BH 04 P 25 BP-5A BH 04 P 25 BP-5A
Hasil data tiang BH 04 P 25 BP-5A (Tiang Pile BH 04 P 25 BP-5A (Bored pile Ø 150
Bor Ø 150 cm, L = 29.5 m – Panjang cm, L = 29.5 m - penetrate 27.1 m) analysis
Penetrasi 27.1 m) menunjukkan kapasitas result shows a pile capacity of about 652.0
tiang uji sebesar 652.0 Ton dengan tahanan tons, consist of 354.0 tons of shaft friction
friksi sebesar 354.0 Ton dan tahanan ujung and 299.0 tons of end-bearing capacity. The
sebesar 299.0 Ton. Penurunan total total and residual settlement is 9.5 mm and
sebesar 9.5 mm dengan penurunan tetap 3.0 mm, respectively.
sebesar 3.0 mm.
GEOTECHNICAL INSTRUMENTATION:
• INCLINOMETER • PIEZOMETER • WATER STAND PIPE • OBSERVATION WELL • SETTLEMENT GAUGES •
FOUNDATION TESTING:
• STATIC LOAD TEST (INSTRUMENTED WITH VWSG) • DYNAMIC LOAD TEST (PDA+CAPWAP) •
• PILE INTEGRITY TEST (PIT) • CROSSHOLE SONIC LOGGING • THERMAL INTEGRITY PROFILING (TIP) •
ENVIRONMENT MONITORING:
• VIBRATION MONITORING • TILTMETER • CRACKMETER •
Ge tech Efathama
Jl. Agung Niaga V blok G6 No.6 – No.8
Sunter Podomoro, Indonesia – 14350
Telp. +62-21-29384721/22 • Fax. +62-21-29384720
www.geotech-indonesia.com
CH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GE
LAMPIRAN A / APPENDIX A
(1) DATA PDA DAN ANALISIS CAPWAP /
(1) DATA PDA & CAPWAP ANALYSIS
GEOTECHNICAL INSTRUMENTATION:
• INCLINOMETER • PIEZOMETER • WATER STAND PIPE • OBSERVATION WELL • SETTLEMENT GAUGES •
FOUNDATION TESTING:
• STATIC LOAD TEST (INSTRUMENTED WITH VWSG) • DYNAMIC LOAD TEST (PDA+CAPWAP) •
• PILE INTEGRITY TEST (PIT) • CROSSHOLE SONIC LOGGING • THERMAL INTEGRITY PROFILING (TIP) •
ENVIRONMENT MONITORING:
• VIBRATION MONITORING • TILTMETER • CRACKMETER •
Pile Dynamics, Inc.
PEMBANGUNAN JALUR KA BANDARA YIA - PAKET TR.02 Pile Driving Analyzer ® (PDA)
BH04 - P25 - BP5A_1 Version: 2020.31
5000 3.05 BN 1
tn m/s 18Feb2021 04:53:29 PM
F V
RMX 461 tn
RSU 695 tn
FMX 1774 tn
EMX 8.09 tn-m
CSX 9.8 MPa
TSX 2.5 MPa
DFN 3 mm
DMX 6 mm
LP 27.1 m
LE 27.5 m
AR 17671.46 cm^2
EM 352 t/cm2
102.4 ms SP 2.40 t/m3
WS 3787.8 m/s
WC 3767.1 m/s
JC 0.60
JF 1.00
5000
F1: [G926] 103.3 PDICAL (0.85) FF6
tn
A2 (PR): [K10662] 417 mv/6.4v/5000g (1.15) VF6
WD A3 (PR): [K10675] 411 mv/6.4v/5000g (1.15) VF6
F4: [R564] 156.1 PDICAL (0.85) FF6
WU
A5 (PE): [60507] 1012 g's/volt (1.15) VF6
A6 (PE): [60524] 1029 g's/volt (1.15) VF6
F7: [P635] 148.1 PDICAL (0.85) FF6
F8: [O758] 156 PDICAL (0.85) FF6
102.4 ms
PEMBANGUNAN JALUR KA BANDARA YIA - PAKET TR.02; Pile: BH04 - P25 - BP5A_1; BOREPILE D.150 - DROP HM 15Ton; Blow: 1 (Test: 18-Feb-2021 16:53:) 19-Feb-2021
GEOTECH EFATHAMA CAPWAP(R) 2014-3
4000 4000
tons Force Msd tons Force Msd
Force Cpt Velocity Msd
3000 3000
2000 2000
1000 1000
5 105 ms 5 105 ms
0 0
11 L/c 11 L/c
-1000 -1000
-2000 -2000
6
Shaft Resistance Length b. Sensors 27.5 m
Load (tons) Distribution Embedment 27.1 m
Pile Top 5
0.0 150.0 300.0 450.0 600.0 750.0 900.0 Top Area 1.77 m2
Bottom
0.0 End Bearing Area 1.77 m2
4
tons/m^2
Top Perimeter 4.71 m
Top E-Modulus 352 tons/cm2
3 Top Spec. Weight 2.4 tons/m3
RU = 652 tons Top Wave Spd. 3788 m/s
SF = 354 tons 2 Overall W.S. 3788 m/s
EB = 299 tons
Displacement (mm)
640.0
Pile Force
15.0 at Ru
800.0
652.5
1 3.6 3.2 14.73 637.8 14.73 4.62 0.98
2 6.0 5.6 19.39 618.4 34.12 8.11 1.72
3 8.4 8.0 25.16 593.2 59.28 10.52 2.23
4 10.8 10.4 28.87 564.3 88.15 12.07 2.56
5 13.2 12.8 32.55 531.8 120.70 13.61 2.89
6 15.5 15.1 34.23 497.6 154.93 14.31 3.04
7 17.9 17.5 35.39 462.2 190.32 14.80 3.14
8 20.3 19.9 36.47 425.7 226.79 15.25 3.24
9 22.7 22.3 39.60 386.1 266.39 16.56 3.51
10 25.1 24.7 42.62 343.5 309.01 17.82 3.78
11 27.5 27.1 44.59 298.9 353.60 18.65 3.96
Avg. Shaft 32.15 13.05 2.77
Toe 298.89 169.14
Soil Model Parameters/Extensions Shaft Toe
Smith Damping Factor 1.40 1.31
Quake (mm) 3.216 2.954
Case Damping Factor 0.30 0.24
Damping Type Viscous Viscous
Unloading Quake (% of loading quake) 100 36
Reloading Level (% of Ru) 100 100
Unloading Level (% of Ru) 78
CASE METHOD
J = 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
RP 1485 1290 1096 902 707 513 319 124 0 0
RX 1493 1299 1104 910 715 521 461 461 461 461
RU 1720 1549 1379 1208 1037 866 695 525 354 183
RAU = 461 (tons); RA2 = 655 (tons)
Current CAPWAP Ru = 652 (tons); Corresponding J(RP)= 0.43; J(RX) = 0.43
VMX TVP VT1*Z FT1 FMX DMX DFN SET EMX QUS KEB
m/s ms tons tons tons mm mm mm tons-m tons tons/mm
1.0 24.94 1685 1743 1774 6.041 3.070 3.000 8.09 1789 101
Analysis: 19-Feb-2021