B BAHAN ALAM
Batu Kali M3 100,000.00 100,000.00
Batu belah 15/20 M3 85,000.00 85,000.00
Batu belah 10/15 M3 70,000.00 70,000.00
Batu belah 5/7 M3 72,500.00 72,500.00
Batu belah 2/3 M3 90,000.00 90,000.00
Batu belah 1/2 M3 100,000.00 100,000.00
Batu Piring Bj 1,750.00 1,600.00
Batu bobos 10 x 20 x 1.50 cm Bj 3,590.00 3,000.00
Kerikil pecah mesin M3 165,000.00 165,000.00
Bataco Uk. 39 x 19 x 10 cm Bj 2,500.00 2,000.00
Roster Bj 7,500.00 7,500.00
Batu merah Bj 420.00 420.00
Sirtu M3 45,000.00 45,000.00
Pasir pasang / cor M3 100,000.00 100,000.00
Pasir urug M3 70,000.00 70,000.00
Tanah urug M3 30,000.00 30,000.00
Tebalan rumput M2 - -
C BAHAN PEREKAT
PC @ 40 Kg Gresik Zak 52,000.00 52,000.00
Semen putih @ 40 Kg Gresik Zak 49,000.00 49,000.00
Semen warna Kg 8,000.00 8,000.00
Semen merah M3 200,000.00 200,000.00
Kapur pasang M3 400,000.00 400,000.00
Kapur Sirih M3 250,000.00 250,000.00
D KAYU ALAM
Papan Bekisting Randu M3 360,000.00 360,000.00
Kayu Tahun Bekisting M3 1,730,000.00 1,730,000.00
Kayu Tahun Lokal Kelas I / Mahoni M3 3,500,000.00 3,500,000.00
Kayu Meranti Papan Klas I M3 4,500,000.00 4,500,000.00
Kayu Meranti Balok Klas II M3 4,300,000.00 4,300,000.00
Kayu Palm Batu Balok Klas I M3 4,250,000.00 4,250,000.00
Kayu Kruing Balok Klas I M3 5,500,000.00 5,500,000.00
Kayu Kruing Papan Klas I M3 5,500,000.00 5,500,000.00
Kayu Bengkirai Balok Klas I M3 4,000,000.00 4,000,000.00
Kayu Bengkirai Papan Klas I M3 4,000,000.00 4,000,000.00
Kayu Kamper Balok Klas I M3 6,000,000.00 6,000,000.00
Kayu Kamper Papan Klas I M3 6,000,000.00 6,000,000.00
Kayu Jati Balok Klas II M3 9,000,000.00 9,000,000.00
Kayu Jati Papan Klas II M3 9,500,000.00 9,500,000.00
Bambu peranca @ 400 cm Ljr 7,500.00 7,500.00
SATUAN COS HEAT
NO JENIS MATERIAL SATUAN HARGA 0% KETERANGAN
TOKO RP
E PENUTUP ATAP GENTENG
Genteng Karang Pilang Ex Bima Ambulu Bh 3,250.00 3,250.00
Bubung Karang Pilang Ex Bima Ambulu Bh 9,000.00 9,000.00
Genteng Model Karang Pilang Ngayur Bh 2,500.00 2,500.00
Bubung Model Karang Pilang Ngayur Bh 5,500.00 5,500.00
Genteng Flame Press Bh 2,750.00 2,750.00
Bubung Flame Press Bh 3,500.00 3,500.00
Genteng Beton Besar Bh 4,000.00 4,000.00
Bubung Beton "Beton Mas" Bh 6,500.00 6,500.00
Genteng Press Beton Tanggung Lokal Bh 2,500.00 2,500.00
Bubungan Press Beton Tanggung Lokal Bh 5,000.00 5,000.00
Genteng Beton Tanggung Model "Monier, Taiwan" Bh 2,800.00 2,800.00
Bubungan Beton Tanggung Model "Monier, Taiwan" Bh 5,700.00 5,700.00
H BESI BETON
Besi Beton Polos Kg 17,500.00 17,500.00
Besi Beton Polos 6 SNI Panjang 12 Ljr 23,000.00 23,000.00
Besi Beton Polos 6 Marking Panjang 12 Ljr 25,000.00 25,000.00
Besi Beton Polos 8 Marking Panjang 12 Ljr 42,500.00 42,500.00
Besi Beton Polos 8 SNI Panjang 12 Ljr 40,000.00 40,000.00
Besi Beton Polos 10 SNI Panjang 12 Ljr 60,000.00 60,000.00
Besi Beton Polos 10 Marking Panjang 12 Ljr 65,000.00 65,000.00
Besi Beton Polos 12 SNI Panjang 12 Ljr 90,000.00 90,000.00
Besi Beton Polos 12 Marking Panjang 12 Ljr 95,000.00 95,000.00
Besi Beton Polos 14 AA Panjang 11.5 Ljr 140,000.00 140,000.00
Besi Beton Polos 16 SNI Panjang 12 Ljr 180,000.00 180,000.00
Besi Beton Polos 16 Marking Panjang 12 Ljr 177,500.00 177,500.00
Besi Beton Polos 19 SNI Panjang 12 Ljr - -
Besi Beton Polos 22 SNI Panjang 12 Ljr - -
Kawat Beton Kg 17,500.00 17,500.00
Besi Beton Profit ST. 37 Kg -
SATUAN COS HEAT
NO JENIS MATERIAL SATUAN HARGA 0% KETERANGAN
TOKO RP
I LANTAI TEGEL & KERAMIK
Tegel Grys Warna 20/20 M2 30,000.00 30,000.00
Tegel Abu-Abu Kepala Basah 20/20 Bj 1,300.00 1,300.00
Paving Stone Abu-Abu Tebal 6 cm (kotak) M2 47,500.00 47,500.00
Paving Stone Abu-Abu Tebal 8 cm M2 50,000.00 50,000.00
Paving Stone Warna Tebal 6 cm M2 52,500.00 52,500.00
Paving Stone Warna Tebal 8 cm M2 55,000.00 55,000.00
Canstin (Curbing) M1 15,850.00 15,850.00
Tegel Keramik 40/40 Putih (Asia) M2 42,500.00 42,500.00
Tegel Keramik 40/40 Warna M2 52,000.00 52,000.00
Tegel Keramik 30/30 Putih Polos M2 30,000.00 30,000.00
Tegel Keramik 30/30 Warna M2 37,500.00 37,500.00
Tegel Keramik 20/25 Dinding M2 75,000.00 75,000.00
Tegel Keramik 25/25 Lantai M2 55,000.00 55,000.00
Tegel Keramik 10/20 Dinding M1 32,500.00 32,500.00
Keramik Terakota 5 x 20 cm M2 68,700.00 68,700.00
Keramik Sudut Mozaik M1 7,500.00 7,500.00
J SANITAIR
Bak Mandi Teraso Bh 180,000.00 180,000.00
Bak Mandi Fiber Glass Bh 300,000.00 300,000.00
Closet Jongkok Porselin Ina Bh 165,000.00 165,000.00
Closet Jongkok Porselin TOTO Bh 195,000.00 195,000.00
Closet Duduk KIA Bh 1,500,000.00 1,500,000.00
Closet Duduk TOTO Bh 5,000,000.00 5,000,000.00
Avour Bak Mandi Biasa Bh 27,500.00 27,500.00
Avour Pembuangan Air Kotor Bh 27,500.00 27,500.00
Wastafel Komplit Setara KIA, INA Bh 350,000.00 350,000.00
Wastafel Komplit Setara TOTO Bh 400,000.00 400,000.00
Bak Cuci Piring Teraso Bh 285,000.00 285,000.00
Bak Cuci Piring Logam Bh 235,000.00 235,000.00
Kran Air 0.50" Handle Biasa Bh 27,500.00 27,500.00
Kran Air 0.50" Handle "Silver Star" Bh 42,500.00 42,500.00
Kran Air 0.50" Handle "Duppon Bh 50,000.00 50,000.00
Kran Air 0.50" leher angsa "Duppon Bh 75,000.00 75,000.00
Shoower 0.50" Handle "Duppon Bh 175,000.00 175,000.00
Jet wooser 0.50" Handle "Duppon Bh 75,000.00 75,000.00
Pipa / Slang Spiral Bh 35,000.00 35,000.00
Pompa Listrik Merk "NATIONAL" Bh 1,500,000.00 1,500,000.00
Pompa Listrik Merk "SANYO" Bh 2,500,000.00 2,500,000.00
Pipa PVC Dia 4" "RRJ" M1 25,000.00 25,000.00
Pipa PVC Dia 3" "RRJ" M1 22,500.00 22,500.00
Pipa PVC Dia 2,5" M1 10,000.00 10,000.00
Pipa PVC Dia 2" M1 7,500.00 7,500.00
Pipa PVC Dia 1,5" M1 8,700.00 8,700.00
Pipa PVC Dia 1" M1 5,000.00 5,000.00
Pipa PVC Dia 0,75" M1 4,375.00 4,375.00
Pipa PVC Dia 0,5" M1 3,750.00 3,750.00
Talang PVC Model Kotak "MASPION" M1 12,500.00 12,500.00
Sambungan Talang Kotak Tanpa Lubang Bh 6,800.00 6,800.00
Sambungan Talang Kotak Dengan Lubang Bh 20,600.00 20,600.00
Tutup Samping Talang Kotak PVC Bh 6,800.00 6,800.00
Hak Penggantung Talang Kotak PVC Bh 5,500.00 5,500.00
Klem Talang Tegak PVC Bh 3,300.00 3,300.00
Pipa PVC Dia 6" "RRJ" M1 62,500.00 62,500.00
Pipa PVC Dia 4" "RRJ" M1 17,500.00 17,500.00
Pipa PVC Dia 3" "RRJ" M1 12,500.00 12,500.00
Pipa PVC Dia 2,5" M1 10,000.00 10,000.00
Pipa PVC Dia 2" M1 7,500.00 7,500.00
Pipa PVC Dia 1,5" M1 8,700.00 8,700.00
Pipa PVC Dia 1" M1 5,000.00 5,000.00
Pipa PVC Dia 0,75" M1 4,375.00 4,375.00
Pipa PVC Dia 0,5" M1 3,750.00 3,750.00
Lem PVC Bh 10,000.00 10,000.00
Watermuur / Sockdrat Bh 7,500.00 7,500.00
Rol TBA Rol 2,000.00 2,000.00
SATUAN COS HEAT
NO JENIS MATERIAL SATUAN HARGA 0% KETERANGAN
TOKO RP
K TRIPLEKS
Plywood 4 mm 90 cm x 210 cm Lmb 65,000.00 55,000.00
Plywood 4 mm 120 cm x 240 cm Lmb 70,000.00 68,700.00
Plywood 6 mm 120 cm x 240 cm Lmb 75,000.00 110,000.00
Plywood 9 mm 120 cm x 240 cm Lmb 137,500.00 137,500.00
Plywood 12 mm 120 cm x 240 cm Lmb 165,000.00 165,000.00
Plywood 18 mm 120 cm x 240 cm Lmb 210,000.00 210,000.00
Teakwood 4 mm 90 cm x 210 cm 3mm Lmb 45,000.00 45,000.00
Teakwood 4 mm 120 cm x 240 cm Lmb 96,200.00 96,200.00
Triplex / Aluminium 4mm 90 cm x 210 cm Lmb 89,300.00 89,300.00
Partikel 12 mm 122 cm x 244 cm Lmb 94,000.00 94,000.00
MDF 3 mm 122 cm x 244 cm Lmb 34,000.00 34,000.00
MDF 6 mm 122 cm x 244 cm Lmb 62,000.00 62,000.00
MDF 9 mm 122 cm x 244 cm Lmb 97,000.00 97,000.00
MDF 12 mm 122 cm x 244 cm Lmb 125,000.00 125,000.00
MDF 15 mm 122 cm x 244 cm Lmb 148,000.00 148,000.00
Multiplexs 15 mm 122 cm x 244 cm Lmb 175,000.00 175,000.00
Multiplexs 20 mm 122 cm x 244 cm Lmb 210,000.00 210,000.00
L PENGUNCI
Kunci Tanam Besar Merk "TOOTI" Bh 151,200.00 151,200.00
Kunci Tanam Merk "YALE" Bh 95,000.00 95,000.00
Kunci Tanam Merk "Kuda Terbang / Kodai " Bh 75,000.00 75,000.00
Kunci Tanam Wing "808" Bh 15,000.00 15,000.00
Engsel Pintu Stel 35,000.00 35,000.00
Grendel Pintu Pernekel Biasa Bh 7,500.00 7,500.00
Grendel Tanam Pernekel Stel 41,200.00 41,200.00
Grendel Tanam Coklat/Brown Stel 34,300.00 34,300.00
Engsel Jendela Stel 12,000.00 12,000.00
Grendel Jendela Pernekel Biasa Bh 6,000.00 6,000.00
Hak Angin Lurus Biasa (Berkait) Stel 5,500.00 5,500.00
Hak Angin Lurus (Stel Maju Mundur) Stel 10,200.00 10,200.00
Hak Angin Sikutan Kecil Pernekel (Sakura) Stel 10,000.00 10,000.00
Hak Angin Sikutan Besar Pernekel (Sakura) Stel 17,100.00 17,100.00
Kaca Bening 6 mm M2 85,000.00 85,000.00
Kaca Bening 5 mm M2 65,000.00 65,000.00
Kaca Reyben 5 mm M2 82,500.00 82,500.00
Naco 70 cm Lebar 15 cm Reyben 5 mm Lmb 22,000.00 22,000.00
Kawat Ghass / Harmonika M2 25,000.00 25,000.00
SATUAN COS HEAT
NO JENIS MATERIAL SATUAN HARGA 0% KETERANGAN
TOKO RP
M BAHAN CAT
Cat Tembok Kwalitas Baik Dulux Kg 97,500.00 97,500.00 243,750.00
Cat Tembok Kwalitas Baik Decolith Kg 18,500.00 18,500.00 92,500.00
Plamuur Tembok Kg 12,000.00 12,000.00
Cat Kayu EMCO Biasa Kg 43,500.00 43,500.00
Cat Kayu EMCO Bintang Kg 49,500.00 49,500.00
Cat Genteng setara Mowilex Kg 35,000.00 35,000.00
Plamuur Kayu Kg 18,500.00 18,500.00
Dempul Kg 17,500.00 17,500.00
Meni Kayu Cap "Pedang" Kg 18,500.00 18,500.00
Meni Besi zhincromet Kg 27,500.00 27,500.00
Minyak Cat Biasa (Thinner Biasa) Ltr 8,500.00 8,500.00
Thinner A Special Ltr 25,500.00 25,500.00
Kertas Gosok Lmb 3,500.00 3,500.00
Cat Besi "Brown" Kg 45,000.00 45,000.00
Cat Besi Emco Kg 42,500.00 42,500.00
Teer Ltr 6,500.00 6,500.00
Sirlagh Kg 90,000.00 90,000.00
Spiritus Ltr 17,500.00 17,500.00
Lem Kayu Fox Kg 25,500.00 25,500.00
N LISTRIK
Titik Lampu + Instalasi Ttk 82,500.00 82,500.00
Kabel NYA 1 x 2.50 mm M' 7,000.00 7,000.00
Kabel NY 2 x 2.50 mm M' 9,000.00 9,000.00
Isolasi Bh 3,300.00 3,300.00
Las Dop Bh 200.00 200.00
Fiting Plafond (Hitam) Bh 8,500.00 8,500.00
Tee Doss PVC Bh 1,500.00 1,500.00
Miniswitch 32 Amp Bh 192,500.00 192,500.00
Pipa Pralon 5/8" Ljr 7,500.00 7,500.00
Lampu TL 2 x 20 Watt Bh 140,000.00 140,000.00
Lampu TL 1 x 20 Watt Phillips Bh 115,000.00 115,000.00
Lampu TL 1 x 40 Watt Phillips Bh 175,000.00 175,000.00
Lampu SL 18 Watt Bh 37,500.00 37,500.00
Lampu Pijar 25, 40, 60 Watt Bh 15,000.00 15,000.00
WD Fighting Porselin Bh 20,000.00 20,000.00
Stop Kontak BROCO Bh 17,500.00 17,500.00
Saklar Ganda BROCO Bh 17,500.00 17,500.00
Saklar Tunggal BROCO Bh 17,500.00 17,500.00
Panel Box MCB Bh 85,000.00 85,000.00
MCB 10 Ampere Bh 75,000.00 75,000.00
Elektrode Kg 30,000.00 30,000.00
-
O BUIS BETON -
1 Pipa Besi Galvanis 1.5" M' 47,500.00 47,500.00
2 Pipa Besi Galvanis 1" M' 35,000.00 35,000.00
3 Pipa Besi Galvanis 0,75" M' 25,000.00 25,000.00
4 Pipa Besi Galvanis 0.5" M' 22,500.00 22,500.00
5 Buis Beton U 20 cm x 100 cm Bh 47,500.00 47,500.00
6 Buis Beton U 30 cm x 100 cm Bh 50,000.00 50,000.00
7 Buis Beton U 40 cm x 100 cm Bh 52,500.00 52,500.00
8 Buis Beton U 50 cm x 100 cm Bh 57,500.00 57,500.00
9 Buis Beton U 60 cm x 60 cm Bh 75,000.00 75,000.00
10 Buis Beton U 80 cm x 60 cm Bh 95,000.00 95,000.00
-
SATUAN COS HEAT
C SEWA ALAT
A BESI
Besi Beton 6 " 175 #REF! #REF!
Besi Beton 8 " 100 40,000.00 4,000,000.00
Besi Beton 10 " 75 #REF! #REF!
Besi Beton 12 " 135 #REF! #REF!
Besi Beton 14 " 100 140,000.00 14,000,000.00
Bendrat 75 17,500.00 1,312,500.00
Paku 50 17,500.00 875,000.00
B BATU
Batu Pondasi 2 180,000.00 360,000.00
Batu Merah 3000 185.00 555,000.00
Batu Cor 3 425,000.00 1,275,000.00
Pasir Kali 5 175,000.00 875,000.00
C PEREKAT
Semen Gresik a 40 kg 85 26,500.00 2,252,500.00
Semen Tigaroda 90 24,500.00 2,205,000.00
Gamping 3 52,000.00 156,000.00
D PERANCA / KAYU
Kayu Kusen 6 / 15 x 400 25 120,000.00 3,000,000.00
Bambu panjang 4 m ' 600 3,000.00 1,800,000.00
Kayu 4 / 6 x 400 1.5 1,730,000.00 2,595,000.00
Kayu 2 / 20 x 200 (Randu) 600 3,000.00 1,800,000.00
Tripleks 120x240 3mm 8 46,000.00 368,000.00
Tripleks 120x240 3 mm ( Milamen ) 1 65,000.00 65,000.00
E PERALATAN
Cangkul 3 35,000.00 105,000.00
Sekrop 4 25,000.00 100,000.00
Ganjo 2 45,000.00 90,000.00
Linggis 2 35,000.00 70,000.00
Betel 5 7,500.00 37,500.00
Palu 3 20,000.00 60,000.00
Kereta Dorong Arco 1 150,000.00 150,000.00
Timba 40 4,000.00 160,000.00
Benang 4 2,500.00 10,000.00
F LAIN - LAIN
Pembuangan Bekas Bongkaran 12 105,000.00 1,260,000.00
Transportasi 1 250,000.00 250,000.00
G UPAH KERJA
Upah kerja Dalam Minggu 3 2,250,000.00 6,750,000.00
TOTAL KESELURUHAN
SATUAN COS HEAT
A BESI
Besi Beton 6 " 395 12,500.00 4,937,500.00
Besi Beton 8 " 220 40,000.00 8,800,000.00
Besi Beton 10 " 90 #REF! #REF!
Besi Beton 12 " 185 #REF! #REF!
Besi Beton 14 " 100 140,000.00 14,000,000.00
Bendrat 150 17,500.00 2,625,000.00
Paku 150 17,500.00 2,625,000.00
B BATU
Batu Pondasi 2 180,000.00 360,000.00
Batu Merah 4000 185.00 740,000.00
Batu Cor 11 425,000.00 4,675,000.00
Pasir Kali 10 175,000.00 1,750,000.00
C PEREKAT
Semen Gresik a 40 kg 160 26,500.00 4,240,000.00
Semen Tigaroda 340 24,500.00 8,330,000.00
Gamping 3 52,000.00 156,000.00
D PERANCA / KAYU
Kayu Kusen 6 / 15 x 400 25 120,000.00 3,000,000.00
Bambu panjang 4 m ' 600 3,000.00 1,800,000.00
Kayu 4 / 6 x 400 2 1,730,000.00 3,460,000.00
Kayu 2 / 20 x 200 (Randu) 1000 3,000.00 3,000,000.00
Tripleks 120x240 3mm 8 46,000.00 368,000.00
Tripleks 120x240 3 mm ( Milamen ) 1 65,000.00 65,000.00
E PERALATAN
Cangkul 4 35,000.00 140,000.00
Sekrop 8 25,000.00 200,000.00
Ganjo 2 45,000.00 90,000.00
Linggis 2 35,000.00 70,000.00
Betel 8 7,500.00 60,000.00
Palu 3 20,000.00 60,000.00
Kereta Dorong Arco 1 150,000.00 150,000.00
Timba 80 4,000.00 320,000.00
Benang 6 2,500.00 15,000.00
F LAIN - LAIN
Pembuangan Bekas Bongkaran 14 105,000.00 1,470,000.00
Transportasi 1 500,000.00 500,000.00
Instalasi Listrik 1 1,500,000.00 1,500,000.00
Sewa molen dan Vibrator 1 1,000,000.00 1,000,000.00
Ijin Listrik 1 350,000.00 350,000.00
G UPAH KERJA
Upah kerja Dalam Minggu 6 2,500,000.00 15,000,000.00
Upah Kusen 94 7,000.00 658,000.00
Upah Pengecoran 32 80,000.00 2,560,000.00
TOTAL KESELURUHAN
36,000.00
30,000.00
29,000.00
28,000.00
28,000.00
28,000.00
28,000.00
28,000.00
18,000.00
20,000.00
400,000.00 91,000.00
89,200.00
89,200.00
122,000.00
97,000.00
129,900.00
1,600.00
3,000.00
67,200.00
60,400.00
48,100.00
44,000.00
7,700.00
81,300.00
3,500.00
142,500.00
238095.23809524 439,300.00 210000
254,200.00 400,000.00
250.00
1,725,000.00
2,443,700.00
2,802,500.00
2,156,200.00
2,802,500.00
3,018,700.00
3,306,200.00
4,168,700.00
4,096,200.00
4,671,200.00
8,625,000.00
10,062,500.00
3,100.00
8,600.00
2,100.00
5,500.00
700.00
4,200.00
3,600.00
6,700.00
2,800.00
5,700.00
51,700.00
34,500.00
71,800.00
54,600.00
43,100.00
64,600.00
67,000.00
21,500.00
32,200.00
43,100.00
13,600.00
79,000.00
21,500.00
8,600.00
11,700.00
30,000.00
8,100.00
13,700.00
100.00
15,700.00
200.00
10,000.00
47,000.00 47000
127,000.00 127000
205,000.00 205000
12,200.00
11,700.00
63,200.00
65,000.00
57,700.00
48,100.00
53,600.00
68,700.00
178,700.00
288,700.00
144,300.00
185,600.00
1,237,500.00
2,062,500.00
27,500.00
27,500.00
330,000.00
364,300.00
275,000.00
226,800.00
26,200.00
41,200.00
34,300.00
1,200,000.00
2,200,000.00
101,200.00 101,200.00
17,500.00 48,700.00
12,500.00 32,500.00
10,000.00 22,500.00
7,500.00 16,200.00
8,700.00 8,700.00
5,000.00 5,000.00
4,375.00 4,300.00
3,750.00 3,700.00
55,000.00
68,700.00
110,000.00
137,500.00
165,000.00
75,600.00
96,200.00
89,300.00
151,200.00
85,000.00
61,800.00
10,200.00
14,300.00
6,800.00
41,200.00
34,300.00
11,000.00
6,800.00
5,500.00
10,200.00
12,300.00
17,100.00
68,700.00
82,500.00
22,000.00
20,600.00
487,500.00 18,500.00
18,500.00
14,000.00
43,700.00
49,300.00
104,000.00
14,300.00
14,300.00
18,700.00
11,800.00
15,600.00
3,000.00
43,300.00
44,000.00
5,700.00
89,300.00
14,000.00
25,500.00
82,500.00
1,300.00
3,300.00
200.00
6,800.00
1,000.00
192,500.00
4,400.00
137,400.00
68,700.00
96,200.00
50,000.00
10,200.00
19,800.00
20,600.00
24,000.00
20,600.00
171,800.00
41,200.00
47,500.00 40,000.00
35,000.00 28,100.00
25,000.00 18,700.00
22,500.00 13,700.00
35,800.00
43,100.00
50,200.00
64,600.00
69,500.00
93,300.00
6,800.00
20,600.00
6,800.00
5,500.00
4,700.00
8,200.00
3,300.00
4,700.00
84,700.00
13,000.00
26,000.00
19,000.00
15,000.00
5,000.00
12,000.00
104,000.00
100,000.00
24,000.00
22,000.00
26,400.00
#REF!
3,065,000.00
4,613,500.00
9,628,000.00
782,500.00
1,510,000.00
6,750,000.00
#REF!
#REF!
7,525,000.00
12,726,000.00
11,693,000.00
1,105,000.00
4,820,000.00
18,218,000.00
#REF!
101,200.00
48,700.00
32,500.00
22,500.00
16,200.00
8,700.00
5,000.00
4,300.00
3,700.00
40,000.00
28,100.00
18,700.00
13,700.00
DAFTAR ANALISA HARGA SATUAN UPAH DAN BAHAN
KHUSUS BANGUNAN GEDUNG WILAYAH JEMBER TIMUR DAN TENGAH
1 M3 GALIAN TANAH
0.7500 Org Pekerja 37,500.00 28,125.00
0.0250 Org Mandor 60,000.00 1,500.00
Jumlah 29,625.00 29,625.00 29,625.00
Dibulatkan 29,600.00 29,600.00
1 M3 AANSTAMPING
1.1000 M3 Batu Kali 85,000.00 93,500.00
0.4000 M3 Pasir Urug 70,000.00 28,000.00
0.6000 Org Pekerja 37,500.00 22,500.00
0.3000 Org Tukang Batu 55,000.00 16,500.00
0.0300 Org Kepala Tukang 50,000.00 1,500.00
0.0300 Org Mandor 60,000.00 1,800.00
Jumlah 121,500.00 42,300.00 163,800.00 163,800.00
Dibulatkan 163,800.00 163,800.00
1 BH FOOT PLAT BETON BERTULANG 1,2 x 1,2 x 0.4 M ( Besi dia 12 mm & 14 mm )
1.5000 Ljr Besi Beton Polos Besi 14 140,000.00 210,000.00
1.5000 Ljr Besi Beton Polos Besi 12 95,000.00 142,500.00
1.4400 Kg Kawat Beton 17,500.00 25,200.00
4.6080 Zak PC @ 40 Kg Gresik 52,000.00 239,616.00
0.4723 M3 Kerikil Pecah Mesin 165,000.00 77,932.80
0.3686 M3 Pasir Cor 100,000.00 36,864.00
1.0000 Bh Pembesian 56,655.00 56,655.00
1.0000 Bh Pengecoran 77,932.80 77,932.80
Jumlah 732,112.80 134,587.80 866,700.60 866,700.60
Dibulatkan 866,700.00 866,700.00
1 M1 BALOK GANTUNG BETON BERTULANG 20/40 ( 6 - 16" + 4 -12 "+ 8" -15)
0.1980 M1 Papan Randu 3/20 360,000.00 71,280.00
0.0650 Kg Paku Biasa 2 '' - 5 '' 17,500.00 1,137.50
0.5739 Ljr Besi Beton Polos Besi 16 SNI 180,000.00 103,304.35
0.4870 Ljr Besi Beton Polos Besi 12 SNI 90,000.00 43,826.09
0.8826 Ljr Besi Beton Polos Besi 8 SNI 40,000.00 35,304.35
0.2000 Kg Kawat Beton 17,500.00 3,500.00
0.6560 Zak PC @ 40 Kg Gresik 52,000.00 34,112.00
0.0656 M3 Kerikil Pecah Mesin 165,000.00 10,824.00
0.0416 M3 Pasir Cor 100,000.00 4,160.00
0.0096 Btg Kayu 4/6 3,500,000.00 33,600.00
3.0000 Btg Bambu 7,500.00 22,500.00
1.0000 M1 Pembesian 27,890.22 27,890.22
1.0000 M1 Bekisting+Bongkar Cetakan 19,277.63 19,277.63
1.0000 M1 Pengecoran 14,728.80 14,728.80
Jumlah 363,548.28 61,896.64 425,444.93 425,444.93
Dibulatkan 425,400.00 425,400.00
1 M2 PLESTERAN 1 : 3
0.2000 Zak PC @ 40 Kg 52,000.00 10,400.00
0.0194 M3 Pasir Pasang 100,000.00 1,940.00
0.2000 Org Pekerja 37,500.00 7,500.00
0.0600 Org Tukang Batu 55,000.00 3,300.00
0.0120 Org Kepala Tukang 50,000.00 600.00
0.0120 Org Mandor 60,000.00 720.00
Jumlah 12,340.00 12,120.00 24,460.00 24,460.00
Dibulatkan 24,400.00 24,400.00
1 M2 PLESTERAN 1 : 4
0.1600 Zak PC @ 40 Kg 52,000.00 8,320.00
0.0210 M3 Pasir Pasang 100,000.00 2,100.00
0.2000 Org Pekerja 37,500.00 7,500.00
0.0600 Org Tukang Batu 55,000.00 3,300.00
0.0120 Org Kepala Tukang 50,000.00 600.00
0.0120 Org Mandor 60,000.00 720.00
Jumlah 10,420.00 12,120.00 22,540.00 22,540.00
Dibulatkan 22,500.00 22,500.00
1 M2 PLESTERAN 1 : 3 : 10
0.0700 Zak PC @ 40 Kg 52,000.00 3,640.00
0.0070 M3 Kapur 400,000.00 2,800.00
0.0300 M3 Pasir Pasang 100,000.00 3,000.00
0.2000 Org Pekerja 37,500.00 7,500.00
0.0600 Org Tukang Batu 55,000.00 3,300.00
0.0120 Org Kepala Tukang 50,000.00 600.00
0.0120 Org Mandor 60,000.00 720.00
Jumlah 9,440.00 12,120.00 21,560.00 21,560.00
Dibulatkan 21,500.00 21,500.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%
1 M' BENANGAN 1 : 2
0.0086 Zak PC @ 40 Kg 52,000.00 447.20
0.0010 M3 Pasir Pasang 100,000.00 100.00
0.0500 Org Pekerja 37,500.00 1,875.00
0.0700 Org Tukang Batu 55,000.00 3,850.00
0.0065 Org Kepala Tukang 50,000.00 325.00
0.0065 Org Mandor 60,000.00 390.00
Jumlah 547.20 6,440.00 6,987.20 6,987.20
Dibulatkan 6,900.00 6,900.00
1 M2 SETRIKAN / SIARAN 1 : 3
0.1320 Zak PC @ 40 Kg 52,000.00 6,864.00
0.0090 M3 Pasir Pasang 100,000.00 900.00
0.3600 Org Pekerja 37,500.00 13,500.00
0.1200 Org Tukang Batu 55,000.00 6,600.00
0.0120 Org Kepala Tukang 50,000.00 600.00
0.0180 Org Mandor 60,000.00 1,080.00
Jumlah 7,764.00 21,780.00 29,544.00
Dibulatkan 29,500.00
1 M2 PASANG ROSTER
23.0000 Bh Roster 7,500.00 172,500.00
0.0403 Zak PC @ 40 Kg 52,000.00 2,095.60
0.0060 M3 Pasir Pasang 100,000.00 600.00
0.0840 Org Pekerja 37,500.00 3,150.00
0.1200 Org Tukang Batu 55,000.00 6,600.00
0.0120 Org Kepala Tukang 50,000.00 600.00
Jumlah 175,195.60 10,350.00 185,545.60 185,545.60
Dibulatkan 185,500.00 185,500.00
1 BH GRENDEL BIASA
1.0000 Bh Grendel Jendela Pernekel Biasa 6,000.00 6,000.00
0.0250 Org Pekerja 37,500.00 937.50
0.0450 Org Tukang Kayu 55,000.00 2,475.00
Jumlah 6,000.00 3,412.50 9,412.50 9,412.50
Dibulatkan 9,400.00 9,400.00
1 TITIK INSTALASI
11.0000 M' Kabel NYM 2 x 2.5 mm 7,000.00 77,000.00
1.0000 Ljr Pipa Paralon 5/8" 7,500.00 7,500.00
0.5000 Bh Isolasi 3,300.00 1,650.00
1.0000 Bh Las Dop 200.00 200.00
1.0000 Bh T Doos PVC 1,500.00 1,500.00
0.1500 Org Pekerja 37,500.00 5,625.00
0.4000 Org Tukang Listrik 45,000.00 18,000.00
0.0400 Org Kepala Tukang 50,000.00 2,000.00
Jumlah 87,850.00 25,625.00 113,475.00 113,475.00
Dibulatkan 113,400.00 113,400.00
1 BH PASANG LAMPU SL
1.0000 Bh Fitting dowlaight 45,000.00 45,000.00
1.0000 Bh Lampu SL 18 Watt 37,500.00 37,500.00
0.2000 Org Tukang Listrik 45,000.00 9,000.00
0.0500 Org Kepala Tukang 50,000.00 2,500.00
Jumlah 82,500.00 11,500.00 94,000.00 94,000.00
Dibulatkan 94,000.00 94,000.00
1 BH PASANG LAMPU TL
1.0000 Bh Lampu TL komplit 175,000.00 175,000.00
0.2000 Org Tukang Listrik 45,000.00 9,000.00
0.0500 Org Kepala Tukang 50,000.00 2,500.00
Jumlah 175,000.00 11,500.00 186,500.00 186,500.00
Dibulatkan 186,500.00 186,500.00
HARGA SATUAN JML HARGA JML HARGA TOTAL
JENIS PEKERJAAN JUMLAH (Rp)
(Rp) BAHAN (Rp) UPAH (Rp) 0%
1 UNIT PEMBUATAN SEPTIKTANK DAN RESAPAN UK. 2.50 X 1.00 X 1.25 (RONG)
3.7500 M3 Galian Tanah 29,600.00 111,000.00
7.5000 M2 Pasang Batu Merah 1 : 4 67,700.00 507,750.00
4.1800 M2 Pasang Batu Merah Kosong 45,300.00 189,354.00
10.8000 M2 Plesteran 1 : 3 22,500.00 243,000.00
0.3180 M3 Plat Beton 1 : 2 : 3 Tb. 8 cm 3,895,600.00 1,238,800.80
1.0000 Ls Lubang Udara Pipa GI Dia 2" 80,000.00 80,000.00
Jumlah - 2,369,904.80 2,369,904.80 2,369,904.80
Dibulatkan 2,369,900.00 2,369,900.00
PLANT : WONOREJO
PEKERJAAN : GUDANG VULKANISIR
TANGGAL : 12 JUNI 2014
SATUAN JUMLAH
No JENIS PEKERJAAN SAT VOLUME HARGA HARGA
Rp Rp
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan bongkar bangunan Ls 1.00 1,000,000.00 1,000,000.00 3.0703 100 3.0703
2 Pasang bauwplank dan pengukuran Ls 1.00 750,000.00 750,000.00 2.3027 100 2.3027
3 Mobilisai Ls 1.00 750,000.00 750,000.00 2.3027 100 2.3027
4 Pembuatan barak karyawan Ls 1.00 250,000.00 250,000.00 0.7676 100 0.7676
JUMLAH 2,750,000.00 8.4434 8.4434
B PEKERJAAN TANAH
1 Galian tanah stroos mixer dan zillo Titik 12.00 360,000.00 4,320,000.00 13.2638 100 13.2638
2 Galian tanah stroos hopper Titik 15.00 40,000.00 600,000.00 1.8422 100 1.8422
3 Galian tanah untuk pondasi hopper M3 14.96 20,000.00 299,200.00 0.9186 100 0.9186
4 Bobok lantai beton rabat Titik 8.00 125,000.00 1,000,000.00 3.0703 100 3.0703
JUMLAH 6,219,200.00 19.0949 19.0949
C PEKERJAAN PASANGAN
1 Pasang batu pondasi hopper M3 72.43 125,000.00 9,053,750.00 27.7978 0 0.0000
2 Pasang beton stroos Φ 40 M3 9.04 700,000.00 6,330,240.00 19.4358 50 9.7179
3 Pasang beton stroos Φ 30 M3 1.06 700,000.00 741,825.00 2.2776 50 1.1388
4 Pasang umpak zillo Uk 45/45x60 M3 0.97 700,000.00 680,400.00 2.0890 0 0.0000
5 Pasang umpak mixer Uk 45/45x45 M3 0.36 700,000.00 255,150.00 0.7834 0 0.0000
6 Pasang kopel sloof mixer 30/45 M3 1.62 700,000.00 1,134,000.00 3.4817 0 0.0000
7 Pasang kopel sloof zillo 30/45 M3 2.38 700,000.00 1,663,200.00 5.1065 0 0.0000
8 Pasang kolom hopper 30/30 M3 2.29 700,000.00 1,600,200.00 4.9131 0 0.0000
9 Pasang balok ring pengikat pondasi M3 3.06 700,000.00 2,142,000.00 6.5766 0 0.0000
JUMLAH 23,600,765.00 72.4617 10.8567
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan bongkar bangunan Ls 1.00 1,000,000.00 1,000,000.00 3.0703 100 3.0703
2 Pasang bauwplank dan pengukuran Ls 1.00 750,000.00 750,000.00 2.3027 100 2.3027
3 Mobilisai Ls 1.00 750,000.00 750,000.00 2.3027 100 2.3027
4 Pembuatan barak karyawan Ls 1.00 250,000.00 250,000.00 0.7676 100 0.7676
JUMLAH 2,750,000.00 8.4434 8.4434
B PEKERJAAN TANAH
1 Galian tanah stroos mixer dan zillo Titik 12.00 360,000.00 4,320,000.00 13.2638 100 13.2638
2 Galian tanah stroos hopper Titik 15.00 40,000.00 600,000.00 1.8422 100 1.8422
3 Galian tanah untuk pondasi hopper M3 14.96 20,000.00 299,200.00 0.9186 100 0.9186
4 Bobok lantai beton rabat Titik 8.00 125,000.00 1,000,000.00 3.0703 100 3.0703
JUMLAH 6,219,200.00 19.0949 19.0949
C PEKERJAAN PASANGAN
1 Pasang batu pondasi hopper M3 72.43 125,000.00 9,053,750.00 27.7978 70 19.4585
2 Pasang beton stroos Φ 40 M3 9.04 700,000.00 6,330,240.00 19.4358 100 19.4358
3 Pasang beton stroos Φ 30 M3 1.06 700,000.00 741,825.00 2.2776 0 0.0000
4 Pasang umpak zillo Uk 45/45x60 M3 0.97 700,000.00 680,400.00 2.0890 100 2.0890
5 Pasang umpak mixer Uk 45/45x45 M3 0.36 700,000.00 255,150.00 0.7834 100 0.7834
6 Pasang kopel sloof mixer 30/45 M3 1.62 700,000.00 1,134,000.00 3.4817 50 1.7409
7 Pasang kopel sloof zillo 30/45 M3 2.38 700,000.00 1,663,200.00 5.1065 100 5.1065
8 Pasang kolom hopper 30/30 M3 2.29 700,000.00 1,600,200.00 4.9131 70 3.4392
9 Pasang balok ring pengikat pondasi M3 3.06 700,000.00 2,142,000.00 6.5766 25 1.6442
JUMLAH 23,600,765.00 72.4617 53.6975
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PERSIAPAN
1 Persiapan Ls 1.00 1.00 1,000,000.00
2 Pembuatan bedeng Ls 1.00 1.00 1,000,000.00
3 Pasang sumur Ls 1.00 1.00 250,000.00
Sub total
II PEKERJAAN PONDASI ZILLO
1 Pengukuran & bauwplank Ls 1.00 1.00 150,000.00
2 Pemeratan tanah M2 (3,5*3,5) 12.25 7,500.00
3 Pembesian & cor sloof M2 (3*4) 12.00 35,000.00
4 Pasang bekisting plat lantai M1 (3,5*4) 14.00 15,000.00
6 Pembesian & Cor plat lantai tebal 15 cm M2 (3,5*3,5) 12.25 35,000.00
7 Pasang bekisting benda uji M1 (3*4) 12.00 30,000.00
8 Pembesian & cor sloof M2 (3*4) 12.00 45,000.00
9 Pasang bekisting kolom 50/50 M1 (1,55*4) 6.20 75,000.00
10 Pembesian & cor kolom 50/50 M1 1,55*4) 6.20 75,000.00
11 Pasang plendes pelek Bh 4.00 4.00 35,000.00
Sub total
III PEKERJAAN TANGKI SOLAR
1 Pengukuran Ls 1.00 1.00 50,000.00
2 Pasang bekisting benda uji Bh 4.00 4.00 35,000.00
3 Pembesian & cor plat 60/60 Bh 4.00 4.00 50,000.00
Sub total
IV PEKERJAAN PONDASI PAGAR
1 Pengukuran & bauwplank Ls 1.00 1.00 500,000.00
2 Perapian galian tanah M1 50.00 50.00 5,000.00
3 Pasang batu pondasi M3 (0,3*1)*50 15.00 150,000.00
Sub total
V PEKERJAAN LAIN LAIN
1 Transportasi Ls 1.00 1.00 500,000.00
Sub total
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PERSIAPAN
1 Pembuatan bedeng tambahan Ls 1.00 1.00 500,000.00
Sub total
II PEKERJAAN KONTAENER
1 Pasang daun jendela sleading Bh 4.00 4.00 125,000.00
2 Pasang daun pintu Bh 1.00 1.00 175,000.00
Sub total
III PEKERJAAN PONDASI PAGAR
Bagian timur
1 Pengukuran & bauwplank Ls 1.00 1.00 500,000.00
2 Perapian galian tanah & perapian M1 (22*5)-50 59.00 5,000.00
3 Galian tanah strous Bh 22.00 22.00 15,000.00
4 Pasang & cor kolom strous Bh 22.00 22.00 50,000.00
5 Pasang batu pondasi M3 (1,00+0,7)/2*1,1*110-(15,0) 87.85 150,000.00
6 Pembesian & cor kolom M1 (1,00*23) 23.00 50,000.00
Bagian selatan
1 Pengukuran & bauwplank Ls 1.00 1.00 500,000.00
2 Perapian galian tanah & perapian M1 25.00 25.00 5,000.00
3 Galian tanah strous Bh 6.00 6.00 15,000.00
4 Pasang & cor kolom strous Bh 6.00 6.00 50,000.00
5 Pasang batu pondasi level 2,00 M3 (1,00*0,7)*25 17.50 150,000.00
6 Pasang batu pondasi M3 (1,00+0,7)/2*1,0*25 21.25 150,000.00
7 Pembesian & cor kolom M1 (1,70*6) 10.20 50,000.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 1.00 750,000.00
2 Langsir material Ls 1.00 1.00 1,500,000.00
3 Transportasi Ls 1.00 1.00 750,000.00
Sub total
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
III PEKERJAAN PONDASI PAGAR
Bagian timur
1 Pasang batu pondasi M3 (1,00+0,7)/2*0,4*110 22.40 150,000.00
2 Pembesian & cor kolom M1 (0,4*23) 9.20 50,000.00
Bagian selatan
1 Pasang batu pondasi M3 (0,7+0,5)/2*0,4*25 6.00 150,000.00
2 Pembesian & cor kolom M1 (0,4*6) 2.40 50,000.00
Bagian selatan bagian 2
1 Pengukuran & bauwplank Ls 1.00 1.00 250,000.00
2 Perapian galian tanah & perapian M1 100.00 100.00 5,000.00
3 Galian tanah strous Bh 20.00 20.00 15,000.00
4 Pasang & cor kolom strous Bh 20.00 20.00 50,000.00
5 Pasang batu pondasi level 2,00 M3 (1,00*0,7)*100 70.00 150,000.00
6 Pembesian & cor kolom M1 (1*20) 20.00 50,000.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 1.00 250,000.00
2 Langsir material Ls 1.00 1.00 500,000.00
3 Transportasi Ls 1.00 1.00 500,000.00
Sub total
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
III PEKERJAAN PONDASI PAGAR
Bagian timur 1 St 110 - 130 m
1 Galian tanah strous Bh 4.00 4.00 15,000.00
2 Pasang & cor kolom strous Bh 4.00 4.00 50,000.00
3 Pasang batu pondasi M3 (1,00+0,5)/2*1,4*20 21.00 150,000.00
4 Pembesian & cor kolom M1 (1,4*4) 5.60 50,000.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 1.00 250,000.00
2 Langsir material Ls 1.00 1.00 500,000.00
3 Transportasi Ls 1.00 1.00 500,000.00
Sub total
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PONDASI PAGAR
Bagian timur 45 M ( St 130 - 175 m)
1 Galian tanah strous Bh 9.00 9.00 15,000.00
2 Pasang & cor kolom strous Bh 9.00 9.00 50,000.00
3 Pasang batu pondasi M3 (1,00+0,5)/2*1,6*35 42.00 150,000.00
4 Pembesian & cor kolom M1 (1,6*9) 14.40 50,000.00
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PONDASI PAGAR
Bagian timur 1 panjang 110 m (St 0,00 - 110,0 M )
1 Pasang batu pondasi pelunasan M3 (0,5+0,4)/2*0,65*110 32.18 150,000.00
2 Pembesian & cor kolom M1 (0,65*22) 14.30 50,000.00
Bagian timur 45 M ( St 175 - 220 m)
1 Galian tanah strous Bh 9.00 9.00 15,000.00
2 Pasang & cor kolom strous Bh 9.00 9.00 50,000.00
3 Pasang batu pondasi M3 (1,00+0,5)/2*1,6*45 54.00 150,000.00
4 Pembesian & cor kolom M1 (1,6*9) 14.40 50,000.00
Bagian selatan
1 Pasang tiang panel Bh 13.00 13.00 30,000.00
Sub total
III PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 1 panjang 25 m (St 0,00 - 25,0 M )
1 Galian tanah strous Bh 6.00 6.00 15,000.00
2 Pasang & cor kolom strous Bh 6.00 6.00 50,000.00
3 Pasang batu pondasi dasar M3 (0,7*0,5)*25 8.75 150,000.00
Sub total
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN KONTAENER
1 Pasang daun jendela sleading Bh (4*2) 8.00 125,000.00
2 Pasang daun pintu Bh (1*2) 2.00 175,000.00
Sub total
II PEKERJAAN LAIN LAIN
1 Transportasi Ls 1.00 1.00 200,000.00
Sub total
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PAGAR PANEL
Bagian timur
1 Pasang tiang panel Bh (56-30) 26.00 30,000.00
2 Pasang bekisting sloof 20/20 M1 (2,5*35) 87.50 25,000.00
3 Pasang pembesian & cor sloof 20/20 M1 (2,5*35) 87.50 40,000.00
4 Pasang daun panel 7 daun M2 (2,5*9) 22.50 45,000.00
Bagian selatan
1 Pasang bekisting sloof 20/20 M1 (2,5*9) 37.50 25,000.00
2 Pasang pembesian & cor sloof 20/20 M1 (2,5*9) 37.50 40,000.00
3 Pasang daun panel 7 daun M2 (2,5*9) 37.50 45,000.00
Sub total
II PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 1 panjang 100 m (St 0,00 - 100,0 M )
1 Galian tanah strous Bh (20-6) 14.00 15,000.00
2 Pasang & cor kolom strous Bh (20-6) 14.00 50,000.00
3 Pasang batu pondasi dasar M3 (0,7*1,20*100)-(0,7*0,5)*25 75.25 150,000.00
4 Pembesian & cor kolom M1 (0,7*20) 14.00 50,000.00
Sub total
III PEKERJAAN LAIN LAIN
1 Siram pohon waru Ls 1.00 1.00 600,000.00
2 Langsir material Ls 1.00 1.00 1,500,000.00
3 Transportasi Ls 1.00 1.00 250,000.00
Sub total
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PONDASI PAGAR
Bagian timur 1 panjang 110 m (St 110,00 - 220,0 M )
1 Pasang batu pondasi pelunasan M3 (0,5+0,4)/2*0,60*110 29.70 150,000.00
2 Pembesian & cor kolom M1 (0,60*22) 13.20 50,000.00
Sub total
II PEKERJAAN PAGAR PANEL
Bagian timur
1 Pasang tiang panel Bh (112-56) 56.00 30,000.00
2 Pasang bekisting sloof 20/20 M1 (2,5*70)-(2,5*35) 87.50 25,000.00
3 Pasang pembesian & cor sloof 20/20 M1 (2,5*70)-(2,5*35) 87.50 40,000.00
4 Pasang daun panel 7 daun M2 (40-9)*2,5 80.60 45,000.00
Sub total
III PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 2 panjang 20 m (St 170,00 - 190,0 M )
1 Galian tanah strous Bh 5.00 5.00 15,000.00
2 Pasang & cor kolom strous Bh 5.00 5.00 50,000.00
3 Pasang batu pondasi dasar M3 (0,7*1,20*20) 16.80 150,000.00
4 Pembesian & cor kolom M1 (0,7*5) 3.50 50,000.00
5 Pasang batu pondasi dinding M3 (0,8+1,20)/2*1,0*20 20.00 150,000.00
6 Pembesian & cor kolom M1 (1,0*5) 5.00 50,000.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Siram pohon waru Ls 1.00 1.00 300,000.00
2 Langsir material Ls 1.00 1.00 1,000,000.00
3 Transportasi Ls 1.00 1.00 250,000.00
Sub total
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PAGAR PANEL
Bagian timur
1 Pasang bekisting sloof 20/20 M1 (2,5*3) 7.50 25,000.00
2 Pasang pembesian & cor sloof 20/20 M1 (2,5*3) 7.50 40,000.00
3 Pasang daun panel 7 daun M2 (30*2,5) 75.00 45,000.00
Sub total
II PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 1 panjang 50 m (St 0,00 - 50,0 M )
1 Pasang batu pondasi dinding M3 (0,8+1,20)/2*1,0*50 50.00 150,000.00
2 Pembesian & cor kolom M1 (1,0*10) 10.00 50,000.00
Sub total
III PEKERJAAN LAIN LAIN
1 Siram pohon waru Ls 1.00 1.00 300,000.00
2 Langsir material Ls 1.00 1.00 500,000.00
3 Transportasi Ls 1.00 1.00 150,000.00
Sub total
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PAGAR PANEL
Bagian timur
1 Pasang daun panel 7 daun M2 (13*2,5) 32.50 45,000.00
Sub total
II PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 1 panjang 50 m (St 0,50 - 101,5,0 M )
1 Pasang batu pondasi dinding M3 (0,8+1,20)/2*1,0*51,5 51.50 150,000.00
2 Pembesian & cor kolom M1 (1,0*10) 10.00 50,000.00
Bagian Barat 1 panjang 100 m (St 0,00 - 101,5,0 M )
1 Pasang bekisting ring tengah 20/20 M1 (50+51,5) 101.50 25,000.00
2 Pasang pembesian & cor ring tengah 20/20 M1 (50+51,5) 101.50 40,000.00
Bagian Barat 1 panjang 75 m (St 0,00 - 75,0 M )
1 Pasang batu pondasi dinding M3 (0,8+0,5)/2*0,9*75 43.88 150,000.00
2 Pembesian & cor kolom M1 (0,9*10) 9.00 50,000.00
Sub total
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 750,000.00
2 Transportasi Ls 1.00 1.00 150,000.00
Sub total
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PAGAR PANEL
Bagian selatan
1 Pasang tiang panel 2M Bh 44.00 32.50 45,000.00
2 Pasang daun panel 3 daun M2 (11*2,5) 32.50 45,000.00
Sub total
II PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat selatan panjang 26,5 m (St 0,00 - 101,5 M )
1 Pasang batu pondasi dinding M3 (0,8+0,5)/2*0,9*26,5 15.50 150,000.00
2 Pembesian & cor kolom M1 (0,9*20) 18.00 50,000.00
Sub total
III PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 2 panjang 20 m (St 170,00 - 190,0 M )
1 Pasang bekisting ring tengah 20/20 M1 20.00 101.50 25,000.00
2 Pasang pembesian & cor ring tengah 20/20 M1 20.00 101.50 40,000.00
3 Pasang batu pondasi dinding M3 (0,4+0,8)/2*1,0*20 20.00 150,000.00
4 Pembesian & cor kolom M1 (0,8*5) 5.00 50,000.00
Sub total
III PEKERJAAN PONDASI SALURAN SISI TIMUR
Bagian Barat 3 panjang 50 m (St 120,00 - 170,0 M )
1 Galian tanah strous Bh 15.00 15.00 15,000.00
2 Pasang & cor kolom strous Bh 15.00 15.00 50,000.00
3 Pasang batu pondasi dasar M3 (0,7*1,20*20) 16.80 150,000.00
4 Pembesian & cor kolom M1 (0,7*5) 3.50 50,000.00
5 Pasang batu pondasi dinding M3 (0,8+1,20)/2*1,0*50 50.00 150,000.00
6 Pembesian & cor kolom M1 (1,0*55) 55.00 50,000.00
8 Pasang bekisting ring tengah 20/20 M1 14.00 14.00 25,000.00
9 Pasang pembesian & cor ring tengah 20/20 M1 14.00 14.00 40,000.00
6 Pasang batu pondasi dinding pelunasan M3 (0,5+0,7)/2*0,6*14 5.04 150,000.00
Sub total
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PAGAR PANEL
Bagian selatan
1 Pasang tiang panel 2M Bh (70-44) 26.00 45,000.00
2 Pasang daun panel 3 daun M2 (42-11)*2,5 77.50 45,000.00
Sub total
II PEKERJAAN PONDASI SALURAN SISI TIMUR
Bagian Barat 3 panjang 50 m (St 120,00 - 170,0 M )
1 Pembesian & cor kolom M1 (0,6*6) 3.60 50,000.00
2 Pasang batu pondasi dinding pelunasan M3 (0,5+0,7)/2*0,6*21 5.04 150,000.00
3 Pembesian ring atas M1 35.00 35.00 25,000.00
Sub total
III PEKERJAAN PONDASI SALURAN SISI BARAT
Bagian Barat 4 panjang 7 m
1 Pasang batu pondasi dinding pelunasan M3 (0,5+0,7)/2*0,6*7 2.52 150,000.00
2 Pembesian & cor kolom M1 (0,6*3) 1.80 50,000.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Langsir material 3 minggu Ls 1.00 1.00 1,000,000.00
2 Turun pagar panel Ls 1.00 1.00 500,000.00
3 Tanam sengon Ls 1.00 1.00 150,000.00
4 Transportasi Ls 1.00 1.00 1,000,000.00
Sub total
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PAGAR PANEL
Bagian selatan
1 Pasang tiang panel 2M Bh 30.00 30.00 45,000.00
2 Pasang daun panel 3 daun M2 (35*2,5) 87.50 45,000.00
Sub total
II PEKERJAAN PONDASI SALURAN
1 Pembesian sloof 25/40 M1 (35*2) 70.00 50,000.00
2 Pembesian balok 20./20 M1 (2,5*11) 27.50 30,000.00
3 Pasang bekisting balok sloof M1 (35*2) 70.00 25,000.00
4 Pasang bekisting balok gantung M1 (2,5*11) 27.50 30,000.00
Sub total
III PEKERJAAN LAIN LAIN
1 Langsir material 3 minggu Ls 1.00 1.00 1,500,000.00
2 Turun pagar panel Ls 1.00 1.00 500,000.00
3 Transportasi Ls 1.00 1.00 1,000,000.00
Sub total
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
II PEKERJAAN PONDASI SALURAN
1 Cor balok 30/60 M1 (36*2) 72.00 40,000.00
2 Cor balok gantung 20./20 M1 (2,5*11) 27.50 25,000.00
3 Setrikan pondasi bawah pintu masuk M2 (35*2)*1,5 105.00 20,000.00
4 Setrikan pondasi utara jembatan M2 (20*1,7*1) 34.00 20,000.00
5 Pasang batu pondasi tambahan 20 cm M3 (0,5*0,2*20) 4.00 150,000.00
6 Pasang batu pondasi tambahan 20 cm M2 (0,5*0,2*101,5) 10.15 150,000.00
7 Ban banan M1 (20*1)+(36*2) 92.00 20,000.00
Sub total
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 500,000.00
3 Transportasi Ls 1.00 1.00 500,000.00
Sub total
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PONDASI SALURAN
1 Perapian galian M1 3.50 3.50 15,000.00
2 Kuras air Ls 1.00 1.00 50,000.00
3 Galian tanah strous Bh 2.00 2.00 15,000.00
4 Pasang & cor kolom strous Bh 2.00 2.00 50,000.00
5 Pasang batu pondasi dasar M3 (1,00*0,6)*3,5 2.10 150,000.00
6 Pembesian & cor kolom M1 (0,6*2) 1.20 50,000.00
7 Pasang batu pondasi dinding M3 (0,6+1,0)/2*1,4*3,5 3.92 150,000.00
8 Pembesian & cor kolom M1 (1,4*2) 2.80 50,000.00
9 Pasang bekisting ring tengah 20/20 M1 3.50 3.50 25,000.00
10 Pasang pembesian & cor ring tengah 20/20 M1 3.50 3.50 40,000.00
Sub total
II PEKERJAAN BETON RING
1 Pasang bekisting ring atas 20/40 M1 10.00 14.00 25,000.00
2 Pasang pembesian & cor ring atas 20/40 M1 10.00 14.00 40,000.00
Sub total
III PEKERJAAN SETRIKAN
1 Setrikan Pondasi selatan jembatan M2 (40*1,7) 68.00 20,000.00
Sub total
IV PEKERJAAN PAGAR PANEL
1 Pasang tiang panel 2M Bh 6.00 6.00 45,000.00
2 Pasang daun panel 3 daun M2 (14*2,5) 35.00 45,000.00
Sub total
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 500,000.00
2 Transportasi Ls 1.00 1.00 500,000.00
Sub total
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PONDASI SALURAN
saluran bagian barat
1 Perapian galian M1 3.50 3.50 15,000.00
2 Kuras air Ls 1.00 1.00 50,000.00
3 Galian tanah strous Bh 2.00 2.00 15,000.00
4 Pasang & cor kolom strous Bh 2.00 2.00 50,000.00
5 Pasang batu pondasi dasar M3 (1,00*0,6)*3,5 2.10 150,000.00
6 Pembesian & cor kolom M1 (0,6*2) 1.20 50,000.00
7 Pasang batu pondasi dinding M3 (0,6+1,0)/2*1,4*3,5 3.92 150,000.00
8 Pembesian & cor kolom M1 (1,4*2) 2.80 50,000.00
9 Pasang bekisting ring tengah 20/20 M1 3.50 3.50 25,000.00
10 Pasang pembesian & cor ring tengah 20/20 M1 3.50 3.50 40,000.00
saluran bagian barat
1 Pasang batu pondasi dinding M3 0,6*0,45*3,5 0.95 150,000.00
2 Pembesian & cor kolom M1 (0,45*2) 0.90 50,000.00
saluran bagian timur
1 Pasang batu pondasi dinding M3 0,6*0,65*10,5 4.10 150,000.00
2 Pembesian & cor kolom M1 (0,65*10,5) 6.83 50,000.00
Sub total
II PEKERJAAN PONDASI SALURAN TOL
1 Bobok pondasi lama M1 (3*2) 6.00 15,000.00
2 Peninggian pondasi saluran M3 (0,5*0,2*3*2) 0.60 150,000.00
Sub total
III PEKERJAAN SETRIKAN
1 Setrikan Pondasi selatan jembatan M2 (40*1,7) 68.00 20,000.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 700,000.00
2 Transportasi Ls 1.00 1.00 200,000.00
Sub total
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PONDASI SALURAN
saluran bagian barat
1 Perapian galian M1 15.00 15.00 15,000.00
2 Pasang bekisting balok 40/60 M1 (15*2) 7.00 35,000.00
3 Pembesian & cor balok 40/60 M1 (15*2) 7.00 70,000.00
4 Pasang bekisting balok 25/25 M1 (1,9*5) 7.00 35,000.00
5 Pembesian & cor balok 25/25 M1 (1,9*5) 7.00 70,000.00
6 Setrikan pondasi bawah pintu masuk M2 (15*2)*1,5 105.00 20,000.00
7 Pasang plat beton Bh 26.00 26.00 25,000.00
Sub total
II PEKERJAAN PONDASI SALURAN TOL
1 Pasang bekisting balok 40/70 M1 (7*1) 7.00 35,000.00
2 Pembesian & cor balok 40/70 M1 (7*1) 7.00 70,000.00
3 Pasang bekisting balok 30/70 M1 (3,15*2) 6.30 30,000.00
4 Pembesian & cor balok 30/70 M1 (3,15*2) 6.30 45,000.00
5 Pasang bekisting balok 25/30 M1 2.00 2.00 30,000.00
6 Pembesian & cor balok 25/30 M1 2.00 2.00 45,000.00
Sub total
III PEKERJAAN SETRIKAN
1 Setrikan Pondasi selatan jembatan M3 (20,5*1,7) 34.85 20,000.00
Sub total
IV PEKERJAAN SALURAN YUDIT
Bagian timur
1 Galian tanah & perapian M1 112.50 112.50 10,000.00
2 Pasangan batu dasar saluran M3 (0,1*0,50*112,5) 5.63 100,000.00
3 Rabatan lantai M2 (0,5*112,5) 56.25 19,000.00
4 Pasang yudit 30 M1 48.00 48.00 15,000.00
Sub total
V PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 700,000.00
2 Turunkan yudit Ls 2.00 2.00 150,000.00
3 Transportasi Ls 1.00 1.00 500,000.00
Sub total
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN SALURAN YUDIT
Bagian timur
1 Galian tanah & perapian M1 (33,36+54,43+22,66+72,19)-112,5 70.14 10,000.00
2 Pasangan batu dasar saluran M3 (0,1*0,50)-(182,64-112,5) 3.51 100,000.00
3 Rabatan lantai M2 (0,5*182,5)-(0,5*112,5) 35.00 19,000.00
4 Pasang yudit 30 M1 182,5-48 134.50 15,000.00
5 Cepitan antara pondasi & yudit M2 182.50 182.50 15,000.00
Bagian barat
1 Galian tanah & perapian M1 (1,6*96) 153.60 10,000.00
2 Pasangan batu dasar saluran M3 (0,1*0,5*96) 4.80 100,000.00
3 Rabatan lantai M2 (0,5*0,96) 0.48 19,000.00
4 Pasang yudit 30 Bh 96.00 96.00 15,000.00
Sub total
II PEKERJAAN LAIN LAIN
1 Pasang bekisting M1 101.50 101.50 25,000.00
2 Pembesian & cor ring M1 101.50 101.50 35,000.00
3 Plesteran & acian M1 (0,6*101,5)*70% 42.63 25,000.00
4 Benangan sudut M1 (101,5*3)*70% 213.15 12,500.00
Sub total
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 750,000.00
2 Transportasi Ls 1.00 1.00 500,000.00
Sub total
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN SALURAN YUDIT
Bagian timur
1 Ban banan pondasi & yudit M2 182.50 182.50 22,000.00
Bagian barat
1 Cepitan yudit dan pondasi M1 96.00 96.00 15,000.00
Sub total
II PEKERJAAN PONDASI SALURAN DEPAN
1 Pengukuran & bauwplank M1 6.00 6.00 25,000.00
1 Perapian galian M1 (6*2) 12.00 15,000.00
2 Kuras air Ls 1.00 1.00 150,000.00
3 Galian tanah strous Bh 2.00 2.00 15,000.00
4 Pasang & cor kolom strous Bh (2*2) 4.00 50,000.00
5 Pasang batu pondasi dasar M3 (1,00*0,6)*6*2 7.20 150,000.00
6 Pembesian & cor kolom M1 (0,6*2)*2 2.40 50,000.00
7 Pasang batu pondasi dinding M3 (0,6+1,0)/2*1,4*6*2 13.44 150,000.00
8 Pembesian & cor kolom M1 (1,4*2)*2 5.60 50,000.00
9 Pasang bekisting ring tengah 20/20 M1 (6*2) 12.00 25,000.00
10 Pasang pembesian & cor ring tengah 20/20 M1 (6*2) 12.00 40,000.00
Pondasi dalam 101,5
1 Plesteran & acian M1 (0,6*101,5)*30% 18.27 25,000.00
2 Benangan sudut M1 (101,5*3)*30% 91.35 12,500.00
Sub total
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 750,000.00
2 Transportasi Ls 1.00 1.00 500,000.00
Sub total
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PONDASI SALURAN DEPAN
1 Pengukuran & bauwplank L1 1.00 1.00 100,000.00
2 Perapian galian M1 (20*2)-(6*2) 28.00 15,000.00
3 Kuras air Ls 1.00 1.00 150,000.00
4 Galian tanah strous Bh (6*2)-2 10.00 15,000.00
5 Pasang & cor kolom strous Bh (6*2)-4 8.00 50,000.00
6 Pasang batu pondasi dasar M3 (1,00*0,6*20*2)-(1,00*0,6*6*2) 16.80 150,000.00
7 Pembesian & cor kolom M1 (0.6*6*2)-(0,6*2)*2 4.80 50,000.00
8 Pasang batu pondasi dinding M3 ((0,6+1,0)/2*1,4*20*2-(0,6+1,0)/2*1,4*6*2 31.36 150,000.00
9 Pembesian & cor kolom M1 (1,4*6*2)-(1,4*2)*2 11.20 50,000.00
10 Pasang bekisting ring tengah 20/20 M1 (20*2)-(6*2) 28.00 25,000.00
11 Pasang pembesian & cor ring tengah 20/20 M1 (20*2)-(6*2) 28.00 40,000.00
12 Pasang batu pondasi dinding diatas ring tengah M3 0,6*0,65*20*2 15.60 150,000.00
Sub total
II PEKERJAAN PARKIR AREA
Bagian selatan
1 Pengukuran & bauwplank Ls 1.00 1.00 250,000.00
2 Galian tanah untuk pasang paving sekat M1 (4*2)+(1,3+3,2+4)*13*2 229.00 2,500.00
3 Pasang sekat / pembatas paving M1 (4*2)+(1,3+3,2+4)*13*2 229.00 12,500.00
4 Keprasan tanah & perapian M2 (4,0+1,3)/2*3,2*13*2 220.48 7,500.00
5 Pasang besi rakitan M2 (3,1+0,4)/2*3,2*13*2 145.60 10,000.00
6 Cor lantai tebal 10 cm M2 (4,0+1,3)/2*3,2*13*2 220.48 15,000.00
7 Pasang Canstin penahan @ 4 buah Unit (4*13*2) 104.00 12,500.00
Sub total
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 300,000.00
2 Pecah batu Ls 1.00 1.00 200,000.00
Sub total
SATUAN
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA
Rp
I PEKERJAAN PONDASI SALURAN DEPAN
1 Pengukuran & bauwplank L1 1.00 1.00 100,000.00
2 Perapian galian M1 (20*2)-(6*2) 28.00 15,000.00
3 Kuras air Ls 1.00 1.00 150,000.00
4 Galian tanah strous Bh (6*2)-2 10.00 15,000.00
5 Pasang & cor kolom strous Bh (6*2)-4 8.00 50,000.00
6 Pasang batu pondasi dasar M3 (1,00*0,6*20*2)-(1,00*0,6*6*2) 16.80 150,000.00
7 Pembesian & cor kolom M1 (0.6*6*2)-(0,6*2)*2 4.80 50,000.00
8 Pasang batu pondasi dinding M3 ((0,6+1,0)/2*1,4*20*2-(0,6+1,0)/2*1,4*6*2 31.36 150,000.00
9 Pembesian & cor kolom M1 (1,4*6*2)-(1,4*2)*2 11.20 50,000.00
10 Pasang bekisting ring tengah 20/20 M1 (20*2)-(6*2) 28.00 25,000.00
11 Pasang pembesian & cor ring tengah 20/20 M1 (20*2)-(6*2) 28.00 40,000.00
12 Pasang batu pondasi dinding diatas ring tengah M3 0,6*0,65*20*2 15.60 150,000.00
Sub total
II PEKERJAAN PARKIR AREA
Bagian selatan
1 Pengukuran & bauwplank Ls 1.00 1.00 250,000.00
2 Galian tanah untuk pasang paving sekat M1 (4*2)+(1,3+3,2+4)*13*2 229.00 2,500.00
3 Pasang sekat / pembatas paving M1 (4*2)+(1,3+3,2+4)*13*2 229.00 12,500.00
4 Keprasan tanah & perapian M2 (4,0+1,3)/2*3,2*13*2 220.48 7,500.00
5 Pasang besi rakitan M2 (3,1+0,4)/2*3,2*13*2 145.60 10,000.00
6 Cor lantai tebal 10 cm M2 (4,0+1,3)/2*3,2*13*2 220.48 15,000.00
7 Pasang Canstin penahan @ 4 buah Unit (4*13*2) 104.00 12,500.00
Sub total
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 300,000.00
2 Pecah batu Ls 1.00 1.00 200,000.00
Sub total
Sub total
Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 500,000.00
2 Bantuan transport pemberangkatan orang2 Ls 1.00 100% 1.00 1,500,000.00
Sub total
Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 500,000.00
Sub total
Sub total
Sub total
II PEKERJAAN REL JENTRI
1 Pengukuran & bauwplank M1 33.00 100% 33.00 10,000.00
2 Pemerataan tanah pondasi M2 (0,5*33)*2 100% 33.00 5,000.00
3 Pasang batu pondasi M3 (0,5*0,30*33)*2 100% 9.90 150,000.00
4 Pasang bekiting M2 (0,15*33*2)*2 100% 19.80 45,000.00
5 Cor beton redymix M3 (0,50*0,15*48) 100% 3.60 160,000.00
6 Cor beton manual M3 (0,50*0,15*18) 100% 1.35 250,000.00
7 Cor lantai
Pemerataan tanah M2 (6,00*33,00) 85% 198.00 5,000.00
Pasang besi wermess tunggal M2 (6,00*33,00) 85% 198.00 5,000.00
Pasang bekisting saluran rel M2 (0,10*33,00)*2 85% 6.60 45,000.00
Cor lantai M2 (6,00*33,00) 85% 198.00 15,000.00
8 Benangan M1 (33*2) 85% 66.00 12,500.00
Sub total
Sub total
Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 100,000.00
Sub total
Sub total
II PEKERJAAN PONDASI FOOTPLAT JENTRY
Pasang pelek Bh 2.00 100% 2.00 25,000.00
Pasang bekisting M2 (0,20*0,60*4)*2 100% 0.96 45,000.00
Cor betonpedestal M3 (0,45*0,50*0,20)*2 100% 0.09 250,000.00
Sub total
III PEKERJAAN COR LANTAI
Cor lantai tahap 2 M2 (5,4,00*26,2) 100% 141.48 15,000.00
Pemerataan tanah tahap 3 L 85 cm M2 (0,85*26,2,00) 100% 22.27 5,000.00
Pasang besi wermess tunggal tahap 3 M2 (0,85*26,2,00) 100% 22.27 5,000.00
Pasang bekisting tahap 3 M2 (0,15*26,20)*2 100% 7.86 45,000.00
Cor lantai tahap 3 M2 (0,85*26,2)*1 100% 22.27 15,000.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 100% 1.00 100,000.00
Sub total
Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran material batu M3 (5,62+18+12) 50% 35.62 35,000.00
2 Langsiran material tanah urug M3 (3,00*2,00*17)+(0,90*3*3) 25% 110.10 35,000.00
Sub total
oke
Sub total
III PEKERJAAN COR LANTAI
Cor lantai tahap 4 & 5
Pemerataan tanah tahap 4 L 1,65 cm M2 (1,65*26,20) 100% 43.23 5,000.00
Pemerataan tanah tahap 5 L 5,40 cm M2 (5,40*26,20) 100% 141.48 5,000.00
Pasang besi wermess tunggal tahap 4 M2 (1,65*26,20) 100% 43.23 5,000.00
Pasang besi wermess tunggal tahap 5 M2 (5,40*26,20) 100% 141.48 5,000.00
Pasang bekisting tahap 3 M2 (0,15*26,20)*2 100% 7.86 45,000.00
Cor lantai tahap 4 M2 (1,65*26,2) 100% 43.23 15,000.00
Cor lantai tahap 5 M2 (5,40*26,2) 100% 141.48 15,000.00
Benangan saluran M1 (5,40*26,2) 100% 141.48 15,001.00
Sub total
IV PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 100% 1.00 100,000.00
Sub total
2 Setrikan dinding pondasi bawah pagar panel M2 (1,30*12,50) 100% 16.25 40,000.00
Benangan sudut M1 12.50 100% 12.50 12,500.00
3 Setrikan dinding pondasi tanjakan pintu masuk M2 (0,80+1,30)/2*6,0 100% 6.30 40,000.00
4 Langsiran material Ls 1.00 100% 1.00 150,000.00
Sub total
II PEKERJAAN PONDASI REL PINTU MASUK TKD
1 Pengukuran & bauwplank M1 20.00 50% 20.00 10,000.00
2 Pemerataan tanah M2 (1,20*20) 50% 24.00 5,000.00
3 Pasang pondasi M3 (0,35*1,00*7) 100% 2.45 130,000.00
4 Balok 25x100 M1 21.00 21.00
Pembesian Kg (21*8*0,89)+(21*6*2,0*0,40) 75% 250.32 2,000.00
Pasang bekisting M2 (0,30*21)+(0,25*1,00*2)+(0,30*10) 75% 9.80 45,000.00
Cor beton readymix M3 (0,30*1,00*11)+(0,30*1,30*7) 75% 6.03 160,000.00
Pasang pipa pvc 6 dim M1 20.00 50% 20.00 15,000.00
Pembuatan rel pintu 12 m1 M1 12.00 100% 12.00 15,000.00
Pasang real pintu dan angkur M1 18.00 100% 18.00 15,000.00
5 Langsiran material Ls 1.00 1.00 150,000.00
Sub total
oke
BON UPAH KERJA
PEKERJAAN : PONDASI KOLAM
LOKASI : PAMOTAN
TANGGAL : 8 JULI s/d 14 JULI 2020
Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran material batu M3 (5,62+18+12) 50% 50% 100% 35.62 35,000.00
2 Langsiran material tanah urug M3 (3,00*2,00*17)+(0,90*3*3) 25% 50% 75% 110.10 35,000.00
Sub total
oke
Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran material Ls 1.00 100% 1.00 100,000.00
Sub total
oke
Sub total
Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran material Ls 1.00 100% 1.00 100,000.00
Sub total
Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran ,material Ls 1.00 100% 1.00 100,000.00
Sub total
Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran material Ls 1.00 100% 1.00 100,000.00
Sub total
Sub total
II PEKERJAAN LAIN LAIN
1 Pembersihan tanah Ls 1.00 100% 1.00 200,000.00
Sub total
Sub total
II PEKERJAAN LAIN LAIN
1 Langsiran material Ls 1.00 100% 1.00 150,000.00
Sub total
Sub total
Sub total
Sub total
Sub total
Sub total
4 Plesteran dinding luar opname tgl 8 sept 2020 M2 (4,0*4,10*2)+(18*4,10)-((1*2*3)+(1,20*1,20*3)) 75% 25% 96.28 20,000.00
Acian dinding M2 (4,0*4,10*2)+(18*4,10)-((1*2*3)+(1,20*1,20*3)) 25% 75% 96.28 10,000.00
Sub total
II RUANG PANEL LISTRIK
1 Plesteran dinding M2 (2,45*1,65)+(0,95*2,45)+(1,25*2,45) 100% 9.43 20,000.00
Acian M2 (2,45*1,65)+(0,95*2,45)+(1,25*2,45) 100% 9.43 10,000.00
Sub total
Sub total
Sub total
II PEKERJAAN LAIN LAIN
1 Pembersihan 1.00 100% 1.00 100,000.00
Sub total
Sub total
JUMLAH
HARGA KETERANGAN
Rp
1,000,000.00
1,000,000.00
250,000.00
2,250,000.00
150,000.00
91,875.00
420,000.00
210,000.00
428,750.00
360,000.00
540,000.00
465,000.00
465,000.00
140,000.00
3,270,625.00
50,000.00
140,000.00
200,000.00
390,000.00
500,000.00
250,000.00
2,250,000.00
3,000,000.00
500,000.00
500,000.00
9,410,625.00
9,410,000.00
IMAM BASORI
KERJA
JUMLAH
HARGA KETERANGAN
Rp
500,000.00
500,000.00
500,000.00
175,000.00
675,000.00
500,000.00
295,000.00
330,000.00
1,100,000.00
13,177,500.00
1,150,000.00
500,000.00
125,000.00
90,000.00
300,000.00
2,625,000.00
3,187,500.00
510,000.00
23,890,000.00
750,000.00
1,500,000.00
750,000.00
3,000,000.00
28,065,000.00
28,060,000.00
IMAM BASORI
KERJA
JUMLAH
HARGA KETERANGAN
Rp
3,360,000.00
460,000.00
900,000.00
120,000.00
250,000.00
500,000.00
300,000.00
1,000,000.00
10,500,000.00
1,000,000.00
18,390,000.00
250,000.00
500,000.00
500,000.00
1,250,000.00
19,640,000.00
19,640,000.00
IMAM BASORI
KERJA
JUMLAH
HARGA KETERANGAN
Rp
60,000.00
200,000.00
3,150,000.00
280,000.00
14,700,000.00
1,400,000.00
100,000.00
125,000.00
75,000.00
250,000.00
2,625,000.00
22,965,000.00
250,000.00
500,000.00
500,000.00
1,250,000.00
24,215,000.00
24,210,000.00
IMAM BASORI
KERJA
JUMLAH
HARGA KETERANGAN
Rp
135,000.00
450,000.00
6,300,000.00
720,000.00
3,937,500.00
350,000.00
105,000.00
350,000.00
3,675,000.00
350,000.00
5,145,000.00
490,000.00
22,007,500.00
660,000.00
1,417,500.00
3,000,000.00
5,077,500.00
250,000.00
500,000.00
500,000.00
1,250,000.00
28,335,000.00
28,330,000.00
IMAM BASORI
KERJA
JUMLAH
HARGA KETERANGAN
Rp
4,826,250.00
715,000.00
135,000.00
450,000.00
8,100,000.00
720,000.00
1,096,875.00
195,000.00
16,238,125.00
900,000.00
937,500.00
1,500,000.00
390,000.00
3,727,500.00
90,000.00
300,000.00
1,312,500.00
1,702,500.00
JUMLAH
HARGA KETERANGAN
Rp
2,000,000.00
800,000.00
500,000.00
1,200,000.00
4,500,000.00
250,000.00
1,500,000.00
750,000.00
2,500,000.00
28,668,125.00
28,660,000.00
IMAM BASORI
KERJA
JUMLAH
HARGA KETERANGAN
Rp
1,000,000.00
350,000.00
1,350,000.00
200,000.00
200,000.00
1,550,000.00
1,550,000.00
IMAM BASORI
KERJA
JUMLAH
HARGA KETERANGAN
Rp
780,000.00
2,187,500.00
3,500,000.00
1,012,500.00
937,500.00
1,500,000.00
1,687,500.00
11,605,000.00
210,000.00
700,000.00
11,287,500.00
700,000.00
12,897,500.00
600,000.00
1,500,000.00
250,000.00
2,350,000.00
26,852,500.00
26,850,000.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
4,455,000.00 100%
660,000.00 SELESAI
5,115,000.00
1,680,000.00
2,187,500.00
3,500,000.00
3,627,000.00
10,994,500.00
75,000.00
250,000.00
2,520,000.00
175,000.00
3,000,000.00
250,000.00
6,270,000.00
300,000.00
1,000,000.00
250,000.00
1,550,000.00
23,929,500.00
23,920,000.00
IMAM BASORI
KERJA
JUMLAH
HARGA KETERANGAN
Rp
187,500.00 100%
300,000.00 100%
3,375,000.00
3,862,500.00
7,500,000.00
500,000.00
8,000,000.00
300,000.00
500,000.00
150,000.00
950,000.00
12,812,500.00
12,810,000.00
IMAM BASORI
KERJA
JUMLAH
HARGA KETERANGAN
Rp
1,462,500.00
1,462,500.00
7,725,000.00
500,000.00
2,537,500.00
4,060,000.00
6,581,250.00
450,000.00
21,853,750.00
750,000.00
150,000.00
900,000.00
24,216,250.00
24,210,000.00
IMAM BASORI
KERJA
JUMLAH
HARGA KETERANGAN
Rp
1,462,500.00
1,462,500.00
1,462,500.00
2,325,375.00
900,000.00
3,225,375.00
2,537,500.00
4,060,000.00
3,000,000.00
250,000.00
9,847,500.00
225,000.00
750,000.00
2,520,000.00
175,000.00
7,500,000.00
2,750,000.00
350,000.00
560,000.00
756,000.00
15,586,000.00
JUMLAH
HARGA KETERANGAN
Rp
210,000.00
75,000.00
250,000.00
1,260,000.00
150,000.00
1,764,000.00
400,000.00
350,000.00
560,000.00
756,000.00
5,775,000.00
210,000.00
75,000.00
250,000.00
1,260,000.00
150,000.00
1,764,000.00
400,000.00
350,000.00
560,000.00
756,000.00
5,775,000.00
210,000.00
75,000.00
250,000.00
1,260,000.00
150,000.00
1,764,000.00
400,000.00
350,000.00
560,000.00
5,019,000.00
3,000,000.00
500,000.00
3,500,000.00
37,933,875.00
37,930,000.00
IMAM BASORI
KERJA
JUMLAH
HARGA KETERANGAN
Rp
1,170,000.00
3,487,500.00
3,487,500.00
180,000.00
756,000.00
875,000.00
1,811,000.00
378,000.00
90,000.00
468,000.00
1,000,000.00
500,000.00
150,000.00
1,000,000.00
2,650,000.00
8,416,500.00
8,410,000.00
IMAM BASORI
KERJA
JUMLAH
HARGA KETERANGAN
Rp
1,350,000.00
3,937,500.00
5,287,500.00
3,500,000.00
825,000.00
1,750,000.00
825,000.00
6,900,000.00
1,500,000.00
500,000.00
1,000,000.00
3,000,000.00
15,187,500.00
15,180,000.00
IMAM BASORI
KERJA
JUMLAH
HARGA KETERANGAN
Rp
2,880,000.00
687,500.00
2,100,000.00
680,000.00
600,000.00
1,522,500.00
1,840,000.00
10,310,000.00
500,000.00
500,000.00
1,000,000.00
11,310,000.00
11,310,000.00
IMAM BASORI
KERJA
JUMLAH
HARGA KETERANGAN
Rp
52,500.00
50,000.00
30,000.00
100,000.00
315,000.00
60,000.00
588,000.00
140,000.00
87,500.00
140,000.00
1,563,000.00
350,000.00
560,000.00
910,000.00
1,360,000.00
1,360,000.00
270,000.00
1,575,000.00
1,845,000.00
500,000.00
500,000.00
1,000,000.00
6,678,000.00
6,670,000.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
52,500.00
50,000.00
30,000.00
100,000.00
315,000.00
60,000.00
588,000.00
140,000.00
87,500.00
140,000.00
141,750.00
45,000.00
614,250.00
341,250.00
2,705,250.00
90,000.00
90,000.00
180,000.00
1,360,000.00
1,360,000.00
700,000.00
200,000.00
900,000.00
5,145,250.00
5,140,000.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
225,000.00
245,000.00
490,000.00
245,000.00
490,000.00
2,100,000.00
650,000.00
4,445,000.00
245,000.00
490,000.00
189,000.00
283,500.00
60,000.00
90,000.00
1,357,500.00
697,000.00
697,000.00
1,125,000.00
562,500.00
1,068,750.00
720,000.00
3,476,250.00
700,000.00
300,000.00
500,000.00
1,500,000.00
11,475,750.00
11,470,000.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
701,400.00
350,700.00
665,000.00
2,017,500.00
2,737,500.00
1,536,000.00
480,000.00
9,120.00
1,440,000.00
9,937,220.00
2,537,500.00
3,552,500.00
1,065,750.00
2,664,375.00
9,820,125.00
750,000.00
500,000.00
1,250,000.00
21,007,345.00
21,000,000.00
IMAM BASORI
KERJA
JUMLAH
HARGA KETERANGAN
Rp
4,015,000.00
1,440,000.00
5,455,000.00
150,000.00
180,000.00
150,000.00
30,000.00
200,000.00
1,080,000.00
120,000.00
2,016,000.00
280,000.00
300,000.00
480,000.00
456,750.00
1,141,875.00
6,584,625.00
750,000.00
500,000.00
1,250,000.00
13,289,625.00
13,280,000.00
IMAM BASORI
KERJA
JUMLAH
HARGA KETERANGAN
Rp
100,000.00
420,000.00
150,000.00
150,000.00
400,000.00
2,520,000.00
240,000.00
4,704,000.00
560,000.00
700,000.00
1,120,000.00
2,340,000.00
13,404,000.00
250,000.00
572,500.00
2,862,500.00
1,653,600.00
1,456,000.00
3,307,200.00
1,300,000.00
11,401,800.00
300,000.00
200,000.00
500,000.00
25,305,800.00
25,300,000.00
IMAM BASORI
KERJA
JUMLAH
HARGA KETERANGAN
Rp
100,000.00
420,000.00
150,000.00
150,000.00
400,000.00
2,520,000.00
240,000.00
4,704,000.00
560,000.00
700,000.00
1,120,000.00
2,340,000.00
13,404,000.00
250,000.00
572,500.00
2,862,500.00
1,653,600.00
1,456,000.00
3,307,200.00
1,300,000.00
11,401,800.00
300,000.00
200,000.00
500,000.00
25,305,800.00
25,300,000.00
IMAM BASORI
KERJA
JUMLAH
HARGA KETERANGAN
Rp
205,000.00
1,132,625.00
96,832.00
153,000.00
68,000.00
25,000.00
12,500.00
62,500.00
1,755,457.00
200,000.00
200,000.00
1,955,457.00
JUMLAH
HARGA KETERANGAN
Rp
2,835,000.00
1,350,000.00
2,700,000.00
5,184,000.00
12,069,000.00
12,069,000.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
1,620,000.00
1,800,000.00
1,800,000.00
3,240,000.00
8,460,000.00
300,000.00
90,000.00
75,000.00
1,200,000.00
1,665,000.00
10,125,000.00
JUMLAH
HARGA KETERANGAN
Rp
749,250.00
495,000.00
495,000.00
891,000.00
2,630,250.00
-
327,600.00
742,500.00
1,400,000.00
1,400,000.00
2,520,000.00
6,390,100.00
-
300,000.00
90,000.00
225,000.00
-
615,000.00
9,635,350.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
819,000.00
-
-
315,000.00
393,750.00
-
242,880.00
270,000.00
337,500.00
2,654,437.50
200,000.00 dilangsir
150,000.00 banyak air
5,382,567.50
-
-
109,200.00
378,000.00
200,000.00
-
74,032.00
138,600.00
77,000.00
100,000.00
1,076,832.00
-
720,000.00
1,872,000.00
468,000.00
1,895,400.00
200,000.00
5,155,400.00
11,614,799.50
KERJA
JUMLAH
HARGA KETERANGAN
Rp
1,638,000.00
-
337,380.00
472,500.00
-
100,000.00 dilangsir
2,547,880.00
-
440,000.00
1,144,000.00
286,000.00
1,485,000.00 Pondasi kecil tambahan
400,000.00
3,755,000.00
-
3,510,000.00
877,500.00
1,462,500.00
731,250.00
1,218,750.00
300,000.00
8,100,000.00
250,000.00
250,000.00
14,402,880.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
211,000.00
420,000.00
84,000.00
472,500.00 Pondasi kecil tambahan
250,000.00
420,000.00
1,857,500.00
-
-
-
487,500.00
243,750.00
-
300,000.00
1,031,250.00
-
-
-
-
-
312,000.00
156,000.00
-
468,000.00
-
-
-
-
-
-
302,400.00
100,000.00
402,400.00
3,759,150.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
700,000.00
936,000.00
175,000.00
234,000.00
-
-
625,000.00
2,670,000.00
-
-
-
-
-
-
-
-
-
700,000.00
936,000.00
175,000.00
234,000.00
-
-
625,000.00
2,670,000.00
-
120,000.00
24,000.00
747,337.50
134,225.00
200,000.00
1,225,562.50
JUMLAH
HARGA KETERANGAN
Rp
405,000.00
279,000.00
202,875.00
1,694,925.00 pondasi kecil
209,250.00 pondasi kecil
-
555,282.00
737,100.00
307,125.00
4,390,557.00
80,000.00
96,009.60
873,600.00
-
139,320.00
-
-
-
-
-
-
-
-
1,188,929.60
500,000.00
500,000.00
12,645,049.10
KERJA
JUMLAH
HARGA KETERANGAN
Rp
380,000.00
106,000.00
-
46,440.00
81,000.00
67,500.00
-
131,880.00
178,200.00
159,000.00
429,000.00
1,458,600.00
3,037,620.00
500,000.00
1,500,000.00
2,000,000.00
5,037,620.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
1,170,000.00
292,500.00
-
-
406,250.00
-
1,868,750.00
-
-
-
-
-
270,000.00
168,750.00
-
123,840.00
180,000.00
150,000.00
1,544,400.00
250,000.00
2,686,990.00
189,000.00
94,500.00
2,088,450.00
1,701,000.00 pasangan tipis
-
245,952.00 Besi kecil
378,000.00
157,500.00
420,000.00
500,000.00
5,774,402.00
10,330,142.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
135,000.00
93,000.00
67,625.00
564,975.00 pondasi kecil
69,750.00 pondasi kecil
-
185,094.00
245,700.00
102,375.00
27,500.00
255,750.00 pondasi kecil
-
81,360.00
108,000.00
45,000.00
1,981,129.00
500,000.00
500,000.00
2,481,129.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
106,000.00
-
46,440.00
48,600.00
40,500.00
-
131,880.00
178,200.00
159,000.00
-
-
500,500.00
1,201,200.00
572,004.40
2,984,324.40
500,000.00
500,000.00
3,484,324.40
JUMLAH
HARGA KETERANGAN
Rp
-
-
-
-
1,080,000.00
2,160,000.00
2,160,000.00
729,000.00
6,480,000.00
450,000.00
450,000.00
121,500.00
1,080,000.00
445,500.00
15,156,000.00
330,000.00
165,000.00
1,485,000.00
891,000.00
576,000.00
337,500.00
841,500.00
841,500.00
252,450.00
2,524,500.00
701,250.00
8,945,700.00
JUMLAH
HARGA KETERANGAN
Rp
100,000.00
25,200.00
286,000.00
49,500.00
336,000.00
36,000.00
51,200.00
58,000.00
320,000.00
783,000.00
2,044,900.00
250,000.00
250,000.00
26,396,600.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
480,000.00
-
300,000.00
20,000.00
120,000.00
902,400.00
936,000.00
439,000.00
365,500.00
-
1,820,000.00
845,000.00
299,520.00
702,000.00
390,000.00
61,440.00
144,000.00
60,000.00
960,000.00
1,080,000.00
175,500.00
1,080,000.00
540,000.00
1,008,000.00
350,000.00
19,639,468.00
JUMLAH
HARGA KETERANGAN
Rp
660,000.00
178,200.00
178,200.00
891,000.00 pondasi
1,782,000.00
792,000.00
1,584,000.00
198,000.00
396,000.00
660,000.00
7,319,400.00
10,000.00
30,000.00
277,680.00
540,000.00
321,500.00
1,179,180.00
600,000.00
1,414,800.00
1,414,800.00
530,550.00
2,122,200.00
6,082,350.00
1,500,000.00
1,500,000.00
35,720,398.00
JUMLAH
HARGA KETERANGAN
Rp
-
2,352,000.00
525,000.00
63,000.00
630,000.00
300,000.00
3,870,000.00
100,000.00
60,000.00
227,500.00
-
-
-
-
50,000.00
-
437,500.00
546,000.00
136,500.00
274,560.00 besi kecil
702,000.00
921,600.00
130,500.00
390,000.00
3,101,160.00
400,000.00
400,000.00
7,808,660.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
108,000.00
210,600.00
1,458,000.00 pasangan tipis
-
163,968.00 Besi kecil
252,000.00
105,000.00
324,000.00
150,000.00
2,771,568.00
2,771,568.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
-
-
-
32,400.00
27,000.00
-
-
-
-
78,000.00
397,800.00
78,000.00
187,200.00
124,800.96
400,406.16
-
688,860.00
-
-
2,014,467.12
100,000.00
100,000.00
2,114,467.12
KERJA
JUMLAH
HARGA KETERANGAN
Rp
148,500.00
148,500.00
44,550.00
445,500.00
123,750.00
297,000.00
825,000.00
2,032,800.00
100,000.00
100,000.00
2,132,800.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
432,000.00
150,000.00
- pembesin kecil
-
-
- pembesin kecil
-
-
-
369,750.00
951,750.00
50,000.00
43,200.00
22,500.00
115,700.00
2,122,200.00
111,350.00
111,350.00
353,700.00
334,050.00
3,032,650.00
100,000.00
100,000.00
4,200,100.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
2,016,000.00
360,000.00
72,000.00
360,000.00
150,000.00
2,958,000.00
-
-
227,500.00
318,500.00
-
-
-
-
150,000.00
-
696,000.00
90,000.00
4,725.00
63,360.00 besi kecil
162,000.00
201,600.00
40,500.00
90,000.00
652,185.00
4,306,185.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
1,052,000.00
210,400.00
105,200.00
812,000.00
150,000.00
244,800.00
1,170,000.00
780,000.00
315,000.00
-
133,848.00 besi kecil
154,687.50
5,127,935.50
623,350.00 langsiran
963,375.00 langsiran
1,586,725.00
6,714,660.50
KERJA
JUMLAH
HARGA KETERANGAN
Rp
216,000.00
421,200.00
3,207,600.00 pasangan tipis
-
374,784.00 Besi kecil
576,000.00
240,000.00
960,000.00
250,000.00
6,245,584.00
6,245,584.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
445,500.00
891,000.00
259,200.00
2,673,000.00
97,200.00
270,000.00
270,021.60
4,635,900.00
100,000.00
100,000.00
4,735,900.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
432,000.00
150,000.00
- pembesin kecil
-
-
- pembesin kecil
-
-
-
369,750.00
951,750.00
216,150.00
707,400.00
216,150.00
707,400.00
353,700.00
648,450.00
2,122,200.00
2,122,341.48
7,093,791.48
100,000.00
100,000.00
8,145,541.48
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
2,688,000.00
600,000.00
650,000.00
156,250.00
252,000.00
150,000.00
4,496,250.00
-
-
318,500.00
-
375,480.00
330,750.00
723,600.00
150,000.00
180,000.00
270,000.00
-
2,348,330.00
6,844,580.00
JUMLAH
HARGA KETERANGAN
Rp
-
285,000.00
114,000.00
592,800.00
-
-
-
1,170,000.00
780,000.00
-
-
133,848.00 besi kecil
154,687.50
3,230,335.50
623,350.00 langsiran
1,926,750.00 langsiran
2,550,100.00
5,780,435.50
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
256,000.00
64,000.00
1,397,760.00
-
387,072.00 besi kecil
80,500.00
2,185,332.00
100,000.00 langsiran
100,000.00
2,285,332.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
2,050,125.00
2,050,125.00
1,227,375.00
3,690,225.00
223,650.00
621,250.00
499,125.00
998,250.00
81,000.00
1,796,850.00
108,000.00
300,000.00
412,533.00
14,058,508.00
200,000.00
200,000.00
14,258,508.00
Pamotan porong , 28 Juli 2020
KERJA
JUMLAH
HARGA KETERANGAN
Rp
1,497,792.00
1,815,750.00
1,614,000.00
200,000.00
200,000.00
21,763,742.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
81,250.00
-
34,560.00 besi kecil
33,750.00
37,500.00
1,454,194.00
-
100,000.00
-
104,256.00 besi kecil
108,000.00
45,000.00
160,000.00
376,000.00 besi kecil
188,000.00
200,000.00
1,281,256.00
-
180,000.00
97,200.00
52,000.00
498,680.00
218,400.00
407,160.00
-
205,492.80 besi kecil
214,650.00
238,500.00
1,094,000.00
273,500.00
440,000.00
200,000.00
4,119,582.80
JUMLAH
HARGA KETERANGAN
Rp
-
150,000.00
487,500.00
625,000.00
100,000.00
1,362,500.00
-
80,000.00
416,000.00
496,000.00
963,375.00 langsiran
963,375.00
9,676,907.80
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
161,000.00
40,250.00
879,060.00
-
331,776.00 besi kecil
69,000.00
-
552,960.00 besi kecil
720,000.00 besi kecil
300,000.00
3,054,046.00
100,000.00 langsiran
100,000.00
3,154,046.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
78,000.00
397,800.00
124,800.00
400,400.00
-
41,472.00
48,000.00
-
-
1,188,000.00
422,400.00
2,700,872.00
100,000.00
100,000.00
2,800,872.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
JUMLAH
HARGA KETERANGAN
Rp
81,250.00
-
34,560.00 besi kecil
33,750.00
37,500.00
1,454,194.00
100,000.00
100,000.00
#REF!
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
256,000.00
64,000.00
1,331,200.00
-
442,368.00 besi kecil
80,000.00
-
- besi kecil
- besi kecil
-
2,173,568.00
100,000.00 langsiran
100,000.00
2,273,568.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
180,000.00
128,000.00
382,500.00
1,836,000.00
350,625.00
233,750.00
244,800.00
163,200.00
765,000.00
4,283,875.00
200,000.00
200,000.00
4,483,875.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
280,627.20 besi kecil
274,050.00
304,500.00
994,700.00
284,200.00
2,138,077.20
-
284,960.00
-
280,627.20 besi kecil
274,050.00
304,500.00
-
193,536.00 besi kecil
37,800.00
15,750.00
336,000.00
84,000.00
80,000.00
40,000.00
1,931,223.20
-
180,000.00
-
65,160.00 besi kecil
180,000.00
60,000.00
137,000.00
54,800.00
284,960.00
-
178,538.40 besi kecil
184,950.00
205,500.00
110,400.00
-
65,160.00 besi kecil
81,000.00
27,000.00
200,000.00
2,014,468.40
JUMLAH
HARGA KETERANGAN
Rp
484,000.00
774,400.00
1,258,400.00
80,000.00
108,000.00
230,400.00
57,600.00
150,000.00
626,000.00
100,000.00
200,000.00
300,000.00
8,268,168.80
Pamotan porong ,18 agustus 2020
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
58,000.00
14,500.00
301,600.00
-
43,008.00 besi kecil
168,000.00
-
77,414.40 besi kecil
100,800.00 besi kecil
192,000.00
1,108,800.00
2,064,122.40
100,000.00 langsiran
100,000.00
2,164,122.40
KERJA
JUMLAH
HARGA KETERANGAN
Rp
110,000.00
343,200.00
-
152,064.00 besi kecil
198,000.00
75,000.00
878,264.00
150,000.00
150,000.00
1,028,264.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
456,192.00 besi kecil
445,500.00
247,500.00
739,200.00
1,888,392.00
288,000.00
288,000.00
409,050.00
518,400.00
1,503,450.00
200,000.00
200,000.00
3,591,842.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
911,700.00
-
232,320.00
504,000.00
250,000.00
-
536,832.00
432,000.00
120,000.00
-
402,624.00
324,000.00
90,000.00
3,803,476.00
828,000.00
200,000.00
1,028,000.00
4,831,476.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
420,000.00
77,500.00
1,128,400.00
-
352,296.00 besi kecil
56,000.00
-
428,544.00 besi kecil
558,000.00
232,500.00
3,253,240.00
100,000.00 langsiran
100,000.00
3,353,240.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
300,000.00
600,000.00
400,000.00
768,000.00
232,320.00
2,300,320.00
2,300,320.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
70,000.00
100,000.00
170,000.00
200,000.00 2 0rang
80,000.00
632,250.00
-
193,536.00 besi kecil
151,200.00
63,000.00
-
16,588.80 besi kecil
16,200.00
4,500.00
1,357,274.80
100,000.00
100,000.00
1,627,274.80
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
1,430,325.00
-
544,320.00 besi kecil
189,000.00
2,163,645.00
100,000.00 langsiran
100,000.00
2,263,645.00
JUMLAH
HARGA KETERANGAN
Rp
360,000.00
121,875.00
125,000.00
606,875.00
1,000,000.00
-
350,000.00
1,350,000.00
1,956,875.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
2,090,000.00
3,237,600.00
1,618,800.00
6,946,400.00
1,401,000.00
-
448,704.00
478,800.00
237,500.00 diatas dak
2,566,004.00
26,250.00
658,750.00
658,750.00
658,750.00
407,250.00
869,550.00
-
-
-
3,279,300.00
100,000.00
200,000.00
300,000.00
13,091,704.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
512,831.25
-
58,080.00
126,000.00
62,500.00
-
134,208.00
108,000.00
30,000.00
109,200.00
1,140,819.25
100,000.00
100,000.00
1,240,819.25
JUMLAH
HARGA KETERANGAN
Rp
-
476,775.00
-
181,440.00 besi kecil
63,000.00
721,215.00
100,000.00 langsiran
100,000.00
821,215.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
620,000.00
437,500.00
900,000.00
792,000.00
540,000.00
1,650,000.00
625,000.00
5,564,500.00
200,000.00
200,000.00
5,764,500.00
JUMLAH
HARGA KETERANGAN
Rp
1,444,200.00
240,700.00
1,684,900.00
700,500.00
-
224,352.00
239,400.00
118,750.00 diatas dak
-
342,144.00 besi kecil
334,125.00
185,625.00
-
172,108.80 besi kecil
224,100.00
93,375.00
1,351,477.80
JUMLAH
HARGA KETERANGAN
Rp
108,000.00
330,000.00
330,000.00
40,500.00
594,000.00
1,402,500.00
100,000.00
200,000.00
300,000.00
6,543,195.80
KERJA
JUMLAH
HARGA KETERANGAN
Rp
512,831.25
-
174,240.00
378,000.00
187,500.00
-
402,624.00
324,000.00
90,000.00
2,069,195.25
100,000.00
100,000.00
2,169,195.25
KERJA
JUMLAH
HARGA KETERANGAN
Rp
244,000.00
244,000.00
105,750.00
732,000.00
1,325,750.00
-
-
207,208.80 besi kecil
286,200.00
119,250.00
-
179,841.60 besi kecil
248,400.00
103,500.00
1,144,400.40
100,000.00
100,000.00
3,999,092.40
KERJA
JUMLAH
HARGA KETERANGAN
Rp
700,500.00
-
224,352.00
239,400.00
118,750.00 diatas dak
-
-
-
1,283,002.00
-
114,048.00 besi kecil
111,375.00
61,875.00
-
57,369.60 besi kecil
74,700.00
31,125.00
1,037,250.00
-
190,026.00 besi kecil
426,937.50
142,312.50
-
59,616.00 besi kecil
155,250.00
48,515.63
2,510,400.23
JUMLAH
HARGA KETERANGAN
Rp
-
-
-
-
683,400.00
683,400.00
100,000.00
200,000.00
300,000.00
4,776,802.23
KERJA
JUMLAH
HARGA KETERANGAN
Rp
288,000.00
2,534,400.00
2,534,400.00
100,000.00
100,000.00
200,000.00
2,734,400.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
-
-
-
- diatas dak
398,208.00
459,000.00
127,500.00
984,708.00
JUMLAH
HARGA KETERANGAN
Rp
100,000.00
200,000.00
300,000.00
3,745,551.48
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
2,112,000.00
2,112,000.00
300,000.00
100,000.00
150,000.00
550,000.00
2,662,000.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
146,000.00
45,990.00
98,550.00
61,320.00
87,600.00
219,000.00
658,460.00
36,000.00
72,000.00
43,200.00
144,000.00
72,000.00
150,000.00
517,200.00
187,500.00
33,750.00
483,750.00
258,000.00
963,000.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
145,000.00
600,000.00 bongkar manual
200,000.00
87,000.00
1,583,400.00
-
162,540.00
157,500.00
196,875.00
-
224,460.00
261,000.00
326,250.00
1,555,125.00
200,000.00 dilangsir
5,699,150.00
5,699,150.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
696,000.00
175,500.00
871,500.00
50,000.00
100,000.00
150,000.00
1,021,500.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
2,236,800.00
2,236,800.00
2,236,800.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
-
2,097,000.00
-
2,097,000.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
162,540.00
157,500.00
196,875.00
1,192,262.50
-
224,460.00
261,000.00
-
-
258,300.00
448,875.00
-
585,000.00
361,922.78
-
29,520.00
72,000.00
45,000.00
906,250.00
4,901,505.28
75,000.00
37,500.00
240,000.00
352,500.00
750,006.00
75,000.00
4,976,505.28
JUMLAH
HARGA KETERANGAN
Rp
809,600.00
809,600.00
100,000.00
100,000.00
909,600.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
32,500.00
87,600.00
101,250.00
97,500.00
318,850.00
62,500.00
11,250.00
161,250.00
86,000.00
321,000.00
904,850.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
-
-
-
208,800.00
-
-
-
203,000.00
585,000.00
361,922.78
-
29,520.00
72,000.00
45,000.00
585,000.00
468,000.00
-
-
-
-
120,000.00
100,000.00
342,375.00
342,375.00
355,500.00
662,962.50
4,481,455.28
65,000.00
16,250.00
338,000.00
150,000.00
419,250.00
4,900,705.28
KERJA
JUMLAH
HARGA KETERANGAN
Rp
372,000.00
186,000.00
900,000.00
-
18,000.00
9,000.00
225,000.00
-
28,800.00
14,400.00
360,000.00
481,400.00
722,100.00
3,316,700.00
188,650.00
94,325.00
282,975.00
3,599,675.00
JUMLAH
HARGA KETERANGAN
Rp
300,000.00
112,500.00
405,000.00
200,000.00
1,017,500.00
492,000.00
492,000.00
625,000.00
367,500.00
625,000.00
1,617,500.00
3,127,000.00
KERJA
JUMLAH
HARGA KETERANGAN
Rp
2,359,087.50
-
2,359,087.50
2,359,087.50
JUMLAH
HARGA KETERANGAN
Rp
55,000.00
13,750.00
286,000.00
150,000.00
-
16,800.00
54,000.00
33,750.00
-
120,000.00
30,000.00
936,000.00
-
50,400.00
162,000.00
101,250.00
150,000.00
2,158,950.00
2,158,950.00
JUMLAH
HARGA KETERANGAN
Rp
1,011,037.50
-
-
-
1,011,037.50
1,011,037.50
JUMLAH
HARGA KETERANGAN
Rp
100,000.00
-
180,880.00
320,625.00
203,000.00
-
248,310.00
319,050.00
187,600.00
-
71,400.00
45,000.00
1,675,865.00
220,000.00
400,000.00
100,000.00
858,000.00
109,200.00
-
476,800.00
-
-
200,000.00
2,364,000.00
100,000.00
60,000.00
-
182,000.00
-
125,160.00
110,250.00
241,200.00
-
150,000.00
150,000.00
1,118,610.00
5,158,475.00
JUMLAH
HARGA KETERANGAN
Rp
240,000.00
24,000.00
60,000.00
924,000.00
- besi kecil
-
-
150,000.00
2,527,075.20
85,000.00
51,000.00
198,900.00
29,750.00
364,650.00
2,891,725.20
JUMLAH
HARGA KETERANGAN
Rp
1,825,000.00
511,000.00
2,336,000.00
3,230,000.00
787,500.00
4,017,500.00
6,353,500.00
JUMLAH
HARGA KETERANGAN
Rp
-
-
2,038,875.00
815,550.00
2,854,425.00
2,854,425.00
JUMLAH
HARGA KETERANGAN
Rp
120,000.00
12,000.00
30,000.00
462,000.00
- besi kecil
-
-
150,000.00
1,338,537.60
1,338,537.60
JUMLAH
HARGA KETERANGAN
Rp
-
1,698,816.00
1,036,800.00
221,184.00
-
377,520.00
263,250.00
46,800.00
-
3,224,000.00
3,627,000.00
1,612,000.00
1,547,520.00
-
315,200.00
1,418,400.00
126,080.00
15,514,570.00
100,000.00
100,000.00
15,614,570.00
JUMLAH
HARGA KETERANGAN
Rp
160,000.00
616,000.00
400,000.00
1,382,400.00 besi kecil
30,000.00
1,812,400.00
20,000.00
12,000.00
100,000.00
150,000.00
250,000.00
4,648,535.20
JUMLAH
HARGA KETERANGAN
Rp
100,000.00
100,000.00
741,125.00
34,000.00
17,000.00
125,000.00
1,117,125.00
-
-
-
-
400,000.00
100,000.00
100,000.00
1,617,125.00
JUMLAH
HARGA KETERANGAN
Rp
-
1,348,050.00
-
-
1,348,050.00
1,348,050.00
JUMLAH
HARGA KETERANGAN
Rp
80,000.00
8,000.00
20,000.00
308,000.00
- besi kecil
-
-
- besi kecil
-
-
- besi kecil
-
-
-
JUMLAH
HARGA KETERANGAN
Rp
40,000.00
4,000.00
10,000.00
154,000.00
- besi kecil
-
-
-
956,958.40
3,982,360.00
JUMLAH
HARGA KETERANGAN
Rp
-
-
472,500.00
800,000.00
-
46,800.00
100,000.00
858,000.00
109,200.00
200,000.00
2,586,500.00
-
-
-
-
-
-
-
-
249,601.56
-
-
249,601.56
-
346,392.00
1,018,800.00
424,500.00
1,789,692.00
4,625,793.56
JUMLAH
HARGA KETERANGAN
Rp
75,600.00
-
250,000.00
928,102.00
JUMLAH
HARGA KETERANGAN
Rp
60,000.00
100,000.00
100,000.00
3,158,330.00
JUMLAH
HARGA KETERANGAN
Rp
120,000.00
45,000.00
73,302.00
330,750.00
314,077.50
106,368.00
81,000.00
151,360.00
-
75,240.00
109,520.00
100,000.00
1,506,617.50
162,000.00
18,900.00
56,700.00
122,850.00
170,100.00
113,400.00
643,950.00
100,000.00
100,000.00
2,250,567.50
JUMLAH
HARGA KETERANGAN
Rp
134,750.00
2,777,378.91
JUMLAH
HARGA KETERANGAN
Rp
777,200.00
562,800.00
388,600.00
281,400.00
-
777,200.00
562,800.00
388,600.00
281,400.00
4,020,000.00
JUMLAH
HARGA KETERANGAN
Rp
-
-
-
-
- besi kecil
-
-
- besi kecil
-
-
- besi kecil
-
-
-
67,800.00
57,500.00
824,000.00
-
-
-
-
- besi kecil
-
-
- besi kecil
-
-
- besi kecil
-
-
-
-
-
-
246,400.00
4,291,007.20
JUMLAH
HARGA KETERANGAN
Rp
371,592.00
187,384.00
-
412,880.00
206,440.00
41,600.00
-
48,060.00
-
20,800.00
-
24,030.00
1,312,786.00
122,500.00
217,500.00
340,000.00
151,000.00
84,560.00
324,480.00
100,000.00
660,040.00
2,312,826.00
JUMLAH
HARGA KETERANGAN
Rp
-
-
-
-
249,040.00
-
662,899.20
764,100.00
212,250.00
1,888,289.20
1,888,289.20
3,484,324.40
15000 0
60000 0
10000 0
26,396,600.00
35,720,398.00
7,808,660.00
86221253.4
2,771,568.00
2,114,467.12
2,132,800.00
4,200,100.00
4,306,185.00
6,714,660.50
151990092.02
6,245,584.00
4,735,900.00
8,145,541.48
6,844,580.00
5,780,435.50
2,285,332.00
14,258,508.00
21,763,742.00
9,676,907.80
3,154,046.00
2,800,872.00
51,654,075.80
#REF!
2,273,568.00
4,483,875.00
7,173,443.00
8,268,168.80
2,164,122.40
1,028,264.00
3,591,842.00
4,831,476.00
3,353,240.00
2,300,320.00
1,627,274.80
2,263,645.00
1,956,875.00
13,091,704.00
1,240,819.25
821,215.00
5,764,500.00
6,543,195.80
2,169,195.25
3,999,092.40
4,776,802.23
2,734,400.00
3,745,551.48
2,662,000.00
ersihan total
2,788,660.00
1,021,500.00
2,236,800.00
2,097,000.00
909,600.00
ersihan total
904,850.00
3,599,675.00
2,359,087.50
2,158,950.00
1,011,037.50
5,158,475.00
2,891,725.20
2,854,425.00
1,338,537.60
15,614,570.00
4,648,535.20
1,617,125.00
1,348,050.00
3,982,360.00
4,625,793.56
3,158,330.00
2,250,567.50
2,777,378.91
4,291,007.20
2,312,826.00
1,888,289.20
BON UPAH KERJA
PEKERJAAN : PEMBUATAN MERAK BETON
LOKASI : PONDASI PAGAR
TANGGAL : 27 AGUSTUS s/d 08 SEPTEMBER 2018
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PERSIAPAN
1 Persiapan Ls 1.00 1.00 1,000,000.00 1,000,000.00
2 Pembuatan bedeng Ls 1.00 1.00 1,000,000.00 1,000,000.00
3 Pasang sumur Ls 1.00 1.00 250,000.00 250,000.00
Sub total 2,250,000.00
II PEKERJAAN PONDASI ZILLO
1 Pengukuran & bauwplank Ls 1.00 1.00 150,000.00 150,000.00
2 Pemeratan tanah M2 (3,5*3,5) 12.25 7,500.00 91,875.00
3 Pembesian & cor sloof M2 (3*4) 12.00 35,000.00 420,000.00
4 Pasang bekisting plat lantai M1 (3,5*4) 14.00 15,000.00 210,000.00
6 Pembesian & Cor plat lantai tebal 15 cm M2 (3,5*3,5) 12.25 35,000.00 428,750.00
7 Pasang bekisting benda uji M1 (3*4) 12.00 30,000.00 360,000.00
8 Pembesian & cor sloof M2 (3*4) 12.00 45,000.00 540,000.00
9 Pasang bekisting kolom 50/50 M1 (1,55*4) 6.20 75,000.00 465,000.00
10 Pembesian & cor kolom 50/50 M1 1,55*4) 6.20 75,000.00 465,000.00
11 Pasang plendes pelek Bh 4.00 4.00 35,000.00 140,000.00
Sub total 3,270,625.00
III PEKERJAAN TANGKI SOLAR
1 Pengukuran Ls 1.00 1.00 50,000.00 50,000.00
2 Pasang bekisting benda uji Bh 4.00 4.00 35,000.00 140,000.00
3 Pembesian & cor plat 60/60 Bh 4.00 4.00 50,000.00 200,000.00
Sub total 390,000.00
IV PEKERJAAN PONDASI PAGAR
1 Pengukuran & bauwplank Ls 1.00 1.00 500,000.00 500,000.00
2 Perapian galian tanah M1 50.00 50.00 5,000.00 250,000.00
3 Pasang batu pondasi M3 (0,3*1)*50 15.00 150,000.00 2,250,000.00
Sub total 3,000,000.00
V PEKERJAAN LAIN LAIN
1 Transportasi Ls 1.00 1.00 500,000.00 500,000.00
Sub total 500,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PERSIAPAN
1 Pembuatan bedeng tambahan Ls 1.00 1.00 500,000.00 500,000.00
Sub total 500,000.00
II PEKERJAAN KONTAENER
1 Pasang daun jendela sleading Bh 4.00 4.00 125,000.00 500,000.00
2 Pasang daun pintu Bh 1.00 1.00 175,000.00 175,000.00
Sub total 675,000.00
III PEKERJAAN PONDASI PAGAR
Bagian timur
1 Pengukuran & bauwplank Ls 1.00 1.00 500,000.00 500,000.00
2 Perapian galian tanah & perapian M1 (22*5)-50 59.00 5,000.00 295,000.00
3 Galian tanah strous Bh 22.00 22.00 15,000.00 330,000.00
4 Pasang & cor kolom strous Bh 22.00 22.00 50,000.00 1,100,000.00
5 Pasang batu pondasi M3 (1,00+0,7)/2*1,1*110-(15,0) 87.85 150,000.00 13,177,500.00
6 Pembesian & cor kolom M1 (1,00*23) 23.00 50,000.00 1,150,000.00
Bagian selatan
1 Pengukuran & bauwplank Ls 1.00 1.00 500,000.00 500,000.00
2 Perapian galian tanah & perapian M1 25.00 25.00 5,000.00 125,000.00
3 Galian tanah strous Bh 6.00 6.00 15,000.00 90,000.00
4 Pasang & cor kolom strous Bh 6.00 6.00 50,000.00 300,000.00
5 Pasang batu pondasi level 2,00 M3 (1,00*0,7)*25 17.50 150,000.00 2,625,000.00
6 Pasang batu pondasi M3 (1,00+0,7)/2*1,0*25 21.25 150,000.00 3,187,500.00
7 Pembesian & cor kolom M1 (1,70*6) 10.20 50,000.00 510,000.00
Sub total 23,890,000.00
IV PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 1.00 750,000.00 750,000.00
2 Langsir material Ls 1.00 1.00 1,500,000.00 1,500,000.00
3 Transportasi Ls 1.00 1.00 750,000.00 750,000.00
Sub total 3,000,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
III PEKERJAAN PONDASI PAGAR
Bagian timur
1 Pasang batu pondasi M3 (1,00+0,7)/2*0,4*110 22.40 150,000.00 3,360,000.00
2 Pembesian & cor kolom M1 (0,4*23) 9.20 50,000.00 460,000.00
Bagian selatan
1 Pasang batu pondasi M3 (0,7+0,5)/2*0,4*25 6.00 150,000.00 900,000.00
2 Pembesian & cor kolom M1 (0,4*6) 2.40 50,000.00 120,000.00
Bagian selatan bagian 2
1 Pengukuran & bauwplank Ls 1.00 1.00 250,000.00 250,000.00
2 Perapian galian tanah & perapian M1 100.00 100.00 5,000.00 500,000.00
3 Galian tanah strous Bh 20.00 20.00 15,000.00 300,000.00
4 Pasang & cor kolom strous Bh 20.00 20.00 50,000.00 1,000,000.00
5 Pasang batu pondasi level 2,00 M3 (1,00*0,7)*100 70.00 150,000.00 10,500,000.00
6 Pembesian & cor kolom M1 (1*20) 20.00 50,000.00 1,000,000.00
Sub total 18,390,000.00
IV PEKERJAAN LAIN LAIN
1 Pembersihan Ls 1.00 1.00 250,000.00 250,000.00
2 Langsir material Ls 1.00 1.00 500,000.00 500,000.00
3 Transportasi Ls 1.00 1.00 500,000.00 500,000.00
Sub total 1,250,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
III PEKERJAAN PONDASI PAGAR
Bagian timur 1 St 110 - 130 m
1 Galian tanah strous Bh 4.00 4.00 15,000.00 60,000.00
2 Pasang & cor kolom strous Bh 4.00 4.00 50,000.00 200,000.00
3 Pasang batu pondasi M3 (1,00+0,5)/2*1,4*20 21.00 150,000.00 3,150,000.00
4 Pembesian & cor kolom M1 (1,4*4) 5.60 50,000.00 280,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PONDASI PAGAR
Bagian timur 45 M ( St 130 - 175 m)
1 Galian tanah strous Bh 9.00 9.00 15,000.00 135,000.00
2 Pasang & cor kolom strous Bh 9.00 9.00 50,000.00 450,000.00
3 Pasang batu pondasi M3 (1,00+0,5)/2*1,6*35 42.00 150,000.00 6,300,000.00
4 Pembesian & cor kolom M1 (1,6*9) 14.40 50,000.00 720,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PONDASI PAGAR
Bagian timur 1 panjang 110 m (St 0,00 - 110,0 M )
1 Pasang batu pondasi pelunasan M3 (0,5+0,4)/2*0,65*110 32.18 150,000.00 4,826,250.00
2 Pembesian & cor kolom M1 (0,65*22) 14.30 50,000.00 715,000.00
Bagian timur 45 M ( St 175 - 220 m)
1 Galian tanah strous Bh 9.00 9.00 15,000.00 135,000.00
2 Pasang & cor kolom strous Bh 9.00 9.00 50,000.00 450,000.00
3 Pasang batu pondasi M3 (1,00+0,5)/2*1,6*45 54.00 150,000.00 8,100,000.00
4 Pembesian & cor kolom M1 (1,6*9) 14.40 50,000.00 720,000.00
Bagian selatan
1 Pasang tiang panel Bh 13.00 13.00 30,000.00 390,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN KONTAENER
1 Pasang daun jendela sleading Bh (4*2) 8.00 125,000.00 1,000,000.00
2 Pasang daun pintu Bh (1*2) 2.00 175,000.00 350,000.00
Sub total 1,350,000.00
II PEKERJAAN LAIN LAIN
1 Transportasi Ls 1.00 1.00 200,000.00 200,000.00
Sub total 200,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PAGAR PANEL
Bagian timur
1 Pasang tiang panel Bh (56-30) 26.00 30,000.00 780,000.00
2 Pasang bekisting sloof 20/20 M1 (2,5*35) 87.50 25,000.00 2,187,500.00
3 Pasang pembesian & cor sloof 20/20 M1 (2,5*35) 87.50 40,000.00 3,500,000.00
4 Pasang daun panel 7 daun M2 (2,5*9) 22.50 45,000.00 1,012,500.00
Bagian selatan
1 Pasang bekisting sloof 20/20 M1 (2,5*9) 37.50 25,000.00 937,500.00
2 Pasang pembesian & cor sloof 20/20 M1 (2,5*9) 37.50 40,000.00 1,500,000.00
3 Pasang daun panel 7 daun M2 (2,5*9) 37.50 45,000.00 1,687,500.00
Sub total 11,605,000.00
II PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 1 panjang 100 m (St 0,00 - 100,0 M )
1 Galian tanah strous Bh (20-6) 14.00 15,000.00 210,000.00
2 Pasang & cor kolom strous Bh (20-6) 14.00 50,000.00 700,000.00
3 Pasang batu pondasi dasar M3 (0,7*1,20*100)-(0,7*0,5)*25 75.25 150,000.00 11,287,500.00
4 Pembesian & cor kolom M1 (0,7*20) 14.00 50,000.00 700,000.00
Sub total 12,897,500.00
III PEKERJAAN LAIN LAIN
1 Siram pohon waru Ls 1.00 1.00 600,000.00 600,000.00
2 Langsir material Ls 1.00 1.00 1,500,000.00 1,500,000.00
3 Transportasi Ls 1.00 1.00 250,000.00 250,000.00
Sub total 2,350,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PONDASI PAGAR
Bagian timur 1 panjang 110 m (St 110,00 - 220,0 M )
1 Pasang batu pondasi pelunasan M3 (0,5+0,4)/2*0,60*110 29.70 150,000.00 4,455,000.00 100%
2 Pembesian & cor kolom M1 (0,60*22) 13.20 50,000.00 660,000.00 SELESAI
Sub total 5,115,000.00
II PEKERJAAN PAGAR PANEL
Bagian timur
1 Pasang tiang panel Bh (112-56) 56.00 30,000.00 1,680,000.00
2 Pasang bekisting sloof 20/20 M1 (2,5*70)-(2,5*35) 87.50 25,000.00 2,187,500.00
3 Pasang pembesian & cor sloof 20/20 M1 (2,5*70)-(2,5*35) 87.50 40,000.00 3,500,000.00
4 Pasang daun panel 7 daun M2 (40-9)*2,5 80.60 45,000.00 3,627,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PAGAR PANEL
Bagian timur
1 Pasang bekisting sloof 20/20 M1 (2,5*3) 7.50 25,000.00 187,500.00 100%
2 Pasang pembesian & cor sloof 20/20 M1 (2,5*3) 7.50 40,000.00 300,000.00 100%
3 Pasang daun panel 7 daun M2 (30*2,5) 75.00 45,000.00 3,375,000.00
Sub total 3,862,500.00
II PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 1 panjang 50 m (St 0,00 - 50,0 M )
1 Pasang batu pondasi dinding M3 (0,8+1,20)/2*1,0*50 50.00 150,000.00 7,500,000.00
2 Pembesian & cor kolom M1 (1,0*10) 10.00 50,000.00 500,000.00
Sub total 8,000,000.00
III PEKERJAAN LAIN LAIN
1 Siram pohon waru Ls 1.00 1.00 300,000.00 300,000.00
2 Langsir material Ls 1.00 1.00 500,000.00 500,000.00
3 Transportasi Ls 1.00 1.00 150,000.00 150,000.00
Sub total 950,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PAGAR PANEL
Bagian timur
1 Pasang daun panel 7 daun M2 (13*2,5) 32.50 45,000.00 1,462,500.00
Sub total 1,462,500.00
II PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 1 panjang 50 m (St 0,50 - 101,5,0 M )
1 Pasang batu pondasi dinding M3 (0,8+1,20)/2*1,0*51,5 51.50 150,000.00 7,725,000.00
2 Pembesian & cor kolom M1 (1,0*10) 10.00 50,000.00 500,000.00
Bagian Barat 1 panjang 100 m (St 0,00 - 101,5,0 M )
1 Pasang bekisting ring tengah 20/20 M1 (50+51,5) 101.50 25,000.00 2,537,500.00
2 Pasang pembesian & cor ring tengah 20/20 M1 (50+51,5) 101.50 40,000.00 4,060,000.00
Bagian Barat 1 panjang 75 m (St 0,00 - 75,0 M )
1 Pasang batu pondasi dinding M3 (0,8+0,5)/2*0,9*75 43.88 150,000.00 6,581,250.00
2 Pembesian & cor kolom M1 (0,9*10) 9.00 50,000.00 450,000.00
Sub total 21,853,750.00
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 750,000.00 750,000.00
2 Transportasi Ls 1.00 1.00 150,000.00 150,000.00
Sub total 900,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PAGAR PANEL
Bagian selatan
1 Pasang tiang panel 2M Bh 44.00 32.50 45,000.00 1,462,500.00
2 Pasang daun panel 3 daun M2 (11*2,5) 32.50 45,000.00 1,462,500.00
Sub total 1,462,500.00
II PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat selatan panjang 26,5 m (St 0,00 - 101,5 M )
1 Pasang batu pondasi dinding M3 (0,8+0,5)/2*0,9*26,5 15.50 150,000.00 2,325,375.00
2 Pembesian & cor kolom M1 (0,9*20) 18.00 50,000.00 900,000.00
Sub total 3,225,375.00
III PEKERJAAN PONDASI SALURAN BARAT
Bagian Barat 2 panjang 20 m (St 170,00 - 190,0 M )
1 Pasang bekisting ring tengah 20/20 M1 20.00 101.50 25,000.00 2,537,500.00
2 Pasang pembesian & cor ring tengah 20/20 M1 20.00 101.50 40,000.00 4,060,000.00
3 Pasang batu pondasi dinding M3 (0,4+0,8)/2*1,0*20 20.00 150,000.00 3,000,000.00
4 Pembesian & cor kolom M1 (0,8*5) 5.00 50,000.00 250,000.00
Sub total 9,847,500.00
III PEKERJAAN PONDASI SALURAN SISI TIMUR
Bagian Barat 3 panjang 50 m (St 120,00 - 170,0 M )
1 Galian tanah strous Bh 15.00 15.00 15,000.00 225,000.00
2 Pasang & cor kolom strous Bh 15.00 15.00 50,000.00 750,000.00
3 Pasang batu pondasi dasar M3 (0,7*1,20*20) 16.80 150,000.00 2,520,000.00
4 Pembesian & cor kolom M1 (0,7*5) 3.50 50,000.00 175,000.00
5 Pasang batu pondasi dinding M3 (0,8+1,20)/2*1,0*50 50.00 150,000.00 7,500,000.00
6 Pembesian & cor kolom M1 (1,0*55) 55.00 50,000.00 2,750,000.00
8 Pasang bekisting ring tengah 20/20 M1 14.00 14.00 25,000.00 350,000.00
9 Pasang pembesian & cor ring tengah 20/20 M1 14.00 14.00 40,000.00 560,000.00
6 Pasang batu pondasi dinding pelunasan M3 (0,5+0,7)/2*0,6*14 5.04 150,000.00 756,000.00
Sub total 15,586,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PAGAR PANEL
Bagian selatan
1 Pasang tiang panel 2M Bh (70-44) 26.00 45,000.00 1,170,000.00
2 Pasang daun panel 3 daun M2 (42-11)*2,5 77.50 45,000.00 3,487,500.00
Sub total 3,487,500.00
II PEKERJAAN PONDASI SALURAN SISI TIMUR
Bagian Barat 3 panjang 50 m (St 120,00 - 170,0 M )
1 Pembesian & cor kolom M1 (0,6*6) 3.60 50,000.00 180,000.00
2 Pasang batu pondasi dinding pelunasan M3 (0,5+0,7)/2*0,6*21 5.04 150,000.00 756,000.00
3 Pembesian ring atas M1 35.00 35.00 25,000.00 875,000.00
Sub total 1,811,000.00
III PEKERJAAN PONDASI SALURAN SISI BARAT
Bagian Barat 4 panjang 7 m
1 Pasang batu pondasi dinding pelunasan M3 (0,5+0,7)/2*0,6*7 2.52 150,000.00 378,000.00
2 Pembesian & cor kolom M1 (0,6*3) 1.80 50,000.00 90,000.00
Sub total 468,000.00
IV PEKERJAAN LAIN LAIN
1 Langsir material 3 minggu Ls 1.00 1.00 1,000,000.00 1,000,000.00
2 Turun pagar panel Ls 1.00 1.00 500,000.00 500,000.00
3 Tanam sengon Ls 1.00 1.00 150,000.00 150,000.00
4 Transportasi Ls 1.00 1.00 1,000,000.00 1,000,000.00
Sub total 2,650,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PAGAR PANEL
Bagian selatan
1 Pasang tiang panel 2M Bh 30.00 30.00 45,000.00 1,350,000.00
2 Pasang daun panel 3 daun M2 (35*2,5) 87.50 45,000.00 3,937,500.00
Sub total 5,287,500.00
II PEKERJAAN PONDASI SALURAN
1 Pembesian sloof 25/40 M1 (35*2) 70.00 50,000.00 3,500,000.00
2 Pembesian balok 20./20 M1 (2,5*11) 27.50 30,000.00 825,000.00
3 Pasang bekisting balok sloof M1 (35*2) 70.00 25,000.00 1,750,000.00
4 Pasang bekisting balok gantung M1 (2,5*11) 27.50 30,000.00 825,000.00
Sub total 6,900,000.00
III PEKERJAAN LAIN LAIN
1 Langsir material 3 minggu Ls 1.00 1.00 1,500,000.00 1,500,000.00
2 Turun pagar panel Ls 1.00 1.00 500,000.00 500,000.00
3 Transportasi Ls 1.00 1.00 1,000,000.00 1,000,000.00
Sub total 3,000,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
II PEKERJAAN PONDASI SALURAN
1 Cor balok 30/60 M1 (36*2) 72.00 40,000.00 2,880,000.00
2 Cor balok gantung 20./20 M1 (2,5*11) 27.50 25,000.00 687,500.00
3 Setrikan pondasi bawah pintu masuk M2 (35*2)*1,5 105.00 20,000.00 2,100,000.00
4 Setrikan pondasi utara jembatan M2 (20*1,7*1) 34.00 20,000.00 680,000.00
5 Pasang batu pondasi tambahan 20 cm M3 (0,5*0,2*20) 4.00 150,000.00 600,000.00
6 Pasang batu pondasi tambahan 20 cm M2 (0,5*0,2*101,5) 10.15 150,000.00 1,522,500.00
7 Ban banan M1 (20*1)+(36*2) 92.00 20,000.00 1,840,000.00
Sub total 10,310,000.00
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 500,000.00 500,000.00
3 Transportasi Ls 1.00 1.00 500,000.00 500,000.00
Sub total 1,000,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PONDASI SALURAN
1 Perapian galian M1 3.50 3.50 15,000.00 52,500.00
2 Kuras air Ls 1.00 1.00 50,000.00 50,000.00
3 Galian tanah strous Bh 2.00 2.00 15,000.00 30,000.00
4 Pasang & cor kolom strous Bh 2.00 2.00 50,000.00 100,000.00
5 Pasang batu pondasi dasar M3 (1,00*0,6)*3,5 2.10 150,000.00 315,000.00
6 Pembesian & cor kolom M1 (0,6*2) 1.20 50,000.00 60,000.00
7 Pasang batu pondasi dinding M3 (0,6+1,0)/2*1,4*3,5 3.92 150,000.00 588,000.00
8 Pembesian & cor kolom M1 (1,4*2) 2.80 50,000.00 140,000.00
9 Pasang bekisting ring tengah 20/20 M1 3.50 3.50 25,000.00 87,500.00
10 Pasang pembesian & cor ring tengah 20/20 M1 3.50 3.50 40,000.00 140,000.00
Sub total 1,563,000.00
II PEKERJAAN BETON RING
1 Pasang bekisting ring atas 20/40 M1 10.00 14.00 25,000.00 350,000.00
2 Pasang pembesian & cor ring atas 20/40 M1 10.00 14.00 40,000.00 560,000.00
Sub total 910,000.00
III PEKERJAAN SETRIKAN
1 Setrikan Pondasi selatan jembatan M2 (40*1,7) 68.00 20,000.00 1,360,000.00
Sub total 1,360,000.00
IV PEKERJAAN PAGAR PANEL
1 Pasang tiang panel 2M Bh 6.00 6.00 45,000.00 270,000.00
2 Pasang daun panel 3 daun M2 (14*2,5) 35.00 45,000.00 1,575,000.00
Sub total 1,845,000.00
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 500,000.00 500,000.00
2 Transportasi Ls 1.00 1.00 500,000.00 500,000.00
Sub total 1,000,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PONDASI SALURAN
saluran bagian barat
1 Perapian galian M1 3.50 3.50 15,000.00 52,500.00
2 Kuras air Ls 1.00 1.00 50,000.00 50,000.00
3 Galian tanah strous Bh 2.00 2.00 15,000.00 30,000.00
4 Pasang & cor kolom strous Bh 2.00 2.00 50,000.00 100,000.00
5 Pasang batu pondasi dasar M3 (1,00*0,6)*3,5 2.10 150,000.00 315,000.00
6 Pembesian & cor kolom M1 (0,6*2) 1.20 50,000.00 60,000.00
7 Pasang batu pondasi dinding M3 (0,6+1,0)/2*1,4*3,5 3.92 150,000.00 588,000.00
8 Pembesian & cor kolom M1 (1,4*2) 2.80 50,000.00 140,000.00
9 Pasang bekisting ring tengah 20/20 M1 3.50 3.50 25,000.00 87,500.00
10 Pasang pembesian & cor ring tengah 20/20 M1 3.50 3.50 40,000.00 140,000.00
saluran bagian barat
1 Pasang batu pondasi dinding M3 0,6*0,45*3,5 0.95 150,000.00 141,750.00
2 Pembesian & cor kolom M1 (0,45*2) 0.90 50,000.00 45,000.00
saluran bagian timur
1 Pasang batu pondasi dinding M3 0,6*0,65*10,5 4.10 150,000.00 614,250.00
2 Pembesian & cor kolom M1 (0,65*10,5) 6.83 50,000.00 341,250.00
Sub total 2,705,250.00
II PEKERJAAN PONDASI SALURAN TOL
1 Bobok pondasi lama M1 (3*2) 6.00 15,000.00 90,000.00
2 Peninggian pondasi saluran M3 (0,5*0,2*3*2) 0.60 150,000.00 90,000.00
Sub total 180,000.00
III PEKERJAAN SETRIKAN
1 Setrikan Pondasi selatan jembatan M2 (40*1,7) 68.00 20,000.00 1,360,000.00
Sub total 1,360,000.00
IV PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 700,000.00 700,000.00
2 Transportasi Ls 1.00 1.00 200,000.00 200,000.00
Sub total 900,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PONDASI SALURAN
saluran bagian barat
1 Perapian galian M1 15.00 15.00 15,000.00 225,000.00
2 Pasang bekisting balok 40/60 M1 (15*2) 7.00 35,000.00 245,000.00
3 Pembesian & cor balok 40/60 M1 (15*2) 7.00 70,000.00 490,000.00
4 Pasang bekisting balok 25/25 M1 (1,9*5) 7.00 35,000.00 245,000.00
5 Pembesian & cor balok 25/25 M1 (1,9*5) 7.00 70,000.00 490,000.00
6 Setrikan pondasi bawah pintu masuk M2 (15*2)*1,5 105.00 20,000.00 2,100,000.00
7 Pasang plat beton Bh 26.00 26.00 25,000.00 650,000.00
Sub total 4,445,000.00
II PEKERJAAN PONDASI SALURAN TOL
1 Pasang bekisting balok 40/70 M1 (7*1) 7.00 35,000.00 245,000.00
2 Pembesian & cor balok 40/70 M1 (7*1) 7.00 70,000.00 490,000.00
3 Pasang bekisting balok 30/70 M1 (3,15*2) 6.30 30,000.00 189,000.00
4 Pembesian & cor balok 30/70 M1 (3,15*2) 6.30 45,000.00 283,500.00
5 Pasang bekisting balok 25/30 M1 2.00 2.00 30,000.00 60,000.00
6 Pembesian & cor balok 25/30 M1 2.00 2.00 45,000.00 90,000.00
Sub total 1,357,500.00
III PEKERJAAN SETRIKAN
1 Setrikan Pondasi selatan jembatan M3 (20,5*1,7) 34.85 20,000.00 697,000.00
Sub total 697,000.00
IV PEKERJAAN SALURAN YUDIT
Bagian timur
1 Galian tanah & perapian M1 112.50 112.50 10,000.00 1,125,000.00
2 Pasangan batu dasar saluran M3 (0,1*0,50*112,5) 5.63 100,000.00 562,500.00
3 Rabatan lantai M2 (0,5*112,5) 56.25 19,000.00 1,068,750.00
4 Pasang yudit 30 M1 48.00 48.00 15,000.00 720,000.00
Sub total 3,476,250.00
V PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 700,000.00 700,000.00
2 Turunkan yudit Ls 2.00 2.00 150,000.00 300,000.00
3 Transportasi Ls 1.00 1.00 500,000.00 500,000.00
Sub total 1,500,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN SALURAN YUDIT
Bagian timur
1 Galian tanah & perapian M1 (33,36+54,43+22,66+72,19)-112,5 70.14 10,000.00 701,400.00
2 Pasangan batu dasar saluran M3 (0,1*0,50)-(182,64-112,5) 3.51 100,000.00 350,700.00
3 Rabatan lantai M2 (0,5*182,5)-(0,5*112,5) 35.00 19,000.00 665,000.00
4 Pasang yudit 30 M1 182,5-48 134.50 15,000.00 2,017,500.00
5 Cepitan antara pondasi & yudit M2 182.50 182.50 15,000.00 2,737,500.00
Bagian barat
1 Galian tanah & perapian M1 (1,6*96) 153.60 10,000.00 1,536,000.00
2 Pasangan batu dasar saluran M3 (0,1*0,5*96) 4.80 100,000.00 480,000.00
3 Rabatan lantai M2 (0,5*0,96) 0.48 19,000.00 9,120.00
4 Pasang yudit 30 Bh 96.00 96.00 15,000.00 1,440,000.00
Sub total 9,937,220.00
II PEKERJAAN LAIN LAIN
1 Pasang bekisting M1 101.50 101.50 25,000.00 2,537,500.00
2 Pembesian & cor ring M1 101.50 101.50 35,000.00 3,552,500.00
3 Plesteran & acian M1 (0,6*101,5)*70% 42.63 25,000.00 1,065,750.00
4 Benangan sudut M1 (101,5*3)*70% 213.15 12,500.00 2,664,375.00
Sub total 9,820,125.00
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 750,000.00 750,000.00
2 Transportasi Ls 1.00 1.00 500,000.00 500,000.00
Sub total 1,250,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN SALURAN YUDIT
Bagian timur
1 Ban banan pondasi & yudit M2 182.50 182.50 22,000.00 4,015,000.00
Bagian barat
1 Cepitan yudit dan pondasi M1 96.00 96.00 15,000.00 1,440,000.00
Sub total 5,455,000.00
II PEKERJAAN PONDASI SALURAN DEPAN
1 Pengukuran & bauwplank M1 6.00 6.00 25,000.00 150,000.00
1 Perapian galian M1 (6*2) 12.00 15,000.00 180,000.00
2 Kuras air Ls 1.00 1.00 150,000.00 150,000.00
3 Galian tanah strous Bh 2.00 2.00 15,000.00 30,000.00
4 Pasang & cor kolom strous Bh (2*2) 4.00 50,000.00 200,000.00
5 Pasang batu pondasi dasar M3 (1,00*0,6)*6*2 7.20 150,000.00 1,080,000.00
6 Pembesian & cor kolom M1 (0,6*2)*2 2.40 50,000.00 120,000.00
7 Pasang batu pondasi dinding M3 (0,6+1,0)/2*1,4*6*2 13.44 150,000.00 2,016,000.00
8 Pembesian & cor kolom M1 (1,4*2)*2 5.60 50,000.00 280,000.00
9 Pasang bekisting ring tengah 20/20 M1 (6*2) 12.00 25,000.00 300,000.00
10 Pasang pembesian & cor ring tengah 20/20 M1 (6*2) 12.00 40,000.00 480,000.00
Pondasi dalam 101,5
1 Plesteran & acian M1 (0,6*101,5)*30% 18.27 25,000.00 456,750.00
2 Benangan sudut M1 (101,5*3)*30% 91.35 12,500.00 1,141,875.00
Sub total 6,584,625.00
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 750,000.00 750,000.00
2 Transportasi Ls 1.00 1.00 500,000.00 500,000.00
Sub total 1,250,000.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
I PEKERJAAN PONDASI SALURAN DEPAN
1 Pengukuran & bauwplank L1 1.00 1.00 100,000.00 100,000.00
2 Perapian galian M1 (20*2)-(6*2) 28.00 15,000.00 420,000.00
3 Kuras air Ls 1.00 1.00 150,000.00 150,000.00
4 Galian tanah strous Bh (6*2)-2 10.00 15,000.00 150,000.00
5 Pasang & cor kolom strous Bh (6*2)-4 8.00 50,000.00 400,000.00
6 Pasang batu pondasi dasar M3 (1,00*0,6*20*2)-(1,00*0,6*6*2) 16.80 150,000.00 2,520,000.00
7 Pembesian & cor kolom M1 (0.6*6*2)-(0,6*2)*2 4.80 50,000.00 240,000.00
8 Pasang batu pondasi dinding M3 ((0,6+1,0)/2*1,4*20*2-(0,6+1,0)/2*1,4*6*2 31.36 150,000.00 4,704,000.00
9 Pembesian & cor kolom M1 (1,4*6*2)-(1,4*2)*2 11.20 50,000.00 560,000.00
10 Pasang bekisting ring tengah 20/20 M1 (20*2)-(6*2) 28.00 25,000.00 700,000.00
11 Pasang pembesian & cor ring tengah 20/20 M1 (20*2)-(6*2) 28.00 40,000.00 1,120,000.00
12 Pasang batu pondasi dinding diatas ring tengah M3 0,6*0,65*20*2 15.60 150,000.00 2,340,000.00
Sub total 13,404,000.00
II PEKERJAAN PARKIR AREA
Bagian selatan
1 Pengukuran & bauwplank Ls 1.00 1.00 250,000.00 250,000.00
2 Galian tanah untuk pasang paving sekat M1 (4*2)+(1,3+3,2+4)*13*2 229.00 2,500.00 572,500.00
3 Pasang sekat / pembatas paving M1 (4*2)+(1,3+3,2+4)*13*2 229.00 12,500.00 2,862,500.00
4 Keprasan tanah & perapian M2 (4,0+1,3)/2*3,2*13*2 220.48 7,500.00 1,653,600.00
5 Pasang besi rakitan M2 (3,1+0,4)/2*3,2*13*2 145.60 10,000.00 1,456,000.00
6 Cor lantai tebal 10 cm M2 (4,0+1,3)/2*3,2*13*2 220.48 15,000.00 3,307,200.00
7 Pasang Canstin penahan @ 4 buah Unit (4*13*2) 104.00 12,500.00 1,300,000.00
Sub total 11,401,800.00
III PEKERJAAN LAIN LAIN
1 Langsir material Ls 1.00 1.00 300,000.00 300,000.00
2 Pecah batu Ls 1.00 1.00 200,000.00 200,000.00
Sub total 500,000.00
60000 0
10000 0
22,694,585.80
34,956,406.00
7,824,660.00
81771247.2
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : KANTOR BATCHING PLANT POH GADING
TANGGAL : 12 MARET s/d 25 MARET 2017
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
A PEKERJAAN PERSIAPAN
1 Pegukuran pasang tiang pancang Ls 1.00 1.00 300,000.00 300,000.00
2 Pasang bauwplank M1 (11+13)*2 48.00 5,000.00 240,000.00
3 Mobilisai Ls 1.00 1.00 250,000.00 250,000.00
Sub total 790,000.00
B PEKERJAAN TANAH
1 Bobok tiang pancang Titik 20.00 20.00 10,000.00 200,000.00
2 Galian tanah pondasi leveling M1 (4,9+4,9+1,85+1,85)*2)+(6,68*2+1,85*4)+(4,45*1)+(0,8*2) 53.81 10,000.00 538,100.00
738,100.00
C PEKERJAAN PASANGAN
1 Pasang lantai kerja M1 (4,9+4,9+1,85+1,85)*2)+(6,68*2+1,85*4)+(4,45*1)+(0,8*2) 53.81 15,000.00 807,150.00
2 Pembesian balok sloof 45x 45 M1 (4,9+4,9+2,7+2,7)*2)+(6,68*2+2,7*4)+(4,45*1)+(0,8*2) 60.61 35,000.00 2,121,350.00
3 Pasang bekisting balok M1 (4,9+4,9+2,7+2,7)*2)+(6,68*2+2,7*4)+(4,45*1)+(0,8*2) 60.61 35,000.00 2,121,350.00
4 Pasang bekisting pedestal Bh 20.00 20.00 25,000.00 500,000.00
5 Pasang angkur plat besi 30x 30 dilas tambah angkur Bh 20.00 20.00 20,000.00 400,000.00
6 Cor umpak zillo Uk 45/45x0.15 M3 (0,45*0,45*0,15)*20 0.61 75,000.00 45,562.50
7 Cor balok sloof zillo 45/45 M3 (53,81*0,45*0,45) 10.90 75,000.00 817,239.38
8 Bongkar bekisting M1 60.00 60.00 5,000.00 300,000.00
Sub total 7,112,651.88
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
A PEKERJAAN OPRITAN
1 Pasang batu pondasi M3 (0,6+0,4)/2*1,70*16 14.45 110,000.00 1,589,500.00 Pasangan tinggi
2 Pasang batu pondasi sayap M3 (0,6+0,4)/2*1,7*6*2 15.30 110,000.00 1,683,000.00 Pasangan tinggi
3 Pasang bekisting kolom struktur 25/25 M1 (1,7*5)+(1,7*2*2)+(1,2*2) 17.70 35,000.00 619,500.00
4 Pembesian dan cor kolom struktur 25/25 M1 (1,7*5)+(1,7*2*2)+(1,2*2) 17.70 45,000.00 796,500.00
5 Pasang bekisting balok atas 20/40 M1 (16+12+12) 40.00 35,000.00 1,400,000.00
6 Pembesian dan cor balok tengah 20/40 M1 (16+12+12) 40.00 45,000.00 1,800,000.00
Sub total 7,888,500.00
B PEKERJAAN PASANG DINDING GUDANG
1 Pembersihan Ls 1.00 1.00 150,000.00 150,000.00
2 Pasang bekisting sloof 20/30 M1 (9*8) 72.00 35,000.00 2,520,000.00
3 Pembesian dan cor sloof 20/30 M1 (9*8) 72.00 45,000.00 3,240,000.00
4 Pasang bata ringan M2 (1,6*9*7) 100.80 19,000.00 1,915,200.00
5 Pasang bekisting kolom praktis M1 (1,6*2)*7 22.40 25,000.00 560,000.00
6 Pembesian dan Cor kolom praktis M1 (1,6*2)*7 22.40 30,000.00 672,000.00
Sub total 9,057,200.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA KETERANGAN
Rp Rp
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
I PEKERJAAN CRUSSER
1 Bon upah sementara Ls 1.00 1.00 1,000,000.00 1,000,000.00
JUMLAH 1,000,000.00
IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 24 JAN s/d 30 JAN 2016
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
I PEKERJAAN CRUSSER
1 Pembesian sloof 40/50 M1 (8.35*4*2)+(14.9*2*2) 126.40 30,000.00 3,792,000.00
JUMLAH 3,792,000.00
I PEKERJAAN GARDU LISTRIK
1 Pengukuran & bauwplank M1 (11+11+5+5) 32.00 5,000.00 160,000.00
2 Galian tanah pondasi Ls (1*1) 1.00 150,000.00 150,000.00
3 Pasang batu pondasi peninggian M1 (10+10+4) 24.00 20,000.00 480,000.00
4 Bekisting beton sloof 20 /40 M1 (4+4+10+10) 28.00 30,000.00 840,000.00
5 Pembesian & cor beton sloof 20/40 M1 (4+4+10+10) 28.00 45,000.00 1,260,000.00
JUMLAH 2,890,000.00
IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 31 JAN s/d 06 FEBR 2016
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
I PEKERJAAN PONDASI SCREEN
1 Pengukuran dan bauwplank M1 (15*2)+(9*2) 48.00 5,000.00 240,000.00
2 Galian tanah dan perapian M1 (15*2)+(8.5*4) 64.00 10,000.00 640,000.00
3 Pasang pondasi lantai kerja M1 (15*2)+(8.5*4) 64.00 17,500.00 1,120,000.00
4 Pasang pembesian M1 (15*2)+(8.5*4) 64.00 15,000.00 960,000.00
JUMLAH 2,960,000.00
II PEKERJAAN GARDU LISTRIK
1 Bekisting beton kolom struktur 25/25 M1 (4.5*6) 27.00 30,000.00 810,000.00
2 Pembesian & cor beton kolom 25/25 M1 (4.5*6) 27.00 45,000.00 1,215,000.00
JUMLAH 2,025,000.00
III PEKERJAAN LAIN LAIN
1 Bongkar bata ringan Ls 1 1.00 250,000.00 250,000.00
2 Transportasi Ls 1 1.00 250,000.00 250,000.00
JUMLAH 500,000.00
IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 07 FEBR s/d 13 FEBR 2016
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
I PEKERJAAN PONDASI SCREEN I
1 Pasang bekisting M1 (15*2)+(8.5*4) 64.00 20,000.00 1,280,000.00
2 Cor beton readimix mutu 400 M1 (15*2)+(8.5*4) 64.00 22,500.00 1,440,000.00
3 Pasang pelex angkur Bh 16.00 16.00 15,000.00 240,000.00
4 Bongkar bekisting M2 (15*2)+(8.5*4) 64.00 12,500.00 800,000.00
JUMLAH 3,760,000.00
I PEKERJAAN PONDASI SCREEN II
1 Pengukuran dan bauwplank M1 (15*2)+(9*2) 48.00 5,000.00 240,000.00
2 Galian tanah dan perapian M1 (15*2)+(8.5*4) 64.00 10,000.00 640,000.00
3 Pasang pondasi lantai kerja M1 (15*2)+(8.5*4) 64.00 20,000.00 1,280,000.00
4 Pasang pembesian M1 (15*2)+(8.5*4) 64.00 15,000.00 960,000.00
5 Pasang pelex angkur Bh 16.00 16.00 15,000.00 240,000.00
JUMLAH 3,360,000.00
II PEKERJAAN GARDU LISTRIK
1 Pasang dinding paving M2 (11.5+10+3.5)+(10*2) 45.00 19,000.00 855,000.00
2 Peninggian tanah dan pemerataan Ls 1.00 1.00 200,000.00 200,000.00
3 Pasang patllah dasar lubang kabel Ls 1.00 1.00 150,000.00 150,000.00
JUMLAH 1,205,000.00
III PEKERJAAN LAIN LAIN
1 Sewa pompa air Hari 2 2.00 100,000.00 200,000.00
2 Transportasi Ls 1 1.00 250,000.00 250,000.00
JUMLAH 450,000.00
IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 14 FEBR s/d 20 FEBR 2016
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
I PEKERJAAN PONDASI SCREEN II
1 Pasang bekisting M1 (15*2)+(8.5*4) 64.00 20,000.00 1,280,000.00
2 Cor beton readimix mutu 400 M1 (15*2)+(8.5*4) 64.00 22,500.00 1,440,000.00
4 Bongkar bekisting M2 (15*2)+(8.5*4) 64.00 12,500.00 800,000.00
JUMLAH 3,520,000.00
II PEKERJAAN GARDU LISTRIK
1 Pasang dinding paving M2 (10*2*0.5) 10.00 19,000.00 190,000.00
2 Peninggian tanah dan pemerataan Ls 1.00 1.00 250,000.00 250,000.00
3 Pasang bata ringan tinggi 0 - 1.5 m M2 (4*3*1.5)+(10*1.5)+(1*1.5*4) 39.00 16,000.00 624,000.00
4 Pasang bata ringantinggi 1.5 -3 m M2 (4*3*1.5)+(10*1.5)+(1*1.5*4) 39.00 19,000.00 741,000.00
5 Pasang bata ringan tinggi 3 - 4 m M2 (4*3*0.75)+(10*0.75)+(10*1) 26.50 20,000.00 530,000.00
6 Pasang bekisting ring balok 10/15 M1 (3.6*3)+(10*1)+(2.7*2) 26.20 30,000.00 786,000.00
7 Pembesian dan cor M1 (3.6*3)+(10*1)+(2.7*2) 26.20 38,000.00 995,600.00
8 Pasang pondasi teras M3 (0.6*0.6*10) 3.60 95,000.00 342,000.00
9 Rabatan lantai M2 (4*10)-(0.5*10) 35.00 12,500.00 437,500.00
10 Plesteran dan acian saluran kabel M2 (0.5*10*2)+(0.6*10) 16.00 19,000.00 304,000.00
JUMLAH 5,200,100.00
III PEKERJAAN PRIMER
1 Pengukuran dan bauwplank M1 (12*2+(7*2) 38.00 5,000.00 190,000.00
2 Pemerataan dengan batu M2 (12*7) 84.00 12,500.00 1,050,000.00
3 Pembesian kolom struktur 27/45 M1 (4*10) 40.00 20,000.00 800,000.00
4 Kuras air Ls 1 1.00 200,000.00 200,000.00
JUMLAH 2,240,000.00
III PEKERJAAN LAIN LAIN
1 Sewa pompa air Hari 4 4.00 100,000.00 400,000.00
2 Transportasi Ls 1 1.00 250,000.00 250,000.00
JUMLAH 650,000.00
IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 14 FEBR s/d 20 FEBR 2016
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
I PEKERJAAN PONDASI SCREEN II
1 Pasang bekisting M1 (15*2)+(8.5*4) 64.00 20,000.00 1,280,000.00
2 Cor beton readimix mutu 400 M1 (15*2)+(8.5*4) 64.00 22,500.00 1,440,000.00
4 Bongkar bekisting M2 (15*2)+(8.5*4) 64.00 12,500.00 800,000.00
JUMLAH 3,520,000.00
II PEKERJAAN GARDU LISTRIK
1 Pasang dinding paving M2 (10*2*0.5) 10.00 19,000.00 190,000.00
2 Peninggian tanah dan pemerataan Ls 1.00 1.00 250,000.00 250,000.00
3 Pasang bata ringan tinggi 0 - 1.5 m M2 (4*3*1.5)+(10*1.5)+(1*1.5*4) 39.00 16,000.00 624,000.00
4 Pasang bata ringantinggi 1.5 -3 m M2 (4*3*1.5)+(10*1.5)+(1*1.5*4) 39.00 19,000.00 741,000.00
5 Pasang bata ringan tinggi 3 - 4 m M2 (4*3*0.75)+(10*0.75)+(10*1) 26.50 20,000.00 530,000.00
6 Pasang bekisting ring balok 10/15 M1 (3.6*3)+(10*1)+(2.7*2) 26.20 30,000.00 786,000.00
7 Pembesian dan cor M1 (3.6*3)+(10*1)+(2.7*2) 26.20 38,000.00 995,600.00
8 Pasang pondasi teras M3 (0.6*0.6*10) 3.60 95,000.00 342,000.00
9 Rabatan lantai M2 (4*10)-(0.5*10) 35.00 12,500.00 437,500.00
10 Plesteran dan acian saluran kabel M2 (0.5*10*2)+(0.6*10) 16.00 19,000.00 304,000.00
JUMLAH 5,200,100.00
III PEKERJAAN PRIMER
1 Pengukuran dan bauwplank M1 (12*2+(7*2) 38.00 5,000.00 190,000.00
2 Pemerataan dengan batu M2 (12*7) 84.00 12,500.00 1,050,000.00
3 Pembesian kolom struktur 27/45 M1 (4*10) 40.00 20,000.00 800,000.00
4 Kuras air Ls 1 1.00 200,000.00 200,000.00
JUMLAH 2,240,000.00
III PEKERJAAN LAIN LAIN
1 Sewa pompa air Hari 4 4.00 100,000.00 400,000.00
2 Transportasi Ls 1 1.00 250,000.00 250,000.00
JUMLAH 650,000.00
IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 21 FEBR s/d 05 MARET 2016
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
II PEKERJAAN GARDU LISTRIK
1 Plesteran dan acian luar M2 (3.8*4.2*2)+(9.6*4.2) 72.24 19,000.00 1,372,560.00
2 Plesteran dan acian dalam M3 (3.8*3.7*4)+(9.6*3.7) 91.76 19,000.00 1,743,440.00
3 Pembesian balok ring 10/25 M1 (11.2*2)+(5.2*3) 38.00 25,000.00 950,000.00
4 Pasang bekisting dak dalam M2 (10*5) 50.00 15,000.00 750,000.00
JUMLAH 4,816,000.00
III PEKERJAAN PRIMER
1 Galian tanah bekas longsor Ls 1 1.00 500,000.00 500,000.00
2 Rabatan lantai kerja M2 (7*4) 28.00 19,000.00 532,000.00
3 Pembesian kolom struktur 27/45 terpasang M1 (4*10) 40.00 60,000.00 2,400,000.00
4 Pembesian kolom struktur 27/45 M2 (4*10) 40.00 40,000.00 1,600,000.00
4 Pembesian sloof 25 /45 M1 (4+6.7+4) 14.70 50,000.00 735,000.00
5 Pembesian Pasang wermess M2 (4+6.7+4)*2 29.40 20,000.00 588,000.00
6 Kuras air Ls 1 1.00 200,000.00 200,000.00
JUMLAH 6,555,000.00
III PEKERJAAN LAIN LAIN
1 Transportasi Ls 1 1.00 200,000.00 200,000.00
JUMLAH 200,000.00
IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 06 MARET s/d 12 MARET 2016
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
II PEKERJAAN GARDU LISTRIK
1 Pasang bekisting samping M2 (0.7*5.4*2)+(0.7*10*2) 21.56 15,000.00 323,400.00
JUMLAH 323,400.00
III PEKERJAAN PRIMER
1 Pasang batu kosongan pertama M3 (6.7*8*0.7)+(6.7*4.5*0.8)+(1*4*0.8) 64.84 45,000.00 2,917,800.00
2 Pasang batu kosongan peninggian M3 (6.7*4.5*0.7)+(0.5*4*0.7) 22.51 45,000.00 1,012,725.00
3 Cor beton pertama M3 (9+45) 54.00 45,000.00 2,430,000.00
4 Cor beton kedua M3 9 9.00 45,000.00 405,000.00
5 Pasang bekisting samping M1 (4+11+6.7) 21.70 15,000.00 325,500.00
6 Pasang bekisting samping M1 (4+11+6.7) 21.70 15,000.00 325,500.00
JUMLAH 7,091,025.00
III PEKERJAAN LAIN LAIN
1 Transportasi Ls 1 1.00 200,000.00 200,000.00
JUMLAH 200,000.00
IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 13 MARET s/d 26 MARET 2016
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
I PEKERJAAN GARDU LISTRIK
1 Pasang bekisting balok M1 (5.4*3)+(11.4*2) 39.00 30,000.00 1,170,000.00
2 Pasang bekisting lisplank M3 (5.4*2)+(11.4*2) 33.60 25,000.00 840,000.00
3 Pasang bekisting plat M2 (5.4*11.4) 61.56 25,000.00 1,539,000.00
4 Pembesian plat M2 (5.4*11.4) 61.56 15,000.00 923,400.00
5 Pembesian lisplank M2 (5.4*2)+(11.4*2)*0.4 19.92 15,000.00 298,800.00
6 Cor plat dak M2 (5.4*11.4) 61.56 17,500.00 1,077,300.00
7 Cor lisplank M2 (5.4*2)+(11.4*2)*0.4 19.92 17,500.00 348,600.00
JUMLAH 6,197,100.00
II PEKERJAAN PRIMER
1 Pasang batu pondasi M3 (1.4*2.4*4.4)+(1.5*2.4*6.7)+(1.5+0.4)*0.5*2.4*4.1) 48.25 100,000.00 4,825,200.00
2 Pembesian kolom 30/50 M1 (1.7*10) 17.00 45,000.00 765,000.00
3 Pembesian wermess M2 (14.7*1.7) 24.99 15,000.00 374,850.00
4 Bekesting kolom M3 (1.7*10) 17.00 45,000.00 765,000.00
5 Bekisting plat M2 (10.7*1.7) 18.19 40,000.00 727,600.00
6 Cor kolom dan plat dinding M3 22.5 22.50 45,000.00 1,012,500.00
JUMLAH 8,470,150.00
III PEKERJAAN LAIN LAIN
1 Transportasi Ls 1 1.00 200,000.00 200,000.00
JUMLAH 200,000.00
IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 27 MARET s/d 02 APRIL 2016
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
I PEKERJAAN GARDU LISTRIK
1 Plesteran & acian dak M1 (5.4*11.4) 61.56 19,000.00 1,169,640.00
JUMLAH 1,169,640.00
II PEKERJAAN PRIMER
1 Pasang batu pondasi M3 (1.4*2*4.4)+(1.5*2*6.7)+(0.4+1.5)*0.5*2*4.1) 40.21 120,000.00 4,825,200.00
2 Pembesian ring tengah 30/50 M1 -
3 Bekesting ring tengah M3 -
4 Cor ring tengah M3 -
JUMLAH 4,825,200.00
III PEKERJAAN LAIN LAIN
1 Transportasi Ls 1 1.00 200,000.00 200,000.00
JUMLAH 200,000.00
IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 19 MARET s/d 26 MARET 2016
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
III PEKERJAAN HOPPER TRANSSISI
1 Pasang batu pondasi timur M3 (0.5+0.6)/2*1.4*3.9+(0.5+0.6)/2*1.4*2.6*4 11.01 95,000.00 1,046,045.00
3 Pembesian kolom 40/40 barat M1 (5*4) 20.00 40,000.00 800,000.00
4 Pembesian ring balk barat M1 20 20.00 40,000.00 800,000.00
5 Bekisting ring balk barat M1 20 20.00 30,000.00 600,000.00
6 Cor kolom dan ring barat M3 (0.4*0.4*2*5)+(0.45*0.7*20) 10.00 45,000.00 450,000.00
JUMLAH 3,696,045.00
IMAM BASORI
BON UPAH KERJA
PEKERJAAN : PEMBUATAN PLANT MERAK BETON
LOKASI : PLANT PASEREPAN
TANGGAL : 27 MARET s/d 02 APRIL 2016
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
PEKERJAAN HOPPER TRANSSISI
1 Pasang batu pondasi timur M3 (0.65+0.8)/2*2.6*3.9+(0.65+0.8)/2*2.6*2.6*4 26.96 90,000.00 2,425,995.00
2 Pasang batu pondasi barat M3 (0.7*1.3*3.9)+(0.7*1.3*2.6*4) 13.01 90,000.00 1,171,170.00
3 Pembesian kolom 40/40 M1 (5*4) 20.00 40,000.00 800,000.00
4 Pembesian ring balk M1 20 20.00 40,000.00 800,000.00
5 Bekisting ring balk M1 20 20.00 30,000.00 600,000.00
6 Cor kolom dan ring M3 (0.4*0.4*2*5)+(0.45*0.7*20) 10.00 45,000.00 450,000.00
JUMLAH 6,247,165.00
SATUAN JUMLAH
No JENIS PEKERJAAN SAT PERHITUNGAN VOLUME HARGA HARGA
Rp Rp
I PEKERJAAN GARDU LISTRIK
1 Pekerjaan bongkaran bekisting Ls 1.00 1.00 250,000.00 250,000.00
JUMLAH 250,000.00
II PEKERJAAN PRIMER
1 Pasang batu pondasi ( T 4.4 s/d T 4.40) M3 (1.4*2*4.4)+(1.5*2*6.7)+(0.4+1.5)*0.5*2*4.1) 40.21 120,000.00 4,825,200.00
2 Pembesian ring tengah 30/50 M1 (4.4+6.7+4.1) 15.20 40,000.00 608,000.00
3 Pembesian wermess M2 (15.2*0.9) 13.68 15,000.00 205,200.00
4 Bekesting ring tengah M3 (4.4+6.7+4.1) 15.20 40,000.00 608,000.00
5 Cor ring tengah M3 (4.4+6.7+4.1)*0.3*0.5 2.28 80,000.00 182,400.00
6 Cor dinding belakang ring tengah M3 (4.4+6.7+4.1)*0.9*0.4 5.47 80,000.00 437,760.00
IMAM BASORI
#REF!
#REF!
#REF!
JUMLAH
NO JENIS PEKERJAAN HARGA
Rp
JUMLAH #REF!
PEMBULATAN #REF!
………………………………….
#REF!
JUMLAH
NO JENIS PEKERJAAN HARGA
Rp
II #REF! #REF!
IV #REF! #REF!
V #REF! #REF!
VI #REF! #REF!
IX #REF! #REF!
X #REF! #REF!
XI #REF! #REF!
JUMLAH #REF!
PEMBULATAN #REF!
JUMLAH
NO JENIS PEKERJAAN HARGA
Rp
I #REF! #REF!
II #REF! #REF!
IV #REF! #REF!
V #REF! #REF!
VI #REF! #REF!
IX #REF! #REF!
X #REF! #REF!
XI #REF! #REF!
JUMLAH 100,000,000.00
PEMBULATAN 100,000,000.00
Pada hari ini Senin , tanggal Lima Belas bulan Desember tahun Dua Ribu Delapan,
yang bertanda tangan dibawah ini :
Dalam hal ini bertindak untuk dan atas nama PT. Bank Central Asia, Tbk .
Selanjutnya disebut sebagai PIHAK PERTAMA.
Dalam hal ini bertindak untuk dan atas nama CV. Karya Agung Jaya .
Selanjutnya disebut sebagai PIHAK KEDUA.
PIHAK PERTAMA dan PIHAK KEDUA secara bersama- sama telah mengadakan
pemeriksaan kembali pekerjaan Pembangunan Ruang Parkir Sepeda Motor di KCU Jember, sesuai
kontrak No 318/SPK/LOGW- VII/2008. Tanggal 26 September 2008 di BCA KCU Jember
Jl. Raya Gajah Mada no 14-18 Jember.
Berdasarkan hasil pemeriksaan , kedua belah pihak telah sepakat dan mempunyai pendapat yang
sama, bahwa pekerjaan tersebut diatas telah selesai / terpasang dan telah berfungsi dengan baik .
Dengan demikian PIHAK KEDUA menyerahkan pekerjaan tersebut kepada PIHAK PERTAMA
untuk pertama kalinya , dan dapat menerima dengan masa free maintenance selama 3 bulan ,
berlaku milai tanggal 13 Desember 2008 s/d 13 Maret 2009.
Demikian berita acara ini dibuat dan ditandatangani oleh kedua belah pihak untuk dapat
dipergunakan seperlunya.
Mengetahui
HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 2 3 4 5 6 7 8 2 3 4 5 6 7 8
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH
PEKERJA
1 PAK TA"EK PEKERJA 1 1 1 1 1 1 6 0 85,000.00 510,000.00 10,000.00 - 510,000.00
2 BUARI PEKERJA 1 1 1 1 1 1 1 7 0 85,000.00 595,000.00 10,000.00 - 595,000.00
3 ANDIK PEKERJA 1 1 1 1 1 1 1 7 0 85,000.00 595,000.00 10,000.00 - 595,000.00
4 DIDIK PEKERJA 1 1 1 1 1 5 0 85,000.00 425,000.00 10,000.00 - 425,000.00
PASURUAN
1 JAKIK TUKANG 1 1 2 0 110,000.00 220,000.00 12,500.00 - 220,000.00
2 WARNO TUKANG 1 1 1 1 4 8 8 100,000.00 400,000.00 12,500.00 100,000.00 500,000.00
3 TUKANG 1 1 1 1 4 8 8 100,000.00 400,000.00 12,500.00 100,000.00 500,000.00
4 EDY PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
5 ALI PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
6 EDY PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
7 ALI PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
3 5 7 13 14 13 14
HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH
0 0 0 0 0 0 0
HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 2 3 4 5 6 7 8 2 3 4 5 6 7 8
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH
PEKERJA
1 PAK TA"EK PEKERJA 1 1 1 1 1 1 6 0 85,000.00 510,000.00 10,000.00 - 510,000.00
2 BUARI PEKERJA 1 1 1 1 1 1 1 7 0 85,000.00 595,000.00 10,000.00 - 595,000.00
3 ANDIK PEKERJA 1 1 1 1 1 1 1 7 0 85,000.00 595,000.00 10,000.00 - 595,000.00
4 DIDIK PEKERJA 1 1 1 1 1 5 0 85,000.00 425,000.00 10,000.00 - 425,000.00
PASURUAN
1 JAKIK TUKANG 1 1 2 0 110,000.00 220,000.00 12,500.00 - 220,000.00
2 WARNO TUKANG 1 1 1 1 4 8 8 100,000.00 400,000.00 12,500.00 100,000.00 500,000.00
3 TUKANG 1 1 1 1 4 8 8 100,000.00 400,000.00 12,500.00 100,000.00 500,000.00
4 EDY PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
5 ALI PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
6 EDY PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
7 ALI PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
3 5 7 13 14 13 14
HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 2 3 4 5 6 7 8 2 3 4 5 6 7 8
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH
PEKERJA
1 PAK TA"EK PEKERJA 1 1 1 1 1 1 6 0 85,000.00 510,000.00 10,000.00 - 510,000.00
2 BUARI PEKERJA 1 1 1 1 1 1 1 7 0 85,000.00 595,000.00 10,000.00 - 595,000.00
3 ANDIK PEKERJA 1 1 1 1 1 1 1 7 0 85,000.00 595,000.00 10,000.00 - 595,000.00
4 DIDIK PEKERJA 1 1 1 1 1 5 0 85,000.00 425,000.00 10,000.00 - 425,000.00
PASURUAN
1 JAKIK TUKANG 1 1 2 0 110,000.00 220,000.00 12,500.00 - 220,000.00
2 WARNO TUKANG 1 1 1 1 4 8 8 100,000.00 400,000.00 12,500.00 100,000.00 500,000.00
3 TUKANG 1 1 1 1 4 8 8 100,000.00 400,000.00 12,500.00 100,000.00 500,000.00
4 EDY PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
5 ALI PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
6 EDY PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
7 ALI PEKERJA 1 1 1 1 4 8.5 8.5 85,000.00 340,000.00 10,000.00 85,000.00 425,000.00
3 5 7 13 14 13 14
HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 12 13 14 15 16 17 18 12 13 14 15 16 17 18
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH
PEKERJA
1 PAIJO PEKERJA 1 1 1 1 1 1 6 0 70,000.00 420000 8,000.00 0 420000
2 HUDA PEKERJA 1 1 2 0 60,000.00 120000 8,000.00 0 120000
3 YUNUS PEKERJA 0 1 1 0 60,000.00 60000 8,000.00 0 60000
4 USNI PEKERJA 1 1 1 1 1 5 0 60,001.00 300005 8,001.00 0 300005
0 2 3 3 3 5 6
JUMLAH UPAH KERJA DAN LEMBURAN Rp 2,185,005
BIAYA PENGAWASAN 10 % Rp 218,501
MOBILISASI & AKOMODASI 5 % Rp 109,250
TOTAL KESELURUHAN Rp 2,512,756
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN SITE PLANT
LOKASI TEMPEH LUMAJANG
MASA KERJA TANGGAL 19 MARET S/D 25 MARET 2017
PERIODE MINGGU KE II ( DUA)
HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 19 20 21 22 23 24 25 19 20 21 22 23 24 25
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH
PEKERJA
1 PAIJO PEKERJA 1 1 1 1 1 1 6 0 70,000.00 420000 8,000.00 0 420000
2 HUDA PEKERJA 1 1 1 1 1 1 6 0 60,000.00 360000 8,000.00 0 360000
3 YUNUS PEKERJA 1 1 1 0 0 1 4 0 60,000.00 240000 8,000.00 0 240000
0 6 6 6 5 5 6
JUMLAH UPAH KERJA DAN LEMBURAN Rp 2,705,000
BIAYA PENGAWASAN 10 % Rp 270,500
MOBILISASI & AKOMODASI 5 % Rp 135,250
TOTAL KESELURUHAN Rp 3,110,750
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN SITE PLANT
LOKASI TEMPEH LUMAJANG
MASA KERJA TANGGAL 26 MARET S/D 02 APRIL2017
PERIODE MINGGU KE II ( DUA)
HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 26 27 28 29 30 31 1 26 27 28 29 30 31 1
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH
PEKERJA
1 PAIJO PEKERJA 1 1 1 1 1 1 6 0 70,000.00 420000 8,000.00 0 420000
2 HUDA PEKERJA 1 1 1 1 1 1 6 0 60,000.00 360000 8,000.00 0 360000
3 YUNUS PEKERJA 1 1 1 0 0 1 4 0 60,000.00 240000 8,000.00 0 240000
0 6 6 6 5 5 6
JUMLAH UPAH KERJA DAN LEMBURAN Rp 2,705,000
BIAYA PENGAWASAN 10 % Rp 270,500
MOBILISASI & AKOMODASI 5 % Rp 135,250
TOTAL KESELURUHAN Rp 3,110,750
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN SITE PLANT
LOKASI TEMPEH LUMAJANG
MASA KERJA TANGGAL 03 APRIL S/D 08 APRIL2017
PERIODE MINGGU KE II ( DUA)
HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 2 3 4 5 6 7 8 2 3 4 5 6 7 8
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH
PEKERJA
1 PAIJO PEKERJA 1 1 1 1 1 1 6 0 70,000.00 420000 8,000.00 0 420000
2 HUDA PEKERJA 1 1 1 1 1 1 6 0 60,000.00 360000 8,000.00 0 360000
3 HUSNI PEKERJA 1 1 1 1 1 1 6 0 60,000.00 360000 8,000.00 0 360000
4 ADI PEKERJA 1 1 1 1 1 1 6 0 60,000.00 360000 8,001.00 0 360000
5 ARIFIN PEKERJA 1 1 1 1 1 1 6 0 60,000.00 360000 8,002.00 0 360000
0 7 6 7 7 7 7
JUMLAH UPAH KERJA DAN LEMBURAN Rp 3,945,006
BIAYA PENGAWASAN 10 % Rp 394,501
MOBILISASI & AKOMODASI 5 % Rp 197,250
TOTAL KESELURUHAN Rp 4,536,757
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN BATCHING PLANT
LOKASI POH GADING
MASA KERJA TANGGAL 21 JANUARI S/D 27 JANUARI 2018
PERIODE MINGGU KE II ( DUA)
HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 21 22 23 24 25 26 27 21 22 23 24 25 26 27
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH
PEKERJA
2 HUDA PEKERJA 1 1 1 1 1 1 6 0 60,000.00 360000 8,000.00 0 360000
3 HUSNI PEKERJA 1 1 1 1 1 1 6 0 60,000.00 360000 8,000.00 0 360000
4 ADI PEKERJA 1 1 1 1 1 1 6 0 60,000.00 360000 8,001.00 0 360000
5 ARIFIN PEKERJA 1 1 1 1 1 1 6 0 60,000.00 360000 8,002.00 0 360000
0 6 6 6 6 6 6
JUMLAH UPAH KERJA DAN LEMBURAN Rp 3,510,000
BIAYA PENGAWASAN 10 % Rp 351,000
MOBILISASI & AKOMODASI 5 % Rp 175,500
TOTAL KESELURUHAN Rp 4,036,500
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN BATCHING PLANT
LOKASI POH GADING
MASA KERJA TANGGAL 28 JANUARI S/D 03 FEBRUARI 2018
PERIODE MINGGU KE II ( DUA)
HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 28 29 30 31 1 2 3 21 22 23 24 25 26 27
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH
PEKERJA
1 HUDA PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 0 390,000.00
2 HUSNI PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 0 390,000.00
3 ADI PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 0 390,000.00
4 ARIFIN PEKERJA 1 1 1 1 1 1 6 0 65,000.00 390,000 8,000.00 0 390,000.00
5 ANDIK PEKERJA 1 1 1 1 4 0 75,000.00 300,000 8,000.00 0 300,000.00
6 HENDRIK PEKERJA 1 1 1 1 4 0 75,000.00 300,000 8,000.00 0 300,000.00
7 WAHYU PEKERJA 1 1 1 1 4 0 65,000.00 260,000 8,000.00 0 260,000.00
8 FAISOL PEKERJA 1 1 1 1 4 0 65,000.00 260,000 8,000.00 0 260,000.00
9 FAUZI PEKERJA 1 1 1 1 4 0 65,000.00 260,000 8,000.00 0 260,000.00
10 FAUZI PEKERJA 1 1 1 1 4 0 65,000.00 260,000 8,000.00 0 260,000.00
11 LEK TUKIMAN PEKERJA 1 1 1 1 4 0 80,000.00 320,000 8,000.00 0 320,000.00
0 7 7 8 8 8 8
JUMLAH UPAH KERJA DAN LEMBURAN Rp 6,350,022
BIAYA PENGAWASAN 10 % Rp 635,002
MOBILISASI & AKOMODASI 5 % Rp 317,501
TOTAL KESELURUHAN Rp 7,302,525
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN BAT PACANG
LOKASI POH GADING
MASA KERJA TANGGAL 28 JANUARI S/D 03 FEBRUARI 2018
PERIODE MINGGU KE II ( DUA)
HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 4 5 6 7 8 9 10 29 30 31 1 2 3 4
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH
6 10 10 10 10 10 10
JUMLAH UPAH KERJA DAN LEMBURAN Rp 8,735,000
BIAYA PENGAWASAN 10 % Rp 873,500
MOBILISASI & AKOMODASI 5 % Rp 436,750
TOTAL KESELURUHAN Rp 10,045,250
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN BAT PACANG
LOKASI POH GADING
MASA KERJA TANGGAL 11 FEBRUARI S/D 17 FEBRUARI 2018
PERIODE MINGGU KE III (TIGA)
HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 11 12 13 14 15 16 17 11 12 13 14 15 16 17
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH
6 10 10 10 10 10 10
JUMLAH UPAH KERJA DAN LEMBURAN Rp 8,735,000
BIAYA PENGAWASAN 10 % Rp 873,500
MOBILISASI & AKOMODASI 5 % Rp 436,750
TOTAL KESELURUHAN Rp 10,045,250
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN BAT PACANG
LOKASI POH GADING
MASA KERJA TANGGAL 18 FEBRUARI S/D 24 FEBRUARI 2018
PERIODE MINGGU KE IV (EMPAT)
HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 18 19 20 21 22 23 24 18 19 20 21 22 23 24
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH
6 10 10 10 10 10 10
JUMLAH UPAH KERJA DAN LEMBURAN Rp 8,735,000
BIAYA PENGAWASAN 10 % Rp 873,500
MOBILISASI & AKOMODASI 5 % Rp 436,750
TOTAL KESELURUHAN Rp 10,045,250
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN BAT PACANG
LOKASI POH GADING
MASA KERJA TANGGAL 25 FEBRUARI S/D 03 MARET 2018
PERIODE MINGGU KE IV (EMPAT)
HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 25 26 27 28 1 2 3 18 19 20 21 22 23 24
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH
6 12 13 14 16 16.5 16
JUMLAH UPAH KERJA DAN LEMBURAN Rp 7,632,506 3,950,000.00
BIAYA PENGAWASAN 10 % Rp 763,251
MOBILISASI & AKOMODASI 5 % Rp 381,625
TOTAL KESELURUHAN Rp 8,777,382
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN BAT PACANG
LOKASI POH GADING
MASA KERJA TANGGAL 04 MARET S/D 10 MARET 2018
PERIODE MINGGU KE IV (EMPAT)
HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 4 5 6 7 8 9 10 4 5 6 7 8 9 10
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH
6 12 13 13.5 14 17.5 14
JUMLAH UPAH KERJA DAN LEMBURAN Rp 8,524,005
BIAYA PENGAWASAN 10 % Rp 852,401
MOBILISASI & AKOMODASI 5 % Rp 426,200
TOTAL KESELURUHAN Rp 9,802,606
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN BAT PACANG
LOKASI POH GADING
MASA KERJA TANGGAL 11 MARET S/D 17 MARET 2018
PERIODE MINGGU KE IV (EMPAT)
HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 11 12 13 14 15 16 17 11 12 13 14 15 16 17
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH
HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 11 12 13 14 15 16 17 11 12 13 14 15 16 17
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH
0.40
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN BAT PACANG
LOKASI POH GADING
MASA KERJA TANGGAL 08 JULI S/D 14 JULI 2018
PERIODE MINGGU KE IV (EMPAT)
HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 8 9 10 11 12 13 14 8 9 10 11 12 13 14
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH
HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 9 10 11 12 13 14 15 15 16 17 18 19 20 21
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH
BON TUKANG
TOTAL KESELURUHAN Rp -
KEGIATAN PENGEMBANGAN MERAK JAYA BETON
PEKERJAAN PONDASI PAGAR
LOKASI PAMOTAN
MASA KERJA TANGGAL 09 DESEMBER S/D 15 DESEMBER 2018
PERIODE MINGGU KE
HARI & TANGGAL KERJA JML JAM LEMBUR JML UPAH KERJA UPAH LEMBUR JUMLAH KETERANGAN
NO NAMA PEKERJA JABATAN 9 10 11 12 13 14 15 15 16 17 18 19 20 21
M S S R K J S HARI M S S R K J S LBR SEHARI SEMINGGU SEJAM SEMINGGU UPAH
BON TUKANG
TOTAL KESELURUHAN Rp -