# Package UTILITY

1 (STORM)
2 (STORM)
3 (STORM)
4 (STORM)
SHOP DRAWING (STORM)
SHOP DRAWING (STORM)
5 (POTABLE)
6 (POTABLE)
7 (POTABLE)
8 (POTABLE)
SHOP DRAWING (POTABLE)
9 (SEWER)
10 (SEWER)
11 (SEWER)
12 (SEWER)
SHOP DRAWING (SEWER)
13 (FIRE)
14 (FIRE)
15 (FIRE)
16 (FIRE)
SHOP DRAWING (FIRE)
17 (LV)
18 (LV)
19 (LV)
20 (LV)
21 (11kV)
22 (11kV)
23 (11kV)
24 (11kV)
25 (ELE DUCT)
26 (ELE DUCT)
(ELE DUCT)
27 (ELE DUCT)
28 (Street Light)
29 (Street Light)
30 (Street Light)
31 (Street Light)
32 (SECURITY)
33 (SECURITY)
34 (SECURITY)
35 (SECURITY)
36 (ICT)
37 (ICT)
38 (ICT)
39 (ICT)
40 (CCTV DUCT)
41 (CCTV DUCT)
42 (CCTV DUCT)
43 (CCTV DUCT)
44 Elect. Services - Pump Station
SHOP DRAWING (ICT) JRC-4
SHOP DRAWING (ICT) JRC-12
(Spare Duct)
(Spare Duct)
(Spare Duct)
(Spare Duct)
45 (GAS)
46 (GAS)
47 (GAS)
48 (GAS)
SHOP DRAWING (GAS)
49 (ROAD)
50 (ROAD)
51 (ROAD)
52 (ROAD)

53 (ROAD)
54 (ROAD)
55 (ROAD)
56 (ROAD)
57 (SINAGE)
58 (SINAGE)
59 (SINAGE)
DRAWING PACKAGE Preparation Period
General Layout (STORM)
Layout Plan (STORM)
Profile (STORM)
Standard Details (STORM)
Manhole Plan and Section (Architectural)
Storm Gullies (Architectural) (10/SHT)
General Layout (POTABLE)
Layout Plan (POTABLE)
Profile (POTABLE)
Standard Details (POTABLE)
Manhole Plan and Section (Structural and Architectural)
General Layout (SEWER)
Layout Plan (SEWER)
Profile (SEWER)
Standard Details (SEWER)
Manhole Plan and Section (Architectural)
General Layout (FIRE)
Layout Plan (FIRE)
Profile (FIRE)
Standard Details (FIRE)
Manhole Plan and Section (Structural and Architectural)
General Layout (LV)
Layout Plan (LV)
Profile (LV)
Standard Details & SLD (LV)
General Layout (11kV)
Layout Plan (11kV)
Profile (11kV)
Standard Details & SLD (11kV)
General Layout (ELE DUCT)
Layout Plan (ELE DUCT)
Profile (ELE DUCT)
Standard Details (ELE DUCT)
General Layout (Street Light)
Layout Plan (Street Light)
Profile (Street Light)
Standard Details & SLD (Street Light)
General Layout (SECURITY)
Layout Plan (SECURITY)
Profile (SECURITY)
Standard Details (SECURITY)
General Layout (ICT)
Layout Plan (ICT)
Profile (ICT)
Standard Details (ICT)
General Layout (CCTV DUCT)
Layout Plan (CCTV DUCT)
Profile (CCTV DUCT)
Standard Details (CCTV DUCT)

Manhole Plan and Section (Structural and Architectural)


Manhole Plan and Section (Structural and Architectural)
General Layout (Spare Duct)
Layout Plan (Spare Duct)
Profile (Spare Duct)
Standard Details (Spare Duct)
General Layout (GAS)
Layout Plan (GAS)
Profile (GAS)
Standard Details (GAS)
Manhole Plan and Section (Structural and Architectural)
TYPICAL SERVICES RESERVATION CROSS SECTIONS
Profile (ROAD)
Typical Cross Section (ROAD)
Grading Plan / SETTING OUT (ROAD)
ROAD AUTO TURN
Traffic Sign & Pavement Marking (ROAD)
STANDARD ROAD - Typical Details
Layout Plan (ROAD)
Pavement Structure Plan (ROAD)
General Layout (SINAGE)
Layout Plan (SINAGE)
Standard Details (SINAGE)

Estimated DWG. PER DAY =


NO OF DRAWING
1
2
16
2
55 As per DM Requirements
13
1
2
2
9
8
1
2
6
18
38 As per DM Requirements
1 * All backdrop to be included upon completion of profile drawing
2
10
10
16
1
2
13
7
1
2
11
4
1
2
n/a
2
1
2
28
9
1
2
16
5
1
2
16
5
1
2
38
4
12
68
16
n/a
n/a
n/a
n/a
1
1
1
6
2
10
6
10
4
5
3
7
3
4
1
2
1
TOTAL NO. OF DRAWINGS = 557
9.3 DWGS
f profile drawing
# WORK PACKAGE
1 ROAD
2 ROAD
3 ROAD
4 ROAD
5 ROAD
6 ROAD
7 ROAD
8 ROAD
9 ROAD
10 CIVIL
11 CIVIL
12 CIVIL
13 CIVIL
14 CIVIL
15 CIVIL
16 CIVIL
17 CIVIL
18 ELECTRICAL
19 ELECTRICAL
20 ELECTRICAL
21 ELECTRICAL
22 ELECTRICAL
23 ELECTRICAL
24 ELECTRICAL
25 ELECTRICAL
26 ELECTRICAL
27 MECHANICAL
28 MECHANICAL
29 MECHANICAL
30 MECHANICAL
31 MECHANICAL
32 MECHANICAL
33 MECHANICAL
34 MECHANICAL
METHOD STATEMENT
Construction of Aggregate Sub Base
Construction of Wet Mix Macadam Road Base
Application of Prime Coat
Construction of Asphaltic Base Course
Application of Tack Coat
Construction of Asphaltic Wearing Course
Installation of Precast Kerbs
Earthworks Clearing and Grubbing, Unclassified Excavation, Formation and Backfilling Works
Application of Pavement Marking
Site Facility Mobilization
Trial Pits Excavation
General Concrete Works
In-Situ GRP Lamination Works
Internal and External Painting Works for Chambers
Grouting Works
Installation of Permanent Chamber Accessories
Waterproofing Membrane System
Cable Laying, Glanding and Termination
11Kv Cable Installation Work
Installation of Cable Raceways & Boxes
Installation of Earthing and lightening System
Testing and Commissioning of Electrical Equipments
Construction & Installation of Precast Street Lighting Foundation
Installation of Feeder Pillar
Street Lighting system installation
Testing & Commissioning Feeder Pillar
Installation & Pressure Test of Underground Synthetical Natural Gas Pipes
Laying and Testing of GRP Storm Water & Sewer Gravity Pipes Lines
Installation & Testing of GRE Pipes & Fittings for Potable Water system
Laying of UPVC Pipes and Fittings for Storm Water & Sewer Gravity Network .
Installation of Fire Hydrant
Laying & Testing of HDPE Fire Fighting Pressure Pipe & Fittings
Disinfection & Flushing for Potable Water Network
PE Pipe Installation for Gas Network.
Preparation Period