10,000.00 0 480000
4 UDIN T.BATU

PEKERJA
1 PAIJO PEKERJA 1 1 1 1 1 1 6 0 70,000.00 420000 8,000.00 0 420000
2 HUDA PEKERJA 1 1 1 1 1 1 6 0 60,000.00 360000 8,000.00 0 360000
3 YUNUS PEKERJA 1 1 1 0 0 1 4 0 60,000.00 240000 8,000.00 0 240000

0 6 6 6 5 5 6
JUMLAH UPAH KERJA DAN LEMBURAN Rp 2,705,000
BIAYA PENGAWASAN 10 % Rp 270,500
MOBILISASI & AKOMODASI 5 % Rp 135,250
TOTAL KESELURUHAN Rp 3,110,750
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN SITE PLANT
LOKASI TEMPEH LUMAJANG
MASA KERJA TANGGAL 26 MARET S/D 02 APRIL2017
PERIODE MINGGU KE II ( DUA)

HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 26 27 28 29 30 31 1 26 27 28 29 30 31 1
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH

1 SUTIKNO MANDOR 1 1 1 1 1 1 6 5 100,000.00 600000 25,000.00 125000 725000


2 PON TUKANG 1 1 1 1 1 1 6 0 80,000.00 480000 10,000.00 0 480000
3 BASHIR T.BATU 1 1 1 1 1 1 6 0 80,000.00 480000 10,000.00 0 480000
4 UDIN T.BATU

PEKERJA
1 PAIJO PEKERJA 1 1 1 1 1 1 6 0 70,000.00 420000 8,000.00 0 420000
2 HUDA PEKERJA 1 1 1 1 1 1 6 0 60,000.00 360000 8,000.00 0 360000
3 YUNUS PEKERJA 1 1 1 0 0 1 4 0 60,000.00 240000 8,000.00 0 240000

0 6 6 6 5 5 6
JUMLAH UPAH KERJA DAN LEMBURAN Rp 2,705,000
BIAYA PENGAWASAN 10 % Rp 270,500
MOBILISASI & AKOMODASI 5 % Rp 135,250
TOTAL KESELURUHAN Rp 3,110,750
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN SITE PLANT
LOKASI TEMPEH LUMAJANG
MASA KERJA TANGGAL 03 APRIL S/D 08 APRIL2017
PERIODE MINGGU KE II ( DUA)

HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 2 3 4 5 6 7 8 2 3 4 5 6 7 8
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH

1 SUTIKNO MANDOR 1 1 1 1 1 1 6 5 100,000.00 600000 25,000.00 125000 725000


2 PON TUKANG 1 1 1 1 1 1 6 0 80,000.00 480000 10,000.00 0 480000
3 RI T.BATU 1 1 1 1 1 5 0 80,000.00 400000 10,000.00 0 400000
4 SURALI T.BATU 1 1 1 1 1 1 6 0 80,001.00 480006 10,001.00 0 480006

PEKERJA
1 PAIJO PEKERJA 1 1 1 1 1 1 6 0 70,000.00 420000 8,000.00 0 420000
2 HUDA PEKERJA 1 1 1 1 1 1 6 0 60,000.00 360000 8,000.00 0 360000
3 HUSNI PEKERJA 1 1 1 1 1 1 6 0 60,000.00 360000 8,000.00 0 360000
4 ADI PEKERJA 1 1 1 1 1 1 6 0 60,000.00 360000 8,001.00 0 360000
5 ARIFIN PEKERJA 1 1 1 1 1 1 6 0 60,000.00 360000 8,002.00 0 360000

0 7 6 7 7 7 7
JUMLAH UPAH KERJA DAN LEMBURAN Rp 3,945,006
BIAYA PENGAWASAN 10 % Rp 394,501
MOBILISASI & AKOMODASI 5 % Rp 197,250
TOTAL KESELURUHAN Rp 4,536,757
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN BATCHING PLANT
LOKASI POH GADING
MASA KERJA TANGGAL 21 JANUARI S/D 27 JANUARI 2018
PERIODE MINGGU KE II ( DUA)

HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 21 22 23 24 25 26 27 21 22 23 24 25 26 27
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH

1 SUTIKNO MANDOR 1 1 1 1 1 1 6 100,000.00 600000 25,000.00 0 600000


2 PON TUKANG 1 1 1 1 1 1 6 0 85,000.00 510000 10,000.00 0 510000
3 SURALI T.BATU 1 1 1 1 1 1 6 0 80,000.00 480000 10,000.00 0 480000
4 SANI T.BATU 1 1 1 1 1 1 6 0 80,000.00 480000 10,001.00 0 480000

PEKERJA
2 HUDA PEKERJA 1 1 1 1 1 1 6 0 60,000.00 360000 8,000.00 0 360000
3 HUSNI PEKERJA 1 1 1 1 1 1 6 0 60,000.00 360000 8,000.00 0 360000
4 ADI PEKERJA 1 1 1 1 1 1 6 0 60,000.00 360000 8,001.00 0 360000
5 ARIFIN PEKERJA 1 1 1 1 1 1 6 0 60,000.00 360000 8,002.00 0 360000

0 6 6 6 6 6 6
JUMLAH UPAH KERJA DAN LEMBURAN Rp 3,510,000
BIAYA PENGAWASAN 10 % Rp 351,000
MOBILISASI & AKOMODASI 5 % Rp 175,500
TOTAL KESELURUHAN Rp 4,036,500
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN BATCHING PLANT
LOKASI POH GADING
MASA KERJA TANGGAL 28 JANUARI S/D 03 FEBRUARI 2018
PERIODE MINGGU KE II ( DUA)

HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 28 29 30 31 1 2 3 21 22 23 24 25 26 27
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH

1 SUTIKNO MANDOR 0 100,000.00 - 25,000.00 0 -


2 TOTOK MANDOR 1 1 1 1 4 100,001.00 400,004 25,001.00 0 400,004.00
3 PON TUKANG 1 1 1 1 1 1 6 0 85,000.00 510,000 10,000.00 0 510,000.00
4 SURALI T.BATU 1 1 1 1 1 1 6 0 80,000.00 480,000 10,000.00 0 480,000.00
5 SANI T.BATU 1 1 1 1 1 1 6 0 80,000.00 480,000 10,000.00 0 480,000.00
6 HAR T.BATU 1 1 1 1 1 1 6 0 80,001.00 480,006 10,000.00 0 480,006.00
7 IMAM T.BATU 1 1 1 1 1 1 6 0 80,002.00 480,012 10,000.00 0 480,012.00

PEKERJA
1 HUDA PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 0 390,000.00
2 HUSNI PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 0 390,000.00
3 ADI PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 0 390,000.00
4 ARIFIN PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 0 390,000.00
5 ANDIK PEKERJA 1 1 1 1 4 0 75,000.00 300,000 8,000.00 0 300,000.00
6 HENDRIK PEKERJA 1 1 1 1 4 0 75,000.00 300,000 8,000.00 0 300,000.00
7 WAHYU PEKERJA 1 1 1 1 4 0 65,000.00 260,000 8,000.00 0 260,000.00
8 FAISOL PEKERJA 1 1 1 1 4 0 65,000.00 260,000 8,000.00 0 260,000.00
9 FAUZI PEKERJA 1 1 1 1 4 0 65,000.00 260,000 8,000.00 0 260,000.00
10 FAUZI PEKERJA 1 1 1 1 4 0 65,000.00 260,000 8,000.00 0 260,000.00
11 LEK TUKIMAN PEKERJA 1 1 1 1 4 0 80,000.00 320,000 8,000.00 0 320,000.00

0 7 7 8 8 8 8
JUMLAH UPAH KERJA DAN LEMBURAN Rp 6,350,022
BIAYA PENGAWASAN 10 % Rp 635,002
MOBILISASI & AKOMODASI 5 % Rp 317,501
TOTAL KESELURUHAN Rp 7,302,525
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN BAT PACANG
LOKASI POH GADING
MASA KERJA TANGGAL 28 JANUARI S/D 03 FEBRUARI 2018
PERIODE MINGGU KE II ( DUA)

HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 4 5 6 7 8 9 10 29 30 31 1 2 3 4
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH

1 SUTIKNO MANDOR 1 1 1 1 1 1 1 7 110,000.00 770,000 25,000.00 770,000.00


2 TOTOK MANDOR 1 1 1 1 1 1 1 7 110,000.00 770,000 25,001.00 0 770,000.00
2 PON TUKANG 1 1 1 1 1 1 6 0 85,000.00 510,000 10,000.00 0 510,000.00
3 SURALI T.BATU 1 1 1 1 1 1 6 0 80,000.00 480,000 10,000.00 0 480,000.00
4 SANI T.BATU 1 1 1 1 1 1 6 0 80,000.00 480,000 10,000.00 0 480,000.00
5 HAR T.BATU 1 1 1 1 1 1 1 7 0 85,000.00 595,000 10,000.00 0 595,000.00
6 IMAM T.BATU 1 1 1 1 1 1 1 7 0 85,000.00 595,000 10,000.00 0 595,000.00

2 HUDA PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 0 390,000.00


3 HUSNI PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 0 390,000.00
4 ADI PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 0 390,000.00
5 ARIFIN PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 0 390,000.00
3 ANDIK PEKERJA 1 1 1 1 1 1 1 7 0 75,000.00 525,000 8,000.00 0 525,000.00
4 HENDRIK PEKERJA 1 1 1 1 1 1 1 7 0 75,000.00 525,000 8,000.00 0 525,000.00
5 WAHYU PEKERJA 1 1 1 1 1 1 1 7 0 65,000.00 455,000 8,000.00 0 455,000.00
6 FAISOL PEKERJA 1 1 1 1 1 1 1 7 0 65,000.00 455,000 8,000.00 0 455,000.00
7 FAUZI PEKERJA 1 1 1 1 1 1 1 7 0 65,000.00 455,000 8,000.00 0 455,000.00
8 LEK TUKIMAN PEKERJA 1 1 1 1 1 1 1 7 0 80,000.00 560,000 8,000.00 0 560,000.00

6 10 10 10 10 10 10
JUMLAH UPAH KERJA DAN LEMBURAN Rp 8,735,000
BIAYA PENGAWASAN 10 % Rp 873,500
MOBILISASI & AKOMODASI 5 % Rp 436,750
TOTAL KESELURUHAN Rp 10,045,250
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN BAT PACANG
LOKASI POH GADING
MASA KERJA TANGGAL 11 FEBRUARI S/D 17 FEBRUARI 2018
PERIODE MINGGU KE III (TIGA)

HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 11 12 13 14 15 16 17 11 12 13 14 15 16 17
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH

1 SUTIKNO MANDOR 1 1 1 1 1 1 1 7 110,000.00 770,000 25,000.00 770,000.00


2 TOTOK MANDOR 1 1 1 1 1 1 1 7 110,000.00 770,000 25,001.00 0 770,000.00
2 PON TUKANG 1 1 1 1 1 1 6 0 85,000.00 510,000 10,000.00 0 510,000.00
3 SURALI T.BATU 1 1 1 1 1 1 6 0 80,000.00 480,000 10,000.00 0 480,000.00
4 SANI T.BATU 1 1 1 1 1 1 6 0 80,000.00 480,000 10,000.00 0 480,000.00
5 HAR T.BATU 1 1 1 1 1 1 1 7 0 85,000.00 595,000 10,000.00 0 595,000.00
6 IMAM T.BATU 1 1 1 1 1 1 1 7 0 85,000.00 595,000 10,000.00 0 595,000.00

2 HUDA PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 0 390,000.00


3 HUSNI PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 0 390,000.00
4 ADI PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 0 390,000.00
5 ARIFIN PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 0 390,000.00
3 ANDIK PEKERJA 1 1 1 1 1 1 1 7 0 75,000.00 525,000 8,000.00 0 525,000.00
4 HENDRIK PEKERJA 1 1 1 1 1 1 1 7 0 75,000.00 525,000 8,000.00 0 525,000.00
5 WAHYU PEKERJA 1 1 1 1 1 1 1 7 0 65,000.00 455,000 8,000.00 0 455,000.00
6 FAISOL PEKERJA 1 1 1 1 1 1 1 7 0 65,000.00 455,000 8,000.00 0 455,000.00
7 FAUZI PEKERJA 1 1 1 1 1 1 1 7 0 65,000.00 455,000 8,000.00 0 455,000.00
8 LEK TUKIMAN PEKERJA 1 1 1 1 1 1 1 7 0 80,000.00 560,000 8,000.00 0 560,000.00

6 10 10 10 10 10 10
JUMLAH UPAH KERJA DAN LEMBURAN Rp 8,735,000
BIAYA PENGAWASAN 10 % Rp 873,500
MOBILISASI & AKOMODASI 5 % Rp 436,750
TOTAL KESELURUHAN Rp 10,045,250
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN BAT PACANG
LOKASI POH GADING
MASA KERJA TANGGAL 18 FEBRUARI S/D 24 FEBRUARI 2018
PERIODE MINGGU KE IV (EMPAT)

HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 18 19 20 21 22 23 24 18 19 20 21 22 23 24
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH

1 SUTIKNO MANDOR 1 1 1 1 1 1 1 7 110,000.00 770,000 25,000.00 770,000.00


2 TOTOK MANDOR 1 1 1 1 1 1 1 7 110,000.00 770,000 25,001.00 0 770,000.00
2 PON TUKANG 1 1 1 1 1 1 6 0 85,000.00 510,000 10,000.00 0 510,000.00
3 SURALI T.BATU 1 1 1 1 1 1 6 0 80,000.00 480,000 10,000.00 0 480,000.00
4 SANI T.BATU 1 1 1 1 1 1 6 0 80,000.00 480,000 10,000.00 0 480,000.00
5 HAR T.BATU 1 1 1 1 1 1 1 7 0 85,000.00 595,000 10,000.00 0 595,000.00
6 IMAM T.BATU 1 1 1 1 1 1 1 7 0 85,000.00 595,000 10,000.00 0 595,000.00

2 HUDA PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 0 390,000.00


3 HUSNI PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 0 390,000.00
4 ADI PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 0 390,000.00
5 ARIFIN PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 0 390,000.00
3 ANDIK PEKERJA 1 1 1 1 1 1 1 7 0 75,000.00 525,000 8,000.00 0 525,000.00
4 HENDRIK PEKERJA 1 1 1 1 1 1 1 7 0 75,000.00 525,000 8,000.00 0 525,000.00
5 WAHYU PEKERJA 1 1 1 1 1 1 1 7 0 65,000.00 455,000 8,000.00 0 455,000.00
6 FAISOL PEKERJA 1 1 1 1 1 1 1 7 0 65,000.00 455,000 8,000.00 0 455,000.00
7 FAUZI PEKERJA 1 1 1 1 1 1 1 7 0 65,000.00 455,000 8,000.00 0 455,000.00
8 LEK TUKIMAN PEKERJA 1 1 1 1 1 1 1 7 0 80,000.00 560,000 8,000.00 0 560,000.00

6 10 10 10 10 10 10
JUMLAH UPAH KERJA DAN LEMBURAN Rp 8,735,000
BIAYA PENGAWASAN 10 % Rp 873,500
MOBILISASI & AKOMODASI 5 % Rp 436,750
TOTAL KESELURUHAN Rp 10,045,250
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN BAT PACANG
LOKASI POH GADING
MASA KERJA TANGGAL 25 FEBRUARI S/D 03 MARET 2018
PERIODE MINGGU KE IV (EMPAT)

HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 25 26 27 28 1 2 3 18 19 20 21 22 23 24
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH

1 SUTIKNO MANDOR 1 1 1 3 110,000.00 330,000


2 TOTOK MANDOR 1 1 1 1 1 1 1 7 110,000.00 770,000 -
3 HAR T.BATU 0.5 1 1.5 0 85,000.00 127,500 10,000.00 - 127,500.00
4 IMAM T.BATU 1 1 1 1 1 1 1 7 1 1 1 3 85,000.00 595,000 10,000.00 30,000 625,000.00 250,000.00
5 P,ADIM T.BATU 1 1 1 1 1 1 1 7 1 1 1 1 4 85,000.00 595,000 10,000.00 40,000 635,000.00 250,000.00
6 LEK TUKIMAN PEKERJA 1 1 1 3 1 1 1 3 80,000.00 240,000 7,500.00 22,500 262,500.00 100,000.00
7 HERMAN PEKERJA 1 1 1 3 1 1 1 3 80,000.00 240,000 7,500.00 22,500 262,500.00 100,000.00
8 ANDIK PEKERJA 1 1 1 1 1 1 1 7 1 1 1 3 80,000.00 560,000 7,500.00 22,500 582,500.00 250,000.00
9 HENDRIK PEKERJA 1 1 1 1 1 1 1 7 1 1 1 3 80,000.00 560,000 7,500.00 22,500 582,500.00 250,000.00
10 LIHIN PEKERJA 1 1 1 1 1 1 1 7 1 1 1 3 70,000.00 490,000 7,500.00 22,500 512,500.00 250,000.00
12 FAISOL PEKERJA 1 1 1 1 1 1 1 7 1 1 1 3 70,000.00 490,000 7,500.00 22,500 512,500.00 250,000.00
13 SALIM PEKERJA 1 1 1 1 1 1 1 7 1 1 1 3 70,000.00 490,000 7,500.00 22,500 512,500.00 250,000.00

1 PON TUKANG 1 1 1 1 4 1 1 85,000.00 340,000 10,000.00 10,000 350,000.00 250,000.00


2 SURALI T.BATU 1 1 1 1 1 5 0 80,000.00 400,000 10,000.00 - 400,000.00 250,000.00
3 HASANI T.BATU 1 1 1 1 0.5 1 5.5 0 80,000.00 440,000 10,000.00 - 440,000.00 250,000.00
4 HUDA PEKERJA 1 1 1 1 1 1 6 1 1 65,000.00 390,000 7,500.00 7,500 397,500.00 250,000.00
5 HUSNI PEKERJA 1 1 1 1 1 5 0 65,000.00 325,000 7,500.00 - 325,000.00 250,000.00
6 ADI PEKERJA 1 1 1 1 1 5 0 65,000.00 325,000 7,500.00 - 325,000.00 250,000.00
7 HOZIN PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 7,500.00 - 390,000.00 250,000.00
8 TAUFIK PEKERJA 1 1 1 1 1 1 6 0 65,001.00 390,006 7,500.00 - 390,006.00 250,000.00

6 12 13 14 16 16.5 16
JUMLAH UPAH KERJA DAN LEMBURAN Rp 7,632,506 3,950,000.00
BIAYA PENGAWASAN 10 % Rp 763,251
MOBILISASI & AKOMODASI 5 % Rp 381,625
TOTAL KESELURUHAN Rp 8,777,382
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN BAT PACANG
LOKASI POH GADING
MASA KERJA TANGGAL 04 MARET S/D 10 MARET 2018
PERIODE MINGGU KE IV (EMPAT)

HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 4 5 6 7 8 9 10 4 5 6 7 8 9 10
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH

1 SUTIKNO MANDOR 1 1 1 3 110,000.00 330,000 330,000.00


2 TOTOK MANDOR 1 1 1 1 1 1 1 7 110,000.00 770,000 - 770,000.00
3 HAR T.BATU 1 1 1 1 1 0.5 5.5 1 1 1 1 1 5 85,000.00 467,500 10,000.00 50,000 517,500.00
4 IMAM T.BATU 1 1 2 1 1 85,000.00 170,000 10,000.00 10,000 180,000.00
5 P,ADIM T.BATU 1 1 1 1 1 1 1 7 1 1 1 1 1 5 85,000.00 595,000 10,001.00 50,005 645,005.00
6 LEK TUKIMAN PEKERJA 1 1 1 1 1 1 1 7 1 1 1 1 1 5 80,000.00 560,000 8,000.00 40,000 600,000.00
7 HERMAN PEKERJA 1 1 1 1 1 1 1 7 1 1 1 1 1 5 80,000.00 560,000 8,000.00 40,000 600,000.00
8 ANDIK PEKERJA 0.5 1 1 1 1 4.5 1 1 1 3 80,000.00 360,000 8,000.00 24,000 384,000.00
9 HENDRIK PEKERJA 0.5 1 1 1 1 4.5 1 1 1 3 80,000.00 360,000 8,000.00 24,000 384,000.00
10 LIHIN PEKERJA 1 1 1 1 1 1 1 7 1 1 1 1 1 5 70,000.00 490,000 8,000.00 40,000 530,000.00
11 TOYIP PEKERJA 1 1 1 1 65,000.00 65,000 8,000.00 8,000 73,000.00
12 FAISOL PEKERJA 1 1 2 1 1 65,000.00 130,000 8,000.00 8,000 138,000.00
13 SALAM PEKERJA 1 1 1 1 1 5 1 1 1 1 4 65,000.00 325,000 8,000.00 32,000 357,000.00

1 PON TUKANG 1 1 1 1 1 1 6 1 1 85,000.00 510,000 10,000.00 10,000 520,000.00


2 SURALI T.BATU 1 1 1 1 1 1 6 0 80,000.00 480,000 10,000.00 - 480,000.00
3 SANI T.BATU 1 1 1 1 1 1 6 0 80,000.00 480,000 10,000.00 - 480,000.00
4 HUDA PEKERJA 1 1 1 1 1 1 6 1 1 65,000.00 390,000 8,000.00 8,000 398,000.00
5 HUSNI PEKERJA 1 1 0.5 1 1 1 5.5 0 65,000.00 357,500 8,000.00 - 357,500.00
6 ADI PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 - 390,000.00
7 HOZIN PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 - 390,000.00

6 12 13 13.5 14 17.5 14
JUMLAH UPAH KERJA DAN LEMBURAN Rp 8,524,005
BIAYA PENGAWASAN 10 % Rp 852,401
MOBILISASI & AKOMODASI 5 % Rp 426,200
TOTAL KESELURUHAN Rp 9,802,606
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN BAT PACANG
LOKASI POH GADING
MASA KERJA TANGGAL 11 MARET S/D 17 MARET 2018
PERIODE MINGGU KE IV (EMPAT)

HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 11 12 13 14 15 16 17 11 12 13 14 15 16 17
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH

1 SUTIKNO MANDOR 1 1 1 1 1 1 1 7 1 1 2 110,000.00 770,000 12,500.00 25,000


2 IMAM T.BATU 1 1 1 1 1 1 1 7 1 1 2 90,000.00 630,000 10,000.00 20,000 650,000.00
3 P,ADIM T.BATU 1 1 1 1 1 1 1 7 1 1 2 85,000.00 595,000 10,000.00 20,000 615,000.00
4 HERMAN PEKERJA 1 1 1 1 1 1 1 7 1 1 2 80,000.00 560,000 7,500.00 15,000 575,000.00
5 HASANI PEKERJA 0 1 1 1 1 1 0 5 0 80,000.00 400,000 7,500.00 - 400,000.00
6 ANDIK PEKERJA 0.5 1 1.5 0 80,000.00 120,000 7,500.00 - 120,000.00
7 HENDRIK PEKERJA 1 1 1 1 1 1 1 7 1 1 2 80,000.00 560,000 7,500.00 15,000 575,000.00
8 FAISOL PEKERJA 1 1 1 1 1 1 1 7 1 1 2 70,000.00 490,000 7,500.00 15,000 505,000.00
9 HOJIN PEKERJA 1 0 1 1 1 0 4 0 65,000.00 260,000 7,500.00 - 260,000.00
10 HUDA PEKERJA 1 1 0 1 1 1 5 0 65,000.00 325,000 7,500.00 - 325,000.00
11 TOFIK PEKERJA 1 1 1 1 1 0 5 0 65,000.00 325,000 7,500.00 - 325,000.00

JUMLAH UPAH KERJA DAN LEMBURAN Rp 4,350,000


KEKURANAGAN Rp 2,918,000
Rp 7,268,000
BON TUKANG Rp 400,000
TOTAL KESELURUHAN Rp 6,868,000
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN BAT PACANG
LOKASI POH GADING
MASA KERJA TANGGAL 11 MARET S/D 17 MARET 2018
PERIODE MINGGU KE IV (EMPAT)

HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 11 12 13 14 15 16 17 11 12 13 14 15 16 17
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH

1 SUTIKNO MANDOR 1 1 1 3 1 1 110,000.00 330,000 12,500.00 12,500


2 PON T.BATU 1 1 1 1 1 1 6 1 1 2 85,000.00 510,000 10,000.00 20,000 530,000.00
3 SURALI T.BATU 1 1 1 1 4 1 1 80,000.00 320,000 10,000.00 10,000 330,000.00
4 HASANI PEKERJA 1 1 1 1 1 1 6 1 1 2 80,000.00 480,000 7,500.00 15,000 495,000.00
5 HUDA PEKERJA 1 1 1 1 1 5 1 1 65,000.00 325,000 7,500.00 7,500 332,500.00
6 HOJIN PEKERJA 1 1 1 1 4 1 1 2 65,000.00 260,000 7,500.00 15,000 275,000.00
7 HUSNI PEKERJA 1 1 1 1 1 5 1 1 2 65,000.00 325,000 7,500.00 15,000 340,000.00
8 ADI PEKERJA 1 1 1 1 4 1 1 65,000.00 260,000 7,500.00 7,500 267,500.00
9 TOFIK PEKERJA 1 1 1 0 3 1 1 65,000.00 195,000 7,500.00 7,500 202,500.00

JUMLAH UPAH KERJA DAN LEMBURAN Rp 2,772,500


KEKURANAGAN Rp 2,918,000
Rp 5,690,500
BON TUKANG Rp 400,000
TOTAL KESELURUHAN Rp 5,290,500

0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN BAT PACANG
LOKASI POH GADING
MASA KERJA TANGGAL 08 JULI S/D 14 JULI 2018
PERIODE MINGGU KE IV (EMPAT)

HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 8 9 10 11 12 13 14 8 9 10 11 12 13 14
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH

1 SUTIKNO MANDOR 1 1 1 1 1 1 1 7 0 110,000.00 770,000 12,500.00 - 770,000.00


2 PON T.BATU 1 1 1 1 1 1 6 0 85,000.00 510,000 10,000.00 - 510,000.00
3 SURALI T.BATU 1 1 1 1 1 1 6 0 80,000.00 480,000 10,000.00 - 480,000.00
4 HASANI PEKERJA 1 1 1 1 1 1 6 0 80,000.00 480,000 7,500.00 - 480,000.00
5 PAIJO PEKERJA 1 1 1 1 1 1 1 7 0 70,000.00 490,000 7,500.00 - 490,000.00
6 HUDA PEKERJA 1 1 1 1 4 0 65,000.00 260,000 7,500.00 - 260,000.00
7 HUSNI PEKERJA 1 1 1 1 1 5 0 65,000.00 325,000 7,500.00 - 325,000.00
8 ADI PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 7,500.00 - 390,000.00
9 P, SATIP PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 7,500.00 - 390,000.00
10 TOPIK PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 7,500.00 - 390,000.00

JUMLAH UPAH KERJA DAN LEMBURAN Rp 4,485,000


KEKURANAGAN Rp 450,000
Rp 4,935,000
BON TUKANG Rp 400,000
TOTAL KESELURUHAN Rp 4,535,000
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN PONDASI PAGAR
LOKASI PAMOTAN
MASA KERJA TANGGAL 09 DESEMBER S/D 15 DESEMBER 2018
PERIODE MINGGU KE

HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 9 10 11 12 13 14 15 15 16 17 18 19 20 21
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH

1 KASIR MANDOR 1 1 1 1 1 1 1 7 0 110,000.00 770,000 12,500.00 - 770,000.00


2 HASAN T.BATU 1 1 1 1 1 1 1 7 0 110,000.00 770,000 12,500.00 - 770,000.00
3 GONDHO T.BATU 1 1 1 1 1 1 1 7 0 100,000.00 700,000 12,500.00 - 700,000.00
4 POLO T.BATU 1 1 1 1 1 5 0 100,000.00 500,000 12,500.00 - 500,000.00
5 NUR T.BATU 1 1 1 1 1 5 0 100,000.00 500,000 12,500.00 - 500,000.00
6 HARIRI T.BATU 1 1 1 1 1 1 1 7 0 90,000.00 630,000 12,500.00 - 630,000.00
7 PAIJO T.BATU 1 1 1 3 0 90,000.00 270,000 12,500.00 - 270,000.00
8 AGUS T.BATU 1 1 1 3 0 90,000.00 270,000 12,500.00 - 270,000.00

9 ISMAIL PEKERJA 1 1 1 1 1 1 1 7 0 75,000.00 525,000 8,500.00 - 525,000.00


10 TAEK PEKERJA 1 1 1 1 1 1 1 7 0 75,000.00 525,000 8,500.00 - 525,000.00
11 SALIM PEKERJA 1 1 1 1 1 1 1 7 0 75,000.00 525,000 8,500.00 - 525,000.00
12 BUARI PEKERJA 1 1 1 1 1 1 6 0 75,000.00 450,000 8,500.00 - 450,000.00
13 JUMARI PEKERJA 1 1 1 1 1 1 1 7 0 75,000.00 525,000 8,500.00 - 525,000.00
14 SAIRI PEKERJA 1 1 1 1 4 0 75,000.00 300,000 8,500.00 - 300,000.00
15 WALUYO PEKERJA 1 1 1 1 4 0 75,000.00 300,000 8,500.00 - 300,000.00
16 SAIHUN PEKERJA 1 1 1 1 1 1 6 0 75,000.00 450,000 8,500.00 - 450,000.00
17 DIN PEKERJA 1 1 1 1 1 1 1 7 0 75,000.00 525,000 8,500.00 - 525,000.00
18 AS PEKERJA 1 1 1 1 1 1 1 7 0 75,000.00 525,000 8,500.00 - 525,000.00
19 RIBUT PEKERJA 1 1 1 1 1 1 1 7 0 75,000.00 525,000 8,500.00 - 525,000.00
20 MUNA PEKERJA 1 1 1 1 1 1 1 7 0 70,000.00 490,000 8,500.00 - 490,000.00
21 MINA PEKERJA 1 1 1 1 1 1 1 7 0 70,000.00 490,000 8,500.00 - 490,000.00

22 NUR TUKANG 1 1 1 1 0.5 1 5.5 0 90,000.00 495,000 8,500.00 - 495,000.00


23 BLACK PEKERJA 1 1 1 1 0.5 1 5.5 0 75,000.00 412,500 8,500.00 - 412,500.00
24 SUHERMAN PEKERJA 1 0.5 1 1 0.5 1 5 0 75,000.00 375,000 8,500.00 - 375,000.00
25 SODIK PEKERJA 1 1 1 1 0.5 1 5.5 0 75,000.00 412,500 8,500.00 - 412,500.00
26 SUHADI PEKERJA 1 1 1 1 0.5 1 5.5 0 75,000.00 412,500 8,500.00 - 412,500.00

JUMLAH UPAH KERJA DAN LEMBURAN Rp 12,672,500


KEKURANAGAN

BON TUKANG
TOTAL KESELURUHAN Rp -
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN PONDASI PAGAR
LOKASI PAMOTAN
MASA KERJA TANGGAL 09 DESEMBER S/D 15 DESEMBER 2018
PERIODE MINGGU KE

HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 9 10 11 12 13 14 15 15 16 17 18 19 20 21
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH

1 SUKASIR MANDOR 1 1 1 1 1 5 0 100,000.00 500,000 12,500.00 - 500,000.00


2 TOTOK T.BATU 1 1 1 1 1 1 6 0 95,000.00 570,000 12,500.00 - 570,000.00
3 NUR JEMBER T.BATU 1 1 1 1 4 0 100,000.00 400,000 12,501.00 - 400,000.00

1 ISMAIL PEKERJA 1 1 1 1 1 1 1 7 0 75,000.00 525,000 8,500.00 - 525,000.00


2 TAEK PEKERJA 1 1 1 0.5 1 4.5 0 75,000.00 337,500 8,500.00 - 337,500.00
3 DIN PEKERJA 1 1 1 1 1 1 1 7 0 75,000.00 525,000 8,500.00 - 525,000.00
4 BUARI PEKERJA 1 1 1 1 1 5 0 75,000.00 375,000 8,500.00 - 375,000.00
5 SAIUN PEKERJA 1 1 0.5 1 3.5 0 75,000.00 262,500 8,500.00 - 262,500.00
6 MUNA PEKERJA 1 1 1 1 1 1 1 7 0 70,000.00 490,000 8,500.00 - 490,000.00
7 MINA PEKERJA 1 1 1 1 1 1 1 7 0 70,000.00 490,000 8,500.00 - 490,000.00

JUMLAH UPAH KERJA DAN LEMBURAN Rp 4,475,000


KEKURANAGAN

BON TUKANG
TOTAL KESELURUHAN Rp -