Location:

I. PREPARATION & EXCAVATION WORKS


Labor:
Construction Foreman at ₱ /day ₱ 0.00
Labor Cost ₱ 0.00

II. CONCRETE & MASONRY WORKS


Materials:
bag/s Portland Cement at ₱ /bag ₱ 0.00
3 3
m Gravel /m 0.00
3 3
m Whitesand /m 0.00
pcs CHB #5 /pc 0.00
pcs CHB #4 /pc 0.00
pcs Reinforced Steel Bar, 10mm /pc 0.00
pcs Reinforced Steel Bar, 12mm /pc 0.00
pcs ¼" x 4' x 8' Ordinary Plywood /pc 0.00
pcs Coco Lumber 2" x 2" x 12', 60 bdft /pc 0.00
pcs Coco Lumber 20" x 3" x 12', 72 bdft /pc 0.00
kg Assorted Common Wire Nails /kg 0.00
kg GI Tie Wire #16 /kg 0.00
Material Cost ₱ 0.00

Equipment:
unit Rental of Concrete Mixer at ₱ /day ₱ 0.00

Labor:
Construction Foreman at ₱ /day ₱ 0.00
Mason /day 0.00
Carpenter /day 0.00
Steel man /day 0.00
Laborer /day 0.00
Labor Cost ₱ 0.00

SUB-TOTAL ₱ 0.00

III. CEILING WORKS


Materials:
at ₱ 0.00
0.00
0.00
0.00
0.00
0.00
Material Cost ₱ 0.00
Labor:
Construction Foreman at ₱ /day ₱ 0.00
Mason /day 0.00
Carpenter /day 0.00
Steel man /day 0.00
Laborer /day 0.00
Labor Cost ₱ 0.00

SUB-TOTAL ₱ 0.00

IV. DOORS & WINDOWS WORKS


Materials:
set Panel Door; 0.8 m x 2.1 m at ₱ /set 0.00
set PVC Door; 0.6 m x 2.1 m /set 0.00
ft2 Steel Casement Windows /ft2 0.00
set Door Hinges /set 0.00
set Door lock /set 0.00
set Aluminum Screen Door /set 0.00
set Window Screen Protector /set 0.00
Material Cost ₱ 0.00

Labor:
Laborer /day 0.00
Labor Cost ₱ 0.00

SUB-TOTAL ₱ 0.00

V. STEEL & TINSMITHRY WORKS


Materials:
lnm Pre-painted Roofing; GA 26 at ₱ /lnm ₱ 0.00
lnm Pre-painted Flashing; GA 26 /lnm 0.00
pcs Angle Bar; 2" x 3/16" /pc 0.00
pcs C-Purlins; 2" x 3" x 1.5 mm /pc 0.00
pcs C-Purlins; 2" x 4" x 1.5 mm /pc 0.00
pcs Reinforced Steel Bar, 10mm (sag rod) /pc 0.00
tube Rubber sealant /tube 0.00
Material Cost ₱ 0.00

Equipment:
unit Rental of Concrete Mixer at ₱ /day ₱ 0.00

Labor:
Tinsmith at ₱ /day ₱ 0.00
Welder /day 0.00
Laborer /day 0.00
Labor Cost ₱ 0.00

SUB-TOTAL ₱ 0.00

VI. TILE WORKS


Materials:
pcs Floor Tiles; 40 x 40 cm at ₱ /pc 0.00
pcs Glazed Tiles; 40 x 40 cm /pc 0.00
pcs Unglazed Tiles; 40 x 40 cm /pc 0.00
bag Tile Adhesive /bag 0.00
kg Tile Grout /kg 0.00
Material Cost ₱ 0.00

Labor:
Tile Setter /day 0.00
Helper /day 0.00
Labor Cost ₱ 0.00

SUB-TOTAL ₱ 0.00

VII. PLUMBING & SANITARY WORKS


Materials:
set Water Closet with Fittings at ₱ /set ₱ 0.00
set Lavatory with Fittings & P-trap /set 0.00
set Urinal with Fittings /set 0.00
pcs uPVC Pipe; 3/4" dia /pc 0.00
pcs uPVC Elbow; 4" dia /pc 0.00
pcs uPVC Tee; 4" dia /pc 0.00
pcs uPVC Reducer; 1/2" & 3/4" dia /pc 0.00
pcs PVC Pipe; 4" dia /pc 0.00
pcs PVC Elbow; 4" dia /pc 0.00
pcs PVC Tee; 4" dia /pc 0.00
pcs Faucet (ordinary) /kg 0.00
Other Plumbing Materials 1000.00 0.00
Material Cost ₱ 0.00

Labor:
Plumber at ₱ /day ₱ 0.00
Laborer /day 0.00
Labor Cost ₱ 0.00

SUB-TOTAL ₱ 0.00
VIII. ELECTRICAL WORKS
Materials:
set Main Switch 60A at ₱ /set ₱ 0.00
set Flourescent Lamp; 40W /set 0.00
pcs CFL Lamp; 18W /pc 0.00
pcs Convenience Outlet /pc 0.00
pcs Switch; 2 gangs /pc 0.00
pcs Switch; 1 gang /pc 0.00
roll Flexible Hose /pc 0.00
roll 0.5 box THHN Wire; 3.5 mm2 /pc 0.00
roll 0.5 box THHN Wire; 5.5 mm2 /pc 0.00
pcs Utility Box /pc 0.00
pcs Junction Box /pc 0.00
roll Electrical Tape /pc 0.00
Other Materials 1000.00 0.00
Material Cost ₱ 0.00

Labor:
Electrician at ₱ /day ₱ 0.00
Laborer /day 0.00
Labor Cost ₱ 0.00

SUB-TOTAL ₱ 0.00

IX. PAINTING WORKS


Materials:
gal Latex Paint Flat at ₱ /gal ₱ 0.00
gal Latex Paint Semi-gloss /gal 0.00
gal Red Oxide Primer /gal 0.00
gal QDE Paint /gal 0.00
gal Paint Thinner /gal 0.00
gal Concrete Neutralizer /gal 0.00
Masonry Putty 0.00
Other Painting Materials 0.00
Material Cost ₱ 0.00

Labor:
Painter at ₱ /day ₱ 0.00
Helper /day 0.00
Labor Cost ₱ 0.00

SUB-TOTAL ₱ 0.00

* SUMMARY
I. PREPARATION & EXCAVATION WORKS ₱ 0.00
II. CONCRETE & MASONRY WORKS 0.00
III. CEILING WORKS 0.00
IV. DOORS & WINDOWS WORKS 0.00
V. STEEL & TINSMITHRY WORKS 0.00
VI. TILE WORKS 0.00
VII. PLUMBING & SANITARY WORKS 0.00
VIII. ELECTRICAL WORKS 0.00
IX. PAINTING WORKS 0.00
DIRECT COST ₱ 0.00
10% PROFIT 0.00
10% OCM
12% VAT
ENG'G SUPERVISION
ESTIMATED TOTAL COST ₱ 0.00
SLAB
Description No. of Set/s Length Width Height Volumeset VOLUMETOTAL
1 0.00 0.00
SLAB

2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
Total 0.00 0.00

CONCRETE WALL or RETAINING WALL


Description No. of Set/s Length Width Height Volumeset VOLUMETOTAL
1 0.00 0.00
WALL

2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
Total 0.00 0.00

COLUMN
Description No. of Set/s Length Width Height Volumeset VOLUMETOTAL
C1 2 3.6 0.125 0.2 0.09 0.18
COLUMN

C2 4 4.4 0.125 0.2 0.11 0.44


3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
Total 0.20 0.62
COLUMN (Circular)
Description No. of Set/s Pi Radius Height Volumeset VOLUMETOTAL
1 3.141593 0.3 3 0.85 0.00
COLUMN

2 3.141593 0.00 0.00


3 3.141593 0.00 0.00
4 3.141593 0.00 0.00
5 3.141593 0.00 0.00
Total 0.85 0.00

FOOTING
Description No. of Set/s Length Width Height Volumeset VOLUMETOTAL
F1 3 0.6 0.6 0.2 0.07 0.22
FOOTING

F2 3 0.8 0.8 0.2 0.13 0.38


3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
Total 0.20 0.60
BEAM
Description No. of Set/s Length Width Height Volumeset VOLUMETOTAL
1 0.00 0.00
BEAM

2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
Total 0 0

GIRDER
Description No. of Set/s Length Width Height Volumeset VOLUMETOTAL
1 0.00 0.00
GIRDER

2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
Total 0.00 0.00

CONCRETE HOLLOW BLOCKS (CHB)


LengthCHB WidthCHB HeightCHB
0.40 0.15 0.20
Description No. of Set/s Length LengthSUB Height HeightSUB No. of Layers No. of CHB
CHB

WF2 2 1.8 0 2.6 0 13 117


WF2 1 1.2 0 2.6 0 13 39
WF2 2 0.1 0 2.6 0 13 6.5
4 0 0 0 0 0 0 0
5 0 0 0 0 0 0 0
Total 162.5

CEMENT MORTAR
CEMENT MORTAR

Description No. of Set/s Length Width Height Volumeset VOLUMETOTAL


1 0.00 0.00
2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
Total 0.00 0.00

CEMENT MORTAR (for Plastering)


Description No. of Set/s Length Width Thickness Volumeset VOLUMETOTAL
1 0.00 0.00
PLASTER

2 0.00 0.00
3 0.00 0.00
PLASTER 4 0.00 0.00
5 0.00 0.00
Total 0.00 0.00
SAY
Class CEMENT SAND GRAVEL CEMENT SAND GRAVEL

0 0 0 0 0 0

SAY
Class CEMENT SAND GRAVEL CEMENT SAND GRAVEL

0 0 0 0 0 0

SAY
Class CEMENT SAND GRAVEL CEMENT SAND GRAVEL
A 9.0 0.5 1 5.58 0.31 0.62

9 0.5 1 5.58 0.31 0.62


SAY
Class CEMENT SAND GRAVEL CEMENT SAND GRAVEL

0 0 0 0 0 0

FACTOR SAY
Class CEMENT SAND GRAVEL CEMENT SAND GRAVEL
A 9.0 0.5 1 5.4 0.3 0.6

9 0.5 1 5.4 0.3 0.6


SAY
Class CEMENT SAND GRAVEL CEMENT SAND GRAVEL

0 0 0 0 0 0

SAY
Class CEMENT SAND GRAVEL CEMENT SAND GRAVEL

0 0 0 0 0 0

SAY:
No. of Layers No. of CHB

Class CEMENT SAND

0 0

Class CEMENT SAND


0 0
Table 1. CONCRETE PROPORTION
Mixture Proportion Cement in Bag
Sand Gravel
Class 40 kg 50 kg
AA 1 : 1/2 : 3 12.0 9.5 0.5 1.0
A 1:02:04 9.0 7.0 0.5 1.0
B 1 : 2 1/2 : 3 7.5 6.0 0.5 1.0
C 1:03:06 6.0 5.0 0.5 1.0