Professional Documents
Culture Documents
For This Building Assuming The Following
For This Building Assuming The Following
For This Building Assuming The Following
- d=440 mm , d’=60mm
ts= 0.1m
1
2 مشروع خرسانة مسلحة
According to UBC code the uniform live load for offices is 250kg/m2=2.5KN/m2
Loads:
D.L= (γc*ts) + (floor Cover) = (25*0.1)+(0.5)=2.5+0.5 = 3 KN/m2
2
2 مشروع خرسانة مسلحة
Ρmax = 0.75 Pb =
0.75(0.85*β*(F’c/Fy)*(600/600+Fy))
Pmax=0.75(0.85*0.85*(27/400)*(600/600+400)= 0.021946
Mu=ф*Pmax*Fy*b*d2*(1-0.59*Pmax*Fy/F’c)
Mu= 0.9*0.021946*400*250*4402*(1-0.59*0.21946*400/27)
Mu= 309 KN.m > 155.27KN.m , *The section is single rectangular beam .
M1=ф*P*Fy*b*d2*(1-0.59*P*Fy/F’c)
155.27*106= 0.9*P*400*250*4402*(1-
0.59*P*400/27)
P=0.012
Take 3 bars.
S=(b-2C-2s-n*ф)/(n-1) = (250-50-50-25*3)2 =
37.5>25 Use one layer .
3
2 مشروع خرسانة مسلحة
M2=W*L2/8 = 12.675*72/8 ≈
77.63 KN.m
Ρmax = 0.75 Pb =
0.75(0.85*β*(F’c/Fy)*(600/600+Fy))
Pmax=0.75(0.85*0.85*(27/400)*(600/600+400)= 0.021946
Mu=ф*Pmax*Fy*b*d2*(1-0.59*Pmax*Fy/F’c)
Mu= 0.9*0.021946*400*250*4402*(1-0.59*0.21946*400/27)
Mu= 309 KN.m > 77.63KN.m , *The section is single rectangular beam .
M2=ф*P*Fy*b*d2*(1-0.59*P*Fy/F’c)
77.63*106= 0.9*P*400*250*4402*(1-
0.59*P*400/27)
P=0.00464
Take 2 bars.
4
2 مشروع خرسانة مسلحة
M3=W*L2/8 = 12.675*62/8 ≈ 57
KN.m
Ρmax = 0.75 Pb =
0.75(0.85*β*(F’c/Fy)*(600/600+Fy))
Pmax=0.75(0.85*0.85*(27/400)*(600/600+400)= 0.021946
Mu=ф*Pmax*Fy*b*d2*(1-0.59*Pmax*Fy/F’c)
Mu= 0.9*0.021946*400*250*4402*(1-0.59*0.21946*400/27)
Mu= 309 KN.m > 57KN.m , *The section is single rectangular beam .
M3=ф*P*Fy*b*d2*(1-0.59*P*Fy/F’c)
57*106= 0.9*P*400*250*4402*(1-0.59*P*400/27)
Take 2 bars.
5
2 مشروع خرسانة مسلحة
M4=W*L2/8 = 12.675*32/8
≈ 14.26 KN.m
Ρmax = 0.75 Pb =
0.75(0.85*β*(F’c/Fy)*(600/600+Fy))
Pmax=0.75(0.85*0.85*(27/400)*(600/600+400)= 0.021946
Mu=ф*Pmax*Fy*b*d2*(1-0.59*Pmax*Fy/F’c)
Mu= 0.9*0.021946*400*250*4402*(1-0.59*0.21946*400/27)
M4=ф*P*Fy*b*d2*(1-0.59*P*Fy/F’c)
14.26*106= 0.9*P*400*250*4402*(1-
0.59*P*400/27)
6
2 مشروع خرسانة مسلحة
Pmax=0.75(0.85*0.85*(27/400)*(600/600+400)= 0.021946
Mu=ф*Pmax*Fy*b*d2*(1-0.59*Pmax*Fy/F’c)
Mu= 0.9*0.021946*400*250*4402*(1-0.59*0.21946*400/27)
Mu= 309 KN.m > 11.4KN.m , *The section is single rectangular beam .
M4=ф*P*Fy*b*d2*(1-0.59*P*Fy/F’c)
14.26*106= 0.9*P*400*250*4402*(1-0.59*P*400/27)
Take 2 bars.
S=(b-2C-2s-n*ф)/(n-1) = (250-50-50-18*2)1 =
178>25 Use one layer .
7
2 مشروع خرسانة مسلحة
Use Pmin=0.0035
Take 2 bars.
S=(b-2C-2s-n*ф)/(n-1) = (250-50-50-18*2)1 =
178>25 Use one layer .
التسليح االبعاد
كانات الرمز
علوي سفلي سمك عرض
8ф8mm/m 3ф25mm 0.5m 0.25m B1
8ф8mm/m 2ф25mm 0.5m 0.25m B2
8ф8mm/m 2ф18mm 0.5m 0.25m B3
8ф8mm/m 2ф18mm 2ф18mm 0.5m 0.25m B4
8ф8mm/m 2ф18mmvv 0.5m 0.25m B5