CEBU BUS RAPID TRANSIT

CNU STATION

FEBRUARY 2021
< STRUCTURAL>
PROJECT SCALE PROJECT SCALE PROJECT SCALE
SHEET NO. DESCRIPTION OF DRAWINGS REMARKS SHEET NO. DESCRIPTION OF DRAWINGS REMARKS SHEET NO. DESCRIPTION OF DRAWINGS REMARKS
TITLE TITLE TITLE

ST-CNU-S-000 TITLE PAGE

CEBU BUS CEBU BUS CEBU BUS


ST-CNU-S-001 DRAWING INDEX - 1 NONE
RAPIT TRANSIT RAPIT TRANSIT RAPIT TRANSIT
(CNU STATION) (CNU STATION) (CNU STATION)
ST-CNU-S-002 NONE,NTS

ST-CNU-S-101 CNU STATION - MASTER PLAN & LOCATION MAP 1/500, NTS

ST-CNU-S-102 1/200

ST-CNU-S-103 CNU STATION - FOUNDATION PLAN 2 & 3 1/200

ST-CNU-S-104 1/200

ST-CNU-S-105 CNU STATION - FOUNDATION PLAN 5 & 6 1/200

ST-CNU-S-201 1/10

ST-CNU-S-202A 1/30

ST-CNU-S-202B 1/30

ST-CNU-S-203 1/10, 1/20

ST-CNU-S-204 1/100

ST-CNU-S-205 1/100

ST-CNU-S-206 1/50

ST-CNU-S-207 1/50

OWNED BY: CONSULTANT CHECKED BY: SUBMITTED BY: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DRAWING NO:

PREPARED BY: REVIEWED BY: DRAWING INDEX - 1


ST-CNU-S-001
MARK STEVEN C. CONSTRUCTION OF CEBU
GREGORIO E. ORIGENES KIM JONG MIN ELMAN JOSE B. MARTINEZ NORVIN V. IMBONG JOHAN G. MARTINEZ PASTOR ANNELI R. LONTOC
KUNHWA EXPERT DIRECTOR, KUNHWA ARCHITECT III - CEBU BRT PIU DEPUTY PROJECT MANAGER PROGRAM MANAGER ASSISTANT SECRETARY UNDERSECRETARY
BUS RAPID TRANSIT PROJECT
PRC NO: 7901 DATE: 07/19/2021
ARCHITECTURAL AND PLUMBING PLANS FOR SYSTEMS AND STAKEHOLDER
RELATIONS - CEBU BRT PIU
BRT - NPMO FOR ROAD TRANSPORT
AND INFRASTRUCTURE
PHILIPPINE RAILWAY
INSTITUTE AND OIC FOR
PACKAGE 1
BRT PROJECTS
PTR NO: 8547099 DATE: 01/12/2021

TIN: 104-124-039-000
STRUCTURAL STAINLESS STEEL NOTES:

1. STRUCTURAL STAINLESS STEEL SHALL BE IN ACCORDANCE WITH AMERICAN INSTITUTE OF


STEEL CONSTRUCTION (AISC) 360 AND DESIGN GUIDE 27 (DG 27)

2. STRUCTURAL STAINLESS STEEL SHALL COMPLY WITH THE FOLLOWING SPECIFICATIONS: BITUMINOUS FILLER

12 mm

25 mm
A. STRUCTURAL STAINLESS STEEL SHAPES, PLATES AND PIPES (UNLESS OTHERWISE NOTED) -
SLAB REINF.
SUS 304, Fy = 170 MPa
FLR. LVL.
B. HIGH STRENGTH BOLTS - ASTM A325 (TYPICAL UON)

"t"
C. WASHERS - ASTM F 436
D. NUTS - ASTM A 563

100
3. UNLESS OTHERWISE NOTED, BEAM CONNECTIONS SHALL BE AISC "SIMPLE SHEAR
CONNECTIONS" WITH ASTM A325 BOLTS DESIGNED FOR ONE HALF THE MAXIMUM TOTAL
GRAVEL BASE POLYUREA JOINT EPOXY
UNIFORM LOAD FOR LATERALLY SUPPORTED BEAMS GIVEN IN TABLE 3-6 OF THE "STEEL
CONSTRUCTION MANUAL".
VAPOR BARRIER SUBGRADE COMPACTED
WHEN REQ. TO 95% OF MAXIMUM
4. HIGH STRENGTH BOLTS MAY BE TIGHTENED TO THE "SNUG TIGHT" CONDITION IN LIEU OF
DRY DENSITY @ OPTIMUM
FULL PRETENSIONING EXCEPT FOR THE FOLLOWING CONNECTIONS WHICH SHALL BE FULLY
MOISTURE CONTENT (MAX.
PRETENSIONED: DEPTH OF COMPRESSED
FILL = (200mm PER LAYER).
A. BOLTED CONNECTIONS USING NON-STANDARD HOLES

5. WELDING SHALL BE IN ACCORDANCE W/ AWS D1.1 "STRUCTURAL WELDING CODE - STEEL".


WELD ELECTRODES SHALL BE ER308L LOW HYDROGEN UNLESS OTHERWISE NOTED,
SLAB ON GRADE CONSTRUCTION
PROVIDE CONTINUOUS FILLET WELD WITH MINIMUM SIZE REQUIRED BY TABLE J2.4 AISC 360.
JOINT DETAIL
6. STAINLESS STEEL MEMBERS SHALL BE SPLICED ONLY WHERE INDICATED. CONTINUOUS
MEMBERS SHALL BE SPLICED OVER SUPPORTS, UNLESS OTHERWISE NOTED. MEMBERS
INDICATED AS DIAPHRAGM CHORDS (DC) SHALL HAVE FULL PENETRATION BUTT WELD
SPLICES, UNLESS OTHERWISE NOTED

OWNED BY: CONSULTANT CHECKED BY: SUBMITTED BY: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DRAWING NO:

PREPARED BY: REVIEWED BY: GENERAL NOTES


STRUCTURAL NOTES
ST-CNU-S-002
MARK STEVEN C. CONSTRUCTION OF CEBU
GREGORIO E. ORIGENES KIM JONG MIN ELMAN JOSE B. MARTINEZ NORVIN V. IMBONG JOHAN G. MARTINEZ PASTOR ANNELI R. LONTOC
KUNHWA EXPERT DIRECTOR, KUNHWA ARCHITECT III - CEBU BRT PIU DEPUTY PROJECT MANAGER PROGRAM MANAGER ASSISTANT SECRETARY UNDERSECRETARY
BUS RAPID TRANSIT PROJECT
PRC NO: 7901 DATE: 07/19/2021
ARCHITECTURAL AND PLUMBING PLANS FOR SYSTEMS AND STAKEHOLDER
RELATIONS - CEBU BRT PIU
BRT - NPMO FOR ROAD TRANSPORT
AND INFRASTRUCTURE
PHILIPPINE RAILWAY
INSTITUTE AND OIC FOR
PACKAGE 1
BRT PROJECTS
PTR NO: 8547099 DATE: 01/12/2021

TIN: 104-124-039-000
CNU BRT STATION

1 2 3 4 5
1,651 3,000 3,900 1,800 2,400 11,700 13,900 1,200 16,000 4,400 35,200 4,400 8,000 1,200 6,800 7,600 1,100

8,800 8,800 8,750 8,850

5 4 3 2 1
35,200
4,000
4,350

8,850 8,750 8,800 8,800


350

350
4,350
4,000
1,100 7,600 6,800 1,200 8,000 20,000 4,000 20,000 16,000 1,200 13,900 11,700 2,400 1,800 3,900 3,000 1,651

MASTER PLAN
1 Scale: 1/700 MTS

LOCATION OF CNU STATION


3 Scale: NTS
BRT STATION MAP
2 Scale: NTS

OWNED BY: CONSULTANT CHECKED BY: SUBMITTED BY: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DRAWING NO:

PREPARED BY: REVIEWED BY: MASTER PLAN


BRT STATION MAP
ST-CNU-S-101
MARK STEVEN C. CONSTRUCTION OF CEBU
GREGORIO E. ORIGENES KIM JONG MIN ELMAN JOSE B. MARTINEZ NORVIN V. IMBONG JOHAN G. MARTINEZ PASTOR ANNELI R. LONTOC
KUNHWA EXPERT DIRECTOR, KUNHWA ARCHITECT III - CEBU BRT PIU DEPUTY PROJECT MANAGER PROGRAM MANAGER ASSISTANT SECRETARY UNDERSECRETARY
BUS RAPID TRANSIT PROJECT
PRC NO: 7901 DATE: 7/19/2021
ARCHITECTURAL AND PLUMBING PLANS FOR SYSTEMS AND STAKEHOLDER
RELATIONS - CEBU BRT PIU
BRT - NPMO FOR ROAD TRANSPORT
AND INFRASTRUCTURE
PHILIPPINE RAILWAY
INSTITUTE AND OIC FOR
PACKAGE 1
BRT PROJECTS
PTR NO: 8547099 DATE: 01/12/2021

TIN: 104-124-039-000
KEY PLAN

1 2 3 4 5
1,200 16,000 4,400
8,800 8,800
35,200
8,800 8,800
N
2,075 2,075 2,075 2,075 2,075 2,075 2,075 2,075 2,075 2,075

B 1,100 1,100
400

3,250

3,250

3,250

3,250

3,250
500

1,100

1,100
A
4,000
3,100

F1 MAT F3 FOOTING F2 MAT F1 MAT F2 MAT F3 FOOTING F1 MAT


T.O.S -80
FOOTING 4,400 FOOTING FOOTING FOOTING 4,400 FOOTING

T.O.S -300

SLAB ON GRADE

@300MM O.C.
BOTHWAYS

CNU STATION
FOUNDATION PLAN - 1
1 Scale: 1/200 MTS

1 2 3 4 5
N
1,200 16,000 4,400 35,200 4,400
8,800 8,800 8,800 8,800
B
400
500

A
4,000
3,100

CNU STATION
ROOF FRAMING PLAN - 1
2 Scale: 1/200 MTS

OWNED BY: CONSULTANT CHECKED BY: SUBMITTED BY: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DRAWING NO:

PREPARED BY: REVIEWED BY:


ST-CNU-S-102
MARK STEVEN C. CONSTRUCTION OF CEBU
GREGORIO E. ORIGENES KIM JONG MIN ELMAN JOSE B. MARTINEZ NORVIN V. IMBONG JOHAN G. MARTINEZ PASTOR ANNELI R. LONTOC
KUNHWA EXPERT DIRECTOR, KUNHWA ARCHITECT III - CEBU BRT PIU DEPUTY PROJECT MANAGER PROGRAM MANAGER ASSISTANT SECRETARY UNDERSECRETARY
BUS RAPID TRANSIT PROJECT
PRC NO: 7901 DATE: 07/19/2021
ARCHITECTURAL AND PLUMBING PLANS FOR SYSTEMS AND STAKEHOLDER
RELATIONS - CEBU BRT PIU
BRT - NPMO FOR ROAD TRANSPORT
AND INFRASTRUCTURE
PHILIPPINE RAILWAY
INSTITUTE AND OIC FOR
PACKAGE 1
BRT PROJECTS
PTR NO: 8547099 DATE: 01/12/2021

TIN: 104-124-039-000
KEY PLAN
LEGENDS:

TOS - 180 1,651 3,000 3,900 1,800 2,400


FOUNDATION PLAN 2
11,700 13,300 1,800 16,000 4,400
FOUNDATION PLAN 3
4,400 8,000 1,200 6,800 7,600 1,100

SLAB ON GRADE SLAB ON GRADE 1,800


1,521 3,000
O.C. BOTHWAYS O.C. BOTHWAYS

RAMP T.O.S -180 T.O.S -180

T.O.S -300 DESIGN BY THE


LANDSCAPE
T.O.S -300

DESIGN BY THE
SLOPE 1/12 SLOPE 1/12 SLOPE 1/12
LANDSCAPE

DESIGN BY THE SLOPE 1/12


LANDSCAPE

T.O.S -180
T.O.S -180

T.O.S -300

T.O.S -300 3,000 SLAB ON GRADE SLAB ON GRADE


DESIGN BY THE
SLOPE 1/12 SLOPE 1/12 SLOPE 1/12
1,800 LANDSCAPE
O.C. BOTHWAYS O.C. BOTHWAYS
1,100 7,600 6,800 1,200 8,000 4,390 4,410 16,000 1,200 13,900 11,700 2,400 1,800 3,900 3,000 1,651

1
1,651 3,000 3,900 1,800 2,400 11,700 13,300 1,800 16,000 4,400

SLAB ON GRADE

O.C. BOTHWAYS

400
B

500
4000
T.O.S -180

3100
A
T.O.S -300

DESIGN BY THE
SLOPE 1/12 SLOPE 1/12
LANDSCAPE

CNU STATION
FOUNDATION PLAN 2
1 Scale: 1/200 MTS

3
4 4 5
4,400 8,000 1,200 6,800 7,600 1,100

SLAB ON GRADE 1,800


1,521 3,000
O.C. BOTHWAYS
400

B
500
4000

T.O.S -180
3100

A T.O.S -300 DESIGN BY THE


LANDSCAPE

SLOPE 1/12

CNU STATION
FOUNDATION PLAN 3
2 Scale: 1/200 MTS
NOTE: TOS+/- 0 = EL +300

OWNED BY: CONSULTANT CHECKED BY: SUBMITTED BY: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DRAWING NO:

PREPARED BY: REVIEWED BY: FOUNDATION PLAN - 2


FOUNDATION PLAN - 3
ST-CNU-S-103
MARK STEVEN C. CONSTRUCTION OF CEBU
GREGORIO E. ORIGENES KIM JONG MIN ELMAN JOSE B. MARTINEZ NORVIN V. IMBONG JOHAN G. MARTINEZ PASTOR ANNELI R. LONTOC
KUNHWA EXPERT DIRECTOR, KUNHWA ARCHITECT III - CEBU BRT PIU DEPUTY PROJECT MANAGER PROGRAM MANAGER ASSISTANT SECRETARY UNDERSECRETARY
BUS RAPID TRANSIT PROJECT
PRC NO: 7901 DATE: 07/19/2021
ARCHITECTURAL AND PLUMBING PLANS FOR SYSTEMS AND STAKEHOLDER
RELATIONS - CEBU BRT PIU
BRT - NPMO FOR ROAD TRANSPORT
AND INFRASTRUCTURE
PHILIPPINE RAILWAY
INSTITUTE AND OIC FOR
PACKAGE 1
BRT PROJECTS
PTR NO: 8547099 DATE: 01/12/2021

TIN: 104-124-039-000
KEY PLAN

1 2 3 4 5
SLAB ON GRADE N
@300MM O.C.
BOTHWAYS
8,000 4,400 35,200 4,400
8,800 8,800 8,800 8,800

T.O.S -300

2,075 2,075 2,075 2,075 2,075 2,075 2,075 2,075 2,075 2,075
3,100
4,000

T.O.S -80

3,250
3,250

3,250

3,250

3,250
500
400

4,400 4,400

A F1 MAT
F3 FOOTING F3 FOOTING

F1 MAT
F2 MAT F1 MAT F2 MAT
FOOTING FOOTING FOOTING FOOTING FOOTING
CNU STATION
FOUNDATION PLAN - 4
1 Scale: 1/200 MTS

1 2 3 4 5 N
8,000 4,400 35,200 4,400
8,800 8,800 8,800 8,800
3,100
4,000

B
500
400

A
CNU STATION
ROOF FRAMING PLAN - 2
2 Scale: 1/200 MTS

OWNED BY: CONSULTANT CHECKED BY: SUBMITTED BY: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DRAWING NO:

PREPARED BY: REVIEWED BY:


ST-CNU-S-104
MARK STEVEN C. CONSTRUCTION OF CEBU
GREGORIO E. ORIGENES KIM JONG MIN ELMAN JOSE B. MARTINEZ NORVIN V. IMBONG JOHAN G. MARTINEZ PASTOR ANNELI R. LONTOC
KUNHWA EXPERT DIRECTOR, KUNHWA ARCHITECT III - CEBU BRT PIU DEPUTY PROJECT MANAGER PROGRAM MANAGER ASSISTANT SECRETARY UNDERSECRETARY
BUS RAPID TRANSIT PROJECT
PRC NO: 7901 DATE: 07/19/2021
ARCHITECTURAL AND PLUMBING PLANS FOR SYSTEMS AND STAKEHOLDER
RELATIONS - CEBU BRT PIU
BRT - NPMO FOR ROAD TRANSPORT
AND INFRASTRUCTURE
PHILIPPINE RAILWAY
INSTITUTE AND OIC FOR
PACKAGE 1
BRT PROJECTS
PTR NO: 8547099 DATE: 01/12/2021

TIN: 104-124-039-000
KEY PLAN
LEGENDS:

TOS - 180 1,651 3,000 3,900 1,800 2,400 11,700 13,300 1,800 16,000

SLAB ON GRADE
4,400 4,400 8,000

SLAB ON GRADE
1,200 6,800 7,600 1,100

1,800
1,521 3,000
O.C. BOTHWAYS O.C. BOTHWAYS

T.O.S -180 T.O.S -180

RAMP
T.O.S -300 DESIGN BY THE
LANDSCAPE
T.O.S -300

DESIGN BY THE
SLOPE 1/12 SLOPE 1/12 SLOPE 1/12
LANDSCAPE

DESIGN BY THE SLOPE 1/12


LANDSCAPE

T.O.S -180
T.O.S -180

T.O.S -300

T.O.S -300 3,000 SLAB ON GRADE SLAB ON GRADE


DESIGN BY THE
SLOPE 1/12 SLOPE 1/12 SLOPE 1/12
1,800 LANDSCAPE
O.C. BOTHWAYS O.C. BOTHWAYS
1,100 7,600 6,800 1,200 8,000 4,390 4,410 16,000 1,200 13,900 11,700 2,400 1,800 3,900 3,000 1,651

FOUNDATION PLAN 5 FOUNDATION PLAN 6

DESIGN BY THE SLOPE 1/12


LANDSCAPE

3100

4000
T.O.S -180

500
A

400
T.O.S -300 3,000 SLAB ON GRADE
SLOPE 1/12
1,800
O.C. BOTHWAYS
1,100 7,600 6,800 1,200 8,000 4,390

CNU STATION
FOUNDATION PLAN 5
1 Scale: 1/200 MTS

B
3100
4000

T.O.S -180
500

A
400

T.O.S -300

SLAB ON GRADE
DESIGN BY THE
SLOPE 1/12 SLOPE 1/12
LANDSCAPE
O.C. BOTHWAYS
4,410 16,000 1,200 13,900 11,700 2,400 1,800 3,900 3,000 1,651

CNU STATION
FOUNDATION PLAN 6
2 Scale: 1/200 MTS
NOTE: TOS+/- 0 = EL +300

OWNED BY: CONSULTANT CHECKED BY: SUBMITTED BY: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DRAWING NO:

PREPARED BY: REVIEWED BY: FOUNDATION PLAN - 5


FOUNDATION PLAN - 6
ST-CNU-S-105
MARK STEVEN C. CONSTRUCTION OF CEBU
GREGORIO E. ORIGENES KIM JONG MIN ELMAN JOSE B. MARTINEZ NORVIN V. IMBONG JOHAN G. MARTINEZ PASTOR ANNELI R. LONTOC
KUNHWA EXPERT DIRECTOR, KUNHWA ARCHITECT III - CEBU BRT PIU DEPUTY PROJECT MANAGER PROGRAM MANAGER ASSISTANT SECRETARY UNDERSECRETARY
BUS RAPID TRANSIT PROJECT
PRC NO: 7901 DATE: 07/19/2021
ARCHITECTURAL AND PLUMBING PLANS FOR SYSTEMS AND STAKEHOLDER
RELATIONS - CEBU BRT PIU
BRT - NPMO FOR ROAD TRANSPORT
AND INFRASTRUCTURE
PHILIPPINE RAILWAY
INSTITUTE AND OIC FOR
PACKAGE 1
BRT PROJECTS
PTR NO: 8547099 DATE: 01/12/2021

TIN: 104-124-039-000
87.5 350 87.5 525

BOLT W/ HEX. NUTS 2@ 50MM


2@ 100MM
REST 200MM

50
PEDESTAL

450

550
37
R1 42 MM THK BASEPLATE
50

PLAN - BASEPLATE (SSC1) PLAN - PEDESTAL (SSC1)


1 Scale: 1/10 MTS
2 Scale: 1/10 MTS

SSC1

42MM THK. BASEPLATE

W/ HEX. NUTS
50MM NON-SHRINK GROUT

STAINLESS STEEL SECTIONS

MARK SSC1 SSC2 SSB1 SSB2

9
150 10 4
300

274

100

168

50
DIAGRAM

6
PEDESTAL

SIZE

SECTION DETAIL (SSC1)


2 Scale: 1/10 MTS

OWNED BY: CONSULTANT CHECKED BY: SUBMITTED BY: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DRAWING NO:

PREPARED BY: REVIEWED BY: PLAN - BASEPLATE


SECTION DETAIL
PLAN - PEDESTAL
ST-CNU-S-201
MARK STEVEN C. CONSTRUCTION OF CEBU STEEL SECTIONS
GREGORIO E. ORIGENES KIM JONG MIN ELMAN JOSE B. MARTINEZ NORVIN V. IMBONG JOHAN G. MARTINEZ PASTOR ANNELI R. LONTOC
KUNHWA EXPERT DIRECTOR, KUNHWA ARCHITECT III - CEBU BRT PIU DEPUTY PROJECT MANAGER PROGRAM MANAGER ASSISTANT SECRETARY UNDERSECRETARY
BUS RAPID TRANSIT PROJECT
PRC NO: 7901 DATE: 07/19/2021
ARCHITECTURAL AND PLUMBING PLANS FOR SYSTEMS AND STAKEHOLDER
RELATIONS - CEBU BRT PIU
BRT - NPMO FOR ROAD TRANSPORT
AND INFRASTRUCTURE
PHILIPPINE RAILWAY
INSTITUTE AND OIC FOR
PACKAGE 1
BRT PROJECTS
PTR NO: 8547099 DATE: 01/12/2021

TIN: 104-124-039-000
F1 - MAT FOOTING
4,150

1,375 700 700 1,375

1,375
B

3,250

500
SSC1
A

SSC1 SSC1
1,375

F1 PLAN
100MM THK. GRAVEL
1 Scale: 1/30 MTS

T.O.S
CONCRETE SLAB

80
100
COMPACTED SOIL

600

1,300
440MM O.C.

600MM
160MM O.C

100MM THK.
GRAVEL BED F1 SECTION
2 Scale: 1/30 MTS

OWNED BY: CONSULTANT CHECKED BY: SUBMITTED BY: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DRAWING NO:

PREPARED BY: REVIEWED BY: F1 - PLAN


F1 - SECTION
ST-CNU-S-202A
MARK STEVEN C. CONSTRUCTION OF CEBU
GREGORIO E. ORIGENES KIM JONG MIN ELMAN JOSE B. MARTINEZ NORVIN V. IMBONG JOHAN G. MARTINEZ PASTOR ANNELI R. LONTOC
KUNHWA EXPERT DIRECTOR, KUNHWA ARCHITECT III - CEBU BRT PIU DEPUTY PROJECT MANAGER PROGRAM MANAGER ASSISTANT SECRETARY UNDERSECRETARY
BUS RAPID TRANSIT PROJECT
PRC NO: 7901 DATE: 07/19/2021
ARCHITECTURAL AND PLUMBING PLANS FOR SYSTEMS AND STAKEHOLDER
RELATIONS - CEBU BRT PIU
BRT - NPMO FOR ROAD TRANSPORT
AND INFRASTRUCTURE
PHILIPPINE RAILWAY
INSTITUTE AND OIC FOR
PACKAGE 1
BRT PROJECTS
PTR NO: 8547099 DATE: 01/12/2021

TIN: 104-124-039-000
F2 - MAT FOOTING
4,150

1,375 700 700 1,375

1,575
B'

3,250

300
A SSC1 SSC1

1,375
SSC1

F2 PLAN
100MM THK. GRAVEL
1 Scale: 1/30 MTS

T.O.S
CONCRETE SLAB

80
100
COMPACTED SOIL

600

1,300
440MM O.C.

600MM
160MM O.C

100MM THK.
GRAVEL BED F2 SECTION
2 Scale: 1/30 MTS

OWNED BY: CONSULTANT CHECKED BY: SUBMITTED BY: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DRAWING NO:

PREPARED BY: REVIEWED BY: F2 - PLAN


F2 - SECTION
ST-CNU-S-202B
MARK STEVEN C. CONSTRUCTION OF CEBU
GREGORIO E. ORIGENES KIM JONG MIN ELMAN JOSE B. MARTINEZ NORVIN V. IMBONG JOHAN G. MARTINEZ PASTOR ANNELI R. LONTOC
KUNHWA EXPERT DIRECTOR, KUNHWA ARCHITECT III - CEBU BRT PIU DEPUTY PROJECT MANAGER PROGRAM MANAGER ASSISTANT SECRETARY UNDERSECRETARY
BUS RAPID TRANSIT PROJECT
PRC NO: 7901 DATE: 07/19/2021
ARCHITECTURAL AND PLUMBING PLANS FOR SYSTEMS AND STAKEHOLDER
RELATIONS - CEBU BRT PIU
BRT - NPMO FOR ROAD TRANSPORT
AND INFRASTRUCTURE
PHILIPPINE RAILWAY
INSTITUTE AND OIC FOR
PACKAGE 1
BRT PROJECTS
PTR NO: 8547099 DATE: 01/12/2021

TIN: 104-124-039-000
PEDESTAL
BASEPLATE 1,100

25 200 25 250 550 550


2@ 50MM
BOLT W/ HEX. NUTS 2@ 100MM
REST 200MM

25
PEDESTAL
200

250
6MM THK BASEPLATE

550
25

1,100
SSC2

SSC2

550
PLAN - BASEPLATE (SSC2) PLAN - PEDESTAL (SSC2)
1 Scale: 1/10 MTS
3 Scale: 1/10 MTS

F3 PLAN
4 Scale: 1/20 MTS

SSC2

12MM THK. BASEPLATE

T.O.S
50MM NON-SHRINK GROUT
W/ HEX. NUTS

80
100MM THK SLAB

100MM GRAVEL BED


300

950

1,200
PEDESTAL

250
BOTHWAYS

SECTION DETAIL (SSC2) F3 SECTION


2 Scale: 1/10 MTS
5 Scale: 1/20 MTS

OWNED BY: CONSULTANT CHECKED BY: SUBMITTED BY: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DRAWING NO:

PREPARED BY: REVIEWED BY: PLAN - BASEPLATE


SECTION DETAIL
PLAN - PEDESTAL
ST-CNU-S-203
MARK STEVEN C. CONSTRUCTION OF CEBU F3 PLAN
GREGORIO E. ORIGENES KIM JONG MIN ELMAN JOSE B. MARTINEZ NORVIN V. IMBONG JOHAN G. MARTINEZ PASTOR ANNELI R. LONTOC
KUNHWA EXPERT DIRECTOR, KUNHWA ARCHITECT III - CEBU BRT PIU DEPUTY PROJECT MANAGER PROGRAM MANAGER ASSISTANT SECRETARY UNDERSECRETARY
BUS RAPID TRANSIT PROJECT F3 SECTION

PRC NO: 7901 DATE: 07/19/2021


ARCHITECTURAL AND PLUMBING PLANS FOR SYSTEMS AND STAKEHOLDER
RELATIONS - CEBU BRT PIU
BRT - NPMO FOR ROAD TRANSPORT
AND INFRASTRUCTURE
PHILIPPINE RAILWAY
INSTITUTE AND OIC FOR
PACKAGE 1
BRT PROJECTS
PTR NO: 8547099 DATE: 01/12/2021

TIN: 104-124-039-000
10107

5053 5053

4353 700 700 4353

4440

2220 2220
50
B SSB2 21
00
43
B2
SS

50
21
500

SSB2
A

1200
SSB1 SSB1

1000
96

70
70

96
B1
SS

1000
6300
6364

12
00
1000
5100
SSB1

10
00
1000

10
0 0
1100

10
00
70
80

58
80

10
00
4769 4769

10
00
ROOF FRAMING PLAN - TYPE 1 ROOF FRAMING PLAN - TYPE 1 (UPPER)
1 2

88
Scale: 1/100 MTS Scale: 1/100 MTS

0
5053
10106

5053 B A 3 Scale: 1/100 MTS


4353 700 700 4353 4000

400 500 3100


SSB2

UPPER ROOF LINE UPPER ROOF LINE


+4,610) +4,610)
498

498
SECONDARY ROOF LINE SECONDARY ROOF LINE
+4,112) +4,112)

SSB2
1612

SSB1 SSB1
4610

4610
4112

4112
SSC1 SSC1
2500

T.O.S -80

(T.O.S (T.O.S -80)


220

220

TYPE 1 ELEVATION TYPE 1 SECTION


5 Scale: 1/100 MTS
6 Scale: 1/100 MTS

OWNED BY: CONSULTANT CHECKED BY: SUBMITTED BY: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DRAWING NO:

PREPARED BY: REVIEWED BY: ROOF FRAMING PLAN - TYPE 1

ST-CNU-S-204
MARK STEVEN C. CONSTRUCTION OF CEBU TYPE 1 ELEVATION
TYPE 1 SECTION
GREGORIO E. ORIGENES KIM JONG MIN ELMAN JOSE B. MARTINEZ NORVIN V. IMBONG JOHAN G. MARTINEZ PASTOR ANNELI R. LONTOC
KUNHWA EXPERT DIRECTOR, KUNHWA ARCHITECT III - CEBU BRT PIU DEPUTY PROJECT MANAGER PROGRAM MANAGER ASSISTANT SECRETARY UNDERSECRETARY
BUS RAPID TRANSIT PROJECT
PRC NO: 7901 DATE: 07/19/2021
ARCHITECTURAL AND PLUMBING PLANS FOR SYSTEMS AND STAKEHOLDER
RELATIONS - CEBU BRT PIU
BRT - NPMO FOR ROAD TRANSPORT
AND INFRASTRUCTURE
PHILIPPINE RAILWAY
INSTITUTE AND OIC FOR
PACKAGE 1
BRT PROJECTS
PTR NO: 8547099 DATE: 01/12/2021

TIN: 104-124-039-000
10366

5183 5183

4483 700 700 4483

00
12
22
14
4410
44
2 8 2205 2205

00
10
22
14

00
10
300

47
A

74
SSB2

00
10

1200
74
62
00
66

74

10
74

66

1000
SS
B2

00
10

1000
6171

5800
47
5872

SSB2 SSB2

12
SSB1

4600

1000
1000
SS
B1

600
SSB1

4973 4973

ROOF FRAMING PLAN - TYPE 2 ROOF FRAMING PLAN - TYPE 2 (UPPER) ROOF FRAMING PLAN - TYPE 2 (BELOW)
1 Scale: 1/100 MTS
2 Scale: 1/100 MTS
3 Scale: 1/100 MTS

10366 B' A
5183 5183 4000

4483 700 700 4483 600 300 3100


SSB2

UPPER ROOF LINE UPPER ROOF LINE


+4,602) +4,602)
489

489
SECONDARY ROOF LINE SECONDARY ROOF LINE
+4,112) +4,112)

SSB2
1612

SSB1 SSB1
4602

4602

4112
4112

SSC1 SSC1
2500

T.O.S -80
(T.O.S (T.O.S -80)
220

220

TYPE 2 ELEVATION TYPE 2 SECTION


5 Scale: 1/100 MTS
6 Scale: 1/100 MTS

OWNED BY: CONSULTANT CHECKED BY: SUBMITTED BY: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DRAWING NO:

PREPARED BY: REVIEWED BY: ROOF FRAMING PLAN - TYPE 1

ST-CNU-S-205
MARK STEVEN C. CONSTRUCTION OF CEBU TYPE 2 ELEVATION
TYPE 2 SECTION
GREGORIO E. ORIGENES KIM JONG MIN ELMAN JOSE B. MARTINEZ NORVIN V. IMBONG JOHAN G. MARTINEZ PASTOR ANNELI R. LONTOC
KUNHWA EXPERT DIRECTOR, KUNHWA ARCHITECT III - CEBU BRT PIU DEPUTY PROJECT MANAGER PROGRAM MANAGER ASSISTANT SECRETARY UNDERSECRETARY
BUS RAPID TRANSIT PROJECT
PRC NO: 7901 DATE: 07/19/2021
ARCHITECTURAL AND PLUMBING PLANS FOR SYSTEMS AND STAKEHOLDER
RELATIONS - CEBU BRT PIU
BRT - NPMO FOR ROAD TRANSPORT
AND INFRASTRUCTURE
PHILIPPINE RAILWAY
INSTITUTE AND OIC FOR
PACKAGE 1
BRT PROJECTS
PTR NO: 8547099 DATE: 01/12/2021

TIN: 104-124-039-000
400 1200 900 1200

SSB2

SSB2

UPPER ROOF LINE


+4,610)
R
10
38

SECONDARY ROOF LINE


1130

+4,112)

SSB1

1132
SSB1
4610

4112
SSC1 SSC1
3480

2980
T.O.S -80 T.O.S -80

(T.O.S -80) (T.O.S -80)


220

220
SECTION BLOW-UP 01 SECTION BLOW-UP 02
1 Scale: 1/50 MTS
2 Scale: 1/50 MTS

OWNED BY: CONSULTANT CHECKED BY: SUBMITTED BY: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DRAWING NO:

PREPARED BY: REVIEWED BY: SECTION BLOW-UP DETAILS 01


SECTION BLOW-UP DETAILS 02
ST-CNU-S-206
MARK STEVEN C. CONSTRUCTION OF CEBU
GREGORIO E. ORIGENES KIM JONG MIN ELMAN JOSE B. MARTINEZ NORVIN V. IMBONG JOHAN G. MARTINEZ PASTOR ANNELI R. LONTOC
KUNHWA EXPERT DIRECTOR, KUNHWA ARCHITECT III - CEBU BRT PIU DEPUTY PROJECT MANAGER PROGRAM MANAGER ASSISTANT SECRETARY UNDERSECRETARY
BUS RAPID TRANSIT PROJECT
PRC NO: 7901 DATE: 07/19/2021
ARCHITECTURAL AND PLUMBING PLANS FOR SYSTEMS AND STAKEHOLDER
RELATIONS - CEBU BRT PIU
BRT - NPMO FOR ROAD TRANSPORT
AND INFRASTRUCTURE
PHILIPPINE RAILWAY
INSTITUTE AND OIC FOR
PACKAGE 1
BRT PROJECTS
PTR NO: 8547099 DATE: 01/12/2021

TIN: 104-124-039-000
900 800 1850 450

R3
INFORMATION POLE LINE

00
+3,380)
933

R30
0

SSC2
3380

2447

T.O.S -80

(T.O.S -80)
220

SECTION BLOW-UP 03
1 Scale: 1/50 MTS

OWNED BY: CONSULTANT CHECKED BY: SUBMITTED BY: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: DRAWING NO:

PREPARED BY: REVIEWED BY: SECTION BLOW-UP DETAILS 03

ST-CNU-S-207
MARK STEVEN C. CONSTRUCTION OF CEBU
GREGORIO E. ORIGENES KIM JONG MIN ELMAN JOSE B. MARTINEZ NORVIN V. IMBONG JOHAN G. MARTINEZ PASTOR ANNELI R. LONTOC
KUNHWA EXPERT DIRECTOR, KUNHWA ARCHITECT III - CEBU BRT PIU DEPUTY PROJECT MANAGER PROGRAM MANAGER ASSISTANT SECRETARY UNDERSECRETARY
BUS RAPID TRANSIT PROJECT
PRC NO: 7901 DATE: 07/19/2021
ARCHITECTURAL AND PLUMBING PLANS FOR SYSTEMS AND STAKEHOLDER
RELATIONS - CEBU BRT PIU
BRT - NPMO FOR ROAD TRANSPORT
AND INFRASTRUCTURE
PHILIPPINE RAILWAY
INSTITUTE AND OIC FOR
PACKAGE 1
BRT PROJECTS
PTR NO: 8547099 DATE: 01/12/2021

TIN: 104-124-039-000