The machine is suitable to tread milk milk temperature on the control board and

to produce different kind of yogurt. when it is reached will close the valve or
In this unit the milk come at the correct switch on/OFF the electrical resistance
temperature from the plate pasteuriser, so it is At this time the operator will add the milk
possible to start immediately with the yogurt ferment and will keep the temperature
production. stabilised using the cold or hot water. When
The operator could check the milk temperature the yogurt will be ready the operator could
on the control board and if it is necessary discharge it trough the valve VFM 01 The unit
adjust it choosing if cooling or heating the milk. works for the heating and the cooling process
If it is necessary to cool the operator could fix in automatic way and when the fixed
temperature on the control panel open the temperature is reached the control panel
valve VSM 01 and the system in automatic stops the pneumatic valve and or the electrical
way will open the Valve V1 , cold water will resistance and keep the temperature fixed. To
enter in the jacket and cool the product until manage the line in a proper way it is enough
the temperature set, see the milk temperature to entrust an operator who knows the machine
on the control panel. after an instruction.
At the contrary if it is necessary to heat the The operator has to know how the machine
system can just the temperature automatically works and its operating cycle. The operator
using the electric resistance. In fact the probe has to be able to identify any errors or
TT01 will switch ON or OFF the electrical mistakes. All these defects have to be
resistance in accordance with the identified and signalised to the
temperature set. maintenance people.
At this time the operator will add the milk The line must not utilise for different purpose,
ferment and will keep the temperature different from the project data. Any
stabilised using the cold or hot water. modification that could restore any danger is
When the yogurt will be ready the operator strictly forbidden. The line has not to be used
could discharge it to the forming table using with product different from the project data or
the valve VFM 01 with different capacity.
The unit works for the heating and cooling All the uses different from the order
process in automatic way and when the fixed specification are strictly forbidden and
temperature is reached the control panel keep Tecmon S.r.l. out of the guarantee.
stops the pneumatic valve (V1 ) or the Please take note that if you wish to utilise
electrical rsistance and keep the temperature the equipment for different purposes please
fixed. The operator could changes the ask the Tecmon S.r.l. technical staff asking
following parameters: for information or modification that could be
• Pasteurisation and working temperature necessary.
• Yogurt maturation temperature Hereafter are indicated some simple rules
• Mixer speed by inverter to avoid a bad use of the equipment:
− Don’t put in the machine any object able to
The pasteurisation temperature and the yogurt damage the part of the machine
temperature are shown on the control panel. − Don’t male any maintenance before
In case that the operator wishes to start from interrupting the electrical supply to
fresh milk and pasteurises it into the unit the the machine or line
procedure is the following: − Check the valves position (if present)
The fresh milk after a filtration normally before starting work
operated manually is put on the machine at the
temperature of 38°C or if the milk came from a
NOTE – In case of bad
refrigerated tank its temperature will be around
3°C.
The first operation is to heat the milk up to the
pasteurisation temperature (usually 90°C)
► function of the equipment
before making any
modifications or repairs
and keep for a certain time manually fixed. In please contact Tecmon S.r.l.
this case the unit using the hot water technical staff.
available in the circuit will heat the milk
When the pasteurisation process is done it
is necessary to cool the milk to get right
temperature for the ferment and acidification
(usually 40/ 45°C) so that fresh water will be
introduced automatically in the jacket of the
tank and the temperature is automatically
adjusted. In this case system will check the
Page 16 of 84
3.3.1 TECHNICAL DESCRIPTION

The technological diagram is indicated on the Attached n° 1 (our drawing N° SDF-098-06-7 rev.A)
enclosed

Technical characteristics
3 PHASE TENSION V 20V 60 Hz
TOTAL INSTALLED POWER kW 3,37
TOTAL ABSORPTION A 14
YOGURT equipment unit data

Volume of the tank LT 50


Inlet milk temperature °C from 3°C to 45°C
Milk temperature range ( if necessary) °C 70-80°C
Curd temperature range °C 45°C
Quantity of energy available in one hour ( electrical resistance capacity) Kcal 2580
Agitator electrical data (M01)

ELECTRICAL MOTOR INSTALLED POWER 6 POLES IP 55 KW 0,37


ALIMENTATION V 220
FREQUENCY Hz 60
PHASES N° 3
ABSORTION A 1,8
Agitator other data

REVOLUTION ENTRANCE RPM 900


REVOLUTION EXIT RPM 15
VARIATION FIELD 60
KIND OF FLANGE GR 80 UNI
Note: variable speed by inverter

► NOTE – Between parenthesis are indicated the reference to the document attached.

3.3.2 FUNCTIONAL DESCRIPTION

The tables hereafter present a general description of the equipment or line principal components
(Tables 0.1) and of the line or equipment auxiliary components (table 0.2)

NOTE: the equipment and accessory position of the machine (line) to which the tables are referred are
indicate on the drawing SDF-098-06 -7 rev A enclosed.

Page 17 of 84
Table 0.1 Principal components

NAME OPERATION POS.

Tank for the yogurt This tank could be use to produce yogurt from fresh milk after or not a S01
preparation pasteurisation cycle. The tank is provided with electrical resistance in
the jacket in which hot water is prepares.
Electrical resistance This electrical resistance of 3 Kw capacity according with the R01
temperature set on the control panel could heat the water in the jacket ,
which heats the milk
Electric agitator 0,37 This agitator keep in movement the product , its speed is changeable by AG1
operator through one inverter

Table 0.2 Auxiliary components


NOTE: the operation described on the column function are carried out automatically from the
control system according to the signal sent to the single components to the main control panel.

NAME OPERATION FUNCTION POS.

TANK
Ball valve 1/2”gas This valve permits at the water to VSM01
enter in the tank jacket
Butterfly valve DN 50 This valve is used to discharge the VFM01
yogurt
PT 100 probe double It measure the product temperature This probe send an electrical TT01
type, connection ¼” inside the tank signal to the temperature
control equipment (8888). This
temperature is also elaborate to
adjust the water temperature
in the jacket opening or closing
the V1 valve or the electrical
resistance
Overflow This overflow permits to the water in TP01
the jacket to exit in case of cooling
Ball Valve 1/2” This valve empty the jacket VSM02
Electro valve ON/OFF This valve adjust the water quantity in This valve works in function of V1
valve ,air open entrance in the jacket , it is driven by the temperature signal received
the instruments in which the mixer from the instruments The
temperature is set. instrument takes this signal
from the plant with the probe
TT01
Security switch This switch stop the agitator if the ZS01
cover is opened for security reason

Page 18 of 84
3.4 OPERATING CYCLE electrical resistance to heat the water into
jacket. After a first rinsing phase , please
This paragraph give an indication about the proceed to wash the plant with a 3% soda
different phase of the operation cycle, it is (NaOH) solution and after that cycle rinse
advisable to read this point with the drawing again. (see after)
SDF-098-06-7 rev A enclosed with this manual
3.4.3. To turn on the plant ( for washing or
The different phases of the working cycle are for production)
the following.
This tank is a single unit, to prepare the unit for
3.4.1 Choosing of the working option working it is necessary to fill the jacket with
water. (never star without water in the
3.4.2 Washing and rinsing of the plant jacket ) so that open the valve VSM 01 and
with preparation of the washing solution close the valve VSM 02 fill water until it coming
out from the over flow. ( max water pressure
3.4.3 turn on the plant 0,5 Bar). .
It is also necessary to control the position of
3.4.4. Washing of the tank the manual valves placed on tank according to
the operator needs.
3.4.5 Product cycle Before starting production it is advisable
to wash as follows
3.4.6 Stop of the production
3.4.4 Washing of the plant
3.4.7 Unit rinsing
In the tank or the CIP unit please prepare a
mixture of water and 3% of NaOH. This
The first operation to do, before starting with preparation need attention and develop heat.
the working cycle is to choose what are the Washing temperature 80°C.
parameters to set on the electrical control The washing cycle have to be made after
panel: and before all working cycle. The washing
cycle foresees:
the option available are: - first passage with clean water in the tank
- second passage with water and soda
Working temperature: please set the dedicate solution
equipment on the control panel (see the - third passage with clean water to rinse the
attached ) plant, using the S01 tank.
Note: It is necessary to carry out the
Hot temperature: it is possible to fix the washing operation with care. The operation
temperature of the milk acting on the control have to verify trough the exit pipes , if the
panel in heating line is cleaned, if not repeat the operation
one more time, until the line is perfectly
Cold temperature: it is possible to fix the cleaned. If it is necessary clean the surface
temperature of the milk acting on the manually.
control panel of the equipment
3.4.5 Product cycle.
Agitator speed with an inverter
The yogurt production is quite simple and the
Working time working parameters ( temperatures and time)
could change according to the kind of yogurt
After choosing the different options the line to produce.
is ready to work. Generally speaking , the milk after a filtration is
pumped in the tank, Its temperature could be
3.4.2. Washing and rinsing around 35°C if the milk come directly from the
cow or ( better) if it was refrigerated at 3 °C.
This operation is used to clean the machine The first operation to carry out is normally to
before the yogurt preparation. In this case put pasteurise the milk.
water in the tank S01 manually or using the CIP This operation could be done using the plate
pump wash the tank properly , and discharge pasteurisation unit or the yogurt production
the water trough the valve VFM01, . If it is unit For the first case see the manual of the
necessary heat the water using the the pasteuriser as the milk will arrive to the unit
Page 19 of 84
already at the right temperature (as 40 or emergency press the red button on the
45°C) using a flexible hoses. control board.
In the other case the milk could be charged
directly on the tank. 3.4.8. Rinsing of the plant
After checking if the jacket is full of water ,the
operator check on the display the milk With new fresh water rinse the unit you could
temperature , then can decide if it is the case heat the water to get a better performance.
to heat or to cool the milk, so that he have to Then check that the unit will be clean before
open or close the manual valves of the thermal discharging water and stop.
fluids circuits.
For instance to heat the milk the valve
VSM01 has to be open , the valve VSM 02 3.5 PHONOMETRIC SURVEYS
has to be closed, the electrical resistance
starts to heat . an increase of water volume INSTRUMENTATION DESCRIPTION
could appears and some drops could be The surveys have been carried out using the
discharge from the overflow. phonometer integrator of Bruel & Kjaer 2236C
For instance to cool the milk the valve VSM type (class 1 in conformity with the CEI 651 and
02 has to be closed , the valve VSM 01 has CEI 804) with the following settings :
to be open, the system will open
automatically the valve V1 and fresh water - weighting of the maximum peak signal C
will flow in the jacket cooling the milk. - weighting in frequency A
Water will be discharged from the overflow. - integration time F
if we have to pasteurise milk the operator will
open the manual valves, set the temperature OPERATION CONDITIONS
on the switch board and the system will
increase automatically the temperature. The measurement is taken 1 mt far from
When the pasteurisation temperature will be the machine
reached the system automatically stop the
electrical resistance So now it necessary to VALUES TAKEN
calculate a waiting time, after that the operator Measurement
start to cool the product opening the manual LA eq = ≤ 70 dBA
valve of the cold circuit (VSM 01) the system
will start to cool automatically the milk opening ATTENTION
the valve V1 During the normal functioning of the lines, in
During this time the agitator will keep mixed the presence of containers and relative feeding
the milk to favourite the diffusion of the lines, the effective noise levels will be above
temperature. the ones measured. After the installation in
When the yogurt temperature will be reach the line, the operator should repeat the
operator could add the milk ferment and mix it phonometric surveys with the machine in
to the milk. normal operating conditions, to check that the
Now is the time to wait that the milk will be limits foreseen by the laws in force are not
transformed in yogurt. During this phase it is exceeded. If the noise is above such limits, the
possible to adjust the temperature. machine could be harmful for the operator’s
When the yogurt is ready, it is possible to cut it safety. If this happens, it is necessary to :
manually (using the manual equipment) or with
the agitator. - place the correct indications in the
When the yogurt is cut it is possible to working zones
discharge it trough the valve VFM 01. The
yogurt will exit for gravity. The bottom of the - put into evidence and limit the access
tank is conical to permit to evacuate to danger zones if possible
completely the tank
- inform the operators of the risks to the
3.4.7 Stop of production. hearing to which they are exposed due to
the noise and individual protection devices
When you start to empty the tank the valve which are to be adopted
of the thermal fluid have to be closed.
When the tank is emptied you could close the - supply the suitable individual protection
valve VFM 01 Immediately after is better to devices, checking that they are correctly used.
start rinsing the plant with new fresh water and
evacuate it using the valve VFM 01. In case of

Page 20 of 84