Name of Project :-Naar ISP


Location:Narfa Bhumi RM-2,Manang

Design of Main Canal and Branches


Canal Water
Manning`s Mean Bank Top
Ground 1V: Height Slope of Slope of Free Bed Surface
Chainage Q B Roughness Area (A) P R Flow Elevation( Remarks
Elevation mH (H) Canal Canal Board Elevation Elevation
Coeff. Velocity m)
(m) (m)
m m Cu.m/s m m n m Sq.m m m m/s Required Proposed m m m m
0 4280 0.035 0.5 0 0.015 0.4 0.2 1.3 0.154 0.18 0.000 0.1 4279.7 4280.1 4280.2
50 4278.5 0.035 0.5 0 0.015 0.4 0.2 1.3 0.154 0.18 0.000 0.030 0.1 4278.2 4278.6 4278.7
100 4276.5 0.035 0.5 0 0.015 0.4 0.2 1.3 0.154 0.18 0.000 0.040 0.1 4276.2 4276.6 4276.7
150 4275.9 0.035 0.5 0 0.015 0.4 0.2 1.3 0.154 0.18 0.000 0.012 0.1 4275.6 4276.0 4276.1
200 4275.5 0.035 0.5 0 0.015 0.4 0.2 1.3 0.154 0.18 0.000 0.008 0.1 4275.2 4275.6 4275.7
250 4275 0.035 0.5 0 0.015 0.4 0.2 1.3 0.154 0.18 0.000 0.010 0.1 4274.7 4275.1 4275.2
300 4273.9 0.035 0.5 0 0.015 0.4 0.2 1.3 0.154 0.18 0.000 0.022 0.1 4273.6 4274.0 4274.1
350 4272 0.035 0.5 0 0.015 0.4 0.2 1.3 0.154 0.18 0.000 0.038 0.1 4271.7 4272.1 4272.2
400 4270.5 0.035 0.5 0 0.015 0.4 0.2 1.3 0.154 0.18 0.000 0.030 0.1 4270.2 4270.6 4270.7
450 4269.9 0.035 0.5 0 0.015 0.4 0.2 1.3 0.154 0.18 0.000 0.012 0.1 4269.6 4270.0 4270.1
500 4268.9 0.035 0.5 0 0.015 0.4 0.2 1.3 0.154 0.18 0.000 0.020 0.1 4268.6 4269.0 4269.1
550 4268.3 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.012 0.1 4268.0 4268.2 4268.3
600 4267.9 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.008 0.1 4267.6 4267.8 4267.9
650 4267.5 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.008 0.1 4267.2 4267.4 4267.5
700 4266.9 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.012 0.1 4266.6 4266.8 4266.9
750 4266.4 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.010 0.1 4266.1 4266.3 4266.4
800 4264 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.048 0.1 4263.7 4263.9 4264.0
850 4263.6 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.008 0.1 4263.3 4263.5 4263.6
900 4262.4 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.024 0.1 4262.1 4262.3 4262.4
950 4261.8 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.012 0.1 4261.5 4261.7 4261.8
1000 4260.1 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.034 0.1 4259.8 4260.0 4260.1

____________ _______________ ______________


Prepared By: Checked By: Approved By:
2

Design of Main Canal and Branches


Canal Water
Manning`s Mean Bank Top
Ground 1V: Height Slope of Slope of Free Bed Surface
Chainage Q B Roughness Area (A) P R Flow Elevation( Remarks
Elevation mH (H) Canal Canal Board Elevation Elevation
Coeff. Velocity m)
(m) (m)
m m Cu.m/s m m n m Sq.m m m m/s Required Proposed m m m m
1050 4259.1 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.020 0.1 4258.8 4259.0 4259.1
1100 4258.9 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.004 0.1 4258.6 4258.8 4258.9
1150 4239 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.398 0.1 4238.7 4238.9 4239.0
1200 4239 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.000 0.1 4238.7 4238.9 4239.0
1250 4236 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.060 0.1 4235.7 4235.9 4236.0
1300 4235 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.020 0.1 4234.7 4234.9 4235.0
1350 4235 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.000 0.1 4234.7 4234.9 4235.0
1380 4230 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.100 0.1 4229.7 4229.9 4230.0
1430 4214 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.320 0.1 4213.7 4213.9 4214.0
1480 4211 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.060 0.1 4210.7 4210.9 4211.0
1530 4210 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.020 0.1 4209.7 4209.9 4210.0
1580 4207 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.060 0.1 4206.7 4206.9 4207.0
1630 4206 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.020 0.1 4205.7 4205.9 4206.0
1680 4205 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.020 0.1 4204.7 4204.9 4205.0
1730 4205 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.000 0.1 4204.7 4204.9 4205.0
1780 4205 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.000 0.1 4204.7 4204.9 4205.0
1830 4204 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.020 0.1 4203.7 4203.9 4204.0
1880 4200 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.080 0.1 4199.7 4199.9 4200.0
1930 4197 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.060 0.1 4196.7 4196.9 4197.0
1980 4195 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.040 0.1 4194.7 4194.9 4195.0
2030 4188 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.140 0.1 4187.7 4187.9 4188.0
2080 4174 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.280 0.1 4173.7 4173.9 4174.0
2130 4171 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.060 0.1 4170.7 4170.9 4171.0
2180 4167 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.080 0.1 4166.7 4166.9 4167.0
2230 4164 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.060 0.1 4163.7 4163.9 4164.0
2280 4156 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.160 0.1 4155.7 4155.9 4156.0
2330 4149 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.140 0.1 4148.7 4148.9 4149.0
2380 4136 0.035 0.3 0 0.015 0.2 0.06 0.7 0.086 0.58 0.002 0.260 0.1 4135.7 4135.9 4136.0

____________ _______________ ______________


Prepared By: Checked By: Approved By:
Design of Cascade Canal

Discharge through Canal = 0.035 cumes

Width of canal = 0.3 m


Discharge per unit width = 0.12 cumes/m

Height of step = 0.4 m

D = 0.003

Ld = 0.37

Length of Step = 0.47

Provide Length of step = 0.5 m


Provide Height of step = 0.4 m
1.9 0 4280 0 0 0 4265
0.42 50 4278.5 0 100 100 4260
100 4276.5 0 200 200 4255
150 4275.9 0 250 250 4250
200 4275.5 0 340 340 4244
250 4275 0 450 450 4239
300 4273.9 0 490 490 4235
350 4271.4 0 510 510 4232
400 4270.5 0 570 570 4228
450 4269.9 0 600 600 4225
500 4268.9 0 650 650 4224
550 4268.3 0 700 700 4221
600 4267.9 0 750 750 4218
650 4267.5 0 770 770 4214
700 4266.9 0 860 860 4208
750 4266.4 0 910 910 4200
800 4264 0 960 960 4196
850 4263.6 1 20 1020 4190
900 4262.4 1 60 1060 4186
950 4261.8
1000 4260.1
1050 4259.1
1100 4258.9
1150 4239
1200 4239
1250 4236
1300 4235
1350 4235
1380 4230
1430 4214
1480 4211
1530 4210
1580 4207
1630 4206
1680 4205
1730 4205
1780 4205
1830 4204
1880 4200
1930 4197
1980 4195
2030 4188
2080 4174
2130 4171
2180 4167
2230 4164
2280 4156
2330 4149
2380 4136
0 4230
100 4225
200 4223
268 4221
7
Government of Nepal
Water Resources and Irrigation Development Division Office
Dadeldhura
Sudurpaschim Province

Name of Project :-Kalikhet ISP


0.00
Design of Main Canal (2396 m)
Manning` Canal Water
Mean Bank Top Maximu
Chainage Ground Q B 1V:mH s Height Area (A) P R Flow Slope of Slope of Free Bed Surface Elevation m
Elevation Roughnes (H) Canal Canal Board Elevation Elevation
Velocity (m) velocity
s Coeff. (m) (m)
m m Cu.m/s m m n m Sq.m m m m/s Required Proposed m m m m
0 2994 0.03 0.3 0 0.015 0.2 0.06 0.7 0.086 0.50 0.001 0.1 2993.982 2994.182 2994.282
25 2993.808 0.03 0.3 0 0.015 0.2 0.06 0.7 0.086 0.50 0.001 0.005 0.1 2993.724 2993.924 2994.024 0.93
50 2989.051 0.03 0.3 0 0.015 0.2 0.06 0.7 0.086 0.50 0.001 0.044 0.1 2991.500 2991.700 2991.800 2.73
75 2984.96 0.03 0.3 0 0.015 0.2 0.06 0.7 0.086 0.50 0.001 0.050 0.1 2989.000 2989.200 2989.300 2.90
100 2980.579 0.03 0.3 0 0.015 0.2 0.06 0.7 0.086 0.50 0.001 0.170 0.1 2980.518 2980.718 2980.818 5.34
125 2976.692 0.03 0.3 0 0.015 0.2 0.06 0.7 0.086 0.50 0.001 0.073 0.1 2976.849 2977.049 2977.149 3.51
150 2973.094 0.03 0.3 0 0.015 0.2 0.06 0.7 0.086 0.50 0.001 0.076 0.1 2973.034 2973.234 2973.334 3.58
175 2968.653 0.03 0.3 0 0.015 0.2 0.06 0.7 0.086 0.50 0.001 0.096 0.1 2968.233 2968.433 2968.533 4.02

____________ _______________ ______________


Prepared By: Checked By: Approved By:
8
Government of Nepal
Water Resources and Irrigation Development Division Office
Dadeldhura
Sudurpaschim Province

Name of Project :-Kalikhet ISP


0.00
Design of Main Canal (2396 m)
Manning` Canal Water
Mean Bank Top Maximu
Chainage Ground Q B 1V:mH s Height Area (A) P R Flow Slope of Slope of Free Bed Surface Elevation m
Elevation Roughnes (H) Canal Canal Board Elevation Elevation
Velocity (m) velocity
s Coeff. (m) (m)
m m Cu.m/s m m n m Sq.m m m m/s Required Proposed m m m m
0 2994 0.03 0.3 0 0.015 0.2 0.06 0.7 0.086 0.50 0.001 0.1 2967.845 2968.045 2968.145
25 2993.808 0.03 0.3 0 0.015 0.2 0.06 0.7 0.086 0.50 0.001 0.108 0.1 2962.427 2962.627 2962.727 4.27
50 2989.051 0.03 0.3 0 0.015 0.2 0.06 0.7 0.086 0.50 0.001 0.110 0.1 2956.910 2957.110 2957.210 4.31
75 2984.96 0.03 0.3 0 0.015 0.2 0.06 0.7 0.086 0.50 0.001 0.105 0.1 2951.666 2951.866 2951.966 4.20
100 2980.579 0.03 0.3 0 0.015 0.2 0.06 0.7 0.086 0.50 0.001 0.088 0.1 2947.276 2947.476 2947.576 3.84
125 2976.692 0.03 0.3 0 0.015 0.2 0.06 0.7 0.086 0.50 0.001 0.081 0.1 2943.223 2943.423 2943.523 3.69
150 2973.094 0.03 0.3 0 0.015 0.2 0.06 0.7 0.086 0.50 0.001 0.076 0.1 2939.436 2939.636 2939.736 3.57
175 2968.653 0.03 0.3 0 0.015 0.2 0.06 0.7 0.086 0.50 0.001 -0.004 0.1 2939.636 2939.836 2939.936 #NUM!

____________ _______________ ______________


Prepared By: Checked By: Approved By:
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Name of Project :-Paltaksa to Taku ISP


Location:Namkha GP-6,Humla
Name of Work: Design of Pipe (From BPT to Reservoir)

RL of Intake = 3141 m
RL of End of Pipe = 2986 m
Difference = 155 m
Length of Pipe = 705 m
Slope = 0.219858
Radius of Pipe = 0.09 m 180 mm Pipe
Depth of Flow = 0.1 m
Area of Partially filled Pipe = 0.01452 m2
Wetted Perimeter = 0.302785 m
Hydraulic Radius 0.047954 m
Manning's Coefficient = 0.009

Discharge 0.099848 m3/s


Velocity 6.876678 m/s
Permissible Velocity 7.2 m/s
Hence 180 mm Pipe Class 12.5 kgf is Prescribed
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Name of Project :-Paltaksa to Taku ISP


Location:Namkha GP-6,Humla
Name of Work: Design of Pipe (From Reservoir to BPT)

RL of Intake = 2972 m
RL of End of Pipe = 2889 m
Difference = 83 m
Length of Pipe = 205 m
Slope = 0.404878
Radius of Pipe = 0.09 m 180 mm Pipe
Depth of Flow = 0.06 m
Area of Partially filled Pipe = 0.001546 m2
Wetted Perimeter = 0.12236 m
Hydraulic Radius 0.012637 m
Manning's Coefficient = 0.009

Discharge 0.005931 m3/s


Velocity 3.835692 m/s
Permissible Velocity 7.6 m/s
Hence 200 mm Pipe Class 12.5 kgf is Prescribed