Professional Documents
Culture Documents
RMC - Terapan
RMC - Terapan
www.nhm.co.id
Pokok Bahasan
Pengantar
RMR, Q-System
& GSI
Kesimpulan
www.nhm.co.id
Pengantar
~Lord Kevin
www.nhm.co.id
Pengantar
www.nhm.co.id
Pengantar
www.nhm.co.id
Pengantar
www.nhm.co.id
Rock Mechanic Logic
www.nhm.co.id
RQD (Deere,1964)
www.nhm.co.id
RQD Berdasarkan Mapping
Palmstrom (1974) memperkenalkan konsep Volumetric
Joint Count(Jv = Joint/meter cubic) RQD = 115 - 3.3 Jv
Palmstrom (2005) melakukan pembaruan:
RQD = 110 – 2.5 Jv
RQD=0 untuk Jv > 44
RQD=100 untuk Jv < 4
www.nhm.co.id
RQD Berdasarkan Mapping
JS-1 = 0.50 m
JS-2 = 0.35 m
JS-3 = 0.30 m
1 1 1
Jv = + +
0.50 0.35 0.30
= 8.2 Joint/m3
0 1
www.nhm.co.id
Rock Mass Rating
www.nhm.co.id
RMR 1989
UCS = 50 to 100 MPa
Joint Spacing RQD = 110 – 2.5 Jv
= 89.5
JC : - Slightly rough
- Sparation<1mm
- Slightly weathered
0 1
www.nhm.co.id
RMR 1989 (RMR basic)
RMR(basic)= 7+17+10+25+15 = 74
www.nhm.co.id
RMR 1989 (Adjusment)
RMR= 74-5 = 69
www.nhm.co.id
RMR vs GSI
GSI = 65 to 70
www.nhm.co.id
RMR89 & RMR14 Software
https://jkundu.com/quickrmr
www.nhm.co.id
Q System
www.nhm.co.id
Q System
X X
𝑅𝑄𝐷 𝐽𝑟 J𝑤
Q= × ×
𝐽𝑛 𝐽𝑎 SRF
89.5 1.5 1
= × ×
9 1 1
= 14.92 (Good) www.nhm.co.id
Aplikasi Klasifikasi Massa Batuan
www.nhm.co.id
Kencana UG Mine
Kencana UG:
- Epitermal Deposit
- Ore body 4-25m width
- Low stress
- Poor/squeezing ground
- UHCF Method (Pastefill)
- Ore Drive Profile 5x5m
- Total lateral advance >93km
Section View
Plan View
Level Access
www.nhm.co.id
Action and Respons Plan
Strength
R6 15
R5 12
R4 7
R3 4
R2 2
R1 1
R0 0
RQD
From To Rating
90 100 20
75 90 17
50 75 13
25 50 8
0 25 3
Joint Spacing
From To Rating
>3 30
1 3 25
0.3 1 20
0.05 0.3 10
<0.05 5
Joint Condtion
Description Rating
No Seperation
25
Open Joint 1 -5 mm
6
Open Joint > 5 mm
0
Ground Water
Description Rating
Dry 10 *)Modified from RMR 1976
Moist 7
Wet 4
4
www.nhm.co.id
Water Problem 0
Rekomendasi Empiris
www.nhm.co.id
24
Reinforcement & Support
www.nhm.co.id
Reinforcement & Support
www.nhm.co.id
Ground Type
T2 T3
T4 T5 www.nhm.co.id
T4 & T5
Rib Pillar/ Spiling Bolt
Shotcrete arc/
Reinforced Ribs Sprayed Concrete
T5
T4
www.nhm.co.id
Ground Failure
Caving
Slumping
www.nhm.co.id
Fall of Ground Treatment
Looking righthand
Looking lefthand
Support
Probe drilling
Inject Resin
Re-probe
Cut 2m max Face
www.nhm.co.id
Terapan Empiris
Fillfence
Paste
Fillfence
>11m
>11m
Long
Tandons
UC1 W
06-Feb-16 KL 10A 9885 19510 4808 251 0 5.0 Arg (Clay) 10 0.05 to 0.3 Open Joint 1-5mm Dry 25 29 0.48 T3 Type 4
OD01
UC1 W
04-Sep-16 KL 10A 9879 19508 4807 241 0 5.0 Arg (Clay) 10 0.05 to 0.3 Open Joint > 5mm Dry 20 23 0.25 T4 Type 4
OD01
UC1 W
05-Sep-16 KL 10A 9876 19505 4807 235 0 5.0 Arg (Clay) 10 0.05 to 0.3 Open Joint > 5mm Dry 20 23 0.25 T4 Type 4
OD01
27-Nov-16 K1 00B UC1 WEST 9880 19816 4997 355 0 5.0 Andesite 40 0.3 to 1 Open Joint 1-5mm Dry 55 51 5.39 T2 Type 3
SILL
08-Feb-17 K1 02B 9975 19725 4979 305 0 5.0 Conglomerate 10 <0.05 Open Joint 1-5mm Moist 25 28 0.43 T3 Type 3
ACCESS
SILL Fragmental
21-Apr-17 K1 02B 9881 19825 4957 5 0 5.0 10 <0.05 Open Joint 1-5mm Dry 25 29 0.48 T3 Type 3
ACCESS Andesite
Fragmental
21-Apr-17 K1 03A UC3 LA01 10002 19796 4932 270 0 5.0 10 0.05 to 0.3 Separation < 1mm Soft Dry 35 40 1.61 T2 Type 3
Andesite
Database
SILL Fragmental
26-Apr-17 K1 02B 9882 19837 4954 5 0 5.0 10 <0.05 Separation < 1mm Soft Dry 35 35 0.93 T2 Type 3
ACCESS Andesite
26-Apr-17 K1 SP 05 ACCESS 10054 19793 4982 10 0 5.0 Andesite 10 0.05 to 0.3 Separation < 1mm Hard Dry 45 50 4.83 T2 Type 3
26-Apr-17 KL SP 16 DD CUDDY 9748 19225 4808 220 0 5.0 Andesite 20 0.05 to 0.3 Separation < 1mm Hard Dry 45 50 4.83 T2 Type 4 HEADING FOR DD CUDDY
30-Apr-17 K1 SP 05 ACCESS 10056 19806 4984 356 0 5.0 Andesite 30 0.05 to 0.3 Separation < 1mm Soft Dry 45 47 3.47 T2 Type 3
09-May-17 KN SUB 14A UC2 LA 10130 20059 4718 90 0 5.0 Conglomerate 20 0.05 to 0.3 Separation < 1mm Soft Moist 40 39 1.44 T2 Type 3 BRECCIA EXPOSED
UC3 N
03-Jun-17 K1 03A 9962 19790 4932 270 0 5.0 Arg (Clay) 10 0.05 to 0.3 Open Joint 1-5mm Dry 30 29 0.48 T3 Type 3
OD04
SILL N FOUND STEEP STRUCTURE
11-Jun-17 K1 06D 10014 20005 4892 330 0 5.0 Basalt 10 0.05 to 0.3 Open Joint 1-5mm Dry 45 41 1.80 T2 Type 3 PARALLEL WITH DRIVE
OD01
UC3 N PRESENCE BRECCIE AT RIGHT SIDE
13-Jun-17 K1 03A 9947 19802 4992 346 0 5.0 Conglomerate 10 0.05 to 0.3 Open Joint 1-5mm Dry 35 36 1.04 T2 Type 3 FACE WITHORIENTATION N 300' E /
OD04 80'
20-Jun-17 KL 15A UC1 WEST 9912 19447 4710 65 0 5.0 Quartz Vein 10 <0.05 Open Joint 1-5mm Moist 30 25 0.31 T3 Type 4 Argi l i c l a yer expos ed vs overha ng
Core to model +
Validated from face mapping
www.nhm.co.id
Rockmass Model
www.nhm.co.id
Damage Mapping
www.nhm.co.id
Kesimpulan
• Ketika digunakan secara benar, klasifikasi massa batuan
adalah alat yang sangat efektif dalam pertimbangan
geoteknikal
• Hampir semua hardrock mining menggunakan klasifikasi
RMR/Q
• Dalam rekomendasi geoteknik perlu menggunakan lebih dari 1
tools bahkan lebih dari 1 metode sebagai komparasi dan
verifikasi
www.nhm.co.id
Prof. Z.T. Richard Bieniawski, 1936-2017