You are on page 1of 4

Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-C-2003

Project Name Date:16 Feb 2011


Contract Number Page 1 of 4
Revision 1

SPECIFICATION – GEOTECHNICAL ENGINEERING INVESTIGATION

This specification has been revised as indicated below and described in the revision record on the following
page. Please destroy all previous revisions.

Revision Date Originator's Reviewed/Checked By Pages


No. Name & Initials Name & Initials
A 8/12/2010 Greg Luttrull 4
0 10/28/10 Greg Luttrull Joey Ramos 4
1 2/16/2011 Greg Luttrull Joey Ramos 4

APPROVALS SIGNATURES DATE

Lead Engineer Greg Luttrull 2/16/2011


Project Engineering
Manager: Ed Haney 2/16/2011
Client Approval:

ISSUED FOR : Construction X Other Approved


Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-C-2003
Project Name Date:16 Feb 2011
Contract Number Page 2 of 4
Revision 1

SPECIFICATION – GEOTECHNICAL ENGINEERING INVESTIGATION

Record of Revisions
Revision Date Description
No.

A 8/12/10 Issued for Approval, Table of Contents Only

0 10/28/10 Issued for Review/Approval

1 2/16/2011 Issued Approved


Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-C-2003
Project Name Date:16 Feb 2011
Contract Number Page 3 of 4
Revision 1

SPECIFICATION – GEOTECHNICAL ENGINEERING INVESTIGATION

Scope

PIP CVS02010, Geotechnical Engineering Investigation Specification, dated February 2009, is adopted for
project use with the following modifications noted in this addendum.

Modifications to the Original Specification

The following requirements are defined as additions, deletions, and revisions to PIP CVS02010.

Section Description

N/A N/A
Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-C-2003
Project Name Date:16 Feb 2011
Contract Number Page 4 of 4
Revision 1

SPECIFICATION – GEOTECHNICAL ENGINEERING INVESTIGATION

PIP CVS02010
Geotechnical Engineering Investigation Specification

Table of Contents
1. INTRODUCTION ............................................................................................................................................ 2
1.1 Purpose................................................................................................................................................ 2
1.2 Scope.................................................................................................................................................... 2
2. REFERENCES ................................................................................................................................................. 2
2.1 Industry Codes and Standards......................................................................................................... 2
3. DEFINITIONS.................................................................................................................................................. 3

4. REQUIREMENTS ........................................................................................................................................... 4
4.1 General ................................................................................................................................................ 4
4.2 Documentation ................................................................................................................................... 5
4.2.1 Field Reports ......................................................................................................................... 5
4.2.2 Preliminary Report ................................................................................................................ 5
4.2.3 Final Report........................................................................................................................... 6
4.3 Execution............................................................................................................................................. 7
4.3.1 General .................................................................................................................................. 7
4.3.2 Examination of Site............................................................................................................... 7
4.3.3 Utilities .................................................................................................................................. 7
4.3.4 Field Work............................................................................................................................. 8
4.3.5 Laboratory Testing ..............................................................................................................10

Data Form
CVS02010-F - Geotechnical Engineering Services - Final Report Checklist

You might also like