United States Department of the Interior

National Park Service


Class B Construction Cost Estimate
BASIS OF ESTIMATE

PROJECT INFORMATION
Project: Project Name

Park: Park Name


Park Alpha: Park Code
PMIS: TBD or PMIS number if known
Estimate Date: Estimate Date
Prepared By: Estimator Name
Company: Company
Address: Address
City, State Zip: City
Phone: Phone

BACKGROUND SUPPORTING MATERIAL (Scope of Work):


Briefly describe scope of work included in the estimate, plan dates, exclusions, etc. List any Government Furnished Property
(GFP)

SOURCE OF COST DATA:


Document all sources of cost information used in the estimate. (Attach additional information if necessary)

ESTIMATE ASSUMPTIONS:
Describe any assumptions made to prepare estimate and highlight areas needing clarification for future estimates.

MAJOR CHANGES FROM PREVIOUS ESTIMATE:


Describe any major changes in scope of work, materials, systems, assumptions, etc. from the previous estimate version.

513509692.xls
Basis of Estimate Page 1 of 102 Print Date: 03/09/2021
United States Department of the Interior
National Park Service
Class B Construction Cost Estimate
BASIS OF ESTIMATE

PROJECT INFORMATION
Project: Project Name

Park: Park Name


Park Alpha: Park Code
PMIS: TBD or PMIS number if known
Estimate Date: Estimate Date

DESCRIPTION OF MARK-UP & ADD-ONS:

Location Factor: 0.00% Describe source and rationale for location factor here When usin
+12.1 loca
Remoteness Factor: 0.00% Site is___miles from published commercial center. Describe other
impacts included

Wage Rate Factor: 0.00% Explain method and justify value

State & Local Taxes: 0.00% Describe type of tax and rates used

Design Contingency: 0.00% Explain & Justify

Standard. General Conditions: 0.00% Explain & Justify

Government General Conditions: 0.00% Explain & Justify

Historic Preservation Factor: 0.00% Describe rationale for using this factor

Contractor Overhead: 0.00% Explain & Justify

Contractor Profit: 0.00% Explain & Justify

Bonds and Permits: 0.00% Explain & Justify

Contracting Method Adjustment: 0.00% Describe anticipated contract method and justify value used.

Annual Inflation Escalation Factor: 0.00% Projected annual inflation rate.

Time Until Project Midpoint (Months) 0 Number of months from estimate (or data) date until the projects
midpoint of construction.

OTHER COMMENTS:
Provide any additional information, qualifications, etc.

513509692.xls
Basis of Estimate Page 2 of 102 Print Date: 03/09/2021
United States Department of the Interior
National Park Service
Class B Construction Cost Estimate
PROJECT COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code
PMIS Number: TBD or PMIS number if known Reviewed By: Reviewer Name
Date: Review Date
Asset / Project Element Size/Count Units
Asset / Project Element Name 0 Unit

Total Material Installation


Item No. WBS Description Material Cost/Unit Total Install Cost Direct Cost/Unit Total Direct Costs NET Cost/Unit Total NET Costs
Cost Cost/Unit
1 A10 Foundations #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
2 A20 Basement Construction #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
3 B10 Superstructure #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
4 B20 Exterior Enclosure #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
5 B30 Roofing #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
6 C10 Interior Construction #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
7 C20 Stairs #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
8 C30 Interior Finishes #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
9 D10 Conveying Systems #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
10 D20 Plumbing Systems #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
11 D30 HVAC #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
12 D40 Fire Protection #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
13 D50 Electrical #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
14 E10 Equipment #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
15 E20 Furnishings #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
16 F10 Special Construction #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
17 F20 Selective Building Demolition #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
18 G10 Site Preparation #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
19 G20 Site Improvements #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
20 G30 Site Mechanical Utilities #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
21 G40 Site Electrical Utilities #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
22 G50 Other Site Construction #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
23 XX Special Use - 1 #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
24 XX Special Use - 2 #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
25 XX Special Use - 3 #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
Subtotal Direct Construction Costs #DIV/0! $ - #DIV/0! $ - #DIV/0! $0 #DIV/0! #DIV/0!
Total Value of Government Furnished Property (GFP) Included in Direct Costs . $0.00 $ - $ - $0 In most cases GFP is normally zero - see
Direct Cost Subtotal without GFP . $ - $ - $0 footnote-
Published Location Factor 0.00% $0 Notes & Comments:
Remoteness Factor 0.00% $0
Federal Wage Rate Factor 0.00% Generally applied against Labor Costs only. $0
State & Local Taxes 0.00% Generally applied against Material Costs only. Please Note if application differs. $0
Design Contingency 0.00% $0
Total Direct Construction Costs $0
Standard General Conditions 0.00% Applied to Total Direct Construction Cost less GFP $0
Government General Conditions 0.00% Applied to Total Direct Construction Cost less GFP $0
Historic Preservation Factor 0.00% Applied to Total Direct Construction Cost less GFP $0
Subtotal NET Construction Cost $0
Overhead 0.00% $0
Profit 0.00% $0
Estimated NET Construction Cost $0
Bonds & Permits 0.00% $0
Contracting Method Adjustment 0.00% $0
Inflation Escalation 0 Months Annual Rate = 0.00% Inc. Bonds & CMA $0
Total Estimated NET Cost of Construction $0

GFP costs are only used when the Government pre-purchases items, or provides other materials out of Government inventory, to be installed by contractor. Adjustments and Markup on GFP only include Inflation Escalation; No other adjustment factors or O&P
markup have been applied.
513509692.xls
Project Cost Summary Page 3 of 102 Print Date: 03/09/2021, 04:20:07
United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item A10 Foundations Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
A1010 STANDARD FOUNDATIONS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL STANDARD FOUNDATIONS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
A1020 SPECIAL FOUNDATIONS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL SPECIAL FOUNDATIONS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, A10 - Foundations 4 of 102 03/09/2021 04:20:07


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item A10 Foundations Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
A1030 SLAB ON GRADE
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL SLAB ON GRADE 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, A10 - Foundations 5 of 102 03/09/2021 04:20:07


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item A10 Foundations Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item A10 Foundations


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

A10 Foundations 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, A10 - Foundations 6 of 102 03/09/2021 04:20:07


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item A20 Basement Construction Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
A2010 BASEMENT EXCAVATION
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASEMENT EXCAVATION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
A2020 BASEMENT WALLS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASEMENT WALLS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, A20 - Basement 7 of 102 03/09/2021 04:20:07


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item A20 Basement Construction Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, A20 - Basement 8 of 102 03/09/2021 04:20:07


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item A20 Basement Construction Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item A20 Basement Construction


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, A20 - Basement 9 of 102 03/09/2021 04:20:07


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item A20 Basement Construction Total Cost: $0


A20 Basement Construction 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, A20 - Basement 10 of 102 03/09/2021 04:20:07


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item B10 Superstructure Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
B1010 FLOOR CONSTRUCTION
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL FLOOR CONSTRUCTION 1000 Unit $ - $0 $ - $0 $ - $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
B1020 ROOF CONSTRUCTION
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL ROOF CONSTRUCTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, B10 - Superstructure 11 of 102 03/09/2021 04:20:07


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item B10 Superstructure Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, B10 - Superstructure 12 of 102 03/09/2021 04:20:07


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item B10 Superstructure Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item B10 Superstructure


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, B10 - Superstructure 13 of 102 03/09/2021 04:20:07


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item B10 Superstructure Total Cost: $0


B10 Superstructure 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, B10 - Superstructure 14 of 102 03/09/2021 04:20:07


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item B20 Exterior Enclosure Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
B2010 EXTERIOR WALLS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL EXTERIOR WALLS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
B2020 EXTERIOR WINDOWS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL EXTERIOR WINDOWS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, B20 - Exterior Enclosure 15 of 102 03/09/2021 04:20:07


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item B20 Exterior Enclosure Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
B2030 EXTERIOR DOORS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL EXTERIOR DOORS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, B20 - Exterior Enclosure 16 of 102 03/09/2021 04:20:07


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item B20 Exterior Enclosure Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item B20 Exterior Enclosure


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, B20 - Exterior Enclosure 17 of 102 03/09/2021 04:20:07


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item B20 Exterior Enclosure Total Cost: $0


B20 Exterior Enclosure 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, B20 - Exterior Enclosure 18 of 102 03/09/2021 04:20:07


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item B30 Roofing Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
B3010 ROOF COVERINGS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL ROOF COVERINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
B3020 ROOF OPENINGS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL ROOF OPENINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, B30 - Roofing 19 of 102 03/09/2021 04:20:07


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item B30 Roofing Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, B30 - Roofing 20 of 102 03/09/2021 04:20:07


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item B30 Roofing Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item B30 Roofing


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, B30 - Roofing 21 of 102 03/09/2021 04:20:07


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item B30 Roofing Total Cost: $0


B30 Roofing 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, B30 - Roofing 22 of 102 03/09/2021 04:20:07


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item C10 Interior Construction Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
C1010 INTERIOR PARTITIONS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL INTERIOR PARTITIONS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
C1020 INTERIOR DOORS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL INTERIOR DOORS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, C10 - Interior Construction 23 of 102 03/09/2021 04:20:07


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item C10 Interior Construction Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
C1030 FITTINGS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL FITTINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, C10 - Interior Construction 24 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item C10 Interior Construction Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item C10 Interior Construction


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, C10 - Interior Construction 25 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item C10 Interior Construction Total Cost: $0


C10 Interior Construction 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, C10 - Interior Construction 26 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item C20 Stairs Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
C2010 STAIR CONSTRUCTION
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL STAIR CONSTRUCTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
C2020 STAIR FINISHES
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL STAIR FINISHES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, C20 - Stairs 27 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item C20 Stairs Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, C20 - Stairs 28 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item C20 Stairs Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item C20 Stairs


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, C20 - Stairs 29 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item C20 Stairs Total Cost: $0


C20 Stairs 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, C20 - Stairs 30 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item C30 Interior Finishes Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
C3010 WALL FINISHES
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL WALL FINISHES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
C3020 FLOOR FINISHES
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL FLOOR FINISHES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, C30 Interior Finishes 31 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item C30 Interior Finishes Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
C3030 CEILING FINISHES
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL CEILING FINISHES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, C30 Interior Finishes 32 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item C30 Interior Finishes Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item C30 Interior Finishes


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, C30 Interior Finishes 33 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item C30 Interior Finishes Total Cost: $0


C30 Interior Finishes 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, C30 Interior Finishes 34 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D10 Conveying Systems Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D1010 ELEVATORS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL ELEVATORS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D1020 ESCALATORS & MOVING WALKS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL ESCALATORS & MOVING WALKS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, D10 Conveying Systems 35 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D10 Conveying Systems Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D1030 MATERIAL HANDLING SYSTEMS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL MATERIAL HANDLING SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D1090 OTHER CONVEYING SYSTEMS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER CONVEYING SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, D10 Conveying Systems 36 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D10 Conveying Systems Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item D10 Conveying Systems


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, D10 Conveying Systems 37 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D10 Conveying Systems Total Cost: $0


D10 Conveying Systems 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, D10 Conveying Systems 38 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D20 Plumbing Systems Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D2010 PLUMBING FIXTURES
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL PLUMBING FIXTURES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D2020 DOMESTIC WATER DISTRIBUTION
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL DOMESTIC WATER DISTRIBUTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, D20 - Plumbing 39 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D20 Plumbing Systems Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D2030 SANITARY WASTE
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL SANITARY WASTE 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D2040 RAIN WATER DRAINAGE
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL RAIN WATER DRAINAGE 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, D20 - Plumbing 40 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D20 Plumbing Systems Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D2050 SPECIAL PLUMBING SYSTEMS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL SPECIAL PLUMBING SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D2090 OTHER PLUMBING SYSTEMS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER PLUMBING SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item D20 Plumbing Systems


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, D20 - Plumbing 41 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D20 Plumbing Systems Total Cost: $0


D20 Plumbing Systems 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, D20 - Plumbing 42 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D30 HVAC Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D3010 ENERGY SUPPLY
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL ENERGY SUPPLY 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D3020 HEAT GENERATING SYSTEMS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL HEAT GENERATING SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, D30- HVAC 43 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D30 HVAC Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D3030 COOLING GENERATING SYSTEMS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL COOLING GENERATING SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D3040 DISTRIBUTION SYSTEMS (HVAC)
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL DISTRIBUTION SYSTEMS (HVAC) 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, D30- HVAC 44 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D30 HVAC Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D3050 TERMINAL & PACKAGE UNITS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL TERMINAL & PACKAGE UNITS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G3060 CONTROLS & INSTRUMENTATION
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL CONTROLS & INSTRUMENTATION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, D30- HVAC 45 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D30 HVAC Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G3070 SPECIAL HVAC SYSTEMS & EQUIPMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL SPECIAL HVAC SYSTEMS & EQUIPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G3080 SYSTEM TESTING & BALANCING
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL SYSTEM TESTING & BALANCING 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, D30- HVAC 46 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D30 HVAC Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G3090 OTHER HVAC SYSTEMS & EQUIPMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER HVAC SYSTEMS & EQUIPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item D30 HVAC


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

D30 HVAC 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, D30- HVAC 47 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D40 Fire Protection Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D4010 FIRE PROTECTION SPRINKLERS SYSTEMS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL FIRE PROTECTION SPRINKLERS SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D4020 STANDPIPE & HOSE SYSTEMS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL STANDPIPE & HOSE SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, D40- Fire Protection 48 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D40 Fire Protection Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D4030 FIRE PROTECTION SPECIALTIES
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL FIRE PROTECTION SPECIALTIES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D4090 OTHER FIRE PROTECTION SYSTEMS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER FIRE PROTECTION SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, D40- Fire Protection 49 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D40 Fire Protection Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item D40 Fire Protection


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, D40- Fire Protection 50 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D40 Fire Protection Total Cost: $0


D40 Fire Protection 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, D40- Fire Protection 51 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D50 Electrical Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D5010 ELECTRICAL SERVICE & DISTRIBUTION
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL ELECTRICAL SERVICE & DISTRIBUTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D5020 LIGHTING & BRANCH WIRING
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL LIGHTING & BRANCH WIRING 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, D50 - Electrical 52 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D50 Electrical Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D5030 COMMUNICATIONS & SECURITY
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL COMMUNICATIONS & SECURITY 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D5040 SPECIAL ELECTRICAL SYSTEMS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL SPECIAL ELECTRICAL SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, D50 - Electrical 53 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D50 Electrical Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
D5090 OTHER ELECTRICAL SYSTEMS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER ELECTRICAL SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item D50 Electrical


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, D50 - Electrical 54 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item D50 Electrical Total Cost: $0


D50 Electrical 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, D50 - Electrical 55 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item E10 Equipment Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
E1010 COMMERCIAL EQUIPMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL COMMERCIAL EQUIPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
E1020 INSTITUTIONAL EQUIPMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL INSTITUTIONAL EQUIPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, E10 - Equipment 56 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item E10 Equipment Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
E1030 VEHICULAR EQUIPMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL VEHICULAR EQUIPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
E1090 OTHER EQUIPMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER EQUIPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, E10 - Equipment 57 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item E10 Equipment Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item E10 Equipment


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, E10 - Equipment 58 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item E10 Equipment Total Cost: $0


E10 Equipment 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, E10 - Equipment 59 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item E20 Furnishings Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
E2010 FIXED FURNISHINGS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL FIXED FURNISHINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
E2020 MOVABLE FURNISHINGS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL MOVABLE FURNISHINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, E-20 Furnishings 60 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item E20 Furnishings Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
E2090 OTHER FURNISHINGS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER FURNISHINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, E-20 Furnishings 61 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item E20 Furnishings Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item E20 Furnishings


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, E-20 Furnishings 62 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item E20 Furnishings Total Cost: $0


E20 Furnishings 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, E-20 Furnishings 63 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item F10 Special Construction Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
F1010 SPECIAL STRUCTURES
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL SPECIAL STRUCTURES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
F1020 INTEGRATED CONSTRUCTION
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL INTEGRATED CONSTRUCTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, F10 - Special Construction 64 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item F10 Special Construction Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
F1030 SPECIAL CONSTRUCTION SYSTEMS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL SPECIAL CONSTRUCTION SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
F1040 SPECIAL FACILITIES
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL SPECIAL FACILITIES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, F10 - Special Construction 65 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item F10 Special Construction Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
F1050 SPECIAL CONTROLS & INSTRUMENTATION
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL SPECIAL CONTROLS & INSTRUMENTATION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item F10 Special Construction


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, F10 - Special Construction 66 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item F10 Special Construction Total Cost: $0


F10 Special Construction 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, F10 - Special Construction 67 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item F20 Selective Building Demolition Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
F2010 BUILDING ELEMENTS DEMOLITION
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BUILDING ELEMENTS DEMOLITION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
F2020 HAZARDOUS COMPONENTS ABATEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL HAZARDOUS COMPONENTS ABATEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, F20 - Selective Demolition 68 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item F20 Selective Building Demolition Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, F20 - Selective Demolition 69 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item F20 Selective Building Demolition Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item F20 Selective Building Demolition


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, F20 - Selective Demolition 70 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item F20 Selective Building Demolition Total Cost: $0


F20 Selective Building Demolition 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, F20 - Selective Demolition 71 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item G10 Site Preparation Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G1010 SITE CLEARING
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL SITE CLEARING 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G1020 SITE DEMOLITION & RELOCATIONS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL SITE DEMOLITION & RELOCATIONS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, G10 Site Preparation 72 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item G10 Site Preparation Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G1030 SITE EARTHWORK
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL SITE EARTHWORK 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G1040 HAZARDOUS WASTE REMEDIATION
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL HAZARDOUS WASTE REMEDIATION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, G10 Site Preparation 73 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item G10 Site Preparation Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G1090 OTHER SITE PREPARATION
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER SITE PREPARATION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item G10 Site Preparation


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, G10 Site Preparation 74 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item G10 Site Preparation Total Cost: $0


G10 Site Preparation 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, G10 Site Preparation 75 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item G20 Site Improvements Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G2010 ROADWAYS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL ROADWAYS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G2020 PARKING LOTS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL PARKING LOTS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, G20 - Site Improvements 76 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item G20 Site Improvements Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G2030 PEDESTRIAN PAVING
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL PEDESTRIAN PAVING 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G2040 SITE DEVELOPMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL SITE DEVELOPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, G20 - Site Improvements 77 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item G20 Site Improvements Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G2050 LANDSCAPING
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL LANDSCAPING 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G2060 SITE FURNISHINGS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL SITE FURNISHINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item G20 Site Improvements


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, G20 - Site Improvements 78 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item G20 Site Improvements Total Cost: $0


G20 Site Improvements 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, G20 - Site Improvements 79 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item G30 Site Mechanical Utilities Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G3010 WATER SUPPLY
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL WATER SUPPLY 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G3020 SANITARY SEWER
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL SANITARY SEWER 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, G-30 - Site Mechanical 80 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item G30 Site Mechanical Utilities Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G3030 STORM SEWER
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL STORM SEWER 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G3040 HEATING DISTRIBUTION
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL HEATING DISTRIBUTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, G-30 - Site Mechanical 81 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item G30 Site Mechanical Utilities Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G3050 COOLING DISTRIBUTION
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL COOLING DISTRIBUTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G3060 FUEL DISTRIBUTION
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL FUEL DISTRIBUTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, G-30 - Site Mechanical 82 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item G30 Site Mechanical Utilities Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G3090 OTHER SITE MECHANICAL UTILITIES
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER SITE MECHANICAL UTILITIES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G30 Site Mechanical Utilities 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, G-30 - Site Mechanical 83 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item G40 Site Electrical Utilities Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G4010 ELECTRICAL DISTRIBUTION
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL ELECTRICAL DISTRIBUTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G4020 SITE LIGHTING
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL SITE LIGHTING 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, G40 - Site Electrical 84 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item G40 Site Electrical Utilities Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G4030 SITE COMMUNICATIONS & SECURITY
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL SITE COMMUNICATIONS & SECURITY 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G4090 OTHER SITE ELECTRICAL UTILITIES
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER SITE ELECTRICAL UTILITIES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, G40 - Site Electrical 85 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item G40 Site Electrical Utilities Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item G40 Site Electrical Utilities


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, G40 - Site Electrical 86 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item G40 Site Electrical Utilities Total Cost: $0


G40 Site Electrical Utilities 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, G40 - Site Electrical 87 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item G50 Other Site Construction Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G5010 SERVICE & PEDESTRIAN TUNNELS
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL SERVICE & PEDESTRIAN TUNNELS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
G5090 OTHER SITE SYSTEMS & EQUIPMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER SITE SYSTEMS & EQUIPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, G50 - Other Site Construction 88 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item G50 Other Site Construction Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, G50 - Other Site Construction 89 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item G50 Other Site Construction Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item G50 Other Site Construction


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, G50 - Other Site Construction 90 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item G50 Other Site Construction Total Cost: $0


G50 Other Site Construction 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, G50 - Other Site Construction 91 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item XX Special Use - 1 Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, Special Use- 1 92 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item XX Special Use - 1 Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, Special Use- 1 93 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item XX Special Use - 1 Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item XX Special Use - 1


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, Special Use- 1 94 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item XX Special Use - 1 Total Cost: $0


XX Special Use - 1 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, Special Use- 1 95 of 102 03/09/2021 04:20:08


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item XX Special Use - 2 Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, Special Use - 2 96 of 102 03/09/2021 04:20:09


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item XX Special Use - 2 Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, Special Use - 2 97 of 102 03/09/2021 04:20:09


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item XX Special Use - 2 Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item XX Special Use - 2


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

XX Special Use - 2 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, Special Use - 2 98 of 102 03/09/2021 04:20:09


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item XX Special Use - 3 Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, Special Use - 3 99 of 102 03/09/2021 04:20:09


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item XX Special Use - 3 Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, Special Use - 3 100 of 102 03/09/2021 04:20:09


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item XX Special Use - 3 Total Cost: $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL INSTALLATION TOTALS


Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit
BASE CODE BASE ELEMENT
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
Optional Code Description 0 Unit $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item XX Special Use - 3


MATERIAL INSTALLATION TOTALS
Uniformat II WBS
Description Quantity Unit Material Total Material Install Total Install Total
Code Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit

513509692.xls, Special Use - 3 101 of 102 03/09/2021 04:20:09


United States Department of the Interior
National Park Service
Class B Construction Cost Estimate (expanded)
LINE ITEM COST SUMMARY
Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Code Reviewed By: Reviewer Name
PMIS Number: TBD or PMIS number if known Date: Review Date

Summary Item XX Special Use - 3 Total Cost: $0


XX Special Use - 3 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

513509692.xls, Special Use - 3 102 of 102 03/09/2021 04:20:09