REPUBLIC OF THE PHILIPPINES

OFFICE OF THE BUILDING


MAIN REINFORCEMENTS TO BE
OFFICIAL
CONTINUOUS (TOP & BOT. BARS) CONSOLACION, CEBU
30 BAR Ø (min)
30 BAR Ø 0.060 30 BAR Ø 30 BAR Ø (min) MAIN REINFORCEMENTS
RECOMMENDING APPROVAL :
25

DEPRESSION
D = FOR BEAM
2t = FOR SLAB

VERIFY
2-12mmØ HOR. BAR HEAD STRUCTURAL SECTION DATE

t/2
D/2

"t"
t/2
Ø10 X 1.0m LONG @ 300 O.C. 10mmØ LAT. TIES SPACED
SLOPE 1:2 V:H (PLACED AT MID-DEPTH OF SLAB @ 150mm O.C. (TYP.) APPROVED BY :

D/2
30 BAR Ø (min)
D = FOR BEAM IF THE LOCATION OF THE CONST. ALTERNATELY PLACED
2t = FOR SLAB JOINT IS NOT WITHIN THE MIDDLE
THIRD.
PROVIDE 2 - Ø25 SHEAR BARS EACH
SIDE IF BEAM CONSTRUCTION JOINT BUILDING OFFICIAL DATE
IS NOT WITHIN THE MIDDLE THIRD SUSPENDED SLAB CONSTRUCTION
OF THE SPAN BEAM / SLAB CHANGE SOFFIT JOINT DETAIL
DETAIL
BEAM CONSTRUCTION TYP. CHB LINTEL BEAM
JOINT DETAIL DETAIL

CHB "t"

PROPOSED PIPE SLEEVE


2D (NO PIPE SLEEVE LOCATIONS
A PIPE SLEEVE
SCH. 40 G.I. PIPE SLEEVE REQUIRED
SHALL BE ALLOWED W/IN
2 - EXTRA STIR. EA. SIDE
THIS ZONE (TYP.))
OF SLEEVE
2D 2D CONCRETE FILLER

PIPE
(T 500

FACE OF 2 EXTRA STIRRUPS CONCRETE


.)
YP

TOP BARS SUPPORT EACH SIDE OF SLEEVE FILLER


2-12mmØ VERT. BAR
TOP BARS CHB VERT. REINF.
Ø16 EXTRA BARS (SEE SCHED.)

40
MASTIC SEALANT 10mmØ LAT. TIES SPACED @ 150mm
E.F. (DIAGONALS)

12mm GAP
EACH SIDE O.C. (TYP.) ALTERNATELY PLACED

(MIN.)
D

PIPE SLEEVE PIPE SLEEVE

D/5
PIPE SLEEVE
Ø 16 CROSS ANCHORS COMPRESSIBLE MATERIALS

40
REQUIRED NOTE: PROVIDE STIFFENER COLUMN AT EVERY 3.0 METER MAX. SPACING
WELDED TO SLEEVE
Ø 16 EXTRA BARS E.F. CHB WALL
(TYPICAL) BOTTOM BARS
BOT BARS
STIR. AS SCHED.
SECTION A -A OTES : SECTION A - A
FACE OF 4d (MIN.)
PIPE SLEEVE MAXIMUM 1. SEEK STRUCT'L ENGINEER'S
SUPPORT
0.30L L/2 0.30L DIAMETER APPROVAL FOR PIPE SLEEVES TYP. STIFFENER COLUMN DETAILS
IS : (LEAST GOVERNS) W/ DIAMETERS BIGGER THAN
LIMIT LOCATION OF PIPE SLEEVE
THE MAXIMUM STIPULATED.
PIPE SLEEVE THRU WALL ON CHB WALLS
L
LEGEND : A) 15 OF BEAM DEPTH
2. PIPE SLEEVES SHALL BE LOCATED
1. D = DEPTH OF BEAM / GIRDER WITHIN TENSION ZONES OF BEAM.
B) 100mm
2. d = PIPE SLEEVE DIAMETER
3. NO PIPE SLEEVES SHALL BE
ALLOWED AT TWICE THE
PIPE SLEEVE THRU BEAM DETAIL BEAM DEPTH (2D) FROM
THE SUPPORT.

W = 1.20m. (max) W = 1.20m. (max)

CHB CHB CHB


WALL WALL WALL
STIFFENER
COLUMNS

2 - 12mm Ø TOP & 2 - 12mm Ø TOP &


BOTTOM BARS BOTTOM BARS STIFFENER
BEAMS
CHB CHB CHB
WINDOW WALL WALL WALL
OPENING

DOOR 16mm Ø VERTICAL BAR


H

OPENING

CHB CHB
WALL WALL

16mm Ø VERTICAL BAR

TYPICAL STIFFENER BEAM/COLUMN ELEVATION

TYPICAL DOOR OPENING TYPICAL WINDOW OPENING

S E A L PROJECT TITLE : APPROVED BY SHEET CONTENT: SHEET NO.:


STEVE RESTTY JAYME AS SHOWN
CIVIL/STRUCTURAL ENGINEER

PROPOSED THREE-STOREY BUILDING ALICIA SALVACION M. TERARIRAY 02


PRC NO.: 178436
REG. DATE: 11-25-2019
TIN NO.: 770637368
PTR NO.: 1036982
DATE: 11-19-2020
PLACE: MANDAUE CITY LOCATION: NANGKA, CONSOLACION, CEBU ADDRESS: JAGOBIAO, MANDAUE CITY