Group 2 Major Component: 1. Main Pump
Group 2 Major Component: 1. Main Pump
1. MAIN PUMP
3 1 2
9 6 5 4 7 8
Standard Recommende
Part name & inspection item d replacement Counter measures
dimension value
Clearance
between piston(1) & d D Replace piston
0.039 0.067
cylinder bore(2) or cylinder
(D-d)
Play between
piston(1) & shoe caulking
0-0.1 0.3
section(3)
(҇) Replace
assembly of
Thickness of shoe piston & shoe
҇
(t) t 4.9 4.7
7 - 19
2. MAIN CONTROL VALVE
Spool ş Existence of scratch, gnawing, rusting or ş Replacement when its outside sliding
corrosion. section has scratch(Especially on seals-
contacting section).
ş O-ring seal sections at both ends. ş Replacement when its sliding section has
scratch.
ş Insert spool in casing hole, rotate and ş Correction or replacement when O-ring is
reciprocate it. damaged or when spool does not move
smoothly.
Around spring ş Rusting, corrosion, deformation or breaking ş Replacement for significant damage.
of spring, spring seat, plug or cover.
7 - 20
3. SWING DEVICE
7 - 21
4. RCV LEVER
Maintenance
Criteria Remark
check item
Leakage The valve is to be replaced when the leakage becomes Conditions :
more than 1000cc/m at neutral handle position, or more Primary pressure : 30kgf/cm2
than 2000cc/m during operation. Oil viscosity : 23cSt
Spool This is to be replaced when the sliding surface has The leakage at the left condition is
worn more than 10ҏm, compared with the non-sliding estimated to be nearly equal to the
surface. above leakage.
Push rod
ٻ7
1mm
Play at operating The pin, shaft, and joint of the operating section are to When a play is due to looseness of
section be replaced when their plays become more than 2mm a tightened section, adjust it.
due to wears or so on.
Notes 1. It is desirable to replace seal materials, such as O-rings, every disassembling. However, they may be
reused, after being confirmed to be free of damage.
2. When loosening the hexagon socket head cap screw(125), replace the seal washers(121) without fail.
7 - 22
5. ACCELERATOR PEDAL
Maintenance
Criteria Remark
check item
Leakage The valve is to be replaced when the leakage effect to Conditions :
the system. For example, the primary pressure drop. Primary pressure : 30kgf/cm 2
Oil viscosity : 23cSt
Spool This is to be replaced when the sliding surface has The leakage at the left condition is
worn more than 10ҏm, compared with the non-sliding estimated to be nearly equal to the
surface. above leakage.
Push rod
ٻ7
1mm
Play at operating The pin, shaft, and joint of the operating section are to When a play is due to looseness of
section be replaced when their plays become more than 2mm a tightened section, adjust it.
due to wears or so on.
Notes 1. It is desirable to replace seal materials, such as O-rings, every disassembling. However, they may be
reused, after being confirmed to be free of damage.
7 - 23
6. TURNING JOINT
Sliding surface with Plating worn or peeled due to seizure or contamination Replace
sealing sections
- Extrusion
Square ring
Seal set -
1.5mm(max)
(0.059in)
7 - 24
7. CYLINDER