ATP Approval Sheet ATP Approval Sheet: Telkomsel ZTE Indonesia
ATP Approval Sheet ATP Approval Sheet: Telkomsel ZTE Indonesia
This approval sheet declares that the Acceptance Test Procedure (ATP) has been performed at the below location.
And the work has been considered as complete and satisfactory fulfil the standard technical requirements in Telkomsel project.
This approval sheet is automatically generated by e-ATP upon acceptance of all person in charge and no more signatures on hard copy is required.
This sheet is inseparable from the ATP report and should be the first thing seen when opening the report.
Band LTE,3G,DCS
BTS/Node B Type
Connect To BSC/RNC RCNZ BAUBAU1
Antenna Type -
Antenna Height -
Azimuth -
TSELPM ZTERPM
Site Name (PO) : Wasolangka Site Name Act. (If CR): Wasolangka
STAGE COMPLETE(Initials/Signatures)
RBS / Node B Site Installation 10-Dec-20
RBS / Node B Site Commissioning 10-Dec-20
RBS / Node B Site Integration 28-Dec-20
RBS / Node B Uploaded Documents 12-Mar-21
ATP Remark :
TSELPM ZTERPM