I. ENUMERATION.

Enumerate the following:

1. Policy Objectives

Ans:​ It is the policy of the government to adopt a set rules and regulations covering
government contracts for infrastructure and other construction projects.
2. Requirements for Prospective Contractors
○ Legal Requirements
○ Technical Requirements
○ Financial Requirements

II. MODIFIED TRUE OR FALSE.

Indicate whether the statement is true or false. Write ​T ​if true and ​F ​if false before each number.
If the statement is false, underline and change the identified word or phrase to make the
statement true. Write the correct word or phrase after each statement.

T​ 1. The Government shall promote maximum participation of eligible Filipino contractors in


all construction projects.
T 2. The contract may be awarded to the lowest prequalified bidder whose bid as evaluated
complies with all the terms and conditions in the call for bid and is the most advantageous
to the Government.
F​3.ans Section 9
● Section 5 stated that “A change order or extra work order may be issued only for
works necessary for the completion of the project and, therefore, shall be within
the general scope of the contract as bidded and awarded.”
F​ ans. Government
4. Inspection of the contract work shall be made by the ​contractor while such contract
work is in progress to ascertain that the completed works comply in all respects with the
standards and requirements set forth in the contract documents.
T​ 5. Construction projects shall generally be undertaken by contract after competitive public
bidding.

III. ESSAY.

Elaborate the “Government’s Right to Take Over Contract Work” in your own understanding.

Ans. In my own understanding the contractor needs to avoid violation stated in section 11 so
that the governments will not take over contrract work.