Project Installation Phase

Page 1-1
SAP SFIN Migration Phases

Migration Phase includes:

 Project Preparation
 Installation
 Customizing  Similar Steps as ASAP Methodology
 Data Migration  Scope is very similar as Class GL to New
GL Migration
 Processing

Page 1-2
SAP SFIN Installation Phase

Although its good to know but these tasks are mainly performed by
BASIS Administrators

 System to back up the Total and Index Tables


 System to delete out the Total and Index Tables
 System to create S/4 HANA Live Views
 Classic General Ledger (GL) and Classic Asset Accounting (AA) will
cease to exist