Nozzle Loads - 115-E-0309
Nozzle Loads - 115-E-0309
109-E-0021
Nozzle Mark Size (NPS) FA (Kgf) FL (Kgf) Fc (Kgf)
S1 12" -2695 1650 1650
S2 12" -1113.2 2970 -1650
HE-4223A
Nozzle Mark Size (NB) FA (Kgf) FL (Kgf) Fc (Kgf)
T1 200 -540 800 800
T2 200 -540 800 800
S1 100 -270 400 400
S2 80 -202 300 300
AD DATA / SUPPORT
OPERATING CASE (DBE) OPERATING CASE (MCE)
SHEAR FORCE
(Kgf)
300 300 112 90 67
-4375 -1350 -9000 -2560 -4900
-3600 1000 7500 2200 -5300 Moment
1000 1500 -3500 -5500 -6000 (Kgf-m)
FL (Kgf) Fc (Kgf) MT (Kgf-m) ML (Kgf-m) MC (Kgf-m)
FOUNDATION LOADS (PER SADDLE)
Wind (Transverse) 312
Wind (Longitudinal) 50
Seismic (Transverse) 254
Seismic (Longitudinal) 508
Wind (Transverse) 174
Wind (Longitudinal) 28
Seismic (Transverse) 142
Seismic (Longitudinal) 283
DESIGN DATA FOR INTERNAL COIL
FLUID NAME
FLUID TYPE
DESIGN PRESSURE Kgf/cm2(g)
o
DESIGN TEMPERATURE C
VISCOSITY @ OP. CONDITION cP
DENSITY @ OP. CONDITION Kg/m 3
WELD JOINT EFFICIENCY
NTERNAL COIL
TW / CW
LIQUID
3
100
0.35 / 1
1000
1
AS PER FIGURE TYPE-2,3,4 OF FIGURE 9.2 ( clause 9.4 of Appendix-9 of ASME Section VIII , Div-1, Ed. 2019.
END CLOSURE THICKNESS CALCULATION (trc) & JACKETED MAXIMUM SPACE WIDTH (j) CALCULATION.
j= 155 mm
trc = 18.42 mm
Figure 9.5 (sketch f-3)
3 Kgf/cm2 (g)
510 mm
155 mm
1397 Kgf/cm2 (g)
10 mm
570 mm
6 mm
18.42 mm
CHANGES IN MDS DUE TO RE
Item no. Data as per Old PDS (Rev-0)
T-1508
Insulation Type / Thk : Not Applicable
- Notable difference in vessel weights (almost reduction of 4 tonne from vessel weight)
due to deletion of external coil & the same need to be updated in MDS
- Updating the same in p-v elite model.
10
11
12
13
14
15
16
17
18
Scope Split Matrix for Agitator
Description
Vendor shall design the agitator as per available data in MDS. In addition to supply of agitator, mechanical seal , motor, gear b
to vendor’s fabricator shop , also testing & inspection of agitator shall be performed by Agitator vendor.
FEA analysis of top cone roof due to agitator loads (both static & dynamic loads) is in tank fabricator's scope. FEA shall be
performed in latest version of Ansys software. If roof thickness changes, Vendor to inform customer accordingly. For reactor ,
head shall be check for agitator dynamic loads through WRC analysis.
Agitator vendor shall provide QAP for approval before submitting agitator drawing.
Tank Vendor to provide independent support structure for mounting agitator for PP-FRP Tanks . Since agitator load cannot be
directly transferred to top head of PP-FRP tank. (This point applicable to PP-FRP tanks only)
Load trial running shall be performed (as mentioned in datasheet) both at vessel fabricator shop & at client site. Agitator vend
scope shall be supervision of agitator assembly & load trail running both at vessel fabricator’s shop & at client site. In case of a
failure , agitator vendor shall be responsible & shall rectify the same.
Vessel/tank fabricator shall perform load trial running of agitator for 2 hours under operating pressure with full working volum
under full vacuum condition , shall be done by the vessel/tank vendor, under the supervision of agitator vendor who will visit a
shop.
Manpower, all lifting tools & tackles, lubricants , power supply & other mechanical & electrical accessories etc. required for ag
assembly & load trial running , shall be provided by the vessel fabricator at shop.
Mechanical seal fitting shall be done by the agitator vendor both at vessel fabricator’s shop & at client site.
Shaft locking shall be done at 2/3 places as per requirement , by considering the safety & to avoid any damages to the shaft or
equipment.
Gear box & motor shall be packed separately in original safe packing material such as wooden boxes etc. to avoid any damage
transportation .
Small components shall be packed separately in suitable safe packing such as wooden boxes
First fill of lubricant is in vessel/tank manufacturer's scope. Also Vendor to provide gear box oil & its oil specification.
Before dispatch the equipment shall be packed on strong wooden reparse (or equivlent safe supporting system) and tied up w
wire rope other suitable means.
Vendor shall depute their service engineer at free of cost for Pre-commissioning check, Erection of Mechanical Seal and Gear B
after erection of Reactor on Site. Gearbox and Agitator has to be mounted on the Vessel/tank at the time of delivery. Commis
of the Mechanical seal and Final Water Trail to be conducted at site in the presence of Service Engineer. Agitator Shaft and Bl
should be locked with thermocol and Wooden Sleepers, inside the vessel.
X : Under Vendor's Scope
X
Motor Power consumption (in calculated horsepower (CHP)) :
D= 1.4 m CHP =
N= 70 RPM
Np = 0.45
No. of Impeller = 3 nos.
Specific Gravity = 1.32
CHP = 14.676 HP
Tube OD = 19.05 mm
Tube thk = 1.65 mm
At = 90.19513 mm2
0.902 cm2
St = tube allowable stress = 1328 kgf/cm2
fe = 1
fy = 1
L(test) = 11 KN
1122 kgf
fr(test) = 0.93667
Tube OD = 25.4 mm
Tube thk = 2.6 mm
At = 186.2336 mm2
1.862 cm2
St = tube allowable stress = 873 kgf/cm2
fe = 1
fy = 1
L(test) = 16 KN
1632 kgf
fr(test) = 1.003983
OR MOCK UP TEST
Tube OD = 19.05 mm
Tube thk = 1.65 mm
At = 90.19513 mm2
0.902 cm2
St = tube allowable stress = 1325
fe = 1
fy = 1
L(test) = 11 KN
1122 kgf
fr(test) = 0.9
Tube OD = 25.4 mm
Tube thk = 2.11 mm
At = 154.3838 mm2
1.544 cm2
St = tube allowable stress = 1746 kgf/cm2
fe = 1
fy = 1
L(test) = 26.5 KN
2702 kgf
fr(test) = 1.002291
CALCULATION FOR DYNAMIC LOADS OF AGITATORS
(Reference : Appendix-D of E.E.U.A Handbook No.9 , Agitator Selection & Design )
Input Value
8 Jamming factor = 1
= tm / (0.75 x r) =
= 1.3 inch
round off to = 1.9 inch
Shaft diameter = 48 mm
fy = 2.35 mPa
Mt = 30xP / 3.14 x N = 2.65 kN-m
= 270.1325 kgf-m
Sr. Item no. Document Description Document Number Revision
No. No.
Mechanical Datasheet for Isolation /
R-S0117 BAR-SUL-200-SPS-001 R04
1 Hydrolysis Vessel
Mechanical Datasheet for Ethoxylation
R-S0118 BAR-SUL-200-SPS-003 R03
2 Vessel