Proposed 125 KLPD Grain based Distillery, 25KLPD Malt Spirit Plant and 4.

5 MW Cogeneration Power Plant


At Village Chiraura, Tehsil Akbarpur, District Kanpur Dehat (U.P.)
ToR Compliance

Point Wise Compliance of Terms of Reference (ToR)


Name of the Proposed 125 KLPD Grain based Distillery, 25 KLPD Malt Spirit Plant and 4.5 MW
Project Cogeneration Power Plant at Village Chiraura, Tehsil Akbarpur, District Kanpur Dehat
(U.P.)
Name of the M/s. Rajasthan Liquors Limited
Project Proponent
MoEFCC ToR letter IA-J-11011/58/2018-IA II (I) dated 24th March,2018
& date

ToR ToR Point Compliance Reference in EIA/


Poin EMP Report
t No.
1. Executive Summary Executive Summary of the project has been
incorporated with this EIA/ EMP report.
2. Introduction
i. Details of the EIA Consultant Details of the EIA Consultant including NABET
including NABET accreditation has been incorporated in this EIA/EMP
accreditation. Report.
ii. Information about the Information about the project proponent has been
project proponent. incorporated in this EIA/EMP Report.
iii. Importance and benefits of Importance and benefits of this project has been given
the project. in this EIA/EMP Report.
3. Project Description
i. Cost of project and time of  Total cost of the project is Rs. 175 Crores.
completion.  After obtaining necessary statutory approvals
approximately 3 years will be required for
commencement of operations.
ii. Products with capacities for Products with capacities for the proposed project are
the proposed project. incorporated in EIA/EMP Report.
iii. If expansion project, details  Details of product with capacities for proposed
of existing products with project have been incorporated in this EIA/ EMP
capacities and whether report.
adequate land is available for  Total project area is 9.7 Ha (24 acres).
expansion, reference of
earlier EC if any.
iv. List of raw materials required List of raw materials required, their source along with
and their source along with their mode of transportation has been incorporated in
mode of transportation. this EIA/EMP Report.
v. Other chemicals and Details of other materials & chemicals required with
materials required with quantities and storage capacities have been
quantities and storage incorporated in this EIA/EMP Report.
capacities.
vi. Details of Emission, effluents, Particular Type Source Management
hazardous waste generation Emissions PM, Boiler  ESP
and their management. So2,NOx  Stack of
adequate height
as per norms
 Necessary
temperature

M/s. Rajasthan Liquors Limited


Proposed 125 KLPD Grain based Distillery, 25KLPD Malt Spirit Plant and 4.5 MW Cogeneration Power Plant
At Village Chiraura, Tehsil Akbarpur, District Kanpur Dehat (U.P.)
ToR Compliance

ToR ToR Point Compliance Reference in EIA/


Poin EMP Report
t No.
profile will be
maintained
CO2 Fermentation Collected and
utilized as an
industrial gas.
Effluent Wastewater Plant processes Treated & recycled in
process
Hazardous Used oil & Industrial activities Sold to authorized
Waste grease vendors for
recycling
Details of and their management are included in this EIA/EMP Report in
Chapter IV.
xii. Requirement of water,
Particulars Total Requirement
power, with source of Source
supply, status of approval,
Water (KLPD)
water balance diagram, man- 1354 Groundwater
power requirement (regular
and contract) Power(MW) 3.0 Proposed 4.5 MW
Co-generation
power plant and
D.G. Sets for
emergency.
Manpower 450 Unskilled/ Semi-
(no. of persons) skilled – Local Area;
Skilled- Outside
Status of Approval:
The application for permission for withdrawal of ground water for 1354 KLD
has already been submitted to CGWA. Copy of the same has been enclosed as
Annexure –1 along with this EIA/EMP Report.
Water balance has also been incorporated in this EIA/EMP Report.
xvii. Process description along  Process description has been incorporated in this
with major equipment and EIA/EMP Report.
machineries, process flow  Process flow sheet from raw material to products /
sheet (quantitative) from mass balance has also been incorporated in this
raw material to products to EIA/EMP Report.
be provided.  The details of major equipment and machineries
have been incorporated in this EIA/EMP Report.
xviii. Hazard identification and Hazard identification and details of safety systems
details of proposed safety have been incorporated in the EIA/ EMP report.
systems.
xix. Expansion & modernization proposals:
a) Copy of all the Not applicable as it is a proposed project.
Environmental Clearance(s)
including Amendments
thereto obtained for the
project from MOEFCC/SEIAA
shall be attached as an

M/s. Rajasthan Liquors Limited


Proposed 125 KLPD Grain based Distillery, 25KLPD Malt Spirit Plant and 4.5 MW Cogeneration Power Plant
At Village Chiraura, Tehsil Akbarpur, District Kanpur Dehat (U.P.)
ToR Compliance

ToR ToR Point Compliance Reference in EIA/


Poin EMP Report
t No.
Annexure.
A certified copy of the latest
Monitoring Report of the
Regional Office of the
Ministry of Environment and
Forests as per circular dated
30th May, 2012 on the status
of compliance of conditions
stipulated in all the existing
environmental clearances
including Amendments shall
be provided.
In addition, status of
compliance of Consent to
Operate for the ongoing/
existing operation of the
project from SPCB shall be
attached with the EIA-EMP
report.
b) In case the existing project Not applicable as it is a proposed project.
has not obtained
environmental clearance,
reasons for not taking EC
under the provisions of the
EIA Notification 1994 and /or
EIA Notification 2006 shall be
provided. Copies of Consent
to Establish/No Objection
Certificate and Consent to
Operate (in case of units
operating prior to EIA
Notification 2006, CTE and
CTO of FY 2005 - 2006)
obtained from the SPCB shall
be submitted. Further,
Compliance report to the
conditions of consents from
the SPCB shall be submitted.
4. Site Details
i. Location of the project site Location details of the project site along with village,
covering village, tehsil, district and state has been incorporated in this
Taluka/Tehsil, District and EIA/EMP Report.
State, Justification for No alternative site has been considered for the
selecting the site, whether proposed project.
other sites were considered.
ii. A toposheet of the study Map showing 10 km radius study area and site location
area of radius of 10 km and on toposheet of 1:50,000 scale has been incorporated
site location on 1:50,000/ in the EIA/EMP Report.
1:25,000 scale on an A3/A2
sheet (including all eco-

M/s. Rajasthan Liquors Limited


Proposed 125 KLPD Grain based Distillery, 25KLPD Malt Spirit Plant and 4.5 MW Cogeneration Power Plant
At Village Chiraura, Tehsil Akbarpur, District Kanpur Dehat (U.P.)
ToR Compliance

ToR ToR Point Compliance Reference in EIA/


Poin EMP Report
t No.
sensitive areas and
environmentally sensitive
places).
iii. Details w.r.t. option analysis Details with respect to selection of site have been
for selection of site incorporated in this EIA/EMP Report.
iv. Co-ordinates (lat-long) of all Corner Co-ordinates of the project site are
four corners of the site. incorporated in the EIA/EMP Report.
v. Google map-Earth Google Earth downloaded map of the project site is
downloaded of the project given in the EIA/EMP Report.
site.
vi. Layout maps indicating Plant Layout showing proposed unit, storage area,
existing unit as well as greenbelt area, other utilities etc. is incorporated in
proposed unit indicating this EIA/EMP Report.
storage area, plant area, The project site is not located within an industrial
greenbelt area, utilities etc. If area/Estate/Complex.
located within an industrial
area/Estate/Complex, layout
of Industrial Area indicating
location of unit within the
Industrial area/Estate.
vii. Photographs of the Photographs of the proposed project site have been
proposed and existing (if incorporated in this EIA/EMP Report.
applicable) plant site. If
existing, show photographs
of plantation/ greenbelt, in
particular.
viii. Land use break-up of total Total project area is 9.7 Ha (24 acres) and the same is
land of the project site under the possession of the company. The land is
(identified and acquired), already acquired by the Company.
government / private - Land break-up of total land of the project site has
agriculture, forest, been incorporated in this EIA/EMP Report.
wasteland, water bodies,
settlements, etc. shall be
included (not required for
industrial area).
ix. A list of major industries with  List of major industries with name and type within
name and type within study the study area (10 km radius) has been
area (10 km radius) shall be incorporated in the EIA/EMP Report.
incorporated. Land use  Land use details of the study area have also been
details of the study area. incorporated in the EIA/EMP Report.
x. Geological features and Geo- Details regarding Geological features and Geo-
hydrological status of the hydrological status of the study area have been given
study area shall be included. under hydro-geological study incorporated in this
EIA/EMP Report.(WILL BE DONE BY JMEPL)
xi. Details of Drainage of the Drainage details of the project site and 10 km radius
project up to 5 km radius of study area have been shown on a map and
study area. If the site is incorporated in this EIA/EMP Report.
within 1 km radius of any Project site is not within 1 km radius of any major river.
major river, peak and lean

M/s. Rajasthan Liquors Limited


Proposed 125 KLPD Grain based Distillery, 25KLPD Malt Spirit Plant and 4.5 MW Cogeneration Power Plant
At Village Chiraura, Tehsil Akbarpur, District Kanpur Dehat (U.P.)
ToR Compliance

ToR ToR Point Compliance Reference in EIA/


Poin EMP Report
t No.
season river discharge as Following rivers/water bodies are found within 10 km
well as flood occurrence radius study area:
frequency based on peak  Ghatampur distributary (0.5 km in North direction)
rainfall data of the past 30
 Rind Nadi (1.5 km in SSW direction)
years. Details of Flood Level
of the project site and  Supa Nala (3.5 km in NNE direction)
maximum Flood Level of the  West Allahabad Branch (4.0 km in NE direction)
river shall also be provided  Non Nadi (7.5 km in SW direction)
(mega green field projects).
xii. Status of acquisition of land. Total project area is 9.7 Ha (24 acres) and the same is -
If acquisition is not under the possession of the company.
complete, stage of the
acquisition process and
expected time of complete
possession of the land.
xiii. R & R details in respect of R & R is not applicable. -
land in line with state
Government policy.
5. Forests & Wildlife related issues (if applicable)
i. Permission and approval; for No forest land is involved in the proposed project; -
the use of forest land thus, no such permission / approval are required.
(forestry clearance), if any,
and recommendations of the
State Forest Department (if
applicable)
ii. Land use map based on No forest land is involved in this proposed project. -
High resolution satellite
imagery (GPS) of the
proposed site delineating
the forestland (in case of
projects involving forest land
more than 40 ha)
iii. Status of Application Not applicable -
submitted for obtaining the
stage I forestry clearance
along with latest status shall
be submitted.
iv. The projects to be located No National Park, Sanctuary, Biosphere Reserve, -
within 10 km of the National Migratory Corridor of wild animals exists within 10 km
Parks, Sanctuaries, radius study area of the project site, hence not
Biosphere Reserves, applicable.
Migratory Corridors of Wild
Animal; the project
proponent shall submit the
map duly authenticated by
Chief Wildlife Warden
showing these features vis-a-
vis the project location and
the recommendations or

M/s. Rajasthan Liquors Limited


Proposed 125 KLPD Grain based Distillery, 25KLPD Malt Spirit Plant and 4.5 MW Cogeneration Power Plant
At Village Chiraura, Tehsil Akbarpur, District Kanpur Dehat (U.P.)
ToR Compliance

ToR ToR Point Compliance Reference in EIA/


Poin EMP Report
t No.
comments of the Chief
Wildlife Warden - thereon.
v. Wildlife Conservation Plan No Schedule I fauna was found within 10 km radius Will be done by
duly authenticated by the study area during the biological survey. JMEPL
Chief Wildlife Warden of the List of flora and fauna found within 10 km radius study
state government for area have been incorporated as Annexure with this
conservation of schedule I EIA/ EMP report.
fauna, if any exists in the
study area.
vi. Copy of application Not Applicable -
submitted for clearance
under the Wildlife
(Protection) Act, 1972, to the
Standing Committee of the
National Board for Wildlife.
6. Environmental Status
i. Determination of Details of atmospheric inversion level at project site
atmospheric inversion level has been compiled from secondary data and
at the project site and site- incorporated in this EIA/EMP Report.
specific micro- Site-specific micro-meteorological data (temperature,
meteorological data using relative humidity, wind speed and direction) were
temperature, relative collected during Summer Season (March to May, 2018)
humidity, hourly wind speed Details of the same have been incorporated in the
and direction and rainfall. EIA/EMP Report.
Hourly meteorological data has been enclosed as
Annexure along with the EIA/EMP Report.
Rainfall data has also been incorporated in the
EIA/EMP Report.
ii. AAQ data (except monsoon) AAQ monitoring for PM10, PM2.5, SO2, NO2, CO was
at 8 locations for PM10, carried out at 8 locations during Summer Season
PM2.5, SO2, NOx, CO and (March to May,2018) within 10 km radius study area.
other parameters relevant to The monitoring stations were selected taking into
the project shall be account the dominant wind direction, population zone
collected. The monitoring and sensitive receptors etc.
stations shall be based CPCB Detail of the same has been incorporated in this
guidelines and take into EIA/EMP Report.
account the pre-dominant
wind direction, population
zone and sensitive receptors
including reserved forests.
iii. Raw data of all AAQ Raw data of all AAQ measurement / detailed AAQM
measurement for 12 weeks tables of all AAQ stations along with min., max.,
of all stations as per average and 98 percentile values for each of the
frequency given in the AAQM parameters have been incorporated as
NAQQM Notification of Nov. Annexure along with the EIA/EMP Report.
2009 along with- min., max.,
average and 98% values for
each of the AAQ parameters
from data of all AAQ stations

M/s. Rajasthan Liquors Limited


Proposed 125 KLPD Grain based Distillery, 25KLPD Malt Spirit Plant and 4.5 MW Cogeneration Power Plant
At Village Chiraura, Tehsil Akbarpur, District Kanpur Dehat (U.P.)
ToR Compliance

ToR ToR Point Compliance Reference in EIA/


Poin EMP Report
t No.
should be provided as an
annexure to the EIA Report.
iv. Surface water quality of Surface water quality within 10 km radius of the
nearby River (100m project site has been assessed and details have been
upstream and downstream) incorporated in this EIA/EMP Report.
and other surface drains at
eight locations as per
CPCB/MoEFCC guidelines.
v. Whether the site falls near to Project site does not fall near to polluted stretch of
polluted stretch of river river identified by the CPCB/ MoEFCC.
identified by the CPCB /
MoEFCC guidelines.
vi. Ground water monitoring Ground water monitoring was carried out at 8
minimum at 8 locations shall locations in the study area Summer Season (March to
be included. May, 2018).
Details of the same have been incorporated in the
EIA/EMP Report.
vii. Noise levels monitoring at 8 Noise level monitoring was carried out at 8 locations
locations within the study within the study area during Summer Season (March
area. to May, 2018).
Details of the same have been incorporated in the
EIA/EMP Report.
viii. Soil Characteristics as per Soil quality sampling was carried out at 8 locations
CPCB guidelines. within the study area during Summer Season (March
to May, 2018).
Details of the same have been incorporated in the
EIA/EMP Report.
ix. Traffic study of the area, type Traffic study of the area with respect to existing
of vehicles, frequency of traffic, type of vehicles, frequency of vehicles for
vehicles for transportation of transportation of materials, additional traffic due to
materials, additional traffic proposed project, parking arrangement etc. have
due to proposed project, been incorporated with this EIA/EMP Report.
parking arrangement etc.

x. Detailed description of flora Details of the flora and fauna found within the study
and fauna (terrestrial and area of 10 km radius have been incorporated in this
aquatic) existing in the study EIA / EMP Report.
area shall be given with No Schedule- I fauna was found within 10 km radius
special reference to rare, study area of the project site.
endemic and endangered
species. If Schedule-I fauna
are found within the study
area, a Wildlife Conservation
Plan shall be prepared and
furnished.
xi. Socio-economic status of the Details reg. Socio-economic status of the study area
study area. has been incorporated in the EIA / EMP Report.

M/s. Rajasthan Liquors Limited


Proposed 125 KLPD Grain based Distillery, 25KLPD Malt Spirit Plant and 4.5 MW Cogeneration Power Plant
At Village Chiraura, Tehsil Akbarpur, District Kanpur Dehat (U.P.)
ToR Compliance

ToR ToR Point Compliance Reference in EIA/


Poin EMP Report
t No.
7. Impact & Environmental Management Plan:
i. Assessment of ground level The incremental ground level concentration of
concentration of pollutants pollutants from the stack emissions based on site-
from the stack emission specific meteorological features has been predicted
based on site-specific via computation done through mathematical
meteorological features. In modeling and incorporated in this EIA/EMP Report.
case the project is located on The project site is not located on a hilly terrain.
hilly terrain characteristics The impact of all the sources of emissions on the AAQ
for determining the potential of the area was assessed. Details of the same along
impacts of the project on the with details of the model used and the input data used
AAQ. Cumulative impact of for modeling have been incorporated in this EIA/EMP
all sources of emissions Report.
(including transportation) on
Isopleths showing air quality contours plotted on
the AAQ of the area shall be
location map have also been incorporated in this
assessed. Details of the
EIA/EMP Report.
model used and the input
data used for modeling shall
also be provided. The air
quality contours shall be
plotted on a location map
showing the location of
project site, habitation
nearby, sensitive receptors,
if any.
ii. Water Quality modeling- in No effluent will be discharged from the plant; as the -
case, of discharge in water plant will be based on “Zero Effluent Discharge”.
body. Therefore, water quality modeling study is not
required.
iii. Impact of the transport of No major impact of the transport of raw materials and
the raw materials and end end products on the surrounding environment due to
products on the surrounding proposed project as material handling will be done in a
environment shall be mechanized way and proper mitigation measures will
assessed and provided. In be adopted. Company ensures that initially the
this regard, options for vehicles will be parked in the allocated parking area in
transport of raw materials the project site.
and finished products and Raw materials will be transported by road. The option
wastes (large quantities) by for transport of raw material & finished products and
rail or rail-cum road wastes (large quantities) by rail or rail-cum transport
transport or conveyor-cum- or conveyor-cum-rail transport is not required.
rail transport shall be
examined.
iv. A note on treatment of Details regarding treatment of wastewater from
wastewater from different different plant operations, extent recycled and reused
plant operations, extent for different purposes have been incorporated in the
recycled and reused for EIA/EMP Report.
different purposes shall be Domestic wastewater generated from the sanitary
included. Complete blocks will be disposed off via septic tanks followed by
scheme of effluent soak pit.
treatment. Characteristics of No effluent will be discharged outside the plant
untreated and treated premises as the project will be based on “Zero Effluent
effluent to meet the

M/s. Rajasthan Liquors Limited


Proposed 125 KLPD Grain based Distillery, 25KLPD Malt Spirit Plant and 4.5 MW Cogeneration Power Plant
At Village Chiraura, Tehsil Akbarpur, District Kanpur Dehat (U.P.)
ToR Compliance

ToR ToR Point Compliance Reference in EIA/


Poin EMP Report
t No.
prescribed standards of Discharge”.
discharge under E (P) Rules.
v. Details of stack emission and Stack emission details have been incorporated in this
action plan for control of EIA/EMP Report.
emissions to meet standards. Efficient Air Pollution Control Equipment (APCE) will
be installed to keep the emissions from all the sources
within the prescribed limit.
vi. Measures for fugitive Measures for control of fugitive emission have been
emission control. incorporated in this EIA/EMP Report.
vii. Details of hazardous waste Used oil generated from plant machinery/gear boxes
generation, and their and D.G. sets as hazardous waste will be sold to
storage, utilization and authorized recyclers.
management. Copies of Fly ash from the boiler will be given to brick
MOU regarding utilization of manufacturers.
solid and hazardous waste in MoU with brick manufacturing units have been
cement plant shall also be attached as Annexure. PLEASE PROVIDE
included. EMP shall include
The concept of waste-minimization, recycle/ reuse/
the concept of waste-
recover techniques, energy conservation and
minimization, recycle/ reuse/
natural resource conservation have been included in
recover techniques, Energy
this EIA/EMP Report and details regarding the same
conservation, and natural
have been incorporated in the EIA/EMP Report.
resource conservation.
viii. Proper utilization of fly ash Fly ash generated from the boiler will carried through -
shall be ensured as per Fly pneumatic system to be stored in silos and then will
Ash Notification, 2009. A be given to the brick manufacturers in closed bulkers/
detailed plan of action shall tankers and used in compost.
be provided.
ix. Action plan for the greenbelt 3.2 ha (7.91 acres) i .e. 33% of the plant area will be
development plan in 33 % developed under greenbelt & plantation.
area i.e. land with not less Details regarding greenbelt / plantation development
than 1,500 trees per ha. along with details of species, width of plantation, etc.
Giving details of species, have been incorporated in this EIA/EMP Report.
width of plantation, planning
schedule etc. shall be
included. The greenbelt shall
be around the project
boundary and a scheme for
greening of the roads used
for the project shall also be
incorporated.
x. Action plan for rainwater Action plan for rainwater harvesting measures at
harvesting measures at plant project site has been prepared to harvest rainwater
site shall be submitted to from the roof tops and storm water drains to recharge
harvest rainwater from the the ground water and also to use for the various
roof tops and storm water activities at the plant site to conserve fresh water and
drains to recharge the reduce the water requirement from other sources.
ground water and also to use Details of the same have been given in Annexure of
for the various activities at the EIA/ EMP Report. WILL BE DONE BY JMEPL
the project site to conserve
fresh water and reduce the

M/s. Rajasthan Liquors Limited


Proposed 125 KLPD Grain based Distillery, 25KLPD Malt Spirit Plant and 4.5 MW Cogeneration Power Plant
At Village Chiraura, Tehsil Akbarpur, District Kanpur Dehat (U.P.)
ToR Compliance

ToR ToR Point Compliance Reference in EIA/


Poin EMP Report
t No.
water requirement from
other sources.
xi. Total capital cost and Cost for Environmental Protection Measures:
recurring cost/annum for  Capital Cost: Rs. 30.0 Crores
environmental pollution  Recurring Cost: Rs. 1.75 Crore / annum.
control measures shall be
Details have been incorporated in the EIA/ EMP report.
included.
xii. Action plan for post-project Action plan for post-project environmental monitoring
environmental monitoring has been incorporated in the EIA/EMP Report.
shall be submitted.
xiii. Onsite and Offsite Disaster Onsite and Offsite Disaster (natural and man-made)
(natural and Man-made) Preparedness and Emergency Management Plan
Preparedness and including Risk Assessment and damage control have
Emergency Management been incorporated in the EIA/EMP Report.
Plan including Risk
Assessment and damage
control. Disaster
management plan should be
linked with District Disaster
Management Plan.
8. Occupational health:
i. Plan and fund allocation to Rs. 10 Lacs per annum has been allocated to ensure
ensure the occupational the occupational health and safety of all contract and
health & safety of all casual workers. Details have been incorporated in this
contract and casual EIA/EMP Report.
workers.
ii. Details of exposure specific This is a proposed project. Details regarding
health status evaluation of Occupational Health & Safety to be adopted in
worker. If the workers’ proposed project have been incorporated in this
health is being evaluated by EIA/EMP Report.
pre designed format, chest
x rays, Audiometry,
Spirometry, Vision testing
(Far & Near vision, colour
vision and any other ocular
defect) ECG, during pre-
placement and periodical
examinations give the
details of the same. Details
regarding last month
analyzed data of
abovementioned
parameters as per age, sex,
duration of exposure and
department wise.
iii. Details of existing Not applicable, as this is a proposed project.
Occupational & Safety
Hazards. What are the
exposure levels of above

M/s. Rajasthan Liquors Limited


Proposed 125 KLPD Grain based Distillery, 25KLPD Malt Spirit Plant and 4.5 MW Cogeneration Power Plant
At Village Chiraura, Tehsil Akbarpur, District Kanpur Dehat (U.P.)
ToR Compliance

ToR ToR Point Compliance Reference in EIA/


Poin EMP Report
t No.
mentioned hazards and
whether they are within
Permissible Exposure level
(PEL). If these are not
within PEL, what measures
the company has adopted
to keep them within PEL so
that health of the workers
can be preserved.
iv. Annual report of health Not applicable, as this is a proposed project.
status of workers with
special reference to
Occupational Health and
Safety.
9. Corporate Environment
Policy :
i. Does the company have a Yes, the company has a laid down Environment Policy
well laid down Environment approved by its Board of Directors. Corporate
Policy approved by its Board Environment Policy of the company has been enclosed
of Directors? If so, it may be with this EIA / EMP Report. PLEASE PROVIDE CEP
detailed in the EIA report.
ii. Does the Environment Policy Yes, the Environment Policy prescribes for standard
prescribe for standard operating process to implement the environmental
operating process / standards.
procedures to bring into
focus any infringement /
deviation / violation of the
environmental or forest
norms / conditions? If so, it
may be detailed in the EIA.
iii. What is the hierarchical The hierarchical system or Administrative order of the
system or Administrative company to deal with the environmental issues and
order of the company to deal for ensuring compliance with the environmental
with the environmental clearance conditions is given.
issues and for ensuring
compliance with the
environmental clearance
conditions? Details of this
system may be given.
iv. Does the company have The environmental management system of the -
system of reporting of non- company engages right from the senior management
compliances / violations of to the implementation team on the ground. System of
environmental norms to the reporting the performance of environmental
Board of Directors of the management system has been incorporated under
company and / or roles & responsibilities of Corporate Environment
shareholders or stakeholders Policy
at large? This reporting
mechanism shall be detailed
in the EIA report.

M/s. Rajasthan Liquors Limited


Proposed 125 KLPD Grain based Distillery, 25KLPD Malt Spirit Plant and 4.5 MW Cogeneration Power Plant
At Village Chiraura, Tehsil Akbarpur, District Kanpur Dehat (U.P.)
ToR Compliance

ToR ToR Point Compliance Reference in EIA/


Poin EMP Report
t No.
10. Details regarding During construction & operation phase, adequate -
infrastructure facilities such infrastructure facilities will be provided to the labor
as sanitation, fuel, restroom force including truck drivers such as restroom,
etc. to be provided to the canteen, sanitation, drinking water, etc.
labor force during
construction as well as to the
casual workers including
truck drivers during
operation phase.
11. Enterprise Social Commitment (ESC)
i. Adequate funds (at least 2.5 1.5% (2.60 Crores) of the total project cost (175 Crores)
% of the project cost) shall be has been earmarked towards the Enterprise Social
earmarked towards the Commitment (ESC) as per the latest circular dated 1 st
Enterprise Social May, 2018. ESC breakup of the cost has been
Commitment based on incorporated in the EIA/EMP Report.
Public Hearing issues and PLEASE
item-wise details along with
time bound action plan shall
be included. Socio-economic
development activities need
to be elaborated upon.
12. Any litigation pending No litigation is pending against the project and/or any -
against the project and/or direction/order passed by any Court of Law against
any direction/order passed the project.
by any Court of Law against The unit has not received any notice under the Section
the project, if so, details 5 of Environment (Protection) Act, 1986 or relevant
thereof shall also be Sections of Air and Water Acts.
included. Has the unit
received any notice under
the Section 5 of Environment
(Protection) Act, 1986 or
relevant Sections of Air and
Water Acts? If so, details
thereof and compliance/ATR
to the notice(s) and present
status of the case.
13. A tabular chart with index Point-wise compliance of the ToRs has been given in -
for point wise compliance of the tabular form.
above TORs.
14. The TORs prescribed shall be Noted. -
valid for a period of three
years for submission of the
EIA-EMP reports along with
Public Hearing Proceedings
(wherever stipulated).
Specific ToRs for distillery
1. List of existing distillery units No distillery is present in 10 km radius study area. WILL -
in the study area along with BE DONE BY JMEPL.
their capacity and sourcing

M/s. Rajasthan Liquors Limited


Proposed 125 KLPD Grain based Distillery, 25KLPD Malt Spirit Plant and 4.5 MW Cogeneration Power Plant
At Village Chiraura, Tehsil Akbarpur, District Kanpur Dehat (U.P.)
ToR Compliance

ToR ToR Point Compliance Reference in EIA/


Poin EMP Report
t No.
of raw material.
2. Number of working days of Number of working days of the distillery unit will be -
the distillery unit. 350 days/annum.
3. Details of raw materials such The major raw material will be sourced from nearby
as molasses /grains, their grain suppliers. PLEASE PROVIDE MoU WITH GRAIN
source with availability. SUPPLIERS
4. Details of the use of steam Total steam required of 36 TPH will be used in the
from the boiler. liquefaction, distillation, MEE and dryer after
proposed project.
Details regarding the same have been incorporated in
this EIA/EMP Report.
5. Surface and ground water Groundwater quality has been assessed and results of
quality around proposed the same have been incorporated in the EIA/EMP
spent wash storage lagoon Report.
and compost yard.
6. Commitment for spent wash The company plans to achieve spent wash generation
generation within 6-8 KL/KL within 6-8 KL/KL of alcohol production.
of alcohol produced.

7. Proposed effluent treatment The distillery will be based on zero effluent discharge.
system for molasses distillery Details regarding treatment of spent wash, spent lees,
(spent wash, spent lees, condensate & utilities have been incorporated in the
condensate and utilities) as EIA/EMP Report.
well as domestic sewage and
scheme for achieving zero
effluent discharge (ZLD).

8. Proposed action to restrict Fresh water consumption will be restricted within 10


fresh water consumption KL/KL of alcohol production. Details regarding the
within 10 KL/KL of alcohol same have been incorporated in this EIA/EMP Report.
production.
9. Details about capacity of The company will have a spent wash holding lagoon,
spent wash holding tank, duly lined and impervious as per specifications to
material used, design prevent contamination of groundwater or land with
consideration. No. of storage capacity for 5 days.
peizometers to be proposed ----- peizometer will be installed around the spent wash
around spent wash holding holding lagoon.
tank and composting yard. PLEASE PROVIDE ABOVE DATA
10. Action plan to control The project will be based on “Zero Effluent Discharge”
ground water pollution. and effective measures will be taken to prevent
ground water pollution. Details of the same have been
incorporated in this EIA/EMP Report.
11. Details of solid waste  Ash from the boiler will be given to nearby brick
management including manufacturers.
management of boiler ash,  Yeast sludge will be sent to the sludge drying beds
yeast, etc. or may be added to the wet cake.
Details of incinerated spent
wash ash generation and its

M/s. Rajasthan Liquors Limited


Proposed 125 KLPD Grain based Distillery, 25KLPD Malt Spirit Plant and 4.5 MW Cogeneration Power Plant
At Village Chiraura, Tehsil Akbarpur, District Kanpur Dehat (U.P.)
ToR Compliance

ToR ToR Point Compliance Reference in EIA/


Poin EMP Report
t No.
disposal.
12. Details of bio composting Not applicable
yard (if applicable).
13. Action plan to control odor Action plan to control odor pollution has been
pollution. incorporated in the EIA/EMP Report.
14. Arrangements for Continuous online monitoring system for stack
installation of continuous emissions will be installed by the Company.
online monitoring system
(24x7 monitoring device).