The Buyers’ Guide to:

Metal Web
Introduction
High performing floors are what contractors look to achieve for their house
buying customers. These ideals can be brought a step closer by using correctly
designed and installed metal web joists.

These products are parallel chord trusses


made from strength-graded timber, joined
with engineered steel webs. Popular with
architects, specifiers, homebuilders and
contractors, factory-made metal web joists
are lightweight, strong and versatile. This
combination allows longer clear spans
giving designers greater freedom of
room layout.

Frequently used in the construction of


floors but also used in roofs, metal web
joists are easier, faster to install and more
cost-effective than other flooring solutions.
The main benefit is the easy access they
provide for services, with no need to cut or
drill holes in the joist. Pipework, ducting
and cabling for heating, ventilation or
electrics can easily be routed through the
joist space long after the metal web joists
have been installed.

Images courtesy of Wolf Systems Limited, MiTek Industries, ITW Construction Products, Pasquill
and Simpson Strong-Tie

Contents
00. Introduction 01
01. Metal web joists 02
02. How to buy metal web joists 03
03. Responsibilities in metal web joist floor design 04
04. Glossary of terms 06
05. Design considerations 08
06. Essential metalwork for floor systems 14
07. Site handling, storage and installation 15
08. Do’s and don’ts 17
09. Construction checklist 18

The Buyers’ Guide to Metal Web page 01


1 Metal web joists

Metal web joists and beams are structural building components which can be
used to create a variety of floor, roof and wall constructions. They can be
combined with solid and engineered wood products or structural steel, either
on site to provide complete floor and roof elements or through offsite
manufacturing to deliver fully assembled floor or roof cassettes.
Metal web joists can be used beyond
domestic applications and are also suitable
for use in commercial and industrial
buildings constructed from timber frame,
masonry, steel or concrete.

Benefits
The benefits of metal web joists are:
• The open web structure means metal
web joists are lighter to handle than
timber equivalents
• Wide timber chords allow for easy
fixings for both the floor decking and
ceiling finish meaning quick and easy
installation
• Flexibility of design and use of high
strength materials mean longer spans
• Open web design delivers ease of Easy access
access for services for services
• Long-term stability is achieved through
less shrinkage due to the reduced
section of timber
• Increased spans, simpler installation of
utilities and services, flexibility of
design and faster installation results in and custom builders and community About the TRA
significantly reduced build costs self-build projects. Many members can The TRA is the respected voice of the
• Made to measure products virtually also help with supply and fit, or supply, fit trussed rafter and metal web joist industry
eliminate site wastage and finish services according to your needs in the UK and Ireland. We are committed
• Consistent quality thanks to precision and budget. to stringent standards of quality and
engineering and offsite manufacture. service and set a professional benchmark
TRA members specialise in commercial for the industry.
Trussed Rafter Association (TRA) metal web joists for hospitals,
members create bespoke designs for all supermarkets, schools and other large Members include the principal
types of homebuilders, from major public projects, all designed to Eurocode manufacturers of trussed rafters, metal
volume housebuilders to individual self 5 for good practice structural integrity. web joists, suppliers and professionals
Many TRA metal web joist manufacturers involved in roof and floor design and
also manufacture trussed rafters, which construction.
can offer the opportunity for cost savings
through streamlining the supply chain. The TRA requires all its manufacturing
We’ve produced this buyer’s guide to members to have third-party supervised
outline where metal web joists can be used quality assurance and professional
and to highlight the key considerations indemnity insurance, helping to ensure
when choosing metal web joists for quality and peace of mind for the
your project. customer.

To find out more, please visit the website www.tra.org.uk to find a TRA member near
you who will be happy to advise you on next steps.

page 02 www.tra.org.uk
2 How to buy metal web joists

When you buy metal web joists from a TRA member, you can be confident
your supplier has been vetted and approved by the industry’s leading
professional association.
We advise that you always speak to a TRA members offer a range of services
TRA member to talk about your specific to suit your requirements. These are
needs as early as possible in the project. categorised as follows and you can
They will be happy to discuss your choose the service(s) according to your
requirements and to advise on the best project needs:
approach for your project.
• Design and supply
• Design, supply and fit
• Design, construct and supply.

Design and supply Design, supply and fit Design, construct and supply
In most cases metal web joists are Where required some TRA members can As we see increasing demand for offsite
provided on a design and supply basis, also provide a service that includes the manufacture, many TRA members are
with the metal web joist manufacturer also manufacture, delivery and installation of offering the customer the opportunity
taking on some or all the elements metal web joists. With a supply and fit to have metal web joists constructed in
of the floor design. This service involves service, you have just one point of the factory and delivered to site as
the customer supplying detailed project contact throughout your floor construction. pre-assembled floor units, termed cassettes.
information directly to the TRA member, Choosing this option gives you the peace Being offsite manufactured, floor cassettes
who then designs the metal web joists of mind in knowing that those responsible help reduce construction time and labour
using specialist software. Such project for the installation are fully qualified required on-site. Improving build schedules
drawings will need to include the specialist floor installers. In addition, and in many cases potentially enhancing
information listed in the ‘Examples of the responsibility for developing risk build quality.
key design responsibilities’ section of this assessments and safe systems of work for
guide. When the metal web floor design storage and installation lies with your To help meet the responsibilities set out
is completed, a copy will be provided to chosen TRA member. here, detailed drawings and written
the customer for approval and once signed instructions are always provided by TRA
off, the TRA member will manufacture members as part of the floor delivery
the components to your specification and package. In addition to this specific
supply them to your site, at an agreed date technical information, TRA members can
and time. also provide guidance on the transport,
handling, storage and installation of our
When choosing a design and supply products. Therefore, contractors and
service, the customer is responsible for designers should always work closely from
ensuring safe unloading and correct as early a stage as possible with their
storage of the products when they are chosen TRA member.
delivered. The customer is also responsible
for ensuring that the metal web joists are
properly installed by a suitably qualified
person.

The Buyers’ Guide to Metal Web page 03


3 Responsibilities in metal web joist floor design

All TRA members use the latest software to design metal web joist floors
to comply with BS EN 1995-1-1 (Eurocode 5) and manufacture them in
accordance with European Technical Assessment Document ETAD 011 for
light composite wood-based beams and columns.
The role of the building designer and the
metal web joist floor designer
The building designer, usually the
architect or structural engineer, has overall
responsibility for the design and structural
integrity of the building. Part of this
responsibility is to ensure that individual
components within a building act
together to form an integrated structure.
They should ensure that the floor design is
compatible with the supporting structure
and that the floor is adequately connected
to the walls.

Information sharing is the key to the


process and the guide below is a brief
summary to how the responsibilities are
shared:

Building Designer Metal Web Joist Floor Designer

Main responsibilities: Main responsibilities:

• Lateral restraint of walls via the floor • Safe support of all floor design loads
• Ensure loads adequately transferred to the building structure
• Design of fixings between metal web joists and timber beams
within the floor zone

Shall provide the following information to the floor designer: Shall provide the following information to the building designer:

1. The building footprint and layout 1. The size and specification of metal web joists
2. The joist span, direction and floor depth available 2. Positions, direction and spacing of all floor components
3. Design dead load or details of types and weights of floor 3. Location of all support bearings used in the design
and ceiling coverings 4. The loadings and use conditions for which the metal web
4. Intended building use and design-imposed loads joists have been designed
5. Position and weight of non-load bearing internal partitions 5. The basis for the design and range of reactions at
6. Other additional loads such as hoist tracks support positions
7. The positions and method of support at all bearing positions 6. Maximum deflection limits and other performance criteria
e.g. hangers or built-in 7. Specification of strongbacks or other stiffening elements
8. Any special requirements for floor members e.g. specific required
chord widths, joist spacing or deflection requirements 8. Fixing details for all multiple members and joist to joist or
9. Size and location of required floor openings e.g. stairs joist to timber beam connections
10. Size and location of large or non-standard services planned 9. Design of joist to masonry or beam to masonry connections
to be run through the floor zone. required
10. Any special handling, storage or installation requirements.

page 04 www.tra.org.uk
The building designer should provide the In addition to this specified design process, Advice and guidance
metal web joist manufacturer with all NHBC standards set out that design and To help meet the responsibilities as set out
relevant information (as detailed on specification information should be issued on page 4, detailed drawings and written
page 4). The manufacturer provides the by the metal web joist designer to site instructions are always provided by TRA
materials to produce a floor that meets supervisors, relevant specialist members as part of the metal web joist
the criteria specified by the building subcontractors and suppliers as below: delivery package. In addition to this
designer. specific technical information, TRA
• Direction of floor span, and size and members can also provide guidance on
The role of floor designer may be spacing of joists the transport, handling, storage and
allocated by the building designer to an • Size of trimmers and trimming joists installation of products. Therefore,
independent consultant or engineer and • Position of strutting contractors and designers should always
in such cases the metal web joist • Detailing of openings in the floor work as closely as possible from an early
manufacturer will simply supply the • Supporting walls below stage with their chosen TRA member.
components specified. • Walls and partitions above
• Positions of restraint straps
• Positions of large service penetrations
e.g. chimneys, SVPs
• Position of insulation
• Details of all junctions
• Manufacturers’ recommendations for
assembly and fixing of proprietary
components.

The Buyers’ Guide to Metal Web page 05


4 Glossary of terms
Bearing Dead Load Metal Web Brands
The part of a metal web joist receiving The load produced by the fabric of the There are currently three brands of metal
structural support. This is usually a wall but building, always long-term (see design web joists available through TRA member
can be a beam or post etc. loads). manufacturers. The general information
in this guide is applicable to all brands of
Building Designer Deflection metal web joist:
The person responsible for the structural The deformation caused by the loads. • easi-joist by Wolf Systems Limited
stability and integrity of the building as • Posi Joist by MiTek Industries
a whole. Imposed Load • SpaceJoist from ITW Construction Products.
The load produced by occupancy and use
Cassette including storage, inhabitants, moveable Nogging
Factory controlled, pre-assembled floor unit partitions. Can be long, medium or Timber pieces fitted at right angles
that helps reduce labour and short term. between the metal web joists to form
construction time on-site. fixing points.
Intermediate Support
Chord Additional bearing point within the length Overall Span
The top or bottom structural timber of the metal web joist. Total length of the metal web joist.
element of a metal web joist.
Live Load Restraint Strap
Chord Splice Term sometimes used for imposed loads. Metal component designed to tie joist and
A structural joint in the top or bottom walls for restraint purposes.
chord formed using a connector plate. Metal Web Joist
Parallel chord trusses made from Strongback
Clear Span strength-graded timber, joined with A strongback is used to dampen vibration
Distance between bearing points at each engineered steel webs. by increasing the stiffness of the floor and
end of the metal web joist. reduce deflection by load sharing.
Metal Webs
Connector Plate V shaped metal plates having integral Timber stress grading
Metal plate having integral teeth punched teeth punched to a patent design from the The classification of timber into different
from the plate material. It is used for plate material. They are applied to both structural qualities based on strength.
joining timber in one plane with no sides of a metal web joist to separate and
overlap. It will have an accreditation support the top and bottom chords. Each Trimmer
certificate and will be manufactured, web will have an accreditation certificate Additional metal web joists or pieces of
usually, from galvanised steel. and will be manufactured, usually, from timber used to frame around openings.
galvanised steel.

page 06 www.tra.org.uk
Joist Definitions Connector plate

Top chord

Top chord splice

Metal web
Column

Intermediate support
End column
Bottom chord splice

Strongback

Bottom chord

End bearing

Perimeter nogging
Floor Definitions
Solid or engineered timber stair trimmer

Strongback

Multiply girder
Ring beam

Stair trimmer

Rimboard

Bearing/wallplate

Binder

Metal web joist

The Buyers’ Guide to Metal Web page 07


5 Design Considerations

As set out in section 3 Responsibilities in metal web joist floor design, the
building designer needs to provide the metal web floor designer with a set of
information on which the floor design will be based. A consideration of these
factors is given in more detail below.

5.1 The building footprint and layout 5.2 The joist span, direction and floor
depth available
The starting point for most floor designs will
be a set of basic dimensioned plans showing Metal web joists can bridge greater clear
the building footprint and fundamental spans than competing products of the same
layout. The floor designer will use these depth giving the building designer better
plans as a framework within which to create flexibility for room layout. However, the
the floor design. most important benefit of a metal web joist
floor is its ability to facilitate quick and easy
installation of the major services.

8177
8177

1390 1800 2285 1200 1502 1690 1200 2585 1200 1502
300

W3 W8 W6
D1
1200 x 1050 1200 x 1200 1200 x 1200
1800 x 2100

3545 89 3943

Dining Kitchen
3884
3395

Bedroom 3 Bedroom 2

3395

4084
4526
6621

D3 D5
D10 D12
89

89

910 x 2100 910 x 2100


8141

910 x 2100 910 x 2100


930 x 2100

8141

910 x 2100
910 x 2100

630 x 1050
930

1498
D8

D16

WC Utility

630
1658

W9
D4

630 x 1050
10103

2115
630

W11

89 Bathroom

10103
850 89 3308
2476

810 x 2100

Cyl
89

D18

3966 89 682 89 2750


4247
Hall
D17
89
27

UP
11

910 x 2100
2818 89 4670
D6
630 x 1050

0
10

2985
x2
630

W2

En-suite
91

4272

910 x 2100
5289
745

300 2486 89 5002 300


D19

5389
890

D7
3815

1360 x 2100
W10
Living Bedroom 1
1200 x 1050
1962

1962

W4
300

1770 x 1050 W7

992 1360 223 1965 1770 1867 1770 x 1050

992 1200 383 1965 1770 1867


2575 5602
2575 5602

Ground floor layout First floor layout

page 08 www.tra.org.uk
Sizes Chord Sizes Nominal joist depths
Metal web joists are available in a wide • 200mm
range of sizes to suit almost any project. • 225mm
Actual dimensions are dependent on loads, • 250mm
spans and specified centres. While the • 300mm
technology exists to make extra-long joists, • 375mm
in practice length is limited by the practicality • 425mm
of handling and transportation.
Layout
Metal web joists are manufactured offsite When used for flooring, joists are
to your exact requirements to eliminate on typically laid perpendicular to
site wastage of both time and materials. 72mm 97mm 122mm 147mm load-bearing walls. However, other
However, if required they can be supplied configurations may be possible when
with a solid trimmable end to accommodate required to suit openings or other
any minor on site variations. construction details. These should be
discussed with the floor designer prior
Flexibility in terms of chord width plus a to the design stage.
variety of different depths allows metal
web joists to meet customer needs in
the most efficient way possible. Some
examples of nominal dimensions are All joists are designed to accommodate a
given here: minimum 100mm nominal round soil and vent
pipe SVP or rectangular 50mm x 300mm
section ducting.

5.3 Design dead load or details of types


and weights of floor and ceiling coverings

The most critical aspect of any floor design


is to ensure that the correct loadings are
defined at the design stage. This will ensure
a safe, effective, and cost-efficient floor
design for the client.

The design is undertaken with the aid of


software, which allows the designer to
accommodate both dead and imposed
loads applicable to the use and occupancy
of the building. The floor designer should
be advised of any unusual loads which
may be applied to the floor system, e.g.
spa baths, snooker tables, hoists etc.

The Buyers’ Guide to Metal Web page 09


5 Design Considerations (cont.)

5.4 Intended building use and design-imposed loads

Floor systems Roof Systems


A metal web joist floor system can provide Metal web joists are suitable for both flat
longer clear spans, which gives greater and pitched roofs where, due to their span
design flexibility in locating bearing walls capability, they can provide an economical
and partitions. This allows the designer alternative to steel, concrete and other
freedom to choose a variety of internal materials.
room layouts within an external shell.

5.5 Position and weight of non-load 5.6 Other additional loads such as
bearing internal partitions hoist tracks

Metal web joists are designed and Building clients are increasingly adding
manufactured to the specific requirements additional loads such as hoists in care
of each project. A design is dependent on homes and adapted living accommodation.
the application and loads applied. Given the significant loads these can
impose on the floor zone it is important
Metal web joists are not designed to detailed information on such requirements
support masonry load-bearing walls but is included at an early stage of design.
can be designed to support lightweight
partition walls.

Image courtesy of Astor-Bannerman

page 10 www.tra.org.uk
5.7 The positions and method of support at all bearing positions e.g. hangers or built-in

Metal web joists can be designed to be supported on either the bottom chord or the top
chord and can be built into supporting elements or connected via joist hangers. Several
typical support details are shown below for masonry and timber frame construction.

Masonry Timber frame

Built In

Packers
Top / Bottom Chord
SVP
supported Trimmer built
Top chord supported
Face fix hanger into wall
metal web joist with
single end column
Metal web joist no Packer
more than 6mm
from back of
hanger

Intermediate support

The Buyers’ Guide to Metal Web page 11


5 Design Considerations (cont.)

5.8 Any special requirements for floor members e.g. specific chord widths, joist spacing or deflection requirements

Floor vibration
Specific customer requirements
regarding floor vibration or deflection
limits should always be discussed with the
floor designer.

Herringbone strutting is not required with


metal web joists. Where the span exceeds
four metres a strongback is normally used
to dampen vibration by increasing the
stiffness of the floor and reduce deflection
by load sharing. TRA members can provide
guidance on installation.

5.9 Size and location of required floor


openings e.g. stairs

The location, size and type of stair or


other openings within the floor area is
one of the most critical aspects of design
in order to transfer the loads and deal
with the practicalities of creating the
opening through the use of trimmers and
girders or multiple metal web joists.

5.10 Size and location of large or non-standard


services planned to be run through the floor
zone

Easy access to services


One of the major benefits of using metal web
joists is that they are designed to easily
accommodate services and utilities within the
floor void area without the need for any cutting,
notching or drilling. If it is necessary, this should
never be undertaken without the joist
manufacturer’s approval. Joist depths may be
varied to suit particular duct requirements.

page 12 www.tra.org.uk
5.11 Other considerations

Horizontal restraint straps However, if the joists are to be used in Standard generic details have
Horizontal restraint straps are used to tie the situations where preservative treatment been developed to address the most
walls to the floors and should be fixed to may be required, then the TRA member’s common aspects of design, and are
perimeter walls in accordance with the advice should be sought and any available through the Robust details’
building designer’s instructions. preservative treatment used should not handbook in terms of acoustics and from
adversely affect the corrosion resistance of your chosen metal web joist supplier in
Preservative treatment the metal webs or plates. terms of defined 30 and 60-minute tested
Metal web joists do not normally need to fire solutions.
be preservative treated when used in floor Fire and acoustics
constructions where the environment is Metal web joists fully comply with all
likely to be classified as Use Class 1 or 2 as relevant standards in relation to fire and
defined in Eurocode 5. acoustics.

The Buyers’ Guide to Metal Web page 13


6 Essential metalwork for floor systems

Specification and use of the correct metalwork is essential to achieve the floor
performance as designed. TRA members are your expert partners who can
help to identify and provide the right products for the job.
Hangers
Metal web joists must be correctly
supported using the appropriate hanger.
There are specific hanger variants for
timber to timber and timber to
masonry connections. There are also
further variants for circumstances where
there is limited masonry above the
connection point. Always ensure the
correct fixing schedule is followed and all
the necessary fixings are applied.
Timber to timber Timber to masonry

Restraint
Lateral restraint is essential to connect
walls and floor elements. Specification of
the correct arrangement for restraint is the
responsibility of the building designer, but
TRA members can assist in identification and
supply of both perpendicular and parallel
lateral restraint metalwork.

Perpendicular lateral restraint Parallel lateral restraint

Multiple joist connections


2-ply joists are typically used around
openings where greater stiffness is required
for oncoming point loads etc. It is essential
that the correct connection detail is used to
ensure this unit acts as one rather than two
halves moving against each other which
can cause excessive deflection in the floor.
TRA members will provide specification
details using structural screws or clips as an
essential element of the floor design. They
will also be happy to supply the appropriate Structural screw connection Structural clip connection
connectors as part of the delivery package.

Ancillary metalwork
Selection of the right metalwork will Page 14 – In the Multiple joist connec-
increase the efficiency of metal web joist tions section, could you make the second
installation and ensure the correct image the same size as the rest please and
connection is made first time every time. can you add the following title - Structur-
al clip connection

Nogging support clips

page 14 www.tra.org.uk
7 Site handling, storage and installation

The TRA manufacturer will take responsibility for the safe loading and delivery
of metal web joists. The responsibility for the safe unloading and handling, once
on site, and the installation is the responsibility of the contractor. However, to
assist the contractor, the TRA member will supply you with the delivery, and on
request, general guidance on their storage, handling and installation.
Metal web joists are delivered in Handling
tightly banded packs to facilitate Site handling safety guide:
mechanical handling which is the
recommended method for 1. When unloading with a crane, fabric slings should
unloading and movement be attached to the timber chords or lifting points
whilst on-site. and not the metal webs. Metal chains / slings
should not be used
2. Slings should be attached to the panel points
Approx 50º
closest to the quarter points
3. If unloading with a forklift, care should be taken
to ensure that the forks do not damage the joists
4. Joists may be lifted as either single units or packs,
but care should be taken to avoid bending,
twisting or dropping
5. Metal web joists should be lifted in a vertical
position.

Storage
Site storage guide:

1. Site storage is intended to be


temporary immediately prior to
installation so delivery should be
arranged to minimise storage time
2. Metal web joists should be stored on
firm level ground well clear of any
vegetation
3. They should be protected with a
weatherproof covering to protect them
from short term exposure to inclement
weather
4. Metal web joists can be stored either
vertically or flat. If stored vertically
there should be adequate bearers
under the node points. If stored
horizontally they should be supported
to prevent distortion.

The Buyers’ Guide to Metal Web page 15


7 Site handling, storage and installation (cont.)

Construction materials shall only


be stored in the 1.5m edge zone
at one end of the joist only.
Remove safety bracing as
Max height 250mm.
decking proceeds
Joists supported by masonry hangers
to have a minimum 675mm cured
masonry above hanger level or as Nail all binders and braces
advised by hanger manufacturer to each joist with 2/no.
65 x 3.5mm nails

2.4
97 x 22mm m
ma
diagonal brace x.

97 x 22mm longitudinal
2.4 Do not store construction
braces connected to m
diagonal bracing at one ma material close to trimmers
x.
end of joist run

Strongback bracing 72 x 47mm top chord


fixed as details above restraint noggings

Temporary bracing
This diagram indicates temporary erection bracing only. It is applicable to both masonry and timber frame construction.
Decking can be laid in lieu of diagonal bracing.

Installation
Site installation guide:

1. Before installing the joists, decide on 6. Spacing is defined by the designer on 11. Care should be taken to ensure that
which area of floor is to be installed the layout drawing supplied and must the specified spacings and bearings are
first and from what end not be increased by the installer maintained
2. Use the layout drawing provided by the 7. Strongbacks should be inserted before 12. Care should be taken to ensure that
manufacturer to place joists in the the joists are fixed, as it may not be joists are level along their lengths and
correct area of the building possible after fixing across the floor and that each is
3. Check the end details of joists and if 8. Do not walk on unbraced metal web correctly supported
any internal support is needed. If joists as they may be unstable 13. All bearing positions should be level
needed, ensure the correct orientation 9. Do not store building materials on and firm and provide the specified
of the joist before raising to floor level unbraced metal web joists minimum bearing area
4. The top chord will always be identified 10. Temporary diagonal bracing laid at 45˚ 14. Temporary bracing may be removed
on each joist and users should ensure and installation of the permanent as floor decking is installed in each
every joist is installed the correct way up strongbacks should be used to stabilise section.
5. Use hoisting straps around the timber the metal web joists
chords, not around the metal webs
when raising to floor level

page 16 www.tra.org.uk
8 Do’s and don’ts of handling, storage and installation of metal web joists

IMPORTANT Modification of
joists is strictly prohibited

4
DO ORIENTATE CORRECTLY

Joists are designed with a specific


top and bottom chord. Refer to joist
profile plots for correct orientation

8
DO NOT DRILL TIMBER

8
DO NOT CUT TIMBER

8 DO NOT DAMAGE
OR REMOVE WEBS
8
DO NOT EXPOSE TO EXCESSIVE MOISTURE

8 DO NOT NOTCH
TIMBER
4
DO CUT TRIMMABLE ENDS IF REQUIRED

4
DO USE WEB OPENINGS FOR SERVICES

4
DO SPACE CORRECTLY

Refer to joist profile plots for


maximum joist spacing

The Buyers’ Guide to Metal Web page 17


8 Construction checklist

For buyers and contractors who are Any points on the list that are checked
responsible for the installation of metal as ‘no’ must be addressed and rectified
web joists, the TRA has produced the before work proceeds.
checklist below as a useful guide of the
construction elements which need to be
inspected to ensure a safe and correct
installation.

Yes No
Metal web joists
Correct quantity, positions and orientation
Centres not greater than specified
Ensure all joists “Top Side” up
Adjacent joists are level with each other and the ends of the joists form a straight line
Joists should be erected straight and vertical
Horizontal deviation: 10mm max
Vertical deviation: 2mm max
Ensure support condition as per drawings
All joists are fully bearing on their supports properly seated on wall plate, hangers etc.
All strongbacks are correctly positioned according to drawings installed tight to underside of
top chord and fixed in accordance with specification
No damage or unauthorised modifications to joists or other floor components
Girders/multiple MWJ and stair trimmers are correctly positioned and connected exactly in
accordance with specification
Any additional restraint required correctly installed and fixed
Correct thickness and width of floor deck installed and fixed in accordance with specification

Yes No
Structural metalwork
Hangers correct to specification and fixed as specified
Restraint straps present and correctly fixed, including packing where required between members

Notes

page 18 www.tra.org.uk
Visit our website for more information: tra.org.uk or traireland.ie

The Building Centre


26 Store Street
London
WC1E 7BT

T: 020 3205 0032


E: info@tra.org.uk

The latest version of this guide can be downloaded online at tra.org.uk or traireland.ie

All information is correct at the date this guide was produced. We reserve the right to make technical changes at any time.

Met0001 – 2020/01