RENCANA ANGGARAN BIAYA (RAB)

HARGA SATUAN JUMLAH


NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)
I. PEKERJAAN PALUD
1.1. Pekerjaan Talud
1.1.1. Pembersihan Lapangan 176.5000 M2 0.00 0.00
1.1.2. Cerucuk Kayu Laut Ǿ 4" , P = 4m 35.0000 M' 0.00 0.00
1.1.3. Lantai Kerja 1:3:5 M3 0.00 0.00
1.1.4. Balok Grid, Beton Bertulang 25x40cm M3 0.00 0.00
1.1.5. Balok Penutup Atas, Beton Bertulang 15x55cm M2 0.00 0.00
1.1.6. Balok Pondasi Beton Cor M3 0.00 0.00
1.1.7. Pasangan Batu Kali 1:3 M2 0.00 0.00
1.1.8. Saluran Air Pipa PVC Ǿ 2" Unit 0.00 0.00
1.1.9. Dewatering Ls 0.00 0.00
0.00

II. PEKERJAAN DECK BETON GAZEBO


2.1. Pekerjaan Urugan
2.1.1. Pekerjaan Tanah Urug M3 0.00 0.00
2.1.2. Pekerjaan Perataan dan Pemadatan M3 0.00 0.00
0.00

2.2. Pekerjaan Beton Non-Struktural


2.2.1. Rabat Beton (1:3:5) M3 0.00 0.00
0.00

III. PEKERJAAN LANDSCAPE


3.1. Hardscape
3.2.1. Rabat Beton (1:3:5) M3 0.00 0.00
3.2.2. Pemasangan Steping Stone M' 0.00 0.00
3.2.3. Pemasangan Jembatan Kali M2 0.00 0.00
3.2.4. Pekerjaan Tangga Akses Atas Unit 0.00 0.00
3.2.5. Pekerjaan Tangga Akses River Tubing Unit 0.00 0.00
3.2.6. Pekerjaan Paving Block M2 0.00 0.00
0.00
3.2. Pagar Pembatas
3.2.1. Pagar Bambu Keliling M' 0.00 0.00
0.00
IV. PEKERJAAN GAZEBO
4.1. Pekerjaan Gazebo Utama
4.1.1. Pekerjaan Kolom (Bambu Betung) M' 0.00 0.00
4.1.2. Pekerjaan Balok Atap dan Alas Gazebo M' 0.00 0.00
4.1.3. Pekerjaan Rangka Atap M2 0.00 0.00
4.1.4. Pekerjaan Penutup Atap Sirap M2 0.00 0.00
4.1.5. Listplank M' 0.00 0.00
4.1.6. Pekerjaan Rangka Alas Gazebo M2 0.00 0.00
4.1.7. Pekerjaan Tangga Gazebo Unit 0.00 0.00
0.00

4.2. Pekerjaan Gazebo Luar


4.2.1. Pekerjaan Kolom (Bambu Betung) M' 0.00 0.00
4.2.2. Pekerjaan Balok Atap dan Alas Gazebo M' 0.00 0.00
4.2.3. Pekerjaan Rangka Atap M2 0.00 0.00
4.2.4. Pekerjaan Penutup Atap Sirap M2 0.00 0.00
4.2.5. Listplank M' 0.00 0.00
4.2.6. Pekerjaan Rangka Alas Gazebo M2 0.00 0.00
4.2.7. Pekerjaan Tangga Gazebo Unit 0.00 0.00
0.00

V. PEKERJAAN BOOTH LAPAK


5.1. Booth Lapak
5.1.1. Booth Lapak Unit 0.00 0.00
0.00
0.00
VI. KAMAR MANDI
6.1. Persiapan
6.1.1. Pemasangan Bowplank 1.0000 Ls 200,000.00 200,000.00
200,000.00
6.2. Bahan
6.2.1. Semen Zak 0.00 0.00
6.2.2. Pasir M3 0.00 0.00
6.2.3. Pasir Urug M3 0.00 0.00
6.2.4. Kerikil M3 0.00 0.00
6.2.5. Batu Kali M3 0.00 0.00
6.2.6. Besi Beton Ǿ 8mm, P = 10 M Btg 0.00 0.00
6.2.7. Besi Beton Ǿ 10mm, P = 10 M Btg 0.00 0.00
6.2.8. Besi Beton Ǿ 12mm, P = 10 M Btg 0.00 0.00
6.2.9. Minyak Bekisting Ltr 0.00 0.00
6.2.10. Paku Kg 0.00 0.00
6.2.11. Kawat Ikat Kg 0.00 0.00
6.2.12. Papan Mal Lbr 0.00 0.00
6.2.13. Kayu Perancah 2x2 Btg 0.00 0.00
6.2.14. Kayu Stut Btg 0.00 0.00
6.2.15. Plywood 3mm Kg 0.00 0.00
6.2.16. Tanah Timbun M3 0.00 0.00
6.2.17. Kusen Pintu Unit 0.00 0.00
6.2.18. Daun Pintu Unit 0.00 0.00
6.2.19. Engsel Set 0.00 0.00
6.2.20. Batu Bata Biji 0.00 0.00
6.2.21. Ventilasi Unit 0.00 0.00
6.2.22. Kran Air Bh 0.00 0.00
6.2.23. Floor Drain Bh 0.00 0.00
6.2.24. Closed Jongkok Bh 0.00 0.00
6.2.25. Cat Tembok Kg 0.00 0.00
6.2.26. Pipa Hawa 2 inch Btg 0.00 0.00
6.2.27. Pipa PVC 1 inch Btg 0.00 0.00
6.2.28. Pipa PVC 3 inch Btg 0.00 0.00
6.2.29. Keramik Ktk 0.00 0.00
6.2.30. Ijuk Kg 0.00 0.00
6.2.31. Seng Gelombang 6 Kaki Lbr 0.00 0.00
6.2.32. Papan Listplank Lbr 0.00 0.00
6.2.33. Kayu 5/5 Btg 0.00 0.00
6.2.34. Kayu 5/10 Btg 0.00 0.00
6.2.35. Kayu 6/12 Btg 0.00 0.00
0.00

6.3. Peralatan
6.3.1. Gerobak Dorong Unit 0.00 0.00
6.3.2. Cangkul Unit 0.00 0.00
6.3.3. Sekop Unit 0.00 0.00
6.3.4. Timba Plastik Bh 0.00 0.00
6.3.5. Raskam Bh 0.00 0.00
6.3.6. Kuas Bh 0.00 0.00
6.3.7. Benang Rol 0.00 0.00
6.3.8. Selang (Water Pass) Rol 0.00 0.00
0.00

6.4 Upah
6.4.1. Kepala Tukang HOK 0.00 0.00
6.4.2. Tukang HOK 0.00 0.00
6.4.3. Pekerja HOK 0.00 0.00
0.00
VII. PEK. INSTALASI DAN SANITASI
7.1 Listrik 1.0000 Ls 0.00 0.00
7.2 Bak Kontrol 1.0000 Unit 0.00 0.00
7.3 Septictank 1.0000 Unit 0.00 0.00
7.4 Resapan 1.0000 Unit 0.00 0.00