Professional Documents
Culture Documents
Guide Document For Itemized Spring Hangers and Tie-Rod Data Sheets
Guide Document For Itemized Spring Hangers and Tie-Rod Data Sheets
Page
GE 353 3 11 0 1 / 19
DOCUMENT REVISIONS
Sections changed in last revision are identified by a vertical line in the margin
INDEX
1. PURPOSE 3
2. REFERENCE DOCUMENTS 3
1. PURPOSE
The purpose of this Guide Document is to define the informations to be completed for
spring hangers and tie-rod hangers items supplied by MANUFACTURERS per data
sheets.
NOTE : Document is illustrated with parts of supplier catalogue . Origin is only to clarify
the text and examples and don’t intend the choice of a selected supplier.
2. REFERENCE DOCUMENTS
This document complete :
00000–00-JSD-1300-10 : JOB SUPPORT DESIGN SPECIFICATION
00000–00-JSS-1383-01 : JOB SUPPLIER SPECIFICATION FOR VARIABLE,
CONSTANT AND TIE-RODS HANGERS.
GE-353-3-10: GUIDE DOCUMENT FOR SPRING HANGER DETERMINATION
o The Excel Data Sheets with all technical information’s and requirements
for supplier
1/ , 2/ et 3 SPRING MARKING N°
UNIT NUMBER : per contract . Unit number may be for different UNITS .
HV for Hanger Variable: As specified in Support Mark . Refer to serial STC 1393
00 for mounting possibilities.
8/ INSULATION THICK: Specify the type and thickness except for personal
protection.
9/ TEMPERATURE: Specify the maximum design temperature or specific
condition at line junction from calculation note.
CAUTION : Read NOTES at the left top of the data sheet.
TEMPERATURE to be specified on cold lines will be the temperature at
connecting point out of insulation.( e.g : minimum ambient temperature from the
project.)
10/ CALCULATION REPORT: Specify if required the process unit per calculation
note, the calculation note number and the concerned node(s) of spring.
For TYPES 20, 21,22, 23, 25 of HV02 ( independent double springs ) specify :
Quantity 2 ( in column quantity) for springs with same loads and specify load by
spring ( e.g: 20 kN x 2 in column REMARK (point 22)
Qauntity 1 with 2 different item numbers in the column SPRING MARKING ( e.g :
HV-1522 and 1523 on ATTACHMENT 1) if loads are not equal ( may be specific on
CN).
For spring support with base height is directly in relation per supplier catalog, so for
installation it shall be provided a free heigth of U + 100 mm except if supplier is defined
early in time at the detailed support phase.
operating
displacement
NOTE : This type shall be used with attention due to the friction between the pipe
and the spring upper base . For horizontal displacements over ~ 5 mm a sliding plate
will be provided at the top of the spring.
As general rule, this type will be used on pumps with horizontal connections.
In other cases for short height X ( under compressor table as example) use the TYPE
26 .
When there is no specific requirement on the project, the using of clamped system
diameter may be limited as follows to consider the influence of clamp price (it’s not an
imposition) .
On classified cold lines or cryogenic lines CLAMPS SHALL NOT BE USED IN DIRECT
CONTACT WITH THE MAIN PIPE.
Use eye nut (clamp will be supplied by PUF manufacturer) for Dia. ½” to 4” and
clevis for over diameters.
PUF SUPPLIER
Eye plate ( STC WE53 ) or clevis welded on a trunnion plate according to loads.
Calculation note not in status FINAL CALCULATION NOTE IFC ( item HV 1521 )
shall be with a quantity of 0
Item modified (HV-1527) : Modified parts shall be clearly defined ( color or/and bolt
line ) so that specialist define the action with supplier according to the prefabrication ( if
item have been fabricated a new item shall be defined ).
INQUIRY PHASE
PURCHASING PHASE
ATTACHMENT 1
ATTACHMENT 2