Construction Material Estimate Sheet
Construction Material Estimate Sheet
Equipment:
unit Rental of Concrete Mixer at ₱ /day ₱ 0.00
Labor:
Construction Foreman at ₱ /day ₱ 0.00
Mason /day 0.00
Carpenter /day 0.00
Steel man /day 0.00
Laborer /day 0.00
Labor Cost ₱ 0.00
SUB-TOTAL ₱ 0.00
SUB-TOTAL ₱ 0.00
Labor:
Laborer /day 0.00
Labor Cost ₱ 0.00
SUB-TOTAL ₱ 0.00
Equipment:
unit Rental of Concrete Mixer at ₱ /day ₱ 0.00
Labor:
Tinsmith at ₱ /day ₱ 0.00
Welder /day 0.00
Laborer /day 0.00
Labor Cost ₱ 0.00
SUB-TOTAL ₱ 0.00
Labor:
Tile Setter /day 0.00
Helper /day 0.00
Labor Cost ₱ 0.00
SUB-TOTAL ₱ 0.00
Labor:
Plumber at ₱ /day ₱ 0.00
Laborer /day 0.00
Labor Cost ₱ 0.00
SUB-TOTAL ₱ 0.00
VIII. ELECTRICAL WORKS
Materials:
set Main Switch 60A at ₱ /set ₱ 0.00
set Flourescent Lamp; 40W /set 0.00
pcs CFL Lamp; 18W /pc 0.00
pcs Convenience Outlet /pc 0.00
pcs Switch; 2 gangs /pc 0.00
pcs Switch; 1 gang /pc 0.00
roll Flexible Hose /pc 0.00
roll 0.5 box THHN Wire; 3.5 mm2 /pc 0.00
roll 0.5 box THHN Wire; 5.5 mm2 /pc 0.00
pcs Utility Box /pc 0.00
pcs Junction Box /pc 0.00
roll Electrical Tape /pc 0.00
Other Materials 1000.00 0.00
Material Cost ₱ 0.00
Labor:
Electrician at ₱ /day ₱ 0.00
Laborer /day 0.00
Labor Cost ₱ 0.00
SUB-TOTAL ₱ 0.00
Labor:
Painter at ₱ /day ₱ 0.00
Helper /day 0.00
Labor Cost ₱ 0.00
SUB-TOTAL ₱ 0.00
* SUMMARY
I. PREPARATION & EXCAVATION WORKS ₱ 0.00
II. CONCRETE & MASONRY WORKS 0.00
III. CEILING WORKS 0.00
IV. DOORS & WINDOWS WORKS 0.00
V. STEEL & TINSMITHRY WORKS 0.00
VI. TILE WORKS 0.00
VII. PLUMBING & SANITARY WORKS 0.00
VIII. ELECTRICAL WORKS 0.00
IX. PAINTING WORKS 0.00
DIRECT COST ₱ 0.00
10% PROFIT 0.00
10% OCM
12% VAT
ENG'G SUPERVISION
ESTIMATED TOTAL COST ₱ 0.00
SLAB
Description No. of Set/s Length Width Height Volumeset VOLUMETOTAL
1 0.00 0.00
SLAB
2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
Total 0.00 0.00
2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
Total 0.00 0.00
COLUMN
Description No. of Set/s Length Width Height Volumeset VOLUMETOTAL
C1 2 3.6 0.125 0.2 0.09 0.18
COLUMN
FOOTING
Description No. of Set/s Length Width Height Volumeset VOLUMETOTAL
F1 3 0.6 0.6 0.2 0.07 0.22
FOOTING
2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
Total 0 0
GIRDER
Description No. of Set/s Length Width Height Volumeset VOLUMETOTAL
1 0.00 0.00
GIRDER
2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
Total 0.00 0.00
CEMENT MORTAR
CEMENT MORTAR
2 0.00 0.00
3 0.00 0.00
PLASTER 4 0.00 0.00
5 0.00 0.00
Total 0.00 0.00
SAY
Class CEMENT SAND GRAVEL CEMENT SAND GRAVEL
0 0 0 0 0 0
SAY
Class CEMENT SAND GRAVEL CEMENT SAND GRAVEL
0 0 0 0 0 0
SAY
Class CEMENT SAND GRAVEL CEMENT SAND GRAVEL
A 9.0 0.5 1 5.58 0.31 0.62
0 0 0 0 0 0
FACTOR SAY
Class CEMENT SAND GRAVEL CEMENT SAND GRAVEL
A 9.0 0.5 1 5.4 0.3 0.6
0 0 0 0 0 0
SAY
Class CEMENT SAND GRAVEL CEMENT SAND GRAVEL
0 0 0 0 0 0
SAY:
No. of Layers No. of CHB
0 0