CH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GE

III. DISKUSI / DISCUSSION

Hasil analisa CAPWAP kami diskusikan Result of CAPWAP Analysis is presented


dibawah ini, dengan hasil selengkapnya below with completed analysis result is
dapat dilihat pada Lampiran A: presented in Appendix A:

BH 04 P 25 BP-5A BH 04 P 25 BP-5A
Hasil data tiang BH 04 P 25 BP-5A (Tiang Pile BH 04 P 25 BP-5A (Bored pile Ø 150
Bor Ø 150 cm, L = 29.5 m – Panjang cm, L = 29.5 m - penetrate 27.1 m) analysis
Penetrasi 27.1 m) menunjukkan kapasitas result shows a pile capacity of about 652.0
tiang uji sebesar 652.0 Ton dengan tahanan tons, consist of 354.0 tons of shaft friction
friksi sebesar 354.0 Ton dan tahanan ujung and 299.0 tons of end-bearing capacity. The
sebesar 299.0 Ton. Penurunan total total and residual settlement is 9.5 mm and
sebesar 9.5 mm dengan penurunan tetap 3.0 mm, respectively.
sebesar 3.0 mm.

Table 2. CAPWAP Result Summaries


CAPWAP
No Tiang
Daya Dukung Total Daya Dukung Friksi Daya Dukung Ujung Penurunan
Pile No
Pile Resistance Friction Capacity End-bearing Capacity Settlement
(Ton) (Ton) (Ton) (mm)
BH 04 P 25
652.0 354.0 299.0 9.5
BP-5A

Scan code for Authenticity

GEOTECHNICAL INSTRUMENTATION:
• INCLINOMETER • PIEZOMETER • WATER STAND PIPE • OBSERVATION WELL • SETTLEMENT GAUGES •

FOUNDATION TESTING:
• STATIC LOAD TEST (INSTRUMENTED WITH VWSG) • DYNAMIC LOAD TEST (PDA+CAPWAP) •
• PILE INTEGRITY TEST (PIT) • CROSSHOLE SONIC LOGGING • THERMAL INTEGRITY PROFILING (TIP) •

ENVIRONMENT MONITORING:
• VIBRATION MONITORING • TILTMETER • CRACKMETER •
Ge tech Efathama
Jl. Agung Niaga V blok G6 No.6 – No.8
Sunter Podomoro, Indonesia – 14350
Telp. +62-21-29384721/22 • Fax. +62-21-29384720
www.geotech-indonesia.com
CH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GE

LAMPIRAN A / APPENDIX A
(1) DATA PDA DAN ANALISIS CAPWAP /
(1) DATA PDA & CAPWAP ANALYSIS

GEOTECHNICAL INSTRUMENTATION:
• INCLINOMETER • PIEZOMETER • WATER STAND PIPE • OBSERVATION WELL • SETTLEMENT GAUGES •

FOUNDATION TESTING:
• STATIC LOAD TEST (INSTRUMENTED WITH VWSG) • DYNAMIC LOAD TEST (PDA+CAPWAP) •
• PILE INTEGRITY TEST (PIT) • CROSSHOLE SONIC LOGGING • THERMAL INTEGRITY PROFILING (TIP) •

ENVIRONMENT MONITORING:
• VIBRATION MONITORING • TILTMETER • CRACKMETER •
Pile Dynamics, Inc.
PEMBANGUNAN JALUR KA BANDARA YIA - PAKET TR.02 Pile Driving Analyzer ® (PDA)
BH04 - P25 - BP5A_1 Version: 2020.31

BOREPILE D.150 - DROP HM 15Ton


PDA Operator: Doddy

5000 3.05 BN 1
tn m/s 18Feb2021 04:53:29 PM
F V
RMX 461 tn
RSU 695 tn
FMX 1774 tn
EMX 8.09 tn-m
CSX 9.8 MPa
TSX 2.5 MPa
DFN 3 mm
DMX 6 mm
LP 27.1 m

LE 27.5 m
AR 17671.46 cm^2
EM 352 t/cm2
102.4 ms SP 2.40 t/m3
WS 3787.8 m/s
WC 3767.1 m/s
JC 0.60
JF 1.00
5000
F1: [G926] 103.3 PDICAL (0.85) FF6
tn
A2 (PR): [K10662] 417 mv/6.4v/5000g (1.15) VF6
WD A3 (PR): [K10675] 411 mv/6.4v/5000g (1.15) VF6
F4: [R564] 156.1 PDICAL (0.85) FF6
WU
A5 (PE): [60507] 1012 g's/volt (1.15) VF6
A6 (PE): [60524] 1029 g's/volt (1.15) VF6
F7: [P635] 148.1 PDICAL (0.85) FF6
F8: [O758] 156 PDICAL (0.85) FF6

102.4 ms
PEMBANGUNAN JALUR KA BANDARA YIA - PAKET TR.02; Pile: BH04 - P25 - BP5A_1; BOREPILE D.150 - DROP HM 15Ton; Blow: 1 (Test: 18-Feb-2021 16:53:) 19-Feb-2021
GEOTECH EFATHAMA CAPWAP(R) 2014-3

4000 4000
tons Force Msd tons Force Msd
Force Cpt Velocity Msd

3000 3000

2000 2000

1000 1000

5 105 ms 5 105 ms
0 0
11 L/c 11 L/c

-1000 -1000

-2000 -2000

6
Shaft Resistance Length b. Sensors 27.5 m
Load (tons) Distribution Embedment 27.1 m
Pile Top 5
0.0 150.0 300.0 450.0 600.0 750.0 900.0 Top Area 1.77 m2
Bottom
0.0 End Bearing Area 1.77 m2
4

tons/m^2
Top Perimeter 4.71 m
Top E-Modulus 352 tons/cm2
3 Top Spec. Weight 2.4 tons/m3
RU = 652 tons Top Wave Spd. 3788 m/s
SF = 354 tons 2 Overall W.S. 3788 m/s
EB = 299 tons
Displacement (mm)

5.0 Dy = 6.511 mm 1 Match Quality 4.14


Dx = 9.508 mm 05 22 38 55 72Top Compr. Stress 0.1 tons/cm2
SET/Bl = 3.000 mm 0.0 Max Compr. Stress 0.1 tons/cm2
Max Tension Stress -0.03 tons/cm2
160.0 EB
Avg. Shaft Quake 3.216 mm
Toe Quake 2.954 mm
10.0 320.0 Avg. Shaft Smith Dpg. 1.40 s/m
tons

Toe Smith Damping 1.31 s/m


480.0 SF

640.0
Pile Force
15.0 at Ru
800.0

CAPWAP(R) 2014-3 Licensed to GEOTECH EFATHAMA


PEMBANGUNAN JALUR KA BANDARA YIA - PAKET TR.02; Pile: BH04 - P25 - BP5A_1
Test: 18-Feb-2021 16:53
BOREPILE D.150 - DROP HM 15Ton; Blow: 1 CAPWAP(R) 2014-3
GEOTECH EFATHAMA OP: Doddy

CAPWAP SUMMARY RESULTS


Total CAPWAP Capacity: 652.49; along Shaft 353.60; at Toe 298.89 tons
Soil Dist. Depth Ru Force Sum Unit Unit
Sgmnt Below Below in Pile of Resist. Resist.
No. Gages Grade Ru (Depth) (Area)
m m tons tons tons tons/m tons/m2

652.5
1 3.6 3.2 14.73 637.8 14.73 4.62 0.98
2 6.0 5.6 19.39 618.4 34.12 8.11 1.72
3 8.4 8.0 25.16 593.2 59.28 10.52 2.23
4 10.8 10.4 28.87 564.3 88.15 12.07 2.56
5 13.2 12.8 32.55 531.8 120.70 13.61 2.89
6 15.5 15.1 34.23 497.6 154.93 14.31 3.04
7 17.9 17.5 35.39 462.2 190.32 14.80 3.14
8 20.3 19.9 36.47 425.7 226.79 15.25 3.24
9 22.7 22.3 39.60 386.1 266.39 16.56 3.51
10 25.1 24.7 42.62 343.5 309.01 17.82 3.78
11 27.5 27.1 44.59 298.9 353.60 18.65 3.96
Avg. Shaft 32.15 13.05 2.77
Toe 298.89 169.14
Soil Model Parameters/Extensions Shaft Toe
Smith Damping Factor 1.40 1.31
Quake (mm) 3.216 2.954
Case Damping Factor 0.30 0.24
Damping Type Viscous Viscous
Unloading Quake (% of loading quake) 100 36
Reloading Level (% of Ru) 100 100
Unloading Level (% of Ru) 78

CASE METHOD
J = 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
RP 1485 1290 1096 902 707 513 319 124 0 0
RX 1493 1299 1104 910 715 521 461 461 461 461
RU 1720 1549 1379 1208 1037 866 695 525 354 183
RAU = 461 (tons); RA2 = 655 (tons)
Current CAPWAP Ru = 652 (tons); Corresponding J(RP)= 0.43; J(RX) = 0.43

VMX TVP VT1*Z FT1 FMX DMX DFN SET EMX QUS KEB
m/s ms tons tons tons mm mm mm tons-m tons tons/mm
1.0 24.94 1685 1743 1774 6.041 3.070 3.000 8.09 1789 101

PILE PROFILE AND PILE MODEL


Depth Area E-Modulus Spec. Weight Perim.
m m2 tons/cm2 tons/m3 m
0.0 1.77 351.5 2.403 4.71
23.5 1.77 351.5 2.403 4.71
27.5 1.77 351.5 2.403 4.71
Toe Area 1.77 m2
Top Segment Length 1.20 m, Top Impedance 1640 tons/m/s
Wave Speed: Pile Top 3787.8, Elastic 3787.8, Overall 3787.8 m/s
Pile Damping 2.00 %
Total volume: 48.597 m3; Volume ratio considering added impedance: 1.000
Time (ms) 0.0 29.5
Time Incr 0.316 0.350

Analysis: 19-Feb-2021